PL211737B1 - Sposób bezstykowej kontroli profilu podsypki - Google Patents

Sposób bezstykowej kontroli profilu podsypki

Info

Publication number
PL211737B1
PL211737B1 PL363339A PL36333903A PL211737B1 PL 211737 B1 PL211737 B1 PL 211737B1 PL 363339 A PL363339 A PL 363339A PL 36333903 A PL36333903 A PL 36333903A PL 211737 B1 PL211737 B1 PL 211737B1
Authority
PL
Poland
Prior art keywords
track
ballast
profile
crushed stone
height
Prior art date
Application number
PL363339A
Other languages
English (en)
Other versions
PL363339A1 (pl
Inventor
Josef Theurer
Bernhard Lichtberger
Original Assignee
Plasser Bahnbaumasch Franz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Plasser Bahnbaumasch Franz filed Critical Plasser Bahnbaumasch Franz
Publication of PL363339A1 publication Critical patent/PL363339A1/pl
Publication of PL211737B1 publication Critical patent/PL211737B1/pl

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • E01B35/06Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)
  • Radar Systems Or Details Thereof (AREA)

Description

Opis wynalazku
Przedmiotem wynalazku jest sposób bezstykowej kontroli profilu podsypki z tłucznia przebiegającego prostopadle do podłużnego kierunku toru kolejowego.
Z amerykań skiego patentu nr US 6 058 628 jest znane rejestrowanie profilu podsypki w powią zaniu z użyciem pługu do tłucznia. Dzięki temu istnieje możliwość zlokalizowania nadmiaru tłucznia i po krótkotrwałym przechowywaniu użycia go na odcinkach toru z niedoborem tłucznia.
Według artykułu w „Rail Engineering International” 2000/3, str. 16, znane jest dokonywanie pomiarów za pomocą elektronicznego wagonu pomiarowego EM-SAT, aby w końcu umożliwić przekazanie dalej do maszyny do podbijania torów zapisanych w pamięci wartości korekcyjnych.
Celem wynalazku jest opracowanie odpowiedniego rodzaju sposobu, za pomocą którego możliwe jest udoskonalone rozsypywanie tłucznia na torze kolejowym.
Cel ten został zrealizowany zgodnie z wynalazkiem za pomocą sposobu bezstykowej kontroli przebiegającego prostopadle do podłużnego kierunku toru kolejowego profilu podsypki z tłucznia toru, który charakteryzuje się tym, że kontrolę przeprowadza się równolegle do wyznaczania błędów wysokości toru kolejowego i przy lokalnym przyporządkowaniu do nich i w zależności od wyznaczonych błędów wysokości i zarejestrowanego tego profilu podsypki oblicza się zapotrzebowanie na tłuczeń niezbędny do podniesienia na zadaną wysokość toru kolejowego i do równomiernego rozsypywania na nim tłucznia.
Do obliczenia zapotrzebowania na tłuczeń na podsypkę, na zarejestrowany profil podsypki nakłada się zadany profil poprzeczny.
Korzystnie, zapotrzebowanie na tłuczeń oblicza się oddzielnie dla lewej albo prawej połówki toru kolejowego i przechowuje się je w pamięci.
Dzięki takiej kombinacji kontroli profilu podsypki z wyznaczeniem błędu wysokości przy dozowaniu tłucznia, w wypadku skupienia dużych błędów wysokości może być uwzględnione niezbędne przy tym zwiększone zapotrzebowanie na tłuczeń. Dzięki temu pomiar położenia toru można wykorzystać w korzystny sposób unikając dodatkowych nakładów na manipulowanie, także przy wyznaczeniu zapotrzebowania na tłuczeń niezbędny do równomiernego rozsypywania tłucznia na torze kolejowym.
Przedmiot wynalazku w przykładzie wykonania został uwidoczniony na rysunku, na którym fig. 1 przedstawia widok z boku elektronicznego wagonu pomiarowego, fig. 2 rejestrowany profil posypki i przechowywany w pami ę ci zadany profil przekroju podsypki z tł ucznia, fig. 3 - odniesione do obydwóch połówek toru graficzne przedstawienie zapotrzebowania na tłuczeń i fig. 4 - wykres objętościowy dla określonego odcinka toru.
Wagon pomiarowy 1 przedstawiony na fig. 1 posiada ramę maszyny 2, która jedzie wózkach 3 po torze kolejowym 4. Do pomiarów położenia toru w znany sposób jest przewidziany połączony z wagonem pomiarowym nadajnik laserowy 5 oraz samodzielnie jadący wagonik przedni, aby w ten sposób utworzyć linię odniesienia 7. Wagon pomiarowy 1 jest wyposażony w mechanizm jazdy 8 i jedzie w kierunku roboczym 9. W kabinie operatora znajduje się komputer 10.
