RU2648133C1 - Method of open-underground development of steeply pitching coal - Google Patents

Method of open-underground development of steeply pitching coal Download PDF

Info

Publication number
RU2648133C1
RU2648133C1 RU2017105040A RU2017105040A RU2648133C1 RU 2648133 C1 RU2648133 C1 RU 2648133C1 RU 2017105040 A RU2017105040 A RU 2017105040A RU 2017105040 A RU2017105040 A RU 2017105040A RU 2648133 C1 RU2648133 C1 RU 2648133C1
Authority
RU
Russia
Prior art keywords
coal
working platform
drilling
mining
wells
Prior art date
Application number
RU2017105040A
Other languages
Russian (ru)
Inventor
Николай Петрович Ситников
Original Assignee
Николай Петрович Ситников
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Николай Петрович Ситников filed Critical Николай Петрович Ситников
Priority to RU2017105040A priority Critical patent/RU2648133C1/en
Application granted granted Critical
Publication of RU2648133C1 publication Critical patent/RU2648133C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

FIELD: mining.
SUBSTANCE: invention relates to coal industry and can be used to develop steeply pitching coals. Method comprises preliminary preparation of the extraction front by constructing a working platform along the formation strike line on the cut side ledge, connected with the formation outlet, installation of the equipment on the work site, delivery of loosened coal to the coal storage, preliminary preparation of the extraction front comprises carrying out a crosscut from the bottom of the coal cut and transport drifts along each formation in opposite directions from the crosscut. Drifts are supported by a support, the drilling rig is used as equipment mounted on the site, for drilling wells with subsequent expansion, mining pressure is controlled by laying the worked out space, the coal storage is built at the bottom of the cut, and the loosened coal is delivered to the coal storage on the drift and crosscut. As an additional equipment mounted on the work site, a coal saw drive is installed, and the wells is expanded with the help of drilling and blasting operations.
EFFECT: technical result is increased efficiency of open-underground mining of steeply pitching coal by improving the means of work mechanization and organization.
3 cl, 2 dwg

Description

Изобретение относится к угольной промышленности и может быть использовано для разработки крутопадающих угольных пластов.The invention relates to the coal industry and can be used to develop steeply falling coal seams.

Известен способ открыто-подземной разработки крутопадающих угольных пластов (патент РФ №2499129), включающий предварительную подготовку фронта очистных работ путем сооружения рабочей площадки по линии простирания пласта на уступе борта разреза, связанном с выходом пласта, монтаж на рабочей площадке оборудования, выемку угля в стороне от рабочей площадки путем проведения параллельных выработок с управлением горным давлением и выдачу отбитого угля на временный склад, отличающийся тем, что предварительная подготовка фронта очистных работ включает проведение слабонаклонного вверх квершлага с нижней точки угольного разреза и транспортных штреков по каждому пласту в противоположные стороны с небольшим уклоном в сторону квершлага, при этом штреки поддерживают рамной крепью с решетчатой затяжкой, рабочую площадку сооружают с присечкой пласта, в качестве оборудования, монтируемого на рабочей площадке, используют буровую установку и став водопроводных труб, параллельные выработки проводят по линии падения пласта до сопряжения со штреком путем бурения и расширения скважин, выемку угля осуществляют гидромонитором из скважины, управление горным давлением осуществляют закладкой выработанного пространства, при этом используют закладочный материал крупнее ячеек решетчатой затяжки, временный склад сооружают на дне разреза, а выдачу отбитого угля на временный склад осуществляют самотечным гидротранспортом по квершлагу.There is a method of open-underground mining of steeply falling coal seams (RF patent No. 2499129), which includes preliminary preparation of the treatment front by constructing a working platform along the strike line on the ledge of the side of the cut associated with the exit of the seam, installing equipment on the working platform, and mining coal aside from the work site by conducting parallel workings with control of rock pressure and the delivery of chipped coal to a temporary warehouse, characterized in that the preliminary preparation of the front of treatment works includes conducting a slightly sloping upward kerchlag from the bottom of the coal mine and transport drifts in each seam in opposite directions with a slight slope towards the kerchlag, while the drifts are supported by a frame support with trellised tightening, the working platform is constructed with a notch of the seam, as equipment mounted on the working the site, use the drilling rig and become water pipes, parallel workings are carried out along the line of formation fall to the interface with the drift through drilling and expansion of wells, yemku jetting coal carried from the wellbore rock pressure control carried stowing, wherein the material used stowing larger lattice cells tightening construct temporary storage section on the bottom, and the coal issuing chipped temporary storage is carried out by gravity flow hydraulic transport crosscut.

