RU2004116773A - METHOD FOR PRODUCING SEAMLESS HOT DEFORMED BOILER PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPE-ROLLING PLANTS WITH PILGRIM STATIONS FOR STEAM BOILERS, STEAM PIPES AND PAN STAINLESS STEPS - Google Patents

METHOD FOR PRODUCING SEAMLESS HOT DEFORMED BOILER PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPE-ROLLING PLANTS WITH PILGRIM STATIONS FOR STEAM BOILERS, STEAM PIPES AND PAN STAINLESS STEPS Download PDF

Info

Publication number
RU2004116773A
RU2004116773A RU2004116773/02A RU2004116773A RU2004116773A RU 2004116773 A RU2004116773 A RU 2004116773A RU 2004116773/02 A RU2004116773/02 A RU 2004116773/02A RU 2004116773 A RU2004116773 A RU 2004116773A RU 2004116773 A RU2004116773 A RU 2004116773A
Authority
RU
Russia
Prior art keywords
ingots
esr
pipes
nlz
diameter
Prior art date
Application number
RU2004116773/02A
Other languages
Russian (ru)
Other versions
RU2275977C2 (en
Inventor
нов Анатолий Васильевич Сафь (RU)
Анатолий Васильевич Сафьянов
Валентин Иреклеевич Тазетдинов (RU)
Валентин Иреклеевич Тазетдинов
Исаак Иосифович Вольберг (RU)
Исаак Иосифович Вольберг
Леонид Игнатьевич Лапин (RU)
Леонид Игнатьевич Лапин
Вениамин Петрович Борисов (RU)
Вениамин Петрович Борисов
Сергей Васильевич Ненахов (RU)
Сергей Васильевич Ненахов
Игорь Александрович Романцов (RU)
Игорь Александрович Романцов
Валерий Александрович Головинов (RU)
Валерий Александрович Головинов
Николай Петрович Климов (RU)
Николай Петрович Климов
Андрей Николаевич Тулин (RU)
Андрей Николаевич Тулин
Сергей Александрович Андрюнин (RU)
Сергей Александрович Андрюнин
Павел Александрович Гриценко (RU)
Павел Александрович Гриценко
Валерий Андреевич Логовиков (RU)
Валерий Андреевич Логовиков
Original Assignee
ОАО "Чел бинский трубопрокатный завод" (RU)
ОАО "Челябинский трубопрокатный завод"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ОАО "Чел бинский трубопрокатный завод" (RU), ОАО "Челябинский трубопрокатный завод" filed Critical ОАО "Чел бинский трубопрокатный завод" (RU)
Priority to RU2004116773/02A priority Critical patent/RU2275977C2/en
Publication of RU2004116773A publication Critical patent/RU2004116773A/en
Application granted granted Critical
Publication of RU2275977C2 publication Critical patent/RU2275977C2/en

Links

Claims (4)