Na początku odcinka toru, który ma być poddany nowym pomiarom, wagonik przedni 6 jest ustawiony w pewnym odstępie przed wagonem pomiarowym 1 i wzorcowany względem punktu stałego. W następnej kolejności wagon pomiarowy 1 jedzie w kierunku roboczym 9 i przy tym rejestruje położenie toru względem linii odniesienia 7 i przechowuje w pamięci w celu późniejszego zastosowania w maszynie do podbijania toru.
Na wysokości ok. 3 do 4 m nad torem 4 jest zamontowany skaner laserowy 11, który, w kierunku prostopadłym do podłużnego kierunku toru, z rozdzielczością kątową 0,25° dokonuje pomiarów odległości podsypki z tłucznia 12 w zakresie kątowym ±50°. Z tych danych w komputerze 10 oblicza się profile podłoża 13 widoczne na fig. 2 i przedstawia na kolorowym monitorze ekranowym. Do tego zmierzonego profilu podsypki 13 wmiksowuje się (przedstawiony za pomocą linii punktowych) zadany profil przekroju 14, który oblicza się z różnic objętości wynikającej z obydwóch wykresów profilu i przedstawia jako wykres belkowy 15 (patrz fig. 3 i fig. 4).
Przy tym obliczeniu ewentualnie ustalony błąd a wysokości toru jest także uwzględniony w ten sposób, że większe błędy położenia toru 1 w następstwie większego podniesienia wymagają podczas następującego po tym procesu podbijania toru większych ilości tłucznia. To oznacza, że zadany profil poprzeczny 14 w sposób obliczeniowy jest podniesiony o błąd położenia toru a w stosunku do profilu podsypki 13, w wyniku czego wadliwe położenie toru jest automatycznie włączone do obliczenia objętości. W szczególności w wypadku dużych i na dłuższym odcinku toru rozprzestrzeniających się wadliwych
PL 211 737 B1 położeń powoduje to, że także te odcinki toru w celu równomiernego rozsypania tłucznia i tym samym w celu optymalnego ustalenia korygowanych po łożeń toru mogą być w sposób zamierzony i wystarczający zaopatrzone w tłuczeń.
Pomiar profilu tłucznia następuje w odstępach wynoszących 2 m, przy czym odnośny profil podsypki 13 jest przedstawiony graficznie odpowiednio na fig. 2 i jest nałożony na zadany profil poprzeczny 14, który został wybrany na początku użytkowania odpowiedniego odcinka toru kolejowego.
Według fig. 3 równolegle tego dla każdego profilu podsypki 13 jest przedstawiony wykres belkowy 15 odniesiony do środka toru kolejowego 16 przy czym zielona belka (tu przedstawiona linią grubą) sygnalizuje nadmiar tłucznia i czerwona belka (przedstawiona linią kreskową) sygnalizuje niedobór tłucznia. Wysokość belki pokazuje wielkość różnicy objętości między zadanym profilem podsypki 13 i zadanym profilem poprzecznym 14. Z widocznej na fig. 3 serii wykresów belkowych 15 można stwierdzić, że na tym odcinku toru kolejowego na lewej połówce toru 17 (nad środkiem toru 16) występuje wyraźny nadmiar tłucznia, podczas gdy na prawej połówce toru (pod środkiem toru 16) występuje częściowo zarówno nieznaczny niedobór, jak i także nieznaczny nadmiar.
Wykres widoczny na fig. 4 przedstawia przebieg różnic objętości tłucznia. Dzięki emu dla określonego odcinka toru kolejowego można dokładnie wyznaczyć niezbędne zapotrzebowanie na tłuczeń w tonach na metr bieżący, przy czym w wyniku powołania się na już wspomniany środek toru 16 wiadomo jest także, czy brakujące zapotrzebowanie na tłuczeń ewentualnie dotyczy tylko połówki toru 17; 18. To może być dokładnie uwzględnione przy zrzucaniu tłucznia, dzięki czemu można zdecydowanie zmniejszyć ruchy tłucznia, które mają być przeprowadzone przez pług do tłucznia. Stanowiący nadwyżkę tłuczeń jest podnoszony z toru kolejowego, na krótko przechowywany i w sposób zamierzony zrzucany na odcinki wymagające tłucznia.
Kombinacja pomiaru położenia toru kolejowego z rejestracją rozkładu tłucznia ma tę szczególną zaletę, że - niejako jako produkt uboczny i bez dodatkowych kosztów związanych z manipulowaniem - tłuczeń zostaje rozmieszczony w optymalny sposób. Ma to dodatkowo, oprócz znacznego efektu oszczędnościowego, także tę szczególną zaletę, że unikając w dużym stopniu zbędnych przemieszczeń dużych ilości tłucznia za pomocą pługa do tłucznia ostatecznie uzyskuje się równomierne rozsypywanie tłucznia na torze kolejowym.
Alternatywnie do przedstawionego przykładu wykonania byłoby możliwe przeprowadzenie wyznaczenia profilu tłucznia w powiązaniu z użyciem maszyny do podbijania toru.

