RU2018105663A - A method of erecting a sheet piling during work on the main pipeline and a sheet piling collapsible fence for arranging a pit - Google Patents

A method of erecting a sheet piling during work on the main pipeline and a sheet piling collapsible fence for arranging a pit Download PDF

Info

Publication number
RU2018105663A
RU2018105663A RU2018105663A RU2018105663A RU2018105663A RU 2018105663 A RU2018105663 A RU 2018105663A RU 2018105663 A RU2018105663 A RU 2018105663A RU 2018105663 A RU2018105663 A RU 2018105663A RU 2018105663 A RU2018105663 A RU 2018105663A
Authority
RU
Russia
Prior art keywords
fence
tongue
sheet piling
pit
elements
Prior art date
Application number
RU2018105663A
Other languages
Russian (ru)
Other versions
RU2018105663A3 (en
RU2705674C2 (en
Inventor
Дмитрий Борисович Ядрихинский
Original Assignee
Дмитрий Борисович Ядрихинский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Дмитрий Борисович Ядрихинский filed Critical Дмитрий Борисович Ядрихинский
Priority to RU2018105663A priority Critical patent/RU2705674C2/en
Publication of RU2018105663A publication Critical patent/RU2018105663A/en
Publication of RU2018105663A3 publication Critical patent/RU2018105663A3/ru
Application granted granted Critical
Publication of RU2705674C2 publication Critical patent/RU2705674C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Claims (2)

1. Способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе, включающий создание в грунте вертикальных элементов ограждения в виде шпунтовых свай с расположением их вдоль ограждаемого объекта в один ряд, последовательное соединение смежных вертикальных элементов между собой связями, закрепление ограждения в грунте и выемку грунта под защитой ограждения до требуемой глубины, при этом вертикальные элементы выполняют длиной, зависящей от глубины выемки грунта, отличающийся тем, что вначале производят сборку направляющего каркаса и фиксацию его на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса, монтаж ограждения начинают с формирования одной из угловых секций периметра ограждения, смежные вертикальные элементы располагают рядом друг с другом и соединяют между собой разъемно с помощью замковых элементов «гребень-обойма» с замыканием периметра ограждения и выполняют формирование периметра котлована путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса, закрепление ограждения в грунте производят строго вертикальным вибропогружением до плотного грунта, перед которым собирают внутреннюю рамку необходимого размера, которую выставляют над осью трубы, необходимую длину вертикальных элементов в зависимости от глубины выемки обеспечивают их наращиванием по вертикали, которое выполняют, используя разборное соединение с помощью закрепленных на шпунтовых панелях проушин, фиксируемых пальцем со шплинтами.1. A method of erecting a sheet piling during work on the main pipeline, including creating vertical fencing elements in the soil in the form of sheet piles with placing them along the enclosed object in a row, connecting the adjacent vertical elements together, connecting the fence in the ground, and excavating under the protection of the fence to the required depth, while the vertical elements perform a length depending on the depth of excavation, characterized in that at first they produce with the orc of the guide frame and its fixation at the place of erection of the sheet piling by hammering up the racks, the installation of the guide frame on them, the installation of the fence begin with the formation of one of the corner sections of the perimeter of the fence, adjacent vertical elements are placed next to each other and are interconnected using lock elements "Comb-holder" with the closure of the perimeter of the fence and perform the formation of the perimeter of the pit by combining the vertical elements of the row outside the perimeter of the guide the frame, the fastening of the fence in the soil is carried out strictly by vertical vibroabsorption to a dense soil, before which an internal frame of the required size is assembled, which is set above the pipe axis, the necessary length of the vertical elements depending on the depth of the recess provide them with vertical extension, which is performed using a collapsible connection with using lugs fixed on tongue-and-groove panels, fixed with a finger and cotter pins. 2. Шпунтовое сборно-разборное ограждение для обустройства котлована, содержащее четыре стойки, установленные по углам ремонтного котлована, прикрепленный к ним сверху направляющий прямоугольный каркас из четырех балок, и шпунтовые сваи, которые вдавлены в грунт и расположены вдоль балок направляющего каркаса вокруг него с формированием замкнутого шпунтового ограждения, отличающееся тем, что смежные шпунтовые сваи ограждения соединены между собой с помощью замкового соединения типа «гребень-обойма», при этом они выполнены в виде шпунтовых панелей с возможностью наращивания их по высоте путем пристыковки к ним дополнительных профилей различной длины с необходимой разбежкой мест стыка с помощью замковых элементов, имеющих конструкцию нижней части из двух соосно расположенных втулок из толстостенной стальной трубы с фасками, выполненных в виде сдвоенной проушины, прикрепляемой посредством сварки к усиленной части полки нижнего элемента составной панели с применением усиливающих стальных пластин, а конструкцию верхней части - из одной втулки из аналогичной толстостенной трубы с фасками, выполненной в виде одинарной проушины, прикрепляемой посредством сварки к усиленной части полки верхнего элемента составной панели с применением усиливающих стальных пластин и соединяемых между собой совмещением отверстий в проушинах и вставлением в них круглого пальца, фиксируемого посредством шплинта с обеих сторон, а вблизи верхних кромок стенок нижней и верхней части составных панелей выполнены прямоугольные отверстия для обеспечения возможности извлечения шпунта с помощью грузоподъемного механизма, служащие также отверстиями для установки стопора, при этом внизу каждой стенки верхней рядовой панели имеются по две выступающие пластины, образующие направляющие пазы для их надежной фиксации на соответствующих стенках нижней части составной панели, торцевые шпунтовые панели над трубопроводом имеют стандартные стенки и расширенную полку, в которой в нижней части выполнен вырез в форме полукруга и к торцу приварена металлическая пластина для исключения повреждений изоляции на трубопроводе, сама полка выполнена из двух пластин, сваренных между собой металлической вставкой внахлест с внешней стороны шпунта, в верхней части торцевого шпунта приварена между двумя пластинами небольшая пластина для удобства работы вибропогружателя, соединение верхней и нижней частей торцевых шпунтов также выполнено с помощью двух замковых соединений.2. A tongue-and-groove collapsible fence for arranging a pit, comprising four racks installed at the corners of a repair pit, a guide rectangular frame of four beams attached to them from above, and tongue-and-groove piles that are pressed into the ground and located along the beams of the guide frame around it with formation closed sheet piling, characterized in that the adjacent sheet piles of the fence are interconnected by means of a lock connection type "comb-holder", while they are made in the form of a sheet pile exit panels with the possibility of increasing them in height by attaching additional profiles of various lengths to them with the necessary separation of the joints with the help of locking elements having the design of the lower part of two coaxially arranged bushings from a thick-walled steel pipe with chamfers made in the form of a double eye attached by means of welding to the reinforced part of the shelf of the lower element of the composite panel using reinforcing steel plates, and the design of the upper part from one sleeve of the same thickness pipe with bevels, made in the form of a single eyelet, attached by welding to the reinforced part of the shelf of the upper element of the composite panel using reinforcing steel plates and interconnected by combining the holes in the eyes and inserting a round finger into them, fixed by means of a cotter pin on both sides, and rectangular holes are made near the upper edges of the walls of the lower and upper parts of the composite panels to allow the tongue to be extracted using a lifting mechanism, serving there are also holes for installing the stopper, while at the bottom of each wall of the upper row panel there are two protruding plates that form guide grooves for their reliable fixation on the corresponding walls of the lower part of the composite panel, the tongue and groove panels above the pipeline have standard walls and an expanded shelf in which a semicircular cutout is made in the lower part and a metal plate is welded to the end to prevent insulation damage on the pipeline, the shelf itself is made of two plates welded to a metal insert row overlapping the outer side of the tongue, the upper part of the end of the tongue is welded between two plates of a small plate for the convenience of the vibrator, the compound of the upper and lower end portions of the tongues are also formed by two locking joints.
RU2018105663A 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit RU2705674C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Publications (3)

Publication Number Publication Date
RU2018105663A true RU2018105663A (en) 2019-08-15
RU2018105663A3 RU2018105663A3 (en) 2019-10-08
RU2705674C2 RU2705674C2 (en) 2019-11-11

Family

ID=67640663

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Country Status (1)

Country Link
RU (1) RU2705674C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434303A (en) * 2021-06-04 2022-12-06 周兆弟 Guard pile, guard structure, guard pile die and production process thereof
CN115596276A (en) * 2022-10-14 2023-01-13 中建八局第二建设有限公司(Cn) Fence and building construction protector