1. Способ производства бесшовных горячедеформированных труб большого и среднего диаметров на трубопрокатных установках с пилигримовыми станами для паровых котлов, паропроводов и коллекторов установок с высокими и сверхкритическими параметрами пара из углеродистых, низколегированных, легированных и высоколегированных марок стали, включающий выплавку слитков в электрических и мартеновских печах, ковку слитков с уковом от 2,0 до 3,0, в зависимости от марки стали, изготовление трубных заготовок путем обточки и сверления центральной части поковок, непрерывную разливку стали (НЛЗ) марок 20,12Х1МФ, 15Х1М1Ф и 15ХМ с последующей ковкой их в поковки с уковом не менее 1,5 и переделом их в заготовки, а также отливку слитков электрошлаковым переплавом (ЭШП), нагрев заготовок и слитков ЭШП до температуры пластичности, прошивку заготовок в станах косой прокатки на оправках, диаметр которых зависит от геометрических размеров гильз, прошивку слитков ЭШП с деформацией металла в станах косой прокатки вдоль расположения кристаллов, путем задачи слитков в стан головной частью, и с посадом по диаметру, равным 8-16%, прокатку гильз в трубы на пилигримовых станах с вытяжками, в зависимости от диаметра и толщины стенки, калибровку и правку труб, отличающийся тем, что в слитках ЭШП и НЛЗ сверлят центральное отверстие, нагревают их до температуры пластичности, прошивают в станах косой прокатки в гильзы с вытяжками, в зависимости от геометрических размеров гильз, а затем прокатывают на пилигримовых станах в трубы.1. Method for the production of seamless hot-deformed pipes of large and medium diameters in tube-rolling plants with pilgrim mills for steam boilers, steam pipelines and manifolds of plants with high and supercritical steam parameters from carbon, low alloy, alloy and high alloy steel grades, including ingots in electric and open-hearth furnaces , forging ingots with weft from 2.0 to 3.0, depending on the grade of steel, manufacturing of tube blanks by turning and drilling the central part of forgings, continuous casting of steel (NLZ) of grades 20,12X1MF, 15X1M1F and 15XM, followed by forging them into forgings with an uk of at least 1.5 and converting them into billets, as well as casting ingots by electroslag remelting (ESR), heating the workpieces and ingots to plasticity temperature, piercing blanks in oblique rolling mills on mandrels, the diameter of which depends on the geometrical dimensions of the sleeves, piercing ESR ingots with deformation of the metal in oblique rolling mills along the location of the crystals, by means of the task of ingots in the mill by the head part, and with diameter fit at 8-16%, rolling the sleeves into pipes on pilgrim mills with hoods, depending on the diameter and wall thickness, calibrating and straightening the pipes, characterized in that the central hole is drilled in the ESR and NLZ ingots, they are heated to the ductility temperature, they are stitched in oblique rolling mills into sleeves with hoods, depending on the geometrical dimensions of the sleeves, and then rolled into pipes on pilgrim mills. 2. Способ по п.1, отличающийся тем, что в слитках ЭШП и НЛЗ сверлят центральное отверстие, диаметр которого определяют из выражения2. The method according to claim 1, characterized in that the central hole is drilled in the ESR and NLZ ingots, the diameter of which is determined from the expression dсв.эшп=d0(Dт/D0),d St. ESP = d 0 (D t / D 0 ), dсв.нлз=d1(Dт/D1),d St. NLS = d 1 (D t / D 1 ), где d0=95 мм - диаметр центрального сверления слитков ЭШП наружным диаметром 500 мм;where d 0 = 95 mm is the diameter of the central drilling of ESR ingots with an outer diameter of 500 mm; d1=90 мм - диаметр центрального сверления НЛЗ наружным диаметром 430 мм;d 1 = 90 mm - the diameter of the central drilling NLZ with an outer diameter of 430 mm; Dт - текущие значения наружных диаметров слитков ЭШП и НЛЗ, мм;D t - current values of the outer diameters of the ingots ESR and NLZ, mm; D0 - слитки ЭШП наружным диаметром 500 мм;D 0 - ESR ingots with an outer diameter of 500 mm; D1 - НЛЗ наружньм диаметром 430 мм.D 1 - NLZ outer diameter 430 mm. 3. Способ по п.1, отличающийся тем, что прошивку слитков ЭШП и НЛЗ в станах косой прокатки производят с вытяжками, значения которых определяют из выражений3. The method according to claim 1, characterized in that the firmware of the ESR and NLZ ingots in the oblique rolling mills is produced with hoods, the values of which are determined from the expressions μэшп3(0,1+Dт/D0),μнлз3(0,3+Dт/D1),μ ESR = μ 3 (0.1 + D t / D 0 ), μ NLS = μ 3 (0.3 + D t / D 1 ), где μ3 - вытяжка в стане косой прокатки при прокатке труб данного размера из кованой заготовки.where μ 3 is the hood in an oblique rolling mill when rolling pipes of a given size from a forged billet. 4. Способ по п.1, отличающийся тем, что нагрев слитков ЭШП и НЛЗ перед прошивкой в станах косой прокатки производят ниже на 20-40°С по сравнению с кованой заготовкой, где большие значения относятся к легированным и высоколегированным маркам стали.4. The method according to claim 1, characterized in that the ESR and NLZ ingots are heated before flashing in oblique rolling mills by 20-40 ° C lower than forged billets, where high values refer to alloyed and high alloy steel grades.
RU2004116773/02A 2004-06-02 2004-06-02 Method for manufacturing seamless hot-deformed boiler tubes of large and mean diameters in tube rolling aggregates with pilger mills for steam boilers, steam conduits and manifolds of plants with high and supercritical parameters of steam from ingots of electroslag refining and continuously cast billets RU2275977C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2004116773/02A RU2275977C2 (en) 2004-06-02 2004-06-02 Method for manufacturing seamless hot-deformed boiler tubes of large and mean diameters in tube rolling aggregates with pilger mills for steam boilers, steam conduits and manifolds of plants with high and supercritical parameters of steam from ingots of electroslag refining and continuously cast billets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2004116773/02A RU2275977C2 (en) 2004-06-02 2004-06-02 Method for manufacturing seamless hot-deformed boiler tubes of large and mean diameters in tube rolling aggregates with pilger mills for steam boilers, steam conduits and manifolds of plants with high and supercritical parameters of steam from ingots of electroslag refining and continuously cast billets