Claims (3)

1. Sposób bezstykowej kontroli przebiegającego prostopadle do podłużnego kierunku toru kolejowego profilu podsypki z tłucznia toru, znamienny tym, że kontrolę przeprowadza się równolegle do wyznaczania błędów wysokości (a) toru kolejowego i przy lokalnym przyporządkowaniu do nich i w zależności od wyznaczonych błędów wysokości (a) i zarejestrowanego do tego profilu podsypki (13) oblicza się zapotrzebowanie na tłuczeń niezbędny do podniesienia na zadaną wysokość toru kolejowego (4) i do równomiernego rozsypywania na nim tłucznia.
2. Sposób według zastrz. 1, znamienny tym, że do obliczenia zapotrzebowania na tłuczeń na podsypkę (12), na zarejestrowany profil podsypki (13) nakłada się zadany profil poprzeczny (14).
3. Sposób według zastrz. 1 albo 2, znamienny tym, że zapotrzebowanie na tłuczeń oblicza się oddzielnie dla lewej albo prawej połówki toru kolejowego (17; 18) i przechowuje się je w pamięci.
PL363339A 2002-11-13 2003-11-06 Sposób bezstykowej kontroli profilu podsypki PL211737B1 (pl)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0076702U AT5982U3 (de) 2002-11-13 2002-11-13 Verfahren zur abtastung eines bettungsprofiles

Publications (2)

Publication Number Publication Date
PL363339A1 PL363339A1 (pl) 2004-05-17
PL211737B1 true PL211737B1 (pl) 2012-06-29

Family

ID=3499216

Family Applications (1)

Application Number Title Priority Date Filing Date
PL363339A PL211737B1 (pl) 2002-11-13 2003-11-06 Sposób bezstykowej kontroli profilu podsypki

Country Status (11)

Country Link
US (1) US6976324B2 (pl)
EP (1) EP1420113B1 (pl)
JP (1) JP4113102B2 (pl)
CN (1) CN1215230C (pl)
AT (2) AT5982U3 (pl)
AU (1) AU2003259627B2 (pl)
DE (1) DE50307227D1 (pl)
DK (1) DK1420113T3 (pl)
ES (1) ES2285083T3 (pl)
PL (1) PL211737B1 (pl)
RU (1) RU2250283C1 (pl)

