RU2426881C1 - Development method of ore deposits with block caving system with active flexible separating covering - Google Patents
Development method of ore deposits with block caving system with active flexible separating covering Download PDFInfo
- Publication number
- RU2426881C1 RU2426881C1 RU2009148977/03A RU2009148977A RU2426881C1 RU 2426881 C1 RU2426881 C1 RU 2426881C1 RU 2009148977/03 A RU2009148977/03 A RU 2009148977/03A RU 2009148977 A RU2009148977 A RU 2009148977A RU 2426881 C1 RU2426881 C1 RU 2426881C1
- Authority
- RU
- Russia
- Prior art keywords
- ore
- block
- workings
- floor
- covering
- Prior art date
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Cleaning In General (AREA)
Abstract
Description
Изобретение относится к горному делу и может быть использовано при подземной разработке рудных месторождений.The invention relates to mining and can be used in underground mining of ore deposits.
Известен способ перемещения горной массы в камере при разработке руды (а.с. СССР №1786882, E21C 41/22, опубл. 20.09.1999). Способ включает проходку подсечного штрека, отбойку и магазинирование полезного ископаемого между породами висячего и лежачего боков, обрушение потолочины блока и генеральный выпуск полезного ископаемого под разделяющим гибким перекрытием с направляющими элементами. Способ характеризуется тем, что направляющие элементы крепят в подсечном штреке и по мере слоевой отбойки полезного ископаемого навешивают по висячему и лежачему бокам по всей высоте отрабатываемого блока до уровня его потолочины, на указанном уровне направляющие элементы пропускают через края гибкого перекрытия у боковых пород и закрепляют, а при выпуске полезного ископаемого направляющие элементы удерживают у висячего и лежачего боков замагазинированным полезным ископаемым и обрушающимися боковыми породами.A known method of moving rock mass in the chamber during the development of ore (AS USSR No. 1786882, E21C 41/22, publ. 09/20/1999). SUBSTANCE: method involves sinking a drift drift, breaking and mineralizing between the rocks of the hanging and lying sides, collapse of the block ceiling and general release of the mineral under a dividing flexible overlap with guide elements. The method is characterized in that the guide elements are fastened in a slash drift and, as the mineral is cut off in layers, they are hung along the hanging and lying sides along the entire height of the working block to the level of its ceiling, at the indicated level, the guide elements are passed through the edges of the flexible overlap at the side rocks and fixed, and when releasing the mineral, the guiding elements are held at the hanging and lying sides by the stained mineral and collapsing side rocks.
Недостатком данного способа является низкая производительность блока, связанная с необходимостью магазинирования руды в блоке, а также высокая вероятность повреждения перекрытия при взрывной отбойке полезного ископаемого.The disadvantage of this method is the low productivity of the block associated with the need to store ore in the block, as well as the high probability of damage to the floor during explosive breaking of the mineral.
Известен способ разработки мощного крутого пласта полезного ископаемого с закладкой выработанного пространства (патент РФ №2283431, Е21С 41/18, опубл. 10.09.2006). Способ включает отработку горизонтального слоя полосами по простиранию механогидравлической отбойкой и транспортировку горной массы с заполнением заходок литой твердеющей закладкой и оставлением в них выработок для последующей подачи в выработанное пространство комбинированной закладки. Отработку пласта ведут полосами в нисходящем порядке с оставлением в нижележащих полосах штрека и печей. Отработку следующей полосы осуществляют гидромонитором, а за гибкое перекрытие в выработанное пространство из бункера с помощью конвейера подают породу, которая пропитывается литой твердеющей закладкой при заполнении подготовительных выработок.There is a method of developing a powerful steep layer of minerals with the laying of the developed space (RF patent No. 2283431, Е21С 41/18, publ. 09/10/2006). The method includes working out the horizontal layer in strips along the strike by mechanohydraulic breaking and transporting the rock mass with filling the castings with a cast hardening bookmark and leaving workings in them for subsequent feeding into the worked out space of the combined bookmark. The development of the formation is carried out in stripes in a descending order, leaving the drift and furnaces in the underlying bands. The development of the next strip is carried out by a hydraulic monitor, and for flexible overlap, a rock is fed into the mined space from the hopper using a conveyor, which is impregnated with a cast hardening tab when filling the preparatory workings.
Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.
Известен способ разработки мощных крутых угольных пластов (патент РФ №2085739, Е21С 41/18, опубл. 27.07.1997), который включает проведение штреков, монтаж гибкого перекрытия, состоящего из двух параллельных ветвей, составленных из цилиндрических секций. Ветви перекрытия скрепляют между собой через жесткие связи, поверх которых укладывают металлическую сетку. Секции в каждой ветви по торцам соединяют гибкой связью. Перепуск перекрытия осуществляют по мере отработки угля нижележащих подэтажей, а демонтируют на аккумулирующем штреке.A known method of developing powerful steep coal seams (RF patent No. 2085739, E21C 41/18, publ. 07.27.1997), which includes drifts, installation of flexible floors, consisting of two parallel branches, composed of cylindrical sections. The overlapping branches are fastened together through rigid ties, on top of which a metal mesh is laid. Sections in each branch at the ends are connected by a flexible connection. Bypassing the overlap is carried out as the coal mining of the underlying floors, and dismantled on the accumulating drift.
Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.
Известен способ слоевой отработки погребенных алмазоносных россыпей с наличием в контурах шахтных полей впадин с алмазосодержащей рудой (патент РФ №2345219, Е21С 41/16, опубл. 27.01.2009). Способ слоевой отработки погребенных алмазоносных россыпей с наличием в контурах шахтных полей впадин с алмазосодержащей рудой включает механизированную отработку верхнего слоя камерами с последующей отработкой опорных целиков и монтажом гибкого перекрытия, отработку системой блочного обрушения нижнего слоя, включающего впадины с алмазосодержащей рудой. Гибкое перекрытие монтируют только над впадинами с алмазосодержащей рудой. Сначала монтируют гибкое перекрытие на почве отрабатываемых камер одновременно с их отработкой, затем - на почве отрабатываемых опорных целиков одновременно с их отработкой, после чего гибкие перекрытия примыкающих камер и опорных целиков соединяют между собой.There is a method of layer mining of buried diamond-bearing placers with the presence in the contours of mine fields of depressions with diamond-containing ore (RF patent No. 2345219, Е21С 41/16, published on January 27, 2009). The method of layer mining of buried diamond-bearing placers with the presence of cavities with diamond-containing ore in the contours of mine fields includes mechanized mining of the upper layer by chambers, followed by working out of the pillars and installation of a flexible ceiling, working out of a block caving system for the lower layer, including hollows with diamond-containing ore. Flexible overlap is mounted only over the hollows with diamond ore. First, a flexible ceiling is mounted on the soil of the processed chambers simultaneously with their development, then - on the soil of the processed support pillars simultaneously with their development, after which the flexible ceilings of adjacent chambers and support pillars are connected to each other.
Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.