Publications (2)

Publication Number Publication Date
RU2004116773A true RU2004116773A (en) 2006-01-10
RU2275977C2 RU2275977C2 (en) 2006-05-10

Family

ID=35871355

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2004116773/02A RU2275977C2 (en) 2004-06-02 2004-06-02 Method for manufacturing seamless hot-deformed boiler tubes of large and mean diameters in tube rolling aggregates with pilger mills for steam boilers, steam conduits and manifolds of plants with high and supercritical parameters of steam from ingots of electroslag refining and continuously cast billets

Country Status (1)

Country Link
RU (1) RU2275977C2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2454286C2 (en) * 2010-10-12 2012-06-27 Открытое акционерное общество "Научно-производственное объединение "Центральный научно-исследовательский институт технологии машиностроения" (ОАО НПО "ЦНИИТМАШ") Method of producing seamless hot-worked boiler and steam pipes
RU2527550C2 (en) * 2012-12-21 2014-09-10 Открытое акционерное общество "Челябинский трубопрокатный завод" PRODUCTION OF SEAMLESS HOT-WORKED BOILER AND STEAM LINE 465×15-24 mm PIPES FROM "10Х9К3Б2МФБР-Ш"-GRADE REFRACTORY STEEL FOR POWER EQUIPMENT WITH STEAM SUPERCRITICAL PARAMETERS
RU2550035C2 (en) * 2013-06-28 2015-05-10 Открытое акционерное общество "Челябинский трубопрокатный завод" Method of fabrication of seamless hot-rolled pipes 530(17-60, 550(25-60, 610(32-50 and 630(32-60 mm out of forged, continuously cast billets, ingots and hollow ingots of electroslag remelting process at pipe-rolling unit 8-16" with pilger mills of jsc chtpz
RU2545952C2 (en) * 2013-06-28 2015-04-10 Открытое акционерное общество "Челябинский трубопрокатный завод" Production of seamless hot-rolled 530 mm and 550 mm diameter pipes at pru with pilger mills for steam boilers, steam lines and manifolds of units operating with high and supercritical parameters of steam
RU2547360C2 (en) * 2013-07-30 2015-04-10 Открытое акционерное общество "Челябинский трубопрокатный завод" METHOD FOR PRODUCTION OF WELDLESS DRAWN PIPES WITH SIZE OF 299×10-13 mm FOR STEAM BOILERS, PIPELINES AND HEADERS OF PLANTS WITH HIGH AND SUPERCRITICAL PARAMETERS OF STEAM FROM STEEL OF GRADE OF "10Х9МФБ-Ш"