Families Citing this family (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9733625B2 (en) 2006-03-20 2017-08-15 General Electric Company Trip optimization system and method for a train
US10308265B2 (en) 2006-03-20 2019-06-04 Ge Global Sourcing Llc Vehicle control system and method
US9950722B2 (en) 2003-01-06 2018-04-24 General Electric Company System and method for vehicle control
US8405837B2 (en) * 2004-06-30 2013-03-26 Georgetown Rail Equipment Company System and method for inspecting surfaces using optical wavelength filtering
US8958079B2 (en) 2004-06-30 2015-02-17 Georgetown Rail Equipment Company System and method for inspecting railroad ties
US8081320B2 (en) * 2004-06-30 2011-12-20 Georgetown Rail Equipment Company Tilt correction system and method for rail seat abrasion
EP1766329B1 (en) * 2004-06-30 2017-02-01 Georgetown Rail Equipment Company System and method for inspecting railroad track
US8209145B2 (en) * 2004-06-30 2012-06-26 Georgetown Rail Equipment Company Methods for GPS to milepost mapping
US9956974B2 (en) 2004-07-23 2018-05-01 General Electric Company Vehicle consist configuration control
ATE388274T1 (de) * 2004-09-22 2008-03-15 Plasser Bahnbaumasch Franz Verfahren zum abtasten einer gleislage
US9828010B2 (en) 2006-03-20 2017-11-28 General Electric Company System, method and computer software code for determining a mission plan for a powered system using signal aspect information
AT505029B1 (de) * 2007-07-31 2008-10-15 Plasser Bahnbaumasch Franz Verfahren zur vermessung einer gleislage
RU2380472C2 (ru) * 2008-02-06 2010-01-27 Общество с ограниченной ответственностью "Путь" Способ комплексного обследования земляного полотна железных дорог
US8914171B2 (en) 2012-11-21 2014-12-16 General Electric Company Route examining system and method
RU2443826C2 (ru) * 2010-02-11 2012-02-27 Открытое Акционерное Общество "Российские Железные Дороги" Выправочно-подбивочно-рихтовочная машина для выправки и контроля железнодорожного пути и оптико-электронная система выправочно-подбивочно-рихтовочной машины
US8875635B2 (en) 2011-03-04 2014-11-04 Georgetown Rail Equipment Company Ballast delivery and computation system and method
US9175998B2 (en) 2011-03-04 2015-11-03 Georgetown Rail Equipment Company Ballast delivery and computation system and method
US8781655B2 (en) 2011-10-18 2014-07-15 Herzog Railroad Services, Inc. Automated track surveying and ballast replacement
US9051695B2 (en) 2011-10-18 2015-06-09 Herzog Railroad Services, Inc. Automated track surveying and ballast replacement
US8615110B2 (en) 2012-03-01 2013-12-24 Herzog Railroad Services, Inc. Automated track surveying and ditching
TWI464377B (zh) * 2012-04-27 2014-12-11 Wistron Corp 測試裝置、檢測系統及其自動檢測之方法
AU2013299501B2 (en) 2012-08-10 2017-03-09 Ge Global Sourcing Llc Route examining system and method
US9255913B2 (en) 2013-07-31 2016-02-09 General Electric Company System and method for acoustically identifying damaged sections of a route
AT514718B1 (de) * 2013-09-11 2015-06-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren für die Korrektur eines Gleises
AT516248B1 (de) * 2014-12-12 2016-04-15 System 7 Railsupport Gmbh Verfahren zur Kalibrierung einer Vorrichtung zum Vermessen von Gleisen
US9849894B2 (en) 2015-01-19 2017-12-26 Tetra Tech, Inc. Protective shroud for enveloping light from a light emitter for mapping of a railway track
US9618335B2 (en) 2015-01-19 2017-04-11 Tetra Tech, Inc. Light emission power control apparatus and method
US10349491B2 (en) 2015-01-19 2019-07-09 Tetra Tech, Inc. Light emission power control apparatus and method
US9849895B2 (en) 2015-01-19 2017-12-26 Tetra Tech, Inc. Sensor synchronization apparatus and method
CA2892885C (en) 2015-02-20 2020-07-28 Tetra Tech, Inc. 3d track assessment system and method
US10416098B2 (en) 2016-05-26 2019-09-17 Georgetown Rail Equiptment Company Three-dimensional image reconstruction using transmission and scatter radiography methods
AT519316B1 (de) * 2016-11-04 2019-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleisbaumaschine mit Gleislagemesssystem
CN106638177B (zh) * 2017-01-13 2020-05-05 中铁四局集团有限公司 一种有砟线路连续卸砟的过程控制方法
US11377130B2 (en) 2018-06-01 2022-07-05 Tetra Tech, Inc. Autonomous track assessment system
US10625760B2 (en) 2018-06-01 2020-04-21 Tetra Tech, Inc. Apparatus and method for calculating wooden crosstie plate cut measurements and rail seat abrasion measurements based on rail head height
US10807623B2 (en) 2018-06-01 2020-10-20 Tetra Tech, Inc. Apparatus and method for gathering data from sensors oriented at an oblique angle relative to a railway track
US10730538B2 (en) 2018-06-01 2020-08-04 Tetra Tech, Inc. Apparatus and method for calculating plate cut and rail seat abrasion based on measurements only of rail head elevation and crosstie surface elevation
CN110116734A (zh) * 2019-05-07 2019-08-13 中国铁建重工集团股份有限公司 磁浮轨道作业车
WO2020232431A1 (en) 2019-05-16 2020-11-19 Tetra Tech, Inc. System and method for generating and interpreting point clouds of a rail corridor along a survey path
JP7220839B2 (ja) * 2020-07-16 2023-02-13 ユニオン建設株式会社 軌きょう扛上装置
RU2755610C1 (ru) * 2020-09-30 2021-09-17 Общество с ограниченной ответственностью "Вагонпутьмашпроект" Способ контроля дозировки балласта и измерительно-управляющее устройство дозированной выгрузки и распределения балласта на железнодорожный путь
CN113449430B (zh) * 2021-07-12 2022-11-08 四川睿铁科技有限责任公司 一种铁路轨道道床综合体积指标计算方法
CN113566717B (zh) * 2021-09-27 2021-12-10 陕西汽车集团股份有限公司 一种用于检测双折弯纵梁的弯曲高度的方法及装置