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2616348C3 (en) * 1976-04-14 1980-06-04 Lube & Krings Maschinen- Und Stahlbau Ohg, 5120 Herzogenrath Device for trench sheeting
RU2122071C1 (en) * 1996-02-22 1998-11-20 Институт проблем транспорта энергоресурсов "ИПТЭР" Process of formation of sheet piling of foundation pit in marsh and gear for its implementation
RU2366781C2 (en) * 2007-04-26 2009-09-10 ОАО "Пластик" Design of barrier for reinforcement of trench walls in performance of earth works
RU2530142C2 (en) * 2012-11-30 2014-10-10 Открытое акционерное общество "Сибнефтепровод" Акционерная компания по транспорту нефти "Транснефть" Method of construction of sheet piling when conducting works at major pipeline and mountable-dismountable sheet piling for development of foundation pit
RU161890U1 (en) * 2015-08-21 2016-05-10 Открытое акционерное общество "Акционерная компания по транспорту нефти "Транснефть" (ОАО "АК "Транснефть") DEVICE FOR POSITIONING OF THE THREAD PILES AT THE ESTABLISHMENT OF THE THREAD DOORS

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434303A (en) * 2021-06-04 2022-12-06 周兆弟 Guard pile, guard structure, guard pile die and production process thereof
CN115434303B (en) * 2021-06-04 2023-12-15 周兆弟 Guard post, guard structure, guard post mold and production process thereof
CN115596276A (en) * 2022-10-14 2023-01-13 中建八局第二建设有限公司(Cn) Fence and building construction protector

Also Published As

Publication number Publication date
RU2018105663A3 (en) 2019-10-08
RU2705674C2 (en) 2019-11-11

Similar Documents

Publication Publication Date Title
KR101253519B1 (en) Method of aseismic reinforcement for existing building structure using pre cast concrete filled steel tube
US20200149240A1 (en) Top-to-bottom construction system
KR102198561B1 (en) reinforcing device and reinforcing method for pillars of structure
JP6241325B2 (en) Levee body, dam body component and method of constructing dam body
RU2018105663A (en) A method of erecting a sheet piling during work on the main pipeline and a sheet piling collapsible fence for arranging a pit
KR101148272B1 (en) Downward Construction Method of Basement applying SCFSliding Channel Form
KR100954967B1 (en) Prefab apparatus for reinforcing head of pile
KR101557380B1 (en) Seismic reinforcement structure and method
KR101567422B1 (en) Vertical structure construction method for vertical and horizontal regid connection
JP2009046829A (en) Aseismatic reinforcing wall
JP6768477B2 (en) How to build an underground structure
KR102482690B1 (en) Bridge foundation construction method using formwork integrated PC panels
KR20220065461A (en) WIRE STRUCTURE FOR STAGGERED LAPPING IN SLURRY WALL, SLURRY WALL and CONSTRUCTION METHOD FOR THE SAME
US3452546A (en) Steel pile assembly for the erection of underground concrete walls
JP7102228B2 (en) How to build concrete sheet pile members, earth retaining walls and earth retaining walls
JP6929170B2 (en) Joint structure of steel pipe piles
KR102553681B1 (en) A slurry wall construction method using a slurry wall connection structure capable of structural integration
KR102568888B1 (en) Seismic resistant slurry wall with joint pilaster
RU2012151227A (en) METHOD FOR ESTABLISHING THE PLAIN FENCING WHEN CARRYING OUT WORKS ON THE MAIN PIPELINE AND THE Dowel Collapsible Fencing For Equipping The Pitted
KR102570016B1 (en) Seismic retrofit slurry wall
KR102464866B1 (en) Constructing method for soundproof wall foundation and soundproof wall foundation constructed by the same
JP3082054B2 (en) Large-scale, deep steel continuous basement wall and method of constructing the same
KR102603493B1 (en) Cap module-based column wall for building foundation
JP7449880B2 (en) Steel pipe column base structure
JP6977688B2 (en) Precast footing for embankments and embankments

Legal Events

Date Code Title Description
QB4A Licence on use of patent

Free format text: LICENCE FORMERLY AGREED ON 20200131

Effective date: 20200131