Also Published As

Publication number Publication date
RU2275977C2 (en) 2006-05-10

Similar Documents

Publication Publication Date Title
RU2322315C2 (en) Method for producing in tube rolling plants with pilger mills seamless hot-deformed elongated tubes for steam boilers, steam conduits and manifolds of plants with high and super-critical parameters of steam
RU2180874C2 (en) Method for making large-diameter boiler tubes of ingots of electroslag refining
RU2006100759A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPELINE PLANTS WITH PILGRIM WORKS FOR STEAM BOILERS, STEAM WIRES AND PERFORMANCE OPERATIONS
RU2523398C1 (en) PRODUCTION OF SEAMLESS COLD-FORMED OIL-WELL TUBING SIZED TO 114,3×6, 8×9000-10700 mm FROM CORROSION-RESISTANT ALLOY OF "ХН30МДБ-Ш" GRADE
RU2004116773A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED BOILER PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPE-ROLLING PLANTS WITH PILGRIM STATIONS FOR STEAM BOILERS, STEAM PIPES AND PAN STAINLESS STEPS
RU2005114094A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPELINE PLANTS WITH PILGRIM WORKS FOR STEAM BOILERS, STEAM PIPES AND OPERATORS OPERATED
RU2005137963A (en) METHOD FOR PRODUCING LARGE AND MEDIUM DIAMETER PIPES ON PIPELINE PLANTS WITH PILGRIM MILLS FROM INGOTS AND TITANIUM ALLOYS BASED ON TITANIUM
RU2006112771A (en) METHOD FOR PRODUCING BARS-ELECTRIC SLAG MELTING FROM DIFFICULTY DEFORMABLE BRANDS OF STEEL AND ALLOYS AND ROLLING FROM THESE GOOD AND MEDIUM DIAMETER PANELS
RU2563566C2 (en) Method of production of cold-wrought seamless pipes and heat-resistant seamless pipe made by this method
RU2005114090A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED PIPES OF LARGE AND MEDIUM DIAMETERS ON PIPELINE PLANTS WITH PILGRIM WORKS FOR STEAM BOILERS, STEAM WIRES AND PERFORMANCE OPERATIONS
RU2570154C2 (en) PRODUCTION OF 377×20-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2537682C2 (en) PRODUCTION OF 377×14-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2351417C2 (en) Method of pipe shell manufacture
US20190040485A1 (en) Stainless steel tubes and method for production thereof
RU2567427C2 (en) METHOD OF PRODUCTION OF 426×15-30 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH CRITICAL AND SUPERCRITICAL STEAM PARAMETERS OF STEEL GRADE "10Х9МФБ-Ш"
RU2564498C1 (en) METHOD OF FABRICATION OF SEAMLESS PIPES WITH SIZES 325×26-45 mm FOR BOILERS, STEAM LINES AND MANIFOLDS OF UNITS WITH HIGH AND SUPERCRITICAL STEAM PARAMETERS FROM "10Х9МФБ-Ш" BRAND STEEL
RU2527587C2 (en) Production of 465×75 mm seamless hot-rolled pipes for steam boilers, steam pipelines and manifolds of plants with high and superhigh steam parameters from esr ingots of "10х9мфб-ш"-grade steel
RU2567407C1 (en) METHOD OF PRODUCTION OF 325×16-25 mm SEAMLESS PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH CRITICAL AND SUPERCRITICAL STEAM PARAMETERS OF STEEL GRADE "10Х9МФБ-Ш"
RU2578060C2 (en) METHOD OF PRODUCTION OF 325×16-30 mm SEAMLESS PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH CRITICAL AND SUPERCRITICAL STEAM PARAMETERS OF STEEL GRADE "10-9¦L+-+"
RU2638263C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×28-32 mm FROM STEEL OF 08Cr18N10T-S GRADE
RU2570150C1 (en) METHOD OF PRODUCTION OF 325×31-60 mm SEAMLESS PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH CRITICAL AND SUPERCRITICAL STEAM PARAMETERS OF STEEL GRADE "10Х9МФБ-Ш"
RU2545969C2 (en) MANUFACTURING METHOD OF SEAMLESS HOT-ROLLED PIPES WITH DIMENSIONS OF 530×25-30 mm FOR STEAM BOILERS, STEAM LINES AND HEADERS OF PLANTS WITH HIGH AND SUPERCRITICAL STEAM PARAMETERS FROM STEEL GRADE "10Х9МФБ-Ш"
RU2638264C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×15-20 mm FROM STEEL TO 08Cr18N10T-S GRADE
RU2638265C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×21-27 mm FROM STEEL OF 08Cr18N10T-S GRADE
RU2564497C1 (en) PRODUCTION OF SEAMLESS HOT-WORKED BOILER AND STEAM LINE 465×25-75 mm PIPES FROM "10Х9К3В2МФБР-Ш"-GRADE REFRACTORY STEEL FOR POWER EQUIPMENT WITH STEAM SUPERCRITICAL PARAMETERS

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20090603