Известен способ разработки крутопадающих рудных залежей малой и средней мощности системой подэтажного обрушения с гибкими разделяющими перекрытиями, принятый за прототип (патент РФ №2301334, Е21С 41/22, опубл. 20.06.2007). Способ включает проведение полевых этажных и подэтажных транспортных штреков, уклона, рампы, заездов к рудному телу и сплошных подсечек на основном горизонте и на подэтажах, проведение отрезных рудных восстающих, которые разделывают в отрезные щели, бурение параллельных скважин и последующую отбойку основных запасов подэтажей. Выпуск руды осуществляют через торцы заездов на каждом подэтаже начиная с верхнего. Перед проведением подготовительных выработок вынимают ниже уровня основного горизонта камеру, объем которой равен объему породы от проходки полевых выработок, и на почву камеры и сплошных подсечек настилают металлическую сетку.There is a method of developing steep-dipping ore deposits of small and medium capacity by a system of sub-floor collapse with flexible dividing floors, adopted as a prototype (RF patent No. 2301334, Е21С 41/22, publ. 20.06.2007). The method includes carrying out field floor and sub-floor transport drifts, a slope, a ramp, races to the ore body and continuous cuts on the main horizon and on the sub-floors, conducting cutting ore risers, which are cut into cutting slots, drilling parallel wells and subsequent breaking of the main reserves of the sub-floors. Ore is discharged through the ends of the races on each sub-floor starting from the top. Before carrying out preparatory workings, a chamber is taken out below the level of the main horizon, the volume of which is equal to the volume of the rock from the sinking of the field workings, and a metal mesh is laid on the soil of the chamber and continuous sweeps.
Недостатком данного способа является возможность повреждения перекрытия при взрывной отбойке полезного ископаемого, а также невозможность использования перекрытия для управления процессом выпуска руды.The disadvantage of this method is the possibility of damage to the floor during the explosive breaking of the mineral, as well as the inability to use the floor to control the process of ore production.
Техническим результатом способа является исключение вероятности повреждения перекрытия при взрывной отбойке полезного ископаемого и использование перекрытия для управления процессом выпуска руды.The technical result of the method is to eliminate the likelihood of damage to the floor during explosive breaking of the mineral and the use of the floor to control the process of ore production.
Технический результат достигается тем, что в способе разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием, включающем проходку подготовительных и нарезных выработок, монтаж гибкого перекрытия в висячем боку рудного тела, отбойку и торцевой выпуск под ним отбитой руды из блока через подэтажные выработки, согласно изобретению по углам блока проходят выработки по мощности рудного тела вкрест его простирания, после чего бурят из них веерные комплекты скважин в висячем боку рудного тела параллельно плоскости залегания рудного тела для проходки отрезной щели, после отбойки которой производят выпуск отбитой руды через подэтажные выработки, затем во всех выработках, пройденных по углам, монтируют лебедки с тросами, после чего тросы с верхнего горизонта спускают до уровня нижней отметки блока, присоединяют к ним активное гибкое перекрытие, выполненное из нескольких рядов эластичных замкнутых оболочек, соединенных с воздуховодом для подачи сжатого воздуха с компрессором, протягивают перекрытие по мере монтажа в отрезную щель до верхнего горизонта, заполняют оболочки воздухом до рабочего давления, натягивают гибкое перекрытие тросами, после чего производят операции очистной выемки, причем по мере отработки запасов блока тросы периодически подтягивают, после отработки запасов блока воздух из оболочек спускают с помощью воздуховода для сброса воздуха и вытягивают перекрытие на верхний или нижний горизонт.The technical result is achieved by the fact that in the method of developing ore deposits by a system of floor caving with an active flexible dividing overlap, including the excavation of preparatory and threaded workings, installation of a flexible overlap in the hanging side of the ore body, breaking and end release under it of beaten ore from the block through the floor workings, according to the invention, workings are carried out at the block corners according to the power of the ore body across its strike, after which they are drilled out of fan sets of wells in the hanging side of the ore body parallel but the ore body bedding planes for driving a cutting gap, after breaking which produce broken ore through the sub-floor workings, then in all workings passed through the corners, winches with cables are mounted, after which the cables from the upper horizon are lowered to the level of the lower mark of the block, attached to active flexible ceiling made of several rows of elastic closed shells connected to the air duct for supplying compressed air with a compressor, stretch the ceiling as it is mounted in a cutting slot to the top of the horizon, fill the shells with air to working pressure, stretch the flexible overlap with ropes, and then carry out cleaning dredging operations, and as the reserves of the block are exhausted, the ropes are periodically pulled up, after the reserves of the block are exhausted, the air is drained from the shells with the air duct and the ceiling is pulled upper or lower horizon.
