NO20100922L - Procedure for establishing and carrying out the towing of a structure underwater - Google Patents

Procedure for establishing and carrying out the towing of a structure underwater

Info

Publication number
NO20100922L
NO20100922L NO20100922A NO20100922A NO20100922L NO 20100922 L NO20100922 L NO 20100922L NO 20100922 A NO20100922 A NO 20100922A NO 20100922 A NO20100922 A NO 20100922A NO 20100922 L NO20100922 L NO 20100922L
Authority
NO
Norway
Prior art keywords
vessel
installation
winch
tower
disconnected
Prior art date
Application number
NO20100922A
Other languages
Norwegian (no)
Other versions
NO339406B1 (en
Inventor
Peter H Vik
Original Assignee
Subsea 7 Norway Nuf
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Subsea 7 Norway Nuf filed Critical Subsea 7 Norway Nuf
Priority to NO20100922A priority Critical patent/NO339406B1/en
Publication of NO20100922L publication Critical patent/NO20100922L/en
Publication of NO339406B1 publication Critical patent/NO339406B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B2003/147Moon-pools, e.g. for offshore drilling vessels

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Yarns And Mechanical Finishing Of Yarns Or Ropes (AREA)
  • Gloves (AREA)
  • Revetment (AREA)

Abstract

Fremgangsmåte for etablering og gjennomføring av slep av en struktur under vann ved hjelp av et fartøy (10) med senterhull vertikalt gjennom fartøyet, samt bruk av en fjernstyrt undervanns farkost under installasjon av strukturen på sjøbunnen. Fremgangsmåten er kjennetegnet ved at det er anbrakt et tårn (12) over senterhullet, der fartøyet (10) bukseres over strukturen som er parkert på sjøbunn, et løfteskrev (3) senkes ned til strukturen og koples opp på løftepunkter (4), en vinsj (13) med wire (14) tar via en kasteblokk (15) opphengt i tårnet (12) lasten av strukturen og løfter denne fra sjøbunnen, hvoretter fartøyet (10) forflyttes til dypere vann. En statisk wire koples opp til festepunkter på tårnet (12), og en styreline (2) føres frem fra fartøyets (10) fremre del til et kalibrert styrvektlodd (5) og videre til strukturen, hvoretter slep mot feltet starter. Fartøyets (10) hastighet avpasses i forhold til den tillatte sjøtilstand og strukturens og fartøyets (10) hydrodynamiske egenskaper. Fartøyets (10) fremdriftsretning justeres i forhold til sleperetningen, slik at fartøyet (10) har stevnen eller akterenden mot vind- og bølgeretningen. Ved ankomst til feltet startes installasjonen av strukturen ved at vinsjen (13) tar lasten av strukturen og den statiske wiren (16) slakkes av, koples fra tårnet (12) og senkes i sjøen. Styrelinen (2) med styrevektloddet (5) koples fra strukturen. Et installasjonsvektlodd kan koples til strukturen med fartøyets (10) kran, for sammen med en ROV å manipulere og kontrollere retningen av strukturen under installasjon, vinsjen (13) senker strukturen ned mot sjøbunnen. Strukturen lander på sjøbunnen og med vinsjen (13) slakkes wiren (14) av, koples fra strukturen og løftes opp til fartøyet (10), installasjonsvektloddet koples fra strukturen, og installasjonen er komplett.Method for establishing and carrying out the towing of a structure underwater by means of a vessel (10) with center holes vertically through the vessel, as well as using a remotely controlled underwater vehicle during installation of the structure on the seabed. The method is characterized in that a tower (12) is placed over the center hole, where the vessel (10) is towed over the structure which is parked on the sea floor, a lifting lug (3) is lowered to the structure and connected to lifting points (4), a winch (13) with wire (14) via a throw block (15) suspended in the tower (12) takes the load of the structure and lifts it from the seabed, after which the vessel (10) is moved to deeper water. A static wire is connected to the attachment points on the tower (12), and a guide line (2) is advanced from the forward part of the vessel (10) to a calibrated guide weight (5) and on to the structure, after which towing the field starts. The speed of the vessel (10) is adjusted to the permissible sea state and the hydrodynamic properties of the structure and vessel (10). The direction of propulsion of the vessel (10) is adjusted in relation to the towing direction, so that the vessel (10) has the bow or stern towards the wind and wave direction. Upon arrival at the field, the installation of the structure is started by the winch (13) taking the load off the structure and the static wire (16) being dropped, disconnected from the tower (12) and lowered into the sea. The guide line (2) with the guide weight solder (5) is disconnected from the structure. An installation weight can be connected to the structure by the vessel's crane (10), together with an ROV to manipulate and control the direction of the structure during installation, the winch (13) lowers the structure to the seabed. The structure lands on the sea floor and with the winch (13) the wire (14) is relaxed, disconnected from the structure and lifted up to the vessel (10), the installation weight solder is disconnected from the structure and the installation is complete.