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT314579B (de) * 1969-01-22 1974-04-10 Plasser Bahnbaumasch Franz Fahrbare Einrichtung zur Aufzeichnung und bzw. oder Korrektur der Lage eines Gleises
AT345881B (de) * 1975-08-18 1978-10-10 Plasser Bahnbaumasch Franz Fahrbare maschine zum kontinuierlichen nivellieren und verdichten der schotterbettung eines gleises
AT373647B (de) * 1982-02-09 1984-02-10 Plasser Bahnbaumasch Franz Gleiskorrekturmaschine zum einblasen von bettungsmaterial
AT391903B (de) * 1989-01-26 1990-12-27 Plasser Bahnbaumasch Franz Fahrbare gleisbearbeitungsmaschine mit einer einrichtung zur steuerung der arbeits-position ihrer arbeits-aggregate bzw. -werkzeuge
AT398213B (de) * 1989-10-31 1994-10-25 Plasser Bahnbaumasch Franz Maschine zum aufnehmen und verteilen des bettungsschotters
AU8941691A (en) * 1990-10-31 1992-05-26 Loram Maintenance Of Way, Inc. Ballast distribution, regulation and reclaiming railroad maintenance device
RU2041310C1 (ru) * 1991-06-27 1995-08-09 Франц Плассер Банбаумашинен-Индустригезельшафт, мбХ Путевой измеритель
AT403066B (de) * 1991-07-12 1997-11-25 Plasser Bahnbaumasch Franz Verfahren zum ermitteln der abweichungen der ist-lage eines gleisabschnittes
AU672921B2 (en) * 1993-11-05 1996-10-17 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. A track maintenance machine for correcting the track geometry
US5605099A (en) * 1994-12-22 1997-02-25 Pandrol Jackson, Inc. Maintenance vehicle and method for measuring and maintaining the level of a railroad track
RU2066645C1 (ru) * 1995-05-05 1996-09-20 Забайкальская железная дорога Мобильный контрольно-вычислительный диагностический комплекс
DE59808965D1 (de) * 1997-11-05 2003-08-14 Plasser Bahnbaumasch Franz Schotterplaniermaschine und Verfahren zum Einschottern eines Gleises
DK0952254T3 (da) * 1998-03-27 2004-03-15 Plasser Bahnbaumasch Franz Fremgangsmåde til sporpositionskorrektion
US6681160B2 (en) * 1999-06-15 2004-01-20 Andian Technologies Ltd. Geometric track and track/vehicle analyzers and methods for controlling railroad systems
AT4766U3 (de) * 2001-06-21 2002-05-27 Plasser Bahnbaumasch Franz Gleisbaumaschine und verfahren zur erfassung einer gleislage
AT411277B (de) * 2001-08-09 2003-11-25 Plasser Bahnbaumasch Franz Maschine und verfahren zum erkennen der schwellenlage eines gleises
US6804621B1 (en) * 2003-04-10 2004-10-12 Tata Consultancy Services (Division Of Tata Sons, Ltd) Methods for aligning measured data taken from specific rail track sections of a railroad with the correct geographic location of the sections