Технический результат достигается также тем, что ширину каждого ряда оболочек принимают равной половине ширины подэтажа, причем каждый ряд оболочек имеет свой воздуховод для подачи и сброса давления сжатого воздуха.The technical result is also achieved by the fact that the width of each row of shells is equal to half the width of the sub-floor, and each row of shells has its own duct for supplying and relieving pressure of compressed air.
Способ разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием поясняется чертежами, на фиг.1 изображен вертикальный разрез блока по линии Б-Б (этап проходки отрезной щели), на фиг.2 изображен разрез блока по линии В-В (этап проходки отрезной щели), на фиг.3 изображен вертикальный разрез блока по линии В-В (этап монтажа активного гибкого перекрытия), на фиг.4 изображен вертикальный разрез блока по линии Г-Г (этап монтажа активного гибкого перекрытия), на фиг.5 изображен вертикальный разрез блока (этап монтажа очистной выемки), на фиг.6 показан общий вид эластичной замкнутой оболочки, где:The method of developing ore deposits by a system of floor caving with an active flexible separating overlap is illustrated by drawings, Fig. 1 shows a vertical section of a block along line BB (step of cutting a cutting gap), Fig. 2 shows a section of a block along line B-B (stage of penetration detachable slit), figure 3 shows a vertical section of the block along the line BB (stage of installation of the active flexible floor), figure 4 shows a vertical section of the block along the line GG (stage of installation of the active flexible floor), figure 5 a vertical section of the block is shown (stage even the cleaning recess), Fig.6 shows a General view of an elastic closed shell, where:
1 - рудное тело, например крутое;1 - ore body, for example steep;
2 - выработки, пройденные по углам блока по мощности рудного тела 1 вкрест его простирания;2 - workings, walked at the corners of the block by the power of the
3 - однобарабанные лебедки с троса для подтяжки перекрытия по мере отработки запасов блока;3 - single-drum winches with a cable for tightening the floor as the block reserves are exhausted;
4 - тросы, соединяющие лебедки 3 с активным гибким перекрытием 5;4 -
5 - активное гибкое перекрытие, выполненное из нескольких рядов эластичных замкнутых оболочек 7;5 - active flexible overlap made of several rows of elastic closed
6 - наклонный съезд;6 - inclined exit;
7 - эластичная замкнутая оболочка;7 - elastic closed shell;
8 - доставочный штрек;8 - delivery drift;
9 - вентиляционный штрек;9 - ventilation drift;
10 - сбойки наклонного съезда 6 с подэтажными буродоставочными штреками 11;10 - failures of
11 - подэтажный буродоставочный орт;11 - sub-floor drilling delivery unit;
12 - взрывные скважины для проходки отрезной щели в висячем боку рудного тела 1;12 - blast holes for sinking a cutting gap in the hanging side of the
13 - взрывные скважины для отбойки запасов блока;13 - blast holes for breaking block stocks;
14 - воздуховод для нагнетания воздуха, соединенный с рядами эластичных замкнутых оболочек 7;14 - duct for air injection, connected to the rows of elastic closed
15 - воздуховод для сброса воздуха, соединенный с рядами эластичных замкнутых оболочек 7;15 - duct for venting, connected to the rows of elastic closed
16 - обрушенные породы висячего бока;16 - collapsed rocks of the hanging side;
17 - отбитая руда;17 - broken ore;
hбл - высота блока, м;h bl - block height, m;
Lбл -длина блока, м;L bl - block length, m;
m - мощность рудного тела 1;m is the thickness of the
α - угол падения рудного тела, градусы.α is the angle of incidence of the ore body, degrees.