NO20100922A 2007-11-26 2010-06-25 Procedure for establishing and carrying out tow of a structure underwater NO339406B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NO20100922A NO339406B1 (en) 2007-11-26 2010-06-25 Procedure for establishing and carrying out tow of a structure underwater

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20076111 2007-11-26
PCT/NO2008/000423 WO2009070034A2 (en) 2007-11-26 2008-11-26 Method for picking up and towing a structure under water
NO20100922A NO339406B1 (en) 2007-11-26 2010-06-25 Procedure for establishing and carrying out tow of a structure underwater

Publications (2)

Publication Number Publication Date
NO20100922L true NO20100922L (en) 2010-08-26
NO339406B1 NO339406B1 (en) 2016-12-12

Family

ID=40510562

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20100922A NO339406B1 (en) 2007-11-26 2010-06-25 Procedure for establishing and carrying out tow of a structure underwater

Country Status (2)

Country Link
NO (1) NO339406B1 (en)
WO (1) WO2009070034A2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2464714B (en) 2008-10-24 2010-09-08 Subsea Deployment Systems Ltd Method and apparatus for subsea installations
CN101913417B (en) * 2010-06-01 2015-09-09 上海海事大学 A kind of giant undersea salvage grab bucket
NO333264B1 (en) 2011-04-18 2013-04-22 Siemens Ag Pump system, method and applications for transporting injection water to an underwater injection well
NO336080B1 (en) * 2011-11-18 2015-05-04 Giertsen As W Vessels and method for underwater towing of heavy loads
US8903108B2 (en) * 2011-12-06 2014-12-02 Apple Inc. Near-field null and beamforming
CN102717877B (en) * 2012-06-21 2014-09-10 中国水产科学研究院渔业机械仪器研究所 Stabilizing structure of floater salvaging device
GB201218569D0 (en) * 2012-10-16 2012-11-28 Mojo Maritime Ltd Improvements in or relating to marine operations
CN104787270B (en) * 2015-04-13 2017-07-07 王梓骅 A kind of synchronizing detection device for shallow water detection
US10267124B2 (en) 2016-12-13 2019-04-23 Chevron U.S.A. Inc. Subsea live hydrocarbon fluid retrieval system and method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB670511A (en) * 1948-04-30 1952-04-23 Centre Nat Rech Scient Improved device for transporting and handling loads at sea
FR2632269B1 (en) * 1988-06-02 1995-01-20 France Etat Armement DEVICE FOR SECURING A LOAD TO A BUILDING
NO316168B1 (en) * 2002-03-06 2003-12-22 Aker Marine Contractors As Procedure for transporting and installing objects at sea
US6871609B2 (en) * 2002-08-30 2005-03-29 Itrec B.V. Multipurpose tower for monohull
DE20308850U1 (en) * 2003-06-02 2003-08-28 Zache, Lothar, 16556 Borgsdorf Catamaran for ship salvage and oil platform disposal includes range of control, lifting and grappling systems
US7527006B2 (en) * 2006-03-29 2009-05-05 Jon Khachaturian Marine lifting apparatus

Also Published As

Publication number Publication date
NO339406B1 (en) 2016-12-12
WO2009070034A2 (en) 2009-06-04
WO2009070034A3 (en) 2009-12-30

Similar Documents

Publication Publication Date Title
NO20100922L (en) Procedure for establishing and carrying out the towing of a structure underwater
CA2658981C (en) An installation and a method for recovering a surface marine vehicle or an underwater vehicle
US9340261B2 (en) Anchor line tensioning method
CN113148030B (en) Laying and installing method for deepwater submarine cable side launching
CN102079363B (en) Anchoring ocean observation and research buoy laying system and method based on small-sized ship
US20090308299A1 (en) Apparatus for recovering an underwater or marine vehicle
FI3947223T3 (en) A method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor
GB1526983A (en) Method and apparatus for repositioning an anchor
WO2014083056A1 (en) An underwater connecting system
MX2010009061A (en) Method for installation of gravity installed anchor and mooring assembly.
AU2007245768B2 (en) Disconnectable mooring system
CN103373446B (en) Jacket removes ship and method for dismounting
CN201834178U (en) Anchoring-type buoy laying apparatus based on small-sized ship
NO315034B1 (en) Method and system for connecting a submarine buoy to a vessel
CN109625187A (en) A method of high focal plane buoy is launched using double auxiliary of hanging
KR100967816B1 (en) Method for mounting thruster in semi-submergible rig
CN103754328B (en) A kind of method of underwater sensor chain Quick distributor
CN113772016B (en) Installation auxiliary system and method for large-tonnage gravity type anchoring foundation
NO138861B (en) PROCEDURE FOR INSTALLATION OF A LADDER ON A MARINE CONSTRUCTION AND CONNECTION EQUIPMENT FOR PERFORMING THE PROCEDURE
CN112498622B (en) Pile foundation installation method of deepwater ocean platform
KR20090101989A (en) Method for mounting thruster in drillship
DK181182B1 (en) An offshore drilling vessel with an external cable connection and method therefor
CN112722161A (en) Low-cost launching construction process for jacket
US2232564A (en) Apparatus for raising sunken submarines
CN202557747U (en) Dismounting ship for jacket

Legal Events

Date Code Title Description
CREP Change of representative

Representative=s name: ZACCO NORWAY AS, POSTBOKS 2003 VIKA

CHAD Change of the owner's name or address (par. 44 patent law, par. patentforskriften)

Owner name: SUBSEA 7 NORWAY AS, NO

MM1K Lapsed by not paying the annual fees