RU2006125429A - Многоуровневая система и способ оптимизации работы железнодорожного транспорта - Google Patents
Многоуровневая система и способ оптимизации работы железнодорожного транспорта Download PDFInfo
- Publication number
- RU2006125429A RU2006125429A RU2006125429/11A RU2006125429A RU2006125429A RU 2006125429 A RU2006125429 A RU 2006125429A RU 2006125429/11 A RU2006125429/11 A RU 2006125429/11A RU 2006125429 A RU2006125429 A RU 2006125429A RU 2006125429 A RU2006125429 A RU 2006125429A
- Authority
- RU
- Russia
- Prior art keywords
- level
- data
- railway
- train
- optimization
- Prior art date
Links
- 238000005457 optimization Methods 0.000 title claims 24
- 238000000034 method Methods 0.000 title claims 6
- 230000003137 locomotive effect Effects 0.000 claims 9
- 239000000446 fuel Substances 0.000 claims 3
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/04—Satellite based navigation systems, e.g. global positioning system [GPS]
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Claims (13)
1. Многоуровневая система управления системой (50) железнодорожного транспорта и ее рабочими компонентами, причем система (50) железнодорожного транспорта содержит первый процессор (202), ассоциированный с уровнем (100) инфраструктуры железных дорог и предназначенный для управления работой инфраструктуры железных дорог, функционирующей на уровне (100) инфраструктуры железных дорог, второй процессор (502), ассоциированный с уровнем (200) сети железнодорожных путей и предназначенный для управления работой сети железнодорожных путей на уровне (200) сети железнодорожных путей, причем упомянутый уровень (100) инфраструктуры железных дорог содержит один или более уровней (200) сети железнодорожных путей, третий процессор (1002), ассоциированный с уровнем (300) поезда и предназначенный для управления работой поезда, функционирующего на уровне (300) поезда, причем упомянутый уровень (200) сети железнодорожных путей содержит один или более уровней (300) поезда, четвертый процессор (1202), ассоциированный с уровнем (400) состава и предназначенный для управления работой состава поезда на уровне (400) состава, при этом упомянутый уровень поезда содержит один или более уровней (400) состава, и пятый процессор (1502), ассоциированный с уровнем (500) локомотива и предназначенный для управления работой локомотива на уровне (500) локомотива, при этом упомянутый уровень (400) состава содержит один или более уровней (500) локомотива, причем каждый процессор (202, 502, 1002, 1202, 1502), ассоциированный с каждым уровнем (100, 200, 300, 400, 500), выполнен с возможностью предоставления процессору, ассоциированному с по меньшей мере одним другим уровнем рабочих параметров, которые задают рабочие характеристики и данные, связанные с уровнем, с которым он ассоциирован, и каждый процессор (202, 502, 1002, 1202, 1502) оптимизирует работу на ассоциированном с ним уровне (100, 200, 300, 400, 500) и работает во взаимодействии с процессором, ассоциированным с по меньшей мере одним другим уровнем, для оптимизации работы системы (50) железнодорожного транспорта на всех уровнях (100, 200, 300, 400, 500) системы (50) железнодорожного транспорта на основе параметра оптимизации.
2. Система по п.1, в которой первый процессор (202), ассоциированный с уровнем (100) инфраструктуры железных дорог, принимает одно или более из: данных (206) инфраструктуры железных дорог, данных (208) сети железнодорожных путей и данных (210) поезда и управляет работой инфраструктуры железных дорог в пределах уровня (100) инфраструктуры железных дорог, по меньшей мере частично, на принятых данных, второй процессор (502), ассоциированный с уровнем (200) сети железнодорожных путей, принимает одно или более из данных (506) инфраструктуры железных дорог, данных (508) сети железнодорожных путей и данных (510) поезда и управляет работой сети железнодорожных путей в пределах уровня (200) сети железнодорожных путей по меньшей мере частично на основе принятых данных, третий процессор (1002), ассоциированный с уровнем (300) поезда, принимает одно или более из данных (1006) инфраструктуры железных дорог, данных (1008) сети железнодорожных путей, данных (1010) поезда и данных (1012) состава и управляет работой поезда в пределах уровня (300) поезда, по меньшей мере частично, на основе принятых данных, четвертый процессор (1202), ассоциированный с уровнем (400) состава, принимает одно или более из данных (1210) поезда, данных (1212) состава и данных (1214) локомотива и управляет работой состава в пределах уровня (400) состава, по меньшей мере частично, на основе принятых данных, пятый процессор (1502), ассоциированный с уровнем (500) локомотива, принимает одно или более из данных (1512) уровня состава и данных (1514) уровня локомотива и управляет работой локомотива в пределах уровня (500) локомотива, по меньшей мере частично, на основе принятых данных.