Способ разработки рудных залежей системой этажного обрушения с активным гибким разделяющим перекрытием осуществляют следующим образом. Рудное тело 1 подготавливают необходимыми подготовительными и нарезными выработками. Проходят доставочный штрек 8. Из доставочного штрека 8 проходят наклонный съезд 6, сбиваемый с вентиляционным штреком 9 вышележащего горизонта. Из наклонного съезда 6 проходят сбойки 10, а из них - подэтажные буродоставочные орты 11. Из доставочного штрека 8 проходят по углам блока по мощности m рудного тела 1 вкрест его простирания (до висячего бока рудного тела 1), ограниченного Lбл - длиной блока и высотой блока hбл, выработки 2. Также из выработок 2 бурят восходящие и нисходящие веера скважин 12. Веера скважин 12 для проходки отрезной щели бурят параллельно плоскости залегания рудного тела в соответствии с его углом падения α в непосредственной близости от висячего бока рудного тела 1. После обуривания вееров скважин 12 параллельно плоскости залегания рудного тела 1 по простиранию в соответствии с паспортом буровзрывных работ, построенным по одной из известных методик, осуществляют заряжание взрывчатым веществом (гранулированным или патронированным) и взрывание. После этого производят выпуск отбитой руды через подэтажные буродоставочные орты 11. Выпуск ведут следующим образом. Погрузочно-доставочная машина (не показана) заезжает в подэтажный буродоставочный орт 11, зачерпывает разрыхленную руду и транспортирует ее по подэтажу до ближайшего рудоспуска (не показан). После выпуска отбитой руды в образованную отрезную щель устанавливают активное гибкое перекрытие 5 в следующей последовательности. Во всех выработках 2 блока монтируют однобарабанные лебедки 3, к которым присоединяют тросы 4. Затем тросы 4 с верхнего горизонта спускают до отметки нижнего горизонта. После этого на натяжные тросы 4 крепят эластичные замкнутые оболочки 7, соединенные между собой, например, с помощью обрезиненных тросов, образующие активное гибкое перекрытие 5, и по мере монтажа затягивают перекрытие 5 в отрезную щель. После протяжки активного гибкого перекрытия 5 его фиксируют в верхней части блока и производят заполнение эластичных замкнутых оболочек 7 сжатым воздухом от компрессора (не показан) до рабочего давления по воздуховоду 15 для нагнетания сжатого воздуха. После этого под защитой активного гибкого перекрытия 5 производят отработку запасов блока. Обуривают в соответствии с паспортом буровзрывных работ взрывные скважины 13 для отбойки запасов блока, взрывают их, проветривают блок и производят выпуск отбитой руды 17 из блока через подэтажные буродоставочные орты 11 под защитой активного гибкого перекрытия 5, которое по мере отработки запасов блока периодически подтягивают. Активное гибкое перекрытие 5 предотвращает разубоживание отбитой руды обрушенными породами 16 висячего бока. Для ликвидации негабаритов ширину каждого ряда оболочек 7 принимают равной половине ширины подэтажа, причем каждый ряд оболочек 7 имеет свои воздуховоды 14 и 15 для подачи и сброса давления сжатого воздуха. В случае небольшого размера куска негабарита его извлекают путем кратковременной подачи сжатого воздуха до максимального давления и сброса его по воздуховодам 14 и 15. Такая операция позволит выдавить небольшие куски негабарита и продолжить очистную выемку. В этом заключается "активность" перекрытия 5, которое можно использовать для управления процессом выпуска руды. Соблюдение данных условий позволит сбрасывать давление сжатого воздуха с помощью воздуховода 15 и извлекать негабарит или дробить его. Затем ряд оболочек 7 снова заполняют сжатым воздухом до рабочего давления по воздуховоду 14 и продолжают отработку запасов блока. При большей ширине ряда оболочек 7 возможны трудности, связанные с извлечением негабарита. После отработки запасов блока воздух из оболочек 7 с помощью воздуховода 15 для сброса воздуха выпускают и активное гибкое перекрытие 5 извлекают для повторного использования.The method of developing ore deposits by a system of floor caving with active flexible separating overlap is as follows. The