Известному способу присущи следующие недостатки, а именно: необходимость наличия больших объемов воды вблизи угольного разреза, мощных электроустановок для водоснабжения гидромониторов, сооружений по очистке загрязненной воды и обезвоживанию горной массы. Использование самотечного гидротранспорта горной массы предопределяет потери угля в пластах в связи с необходимостью обеспечения уклона желобчатого става в пределах 3-5 метров на 100 метров его длины.The known method has the following disadvantages, namely: the need for large volumes of water near the coal mine, powerful electrical installations for water supply of hydromonitors, facilities for the purification of contaminated water and dehydration of the rock mass. The use of gravity hydraulic transport of rock mass determines the loss of coal in the seams due to the need to ensure the slope of the grooved stave within 3-5 meters per 100 meters of its length.

Необходимо отметить, что расход электроэнергии при гидромониторной отбойке угля значительно превышает ее расход при механическом способе разрушения угля.It should be noted that the energy consumption during hydromonitor breaking of coal significantly exceeds its consumption in the mechanical method of coal destruction.

Целью изобретения является повышение эффективности открыто-подземной разработки крутопадающих угольных пластов путем совершенствования средств механизации и организации работ. Поставленная цель достигается тем, что в качестве оборудования, монтируемого на рабочей площадке, используют привод угольной пилы с повышенной энерговооруженностью, соразмерной мощности экскаватора ЭКГ-4у.The aim of the invention is to increase the efficiency of open-underground mining steeply falling coal seams by improving the means of mechanization and organization of work. This goal is achieved by the fact that as the equipment mounted on the working platform, use a coal saw drive with increased power ratio, commensurate with the power of the ECG-4u excavator.

Действительно, расположение передвижного привода угольной пилы на рабочей площадке уступа борта разреза позволяет использовать крупногабаритные механизмы и электродвигатели с повышенной энерговооруженностью, что недостижимо в подземных условиях. Отметим безопасность условий труда для обслуживающего персонала.Indeed, the location of the mobile coal saw drive on the working platform of the ledge of the side of the section allows the use of large-sized mechanisms and electric motors with increased power supply, which is unattainable in underground conditions. We note the safety of working conditions for staff.

Изобретение поясняется схемами, где на фиг. 1 показана схема подготовки и отработки приконтурных запасов с борта разреза; на фиг. 2 - фрагмент функционирования привода угольной пилы на рабочей площадке уступа 7.The invention is illustrated by diagrams, where in FIG. 1 shows a diagram of the preparation and development of marginal reserves from the side of the section; in FIG. 2 - a fragment of the operation of the coal saw drive on the working platform of the ledge 7.