3. Многоуровневая система для управления системой (50) железнодорожного транспорта и ее рабочими компонентами, причем система (50) железнодорожного транспорта содержит первый уровень, предназначенный для оптимизации работы в пределах первого уровня, включающего в себя рабочие параметры первого уровня, задающие рабочие характеристики и данные первого уровня, и второй уровень, предназначенный для оптимизации работы в пределах второго уровня, включающего в себя рабочие параметры второго уровня, задающие рабочие характеристики и данные второго уровня, при этом упомянутый первый уровень предоставляет рабочие параметры первого уровня второму уровню, а второй уровень предоставляет рабочие параметры второго уровня первому уровню, и каждая из упомянутых оптимизации работы на первом уровне и оптимизации работы на втором уровне является функцией оптимизирования параметра оптимизации системы.
4. Система по п.3, в которой параметр оптимизации системы отражает одно или более из использования топлива, экономической оценки времени доставки груза, перевозимого по системе железных дорог, заранее заданных изменений условий, степени изменения условий и степени изменения одного условия относительно другого условия.
5. Система по п.3, в которой оптимизация работы на первом уровне и оптимизация работы на втором уровне содержит идентифицикацию ключевых рабочих ограничений и данных на одном из первого и второго уровней и передачу этих ограничений и данных на другой из первого и второго уровней для оптимизации производительности на этом другом уровне.
6. Способ оптимизации работы системы (50) железнодорожного транспорта, имеющей первый уровень и второй уровень, содержащий этапы, на которых передают рабочий параметр первого уровня, который задает рабочие характеристики первого уровня, с первого уровня на второй уровень, передают рабочий параметр второго уровня, который задает рабочие характеристики второго уровня, со второго уровня на первый уровень, оптимизируют работу системы комбинации первого уровня и второго уровня на основе параметра оптимизации системы, оптимизируют работу на первом уровне на основе параметра оптимизации первого уровня и частично на основе параметра оптимизации системы, и оптимизируют работу на втором уровне на основе параметра оптимизации второго уровня и частично на основе параметра оптимизации системы.
7. Способ по п.6, в котором параметр оптимизации первого уровня, параметр оптимизации второго уровня и параметр оптимизации системы являются общим параметром оптимизации.
8. Способ по п.7, в котором общий параметр оптимизации отражает одно или более из использования топлива, экономической оценки времени доставки груза, перевозимого по системе железных дорог, заранее заданных изменений условий, степени изменения условий и степени изменения одного условия относительно другого условия.
9. Способ по п.6, в котором рабочие параметры предоставляют с одного уровня на другой через заранее заданные интервалы времени.
10. Способ по п.6, в котором этап оптимизации работы системы по комбинации первого уровня и второго уровня на основе параметра оптимизации содержит этап, на котором идентифицируют ключевые рабочие ограничения и данные на одном из первого и второго уровней и передают эти ограничения и данные на другой из первого и второго уровня для оптимизации производительности на этом другом уровне.
11. Многоуровневая система для управления системой железнодорожного транспорта и ее рабочими компонентами, причем система железнодорожного транспорта содержит первый уровень, включающий в себя рабочие параметры первого уровня, задающие рабочие характеристики и данные первого уровня, и второй уровень, включающий в себя рабочие параметры второго уровня, предназначенные для оптимизации работы на втором уровне, при этом рабочие параметры второго уровня отражают изменения в рабочих характеристиках и данных второго уровня, при этом упомянутый второй уровень предоставляет первому уровню оптимизированные рабочие параметры второго уровня.
12. Система по п.11, в которой упомянутая оптимизация работы на втором уровне является функцией оптимизирования параметра оптимизации системы железнодорожного транспорта.