Also Published As

Publication number Publication date
ES2285083T3 (es) 2007-11-16
US20040088891A1 (en) 2004-05-13
JP2004162524A (ja) 2004-06-10
AT5982U2 (de) 2003-02-25
AU2003259627B2 (en) 2008-02-07
EP1420113A2 (de) 2004-05-19
CN1500940A (zh) 2004-06-02
AT5982U3 (de) 2003-12-29
AU2003259627A1 (en) 2005-02-24
US6976324B2 (en) 2005-12-20
JP4113102B2 (ja) 2008-07-09
EP1420113B1 (de) 2007-05-09
CN1215230C (zh) 2005-08-17
ATE362014T1 (de) 2007-06-15
PL363339A1 (pl) 2004-05-17
RU2250283C1 (ru) 2005-04-20
DE50307227D1 (de) 2007-06-21
DK1420113T3 (da) 2007-07-16
EP1420113A3 (de) 2005-04-06

Similar Documents

Publication Publication Date Title
PL211737B1 (pl) Sposób bezstykowej kontroli profilu podsypki
US11255055B2 (en) Method and system for maintenance of a permanent way for rail vehicles
US20150057851A1 (en) Ballast delivery and computation system and method
RU2682953C2 (ru) Способ измерения и изображения геометрии пути системы рельсового пути
CA2770923C (en) Ballast delivery and computation system and method
RU2150545C1 (ru) Машина для разравнивания щебня и способ балластировки щебнем рельсового пути
RU2187593C2 (ru) Способ для корректировки положения рельсового пути
CN105040557B (zh) 摊铺厚度测量系统、摊铺机以及摊铺厚度测量方法
Zarembski et al. On the use of ballast inspection technology for the management of track substructure
US20210222373A1 (en) Method for automatic correction of the position of a track
CN105839475A (zh) 一种整体道床施工方法
CN111827033A (zh) 一种高速公路互通匝道路基加宽填筑固化土施工方法
EP3947816B1 (de) Schotterplaniermaschine
US4432284A (en) Mobile ballast cleaning machine
CN101551241A (zh) 一种集装箱平车锁座平面度检测方法、系统及装置
KR102528590B1 (ko) 노반 침하 계측용 지그
Zarembski et al. Use of ballast inspection technology for the prioritization, planning and management of ballast delivery and placement
RU2149940C1 (ru) Путеукладочная машина с базовой системой для управления рабочим агрегатом и способ
CN113174793A (zh) 一种通过改良填筑材料固化土加宽路基的施工方法
CN109973099B (zh) 一种桥式盾构铁轨垂直位移量的监测方法
RU2394714C1 (ru) Способ контроля состояния рельсового пути
KR102765078B1 (ko) 철도 궤도를 측정하는 방법 및 시스템
RU2212636C2 (ru) Способ взвешивания на вагонных электронных весах для оценки безопасности движения вагонов с сыпучими грузами
RU2769590C1 (ru) Способ контроля дозирования сыпучего груза, преимущественно балласта, на железнодорожный путь из специального подвижного состава с известной жесткостью рессорного подвешивания и система для его реализации
Rabe Structural pavement monitoring with non-destructive measuring devices: Experiences from a pilot project in Germany