При достижении угольным разрезом глубины разработки, обусловленной экономически оправданным коэффициентом вскрыши, в границах горного отвода остаются запасы за контуром разреза (в приконтурной зоне), которые открытыми горными работами не могут быть извлечены и списываются как нецелесообразные к отработке. При строительстве разреза открытыми горными работами вскрывается не один, а свита угольных пластов различной мощности, и обычно самый продуктивный пласт является самым нижним. В связи с этим угольные пласты, залегающие в рабочем борту разреза, и составляют запасы приконтурной зоны. Предлагаемый способ может быть реализован следующим образом. При приближении горных работ к границе горного отвода по глубине, когда выемку угля ведут из самого нижнего и, возможно, самого мощного пласта 1 свиты, приступают к вскрытию и подготовке запасов, сосредоточенных в угольных пластах 2, 3 данной свиты (фиг. 1), залегающих в рабочем борту разреза. Для этого примерно в средней части разреза по линии простирания с его дна проводят квершлаг 4, вскрывающий все угольные пласты свиты, имеющиеся в приконтурной зоне разреза, и разделяют пространство разреза на два крыла. Квершлаг 4 проводят средствами механизации, использующимися при проведении подземных горных выработок. Затем таким же образом проводят штреки 5, 6 в обоих крыльях, по каждому из пересеченных пластов. При этом квершлаг 4 и штреки 5, 6 проходят под уклоном не более 0,005 и крепят согласно паспорту крепления. После доработки запасов угля на дне разреза и вывода средств механизации за его пределы приступают к выемке запасов в приконтурной зоне. Для этого, начиная с верхнего пласта 3 свиты и дальней границы крыла разреза на рабочей площадке уступа 7 рабочего борта, бурят две скважины 8 и 9 диаметром 250-500 мм у почвы пласта до штрека 5 с расстоянием, равным расстоянию между рабочими канатами угольной пилы 10, привод которой установлен на самоходной крупногабаритной платформе 11, оборудованной соответствующими механизмами и мощными двигателями, защищенными кузовом 12 (фиг. 2). Расстояние между рабочими канатами 45 мм принимается в зависимости от мощности привода и категории крепости угля. После выемки первой полосы угля образуется выработанное пространство (камера), поэтому следующую полосу угля вынимают с оставлением между ними определенного целика угля и так далее. Управление горным давлением осуществляют закладкой выработанного пространства вскрышными породами. Отбитый в камере 15 пласта 3 уголь транспортируют конвейерами по штреку 5 и квершлагу 4 на угольный склад 13. Камеру 15 подготавливают к выемке путем бурения скважин 17 диаметрами, равными 100-120 мм.When a coal mine reaches the development depth due to an economically justified overburden coefficient, reserves outside the mine allotment remain in the boundaries of the mine allotment (in the marginal zone), which cannot be extracted by open cast mining and are written off as inappropriate for mining. During the construction of a mine by opencast mining, not one but a suite of coal seams of various thicknesses is opened, and usually the most productive layer is the lowest. In this regard, coal seams lying in the working board of the section, and make up the reserves of the marginal zone. The proposed method can be implemented as follows. As mining operations approach the depth of the mining allotment boundary when coal is mined from the lowest and possibly the most powerful formation 1 of the formation, they begin to open and prepare reserves concentrated in coal seams 2, 3 of this formation (Fig. 1), lying in the working board of the cut. To do this, approximately in the middle part of the section along the strike line from its bottom, a crossbreaker 4 is opened, revealing all the coal seams of the suite that are in the contour zone of the section, and divide the space of the section into two wings. Crossover 4 is carried out by means of mechanization used in underground mining. Then, drifts 5, 6 are carried out in the same way in both wings, for each of the crossed formations. At the same time crossover 4 and drifts 5, 6 pass at a slope of not more than 0.005 and fasten according to the passport of fastening. After the refinement of coal reserves at the bottom of the mine and the withdrawal of mechanization means beyond it, they begin to extract reserves in the marginal zone. To do this, starting from the upper layer of the 3 suites and the far boundary of the section wing on the working platform of ledge 7 of the working side, two wells 8 and 9 with a diameter of 250-500 mm are drilled at the soil of the formation to drift 5 with a distance equal to the distance between the working ropes of a coal saw 10 , the drive of which is mounted on a self-propelled large-sized platform 11, equipped with appropriate mechanisms and powerful engines, protected by a body 12 (Fig. 2). The distance between the working ropes of 45 mm is taken depending on the drive power and coal strength category. After excavation of the first strip of coal, a mined-out space (chamber) is formed, therefore, the next strip of coal is removed with a certain pillar of coal left between them and so on. Management of rock pressure is carried out by laying open space overburden. The coal beaten off in the chamber 15 of the formation 3 is transported by conveyors along the drift 5 and the cross-turn 4 to the coal warehouse 13. The chamber 15 is prepared for excavation by drilling 17 wells with diameters of 100-120 mm.