13. Система по п.12, в которой параметр оптимизации системы отражает одно или более из изменения использования топлива, изменения экономической оценки времени доставки груза, перевозимого по системе железных дорог, степени изменения рабочих параметров второго уровня, степени изменения по отношению ко времени и степени изменения одного условия относительно другого условия.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/736,089 | 2003-12-15 | ||
US10/736,089 US8538611B2 (en) | 2003-01-06 | 2003-12-15 | Multi-level railway operations optimization system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2006125429A true RU2006125429A (ru) | 2008-01-27 |
RU2359857C2 RU2359857C2 (ru) | 2009-06-27 |
Family
ID=34710461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2006125429/11A RU2359857C2 (ru) | 2003-12-15 | 2004-06-30 | Многоуровневая система и способ оптимизации работы железнодорожного транспорта |
Country Status (10)
Country | Link |
---|---|
US (1) | US8538611B2 (ru) |
EP (1) | EP1697196B1 (ru) |
CN (1) | CN1906074B (ru) |
AU (1) | AU2004305456B2 (ru) |
BR (1) | BRPI0416721A (ru) |
DE (1) | DE602004018541D1 (ru) |
MX (1) | MXPA06006844A (ru) |
RU (1) | RU2359857C2 (ru) |
WO (1) | WO2005061300A1 (ru) |
ZA (1) | ZA200605430B (ru) |
Families Citing this family (113)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9193268B2 (en) * | 2001-03-27 | 2015-11-24 | General Electric Company | Hybrid energy power management system and method |
US9151232B2 (en) | 2001-03-27 | 2015-10-06 | General Electric Company | Control system and method |
US7882789B2 (en) * | 2001-03-27 | 2011-02-08 | General Electric Company | System and method for managing emissions from diesel powered systems |
US10308265B2 (en) | 2006-03-20 | 2019-06-04 | Ge Global Sourcing Llc | Vehicle control system and method |
US9733625B2 (en) | 2006-03-20 | 2017-08-15 | General Electric Company | Trip optimization system and method for a train |
US9233696B2 (en) * | 2006-03-20 | 2016-01-12 | General Electric Company | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear |
US10569792B2 (en) | 2006-03-20 | 2020-02-25 | General Electric Company | Vehicle control system and method |
US7290807B2 (en) * | 2002-06-26 | 2007-11-06 | General Electric Company | Method and system of limiting the application of sand to a railroad rail |
US9950722B2 (en) * | 2003-01-06 | 2018-04-24 | General Electric Company | System and method for vehicle control |
US8924049B2 (en) | 2003-01-06 | 2014-12-30 | General Electric Company | System and method for controlling movement of vehicles |
US7937193B2 (en) * | 2003-02-27 | 2011-05-03 | General Electric Company | Method and apparatus for coordinating railway line of road and yard planners |
US20060212186A1 (en) * | 2003-02-27 | 2006-09-21 | Philp Joseph W | Method and apparatus for scheduling maintenance of way |
EP1730009A1 (en) * | 2004-03-27 | 2006-12-13 | DeltaRail Group Limited | Train operating system |
US7940016B2 (en) | 2004-08-09 | 2011-05-10 | Railpower, Llc | Regenerative braking methods for a hybrid locomotive |
WO2006110371A2 (en) * | 2005-04-07 | 2006-10-19 | New York Air Brake Corporation | Multimedia train simulator |
CA2544910C (en) * | 2005-04-25 | 2013-07-09 | Railpower Technologies Corp. | Multiple prime power source locomotive control |
US7522990B2 (en) * | 2005-06-08 | 2009-04-21 | General Electric Company | System and method for improved train handling and fuel consumption |
US8145382B2 (en) * | 2005-06-17 | 2012-03-27 | Greycell, Llc | Entertainment system including a vehicle |
US20090112672A1 (en) * | 2005-06-30 | 2009-04-30 | Flaemig Hartmut | Method and Arrangement for Optimized Maintenance of Components |
US7661370B2 (en) | 2005-10-19 | 2010-02-16 | Railpower, Llc | Design of a large low maintenance battery pack for a hybrid locomotive |
DE102005061397A1 (de) * | 2005-12-22 | 2007-06-28 | Robert Bosch Gmbh | Verfahren zum Betreiben eines Hybridfahrzeugs |
US9689681B2 (en) | 2014-08-12 | 2017-06-27 | General Electric Company | System and method for vehicle operation |