Применение предлагаемого способа разработки рудных залежей системой этажного обрушения с гибкими разделяющими перекрытиями обеспечивает следующие преимущества:The application of the proposed method for the development of ore deposits by a system of floor caving with flexible dividing floors provides the following advantages:
- снижение вероятности повреждения перекрытия в период очистной выемки;- reducing the likelihood of damage to the floor during the period of treatment excavation;
- снижение трудоемкости проведения операций по монтажу гибкого перекрытия;- reducing the complexity of the installation of flexible flooring;
- снижение разубоживания при отработке камерных запасов.- reduction of dilution when mining chamber reserves.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2009148977/03A RU2426881C1 (en) | 2009-12-28 | 2009-12-28 | Development method of ore deposits with block caving system with active flexible separating covering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2009148977/03A RU2426881C1 (en) | 2009-12-28 | 2009-12-28 | Development method of ore deposits with block caving system with active flexible separating covering |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2009148977A RU2009148977A (en) | 2011-07-10 |
RU2426881C1 true RU2426881C1 (en) | 2011-08-20 |
Family
ID=44739908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2009148977/03A RU2426881C1 (en) | 2009-12-28 | 2009-12-28 | Development method of ore deposits with block caving system with active flexible separating covering |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2426881C1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184694A (en) * | 2018-09-05 | 2019-01-11 | 巴彦淖尔西部铜业有限公司 | A kind of pre- anchor sublevel drilling stage open stope afterwards filling mining method of upper disk |
-
2009
- 2009-12-28 RU RU2009148977/03A patent/RU2426881C1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
RU2009148977A (en) | 2011-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2475647C2 (en) | Mining method of thick steep ore bodies | |
RU2390633C1 (en) | Procedure for development of steeply pitching beds of coal | |
RU2405109C1 (en) | Method of developing thick ore deposits by underground mining with interchamber pillars support | |
RU2398966C1 (en) | Method for mining thick steeply inclined and steep coal beds | |
RU2309253C1 (en) | Method for kimberlite pipe cutting in layers in upward direction along with goaf filling | |
RU2283431C1 (en) | Method for thick steep mineral seam mining along with goaf filling | |
RU2563857C1 (en) | Method of development of inclined ore deposits in range of bedding angles 15-35 degrees and thickness of ore bodies 15-30 meters with caving of ore and surrounding rocks | |
RU2322583C2 (en) | Development method for steep and inclined deposit having low and medium thickness | |
RU2648371C1 (en) | Method to mine thick steep deposits of unstable ore | |
RU2502872C1 (en) | Development method of thick steeply dipping ore bodies | |
RU2352780C1 (en) | Method of ore bodies development | |
RU2325529C1 (en) | Mining method for steep ore bodies | |
US3900226A (en) | Hydraulic mining method | |
RU2426881C1 (en) | Development method of ore deposits with block caving system with active flexible separating covering | |
RU2341657C1 (en) | Method of prevention of development entries in coal bed areas | |
RU2086773C1 (en) | Method for degassing of follower-seam | |
RU2444625C1 (en) | Development method of tube-like and thick ore bodies | |
RU2407892C1 (en) | Protection method of development drifts | |
RU2472932C1 (en) | Development method of flat and inclined thick ore bodies | |
RU2563003C1 (en) | Method of excavation of thick flat coal beds | |
RU2424432C1 (en) | Ore body mining method | |
RU2415266C1 (en) | Method of coal extraction from chambers with pre-production mining of methane | |
RU2648133C1 (en) | Method of open-underground development of steeply pitching coal | |
RU2607131C1 (en) | Thick flat dipping ore deposits at big depths development method | |
RU2367794C1 (en) | Recovery method of minerals |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20111229 |