И последующим их взрыванием и выгрузкой отбитого угля на конвейерный штрек 5. Проветривание камеры 15 и прилегающих горных выработок с ходком 16 осуществляется вентиляционной струей, поступающей с конвейерного штрека. Пласты 1, 2 угольной свиты отрабатывают подобным способом.And their subsequent blasting and unloading of the beaten-off coal onto the conveyor drift 5. The ventilation of the chamber 15 and adjacent mine workings with a walker 16 is carried out by a ventilation stream coming from the conveyor drift. The coal seams 1, 2 are worked out in a similar way.

Claims (3)

1. Способ открыто-подземной разработки крутопадающих угольных пластов, включающий предварительную подготовку фронта очистных работ путем сооружения рабочей площадки по линии простирания пласта на уступе борта разреза, связанном с выходом пласта, монтаж на рабочей площадке оборудования, выдачу отбитого угля на угольный склад, при этом предварительная подготовка фронта очистных работ включает проведение квершлага с нижней точки угольного разреза и транспортных штреков по каждому пласту в противоположные стороны от квершлага, при этом штреки поддерживают крепью, в качестве оборудования, монтируемого на рабочей площадке, используют буровую установку, для бурения скважин с последующим их расширением, при этом управление горным давлением осуществляют закладкой выработанного пространства, угольный склад сооружают на дне разреза, а выдачу отбитого угля на угольный склад осуществляют по штреку и квершлагу, отличающийся тем, что в качестве дополнительного оборудования, монтируемого на рабочей площадке, устанавливают привод угольной пилы, а расширение скважин осуществляют с помощью буровзрывных работ.1. The method of open-underground mining of steeply falling coal seams, including preliminary preparation of the treatment front by constructing a working platform along the strike line on the ledge of the side of the section associated with the exit of the seam, installing equipment on the working platform, issuing beaten coal to a coal warehouse, while preliminary preparation of the sewage treatment front includes conducting a cross-section from the bottom of the coal mine and transport drifts along each layer in opposite directions from the cross-section, while the tracks are supported by a lining, a drilling rig is used as equipment mounted on a work site, for drilling wells with their subsequent expansion, while the rock pressure is controlled by laying out the worked out space, the coal warehouse is built at the bottom of the cut, and the delivery of beaten coal to the coal warehouse is carried out on drift and cross-turn, characterized in that as an additional equipment mounted on the working platform, a coal saw drive is installed, and the wells are expanded using blasting. 2. Способ по п. 1, отличающийся тем, что привод угольной пилы выполняют самоходным.2. The method according to p. 1, characterized in that the coal saw drive is self-propelled. 3. Способ по п. 1, отличающийся тем, что в качестве привода угольной пилы используют переоборудованный экскаватор ЭКГ-4у.3. The method according to p. 1, characterized in that a converted ECG-4u excavator is used as a coal saw drive.
RU2017105040A 2017-02-15 2017-02-15 Method of open-underground development of steeply pitching coal RU2648133C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2017105040A RU2648133C1 (en) 2017-02-15 2017-02-15 Method of open-underground development of steeply pitching coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2017105040A RU2648133C1 (en) 2017-02-15 2017-02-15 Method of open-underground development of steeply pitching coal

Publications (1)

Publication Number Publication Date
RU2648133C1 true RU2648133C1 (en) 2018-03-22

Family

ID=61707975

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2017105040A RU2648133C1 (en) 2017-02-15 2017-02-15 Method of open-underground development of steeply pitching coal