US9828010B2 (en) | 2006-03-20 | 2017-11-28 | General Electric Company | System, method and computer software code for determining a mission plan for a powered system using signal aspect information |
US20080201019A1 (en) * | 2006-03-20 | 2008-08-21 | Ajith Kuttannair Kumar | Method and computer software code for optimized fuel efficiency emission output and mission performance of a powered system |
US9266542B2 (en) * | 2006-03-20 | 2016-02-23 | General Electric Company | System and method for optimized fuel efficiency and emission output of a diesel powered system |
US8126601B2 (en) * | 2006-03-20 | 2012-02-28 | General Electric Company | System and method for predicting a vehicle route using a route network database |
US8630757B2 (en) * | 2006-03-20 | 2014-01-14 | General Electric Company | System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks |
US8473127B2 (en) | 2006-03-20 | 2013-06-25 | General Electric Company | System, method and computer software code for optimizing train operations considering rail car parameters |
US9156477B2 (en) | 2006-03-20 | 2015-10-13 | General Electric Company | Control system and method for remotely isolating powered units in a vehicle system |
US8370007B2 (en) * | 2006-03-20 | 2013-02-05 | General Electric Company | Method and computer software code for determining when to permit a speed control system to control a powered system |
US8249763B2 (en) | 2006-03-20 | 2012-08-21 | General Electric Company | Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings |
US8768543B2 (en) * | 2006-03-20 | 2014-07-01 | General Electric Company | Method, system and computer software code for trip optimization with train/track database augmentation |
US20080183490A1 (en) * | 2006-03-20 | 2008-07-31 | Martin William P | Method and computer software code for implementing a revised mission plan for a powered system |
US8398405B2 (en) | 2006-03-20 | 2013-03-19 | General Electric Company | System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller |
US8370006B2 (en) | 2006-03-20 | 2013-02-05 | General Electric Company | Method and apparatus for optimizing a train trip using signal information |
US8290645B2 (en) | 2006-03-20 | 2012-10-16 | General Electric Company | Method and computer software code for determining a mission plan for a powered system when a desired mission parameter appears unobtainable |
US8788135B2 (en) | 2006-03-20 | 2014-07-22 | General Electric Company | System, method, and computer software code for providing real time optimization of a mission plan for a powered system |
US7974774B2 (en) * | 2006-03-20 | 2011-07-05 | General Electric Company | Trip optimization system and method for a vehicle |
US9527518B2 (en) * | 2006-03-20 | 2016-12-27 | General Electric Company | System, method and computer software code for controlling a powered system and operational information used in a mission by the powered system |
US9201409B2 (en) * | 2006-03-20 | 2015-12-01 | General Electric Company | Fuel management system and method |
US8401720B2 (en) * | 2006-03-20 | 2013-03-19 | General Electric Company | System, method, and computer software code for detecting a physical defect along a mission route |
US20080208401A1 (en) * | 2006-03-20 | 2008-08-28 | Ajith Kuttannair Kumar | System, method, and computer software code for insuring continuous flow of information to an operator of a powered system |
US8295993B2 (en) * | 2006-03-20 | 2012-10-23 | General Electric Company | System, method, and computer software code for optimizing speed regulation of a remotely controlled powered system |
US8998617B2 (en) | 2006-03-20 | 2015-04-07 | General Electric Company | System, method, and computer software code for instructing an operator to control a powered system having an autonomous controller |
US8485822B2 (en) * | 2006-05-31 | 2013-07-16 | Caterpillar Inc. | Simulation system implementing historical machine data |
US9037323B2 (en) | 2006-12-01 | 2015-05-19 | General Electric Company | Method and apparatus for limiting in-train forces of a railroad train |
US8494696B2 (en) * | 2006-10-02 | 2013-07-23 | General Electric Company | System, method, and computer software code for improved fuel efficiency emission output, and mission performance of a powered system |
US20080125924A1 (en) * | 2006-10-02 | 2008-05-29 | Wolfgang Daum | System, method, and computer software code for optimized fuel efficiency emission output, and mission performance of a diesel powered system |
US9580090B2 (en) | 2006-12-01 | 2017-02-28 | General Electric Company | System, method, and computer readable medium for improving the handling of a powered system traveling along a route |
US8229607B2 (en) * | 2006-12-01 | 2012-07-24 | General Electric Company | System and method for determining a mismatch between a model for a powered system and the actual behavior of the powered system |
WO2008073547A2 (en) * | 2006-12-07 | 2008-06-19 | General Electric Company | Trip optimization system and method for a diesel powered system |
MX2008003368A (es) * | 2006-12-07 | 2008-09-25 | Gen Electric | Sistema y método de optimización de recorrido para un tren. |
US8180544B2 (en) * | 2007-04-25 | 2012-05-15 | General Electric Company | System and method for optimizing a braking schedule of a powered system traveling along a route |
US7533636B2 (en) * | 2007-04-30 | 2009-05-19 | General Electric Company | System, method, and computer readable media for controlling cooling in a diesel fueled power generation unit |
US9120493B2 (en) | 2007-04-30 | 2015-09-01 | General Electric Company | Method and apparatus for determining track features and controlling a railroad train responsive thereto |
US20080288132A1 (en) | 2007-05-16 | 2008-11-20 | General Electric Company | Method of operating vehicle and associated system |
US9073562B2 (en) * | 2007-10-12 | 2015-07-07 | General Electric Company | System and method for a simulation based movement planner |
US8645047B2 (en) * | 2007-11-06 | 2014-02-04 | General Electric Company | System and method for optimizing vehicle performance in presence of changing optimization parameters |
CN101983152A (zh) * | 2008-02-07 | 2011-03-02 | 通用电气公司 | 用于机动系统的优化的燃料效率、排放量和任务性能的方法 |
CN102700567B (zh) * | 2008-02-07 | 2015-09-23 | 通用电气公司 | 用于机动系统的优化的燃料效率、排放量和任务性能的方法 |
US8190312B2 (en) * | 2008-03-13 | 2012-05-29 | General Electric Company | System and method for determining a quality of a location estimation of a powered system |
US8965604B2 (en) | 2008-03-13 | 2015-02-24 | General Electric Company | System and method for determining a quality value of a location estimation of a powered system |
US8140203B2 (en) * | 2008-04-08 | 2012-03-20 | General Electric Company | Method for controlling vehicle operation incorporating quick clearing function |
US8676410B2 (en) | 2008-06-02 | 2014-03-18 | General Electric Company | System and method for pacing a plurality of powered systems traveling along a route |
US8364632B2 (en) | 2008-08-26 | 2013-01-29 | Hitachi, Ltd. | Operation arrangement support system and method thereof |
US7693651B2 (en) * | 2008-09-05 | 2010-04-06 | Gm Global Technology Operations, Inc. | Methods and systems for monitoring fuel status of vehicles |
US8463469B2 (en) * | 2008-12-17 | 2013-06-11 | General Electric Company | Digital railroad system |
US8155811B2 (en) * | 2008-12-29 | 2012-04-10 | General Electric Company | System and method for optimizing a path for a marine vessel through a waterway |
US20100174484A1 (en) * | 2009-01-05 | 2010-07-08 | Manthram Sivasubramaniam | System and method for optimizing hybrid engine operation |
JP5183535B2 (ja) * | 2009-03-16 | 2013-04-17 | 株式会社日立製作所 | データ入力支援装置及びデータ入力支援方法 |
US9834237B2 (en) | 2012-11-21 | 2017-12-05 | General Electric Company | Route examining system and method |
US8234023B2 (en) * | 2009-06-12 | 2012-07-31 | General Electric Company | System and method for regulating speed, power or position of a powered vehicle |
US8989926B2 (en) * | 2009-11-18 | 2015-03-24 | Convergent Communications, Inc. | Railroad signaling and communication system using a fail-safe voltage sensor to verify trackside conditions in safety-critical railroad applications |