Country Status (1)

Country Link
RU (1) RU2648133C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2733759C1 (en) * 2019-12-18 2020-10-06 Владимир Иванович Бунин Open-underground method of development of stratified deposits of minerals

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU676730A1 (en) * 1978-06-12 1979-07-30 Московский Ордена Трудового Красного Знамени Горный Институт Method of excavating steep beds of minerals
SU678189A1 (en) * 1978-05-04 1979-08-05 Специальное Конструкторско-Технологическое Бюро Института Геотехнической Механики Ан Украинской Сср Method of mining mineral fields
US4536035A (en) * 1984-06-15 1985-08-20 The United States Of America As Represented By The United States Department Of Energy Hydraulic mining method
SU1278458A1 (en) * 1984-06-13 1986-12-23 Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского Method of mining minerals in working steep seams in ascending strips
RU2499129C1 (en) * 2012-05-23 2013-11-20 Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) Method open underground mining of steep coal beds

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU678189A1 (en) * 1978-05-04 1979-08-05 Специальное Конструкторско-Технологическое Бюро Института Геотехнической Механики Ан Украинской Сср Method of mining mineral fields
SU676730A1 (en) * 1978-06-12 1979-07-30 Московский Ордена Трудового Красного Знамени Горный Институт Method of excavating steep beds of minerals
SU1278458A1 (en) * 1984-06-13 1986-12-23 Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского Method of mining minerals in working steep seams in ascending strips
US4536035A (en) * 1984-06-15 1985-08-20 The United States Of America As Represented By The United States Department Of Energy Hydraulic mining method
RU2499129C1 (en) * 2012-05-23 2013-11-20 Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) Method open underground mining of steep coal beds

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2733759C1 (en) * 2019-12-18 2020-10-06 Владимир Иванович Бунин Open-underground method of development of stratified deposits of minerals

Similar Documents

Publication Publication Date Title
AU2012272545B2 (en) Mining method for gassy and low permeability coal seams
WO2016112771A1 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
RU2333363C1 (en) Method of monitoring gas emission during mining operations in series of highly gaseous coal seams
RU2310752C1 (en) Method for steeply inclined medium-thickness and thin coal seam development
RU2360115C1 (en) Stripe-along-pitch method of development of thick steeply inclined coal bed
RU2472936C1 (en) Control method of poorly caving roof at entry of mechanised complex to removal chamber
RU2439323C1 (en) Method to mine inclined ore deposits
CN104632224B (en) Shortwall hydraulic mining method along strike
RU2648133C1 (en) Method of open-underground development of steeply pitching coal
CN105370280A (en) Nondestructive blasting mining method of underground slightly inclined double-layer thin jade ores
RU2310073C1 (en) Safe mine for gas-bearing fire-hazardous seam cutting
RU2499129C1 (en) Method open underground mining of steep coal beds
RU2593833C1 (en) Method of producing a thick seam with underroof coal discharge
RU2563003C1 (en) Method of excavation of thick flat coal beds
RU2449125C1 (en) Method to mine large sloping ore bodies
RU2490456C1 (en) Method for open-underground mining of thick flat coal bed
CN105804747B (en) A kind of ultra-thin coal seam waterpower bores the mining method that pops
RU2422639C1 (en) Zolotaryov safe coal mine
RU2388911C2 (en) Complex method for development of beds that are dangerous by gas and dust, disposed to mountain bumps and spontaneous emissions
RU2434139C1 (en) Degassing method of worked-out area
CN103982184A (en) Falling ore directional slip control method adopting underground mine bottom-pillar-free caving mining method
RU2415266C1 (en) Method of coal extraction from chambers with pre-production mining of methane
RU2315867C2 (en) Method for thick steeply inclined coal seam excavation
RU2488693C1 (en) Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system
RU2607131C1 (en) Thick flat dipping ore deposits at big depths development method