US10665040B2 (en) * | 2010-08-27 | 2020-05-26 | Zonar Systems, Inc. | Method and apparatus for remote vehicle diagnosis |
RU2469895C2 (ru) * | 2010-09-01 | 2012-12-20 | Общество С Ограниченной Ответственностью "Авп Технология" | Способ повышения уровня безопасности в пути следования подвижного состава на основе прогнозного расчета скорости движения и способ определения режима торможения подвижного состава на основе оценки эффективности действия тормозов и длины тормозного пути |
CN103415425B (zh) | 2010-12-31 | 2017-02-15 | 通用电气公司 | 用于控制车辆的系统和方法 |
US20120203402A1 (en) * | 2011-02-07 | 2012-08-09 | International Business Machines Corporation | Intelligent Railway System for Preventing Accidents at Railway Passing Points and Damage to the Rail Track |
DE102011004327A1 (de) * | 2011-02-17 | 2012-08-23 | Siemens Aktiengesellschaft | Verfahren zum Betreiben eines Schienenfahrzeugs |
RU2474506C1 (ru) * | 2011-07-01 | 2013-02-10 | Анатолий Александрович Анашкин | Устройство контроля параметров механического и электрического оборудования железнодорожного вагона |
US9156483B2 (en) * | 2011-11-03 | 2015-10-13 | General Electric Company | System and method for changing when a vehicle enters a vehicle yard |
US20130131968A1 (en) * | 2011-11-23 | 2013-05-23 | Mitchell Scott Wills | Transportation scheduling system and method |
US20160222895A1 (en) * | 2011-12-16 | 2016-08-04 | General Electric Company | Multi-fuel system and method |
FR2987589B1 (fr) * | 2012-03-05 | 2014-04-11 | Alstom Transport Sa | Reseau ferroviaire electrique et procede d'echange d'energie associe. |
US8594865B1 (en) * | 2012-05-17 | 2013-11-26 | New York Air Brake Corporation | Train control system |
WO2014045313A1 (ja) * | 2012-09-18 | 2014-03-27 | 株式会社 東芝 | ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム |
CN103675505B (zh) * | 2012-09-20 | 2016-12-28 | 西南交通大学 | 评测复线路堤区段电气化铁路雷击跳闸率的方法 |
CN103675506B (zh) * | 2012-09-20 | 2016-12-07 | 西南交通大学 | 评测单线高架区段电气化铁路雷击跳闸率的方法 |
US9682716B2 (en) | 2012-11-21 | 2017-06-20 | General Electric Company | Route examining system and method |
US9669851B2 (en) | 2012-11-21 | 2017-06-06 | General Electric Company | Route examination system and method |
RU2520203C1 (ru) * | 2012-12-07 | 2014-06-20 | Открытое акционерное общество "Научно-исследовательский и проектно-конструкторский институт информатизации, автоматизации и связи на железнодорожном транспорте" (ОАО "НИИАС") | Система для определения показателей работы двух объединенных железнодорожных станций |
DE102012112418A1 (de) * | 2012-12-17 | 2014-06-18 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Verfahren zum Verteilen eines Wunschdrehmomentes |
US8983690B2 (en) | 2013-03-14 | 2015-03-17 | Mitsubishi Electric Research Laboratories, Inc. | System and method for optimizing energy consumption in railway systems with energy storage devices |
US20150066561A1 (en) * | 2013-08-29 | 2015-03-05 | General Electric Company | Vehicle yard planner system and method |
US10532755B2 (en) | 2014-03-27 | 2020-01-14 | Ge Global Sourcing Llc | Control system and method for a transportation network |
US10399584B2 (en) | 2014-03-27 | 2019-09-03 | Ge Global Sourcing Llc | System and method integrating an energy management system and yard planner system |
KR101841802B1 (ko) | 2014-09-15 | 2018-03-23 | 엘에스산전 주식회사 | 철도 차량에서의 자동 열차 운행장치 |
EA029113B1 (ru) * | 2015-01-30 | 2018-02-28 | Общество с ограниченной ответственностью "Смартвиз" | Способ и система энергооптимального управления автономным железнодорожным подвижным составом |
PE20230969A1 (es) | 2015-05-28 | 2023-06-16 | Joy Global Longview Operations Llc | Maquina de mineria y sistema de almacenamiento de energia para la misma |
US10705519B2 (en) | 2016-04-25 | 2020-07-07 | Transportation Ip Holdings, Llc | Distributed vehicle system control system and method |
CA3030823C (en) * | 2016-07-29 | 2019-05-28 | New York Air Brake Llc | Automated system and method for optimizing the control of a train |
US10279823B2 (en) * | 2016-08-08 | 2019-05-07 | General Electric Company | System for controlling or monitoring a vehicle system along a route |
CN110312855A (zh) * | 2017-02-21 | 2019-10-08 | 发电机微动力公司 | 用于基于dc链路电平的发电的燃料流的控制 |
JP7066365B2 (ja) * | 2017-10-16 | 2022-05-13 | 株式会社日立製作所 | ダイヤ作成装置および自動列車制御システム |
RU2668492C1 (ru) * | 2017-11-21 | 2018-10-01 | Дмитрий Юрьевич Брежнев | Система обеспечения разрядными грузами и способ оптимизации структуры и характеристик системы |
JP6948253B2 (ja) * | 2017-12-27 | 2021-10-13 | 株式会社日立製作所 | 車両最適化システムおよび車両最適化装置 |
RU2671790C1 (ru) * | 2018-01-09 | 2018-11-06 | Акционерное общество Научно-исследовательский и проектно-конструкторский институт информатизации, автоматизации и связи на железнодорожном транспорте | Система для управления работой сортировочных станций направления железнодорожной сети |
RU2725354C1 (ru) * | 2019-09-09 | 2020-07-02 | Открытое Акционерное Общество "Российские Железные Дороги" | Способ повышения надежности систем железнодорожной автоматики и телемеханики с оценкой его эффективности |
WO2021225461A1 (ru) * | 2020-05-06 | 2021-11-11 | Общество с ограниченной ответственностью "Смартвиз" | Способ и система повышения кпд подвижного состава |
CN111997732B (zh) * | 2020-09-02 | 2021-12-31 | 中车大连机车车辆有限公司 | 一种基于分布感知的铁路机车控制系统及方法 |
WO2022051922A1 (zh) * | 2020-09-09 | 2022-03-17 | 中车株洲电力机车研究所有限公司 | 列车自动驾驶节能控制方法、相关设备及可读存储介质 |
CN112183845B (zh) * | 2020-09-24 | 2023-04-07 | 北京交通大学 | 普速铁路ctc系统调度集中模式下操作方式优化方法 |
EP4166419A1 (en) | 2021-10-18 | 2023-04-19 | Tata Consultancy Services Limited | System and method for railway network access planning |
US20230127799A1 (en) * | 2021-10-26 | 2023-04-27 | Transportation Ip Holdings, Llc | Sensor system for a vehicle |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0055498A1 (de) * | 1980-12-23 | 1982-07-07 | BBC Aktiengesellschaft Brown, Boveri & Cie. | Verfahren und Einrichtung zur distanzselektiven Kurzschlussüberwachung von elektrischen Leitungen |
US5129605A (en) * | 1990-09-17 | 1992-07-14 | Rockwell International Corporation | Rail vehicle positioning system |
US5177684A (en) * | 1990-12-18 | 1993-01-05 | The Trustees Of The University Of Pennsylvania | Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto |
GB2263993B (en) | 1992-02-06 | 1995-03-22 | Westinghouse Brake & Signal | Regulating a railway vehicle |
US5420883A (en) * | 1993-05-17 | 1995-05-30 | Hughes Aircraft Company | Train location and control using spread spectrum radio communications |
US5623413A (en) * | 1994-09-01 | 1997-04-22 | Harris Corporation | Scheduling system and method |
US5828979A (en) * | 1994-09-01 | 1998-10-27 | Harris Corporation | Automatic train control system and method |
US5836529A (en) * | 1995-10-31 | 1998-11-17 | Csx Technology, Inc. | Object based railroad transportation network management system and method |
US6334654B1 (en) * | 1996-09-13 | 2002-01-01 | New York Air Brake Corporation | Integrated train electrical and pneumatic brakes |
AU734038B2 (en) | 1997-02-07 | 2001-05-31 | Ge-Harris Railways Electronics, L.L.C. | A system and method for automatic train operation |
US6263266B1 (en) * | 1998-09-11 | 2001-07-17 | New York Air Brake Corporation | Method of optimizing train operation and training |
WO1999014093A1 (en) * | 1997-09-12 | 1999-03-25 | New York Air Brake Corporation | Method of optimizing train operation and training |
DE19822803A1 (de) | 1998-05-20 | 1999-11-25 | Alcatel Sa | Verfahren zum Betrieb von Schienenfahrzeugen sowie Zugsteuerzentrale und Fahrzeuggerät hierfür |
US20110208567A9 (en) * | 1999-08-23 | 2011-08-25 | Roddy Nicholas E | System and method for managing a fleet of remote assets |
US7783507B2 (en) * | 1999-08-23 | 2010-08-24 | General Electric Company | System and method for managing a fleet of remote assets |
US6490523B2 (en) * | 1999-12-30 | 2002-12-03 | Ge Harris Railway Electronics, Inc. | Methods and apparatus for locomotive tracking |
US20060005736A1 (en) * | 2001-03-27 | 2006-01-12 | General Electric Company | Hybrid energy off highway vehicle electric power management system and method |
US7021588B2 (en) | 2001-06-21 | 2006-04-04 | General Electric Company | System and method for managing two or more locomotives of a consist |
DE10147231A1 (de) | 2001-09-14 | 2003-04-03 | Siemens Ag | Verfahren und Anordnung zur Fahrplanoptimierung in Liniennetzen sowie ein entsprechendes Computergrogramm-Erzeugnis und ein entsprechendes computerlesbares Speichermedium |
US6799097B2 (en) * | 2002-06-24 | 2004-09-28 | Modular Mining Systems, Inc. | Integrated railroad system |
US6631322B1 (en) * | 2002-12-06 | 2003-10-07 | General Electric Co. | Method and apparatus for vehicle management |
-
2003
- 2003-12-15 US US10/736,089 patent/US8538611B2/en not_active Expired - Lifetime
-
2004
- 2004-06-30 EP EP04756377A patent/EP1697196B1/en not_active Expired - Lifetime
- 2004-06-30 AU AU2004305456A patent/AU2004305456B2/en not_active Ceased
- 2004-06-30 RU RU2006125429/11A patent/RU2359857C2/ru active
- 2004-06-30 CN CN2004800406397A patent/CN1906074B/zh not_active Expired - Fee Related
- 2004-06-30 WO PCT/US2004/020910 patent/WO2005061300A1/en active Application Filing
- 2004-06-30 BR BRPI0416721-0A patent/BRPI0416721A/pt not_active IP Right Cessation
- 2004-06-30 MX MXPA06006844A patent/MXPA06006844A/es active IP Right Grant
- 2004-06-30 DE DE602004018541T patent/DE602004018541D1/de not_active Expired - Lifetime
-
2006
- 2006-06-30 ZA ZA200605430A patent/ZA200605430B/en unknown
Also Published As
Publication number | Publication date |
---|---|
AU2004305456B2 (en) | 2010-08-26 |
AU2004305456A1 (en) | 2005-07-07 |
RU2359857C2 (ru) | 2009-06-27 |
MXPA06006844A (es) | 2006-08-23 |
EP1697196A1 (en) | 2006-09-06 |
BRPI0416721A (pt) | 2007-01-16 |
US20040133315A1 (en) | 2004-07-08 |
WO2005061300A1 (en) | 2005-07-07 |
ZA200605430B (en) | 2008-04-30 |
EP1697196B1 (en) | 2008-12-17 |
CN1906074B (zh) | 2011-03-02 |
DE602004018541D1 (de) | 2009-01-29 |
US8538611B2 (en) | 2013-09-17 |
CN1906074A (zh) | 2007-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2006125429A (ru) | Многоуровневая система и способ оптимизации работы железнодорожного транспорта | |
ATE377540T1 (de) | Intelligentes kommunikations-, befehls- und steuersystem für ein landgestütztes fahrzeug | |
JP2010505678A5 (ru) | ||
US10059354B2 (en) | Locomotive-to-wayside device communication system and method and wayside device therefor | |
CA2454739A1 (en) | Multi-level railway operations optimization | |
JP2009530183A5 (ru) | ||
US20080082223A1 (en) | System and method for optimized fuel efficiency and emission output of a diesel powered system | |
US20100023190A1 (en) | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear | |
US20080109124A1 (en) | Method of planning the movement of trains using pre-allocation of resources | |
US20100217462A1 (en) | Operating system and method for controlling a powered vehicle | |
AU2014281706A1 (en) | Vehicle group monitoring | |
WO2008042516A3 (en) | System and method for optimizing parameters of multiple rail vehicles operating over multiple intersecting railroad networks | |
EA033800B1 (ru) | Система и способ управления транспортным средством | |
EA025731B1 (ru) | Способ управления механизированной системой, основанный на плане выполнения целевой задачи | |
RU2008135320A (ru) | Способ диспетчеризации заторов в системе железных дорог | |
US20090076667A1 (en) | System, method and computer software code for determining a mission plan for a powered system using signal aspect information | |
Jovanovic | Improving railroad on-time performance: Models, algorithms and applications. | |
JP2011020578A (ja) | 鉄道車両の運転経路の変更管理方法及びそのシステム | |
WO2008073546A3 (en) | Method and apparatus for optimizing railroad train operation for a train including multiple distributed-power locomotives | |
ATE391654T1 (de) | Betriebsführungssystem für schienengebundene verkehrsmittel mit wechsel der art der zugbeeinflussung | |
Pollehn et al. | Evaluating the effects of automation components in service networks of rail freight | |
US12060094B2 (en) | Managing, monitoring, and validating train consists | |
Laskaris et al. | A real-time holding decision rule accounting for passenger travel cost | |
Ivina et al. | Railway maintenance windows: Discrepancies between planning and practice in Sweden | |
JP2010126075A (ja) | 運行計画作成システム、運行計画作成方法 |