CN109625187A - A method of high focal plane buoy is launched using double auxiliary of hanging - Google Patents

A method of high focal plane buoy is launched using double auxiliary of hanging Download PDF

Info

Publication number
CN109625187A
CN109625187A CN201811542442.3A CN201811542442A CN109625187A CN 109625187 A CN109625187 A CN 109625187A CN 201811542442 A CN201811542442 A CN 201811542442A CN 109625187 A CN109625187 A CN 109625187A
Authority
CN
China
Prior art keywords
buoy
launched
water
present
focal plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811542442.3A
Other languages
Chinese (zh)
Inventor
王海员
李奎平
刘建军
吴伟
王辉武
刘宝洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Institute of Oceanography SOA
Original Assignee
First Institute of Oceanography SOA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Institute of Oceanography SOA filed Critical First Institute of Oceanography SOA
Priority to CN201811542442.3A priority Critical patent/CN109625187A/en
Publication of CN109625187A publication Critical patent/CN109625187A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B2022/006Buoys specially adapted for measuring or watch purposes

Abstract

The present invention relates to a kind of double put-on methods for hanging auxiliary and launching high focal plane buoy, specific steps include the preparation before (1) buoy is launched;(2) the main floating body of buoy is launched into water;(3) dan anchor system system cables enter water;(4) instrument on buoy hawser enters water;(5) weight anchor enters water.The step (2) and step (5) are needed using the double crane on buoy operation ship.The present invention is due to using the technology described above; it has the advantage that the present invention by carrying out the preparation link before launching; it is in advance that hawser disk is good spare; use double methods for hanging and only swinging lifting buoy and being launched; greatly improve the safety and efficiency of buoy operation; the instrument loss and damaged condition being avoided as much as possible during retrievable buoys, greatly protect the safety of operator, improve the success rate of buoy operation.

Description

A method of high focal plane buoy is launched using double auxiliary of hanging
Technical field
The invention belongs to field of ocean engineering, relate in particular to a kind of put-on method of high focal plane buoy.
Background technique
With nation-building ocean power implementation, under the novel scientific investigation ship with power function is numerous and confused in recent years Water starts to carry out marine scientific investigation work operations.And important equipment of the buoy as oceanographic survey, because system structure is multiple Miscellaneous, dispensing and recovery difficult are big.Buoy dispensing is always one of highest work of scientific investigation ship task difficulty coefficient.Traditional dispensing Floating calibration method often because the reasons such as marine sea situation is bad cause buoy dispensing difficult, or even will cause the part on buoy The case where equipment damage.The dispensing operating process of depth float is cumbersome, and the operation duration is long, careless slightly to be easy to cause standard type It is impaired, it is therefore desirable to which that the putting mode of current high focal plane buoy is improved.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of put-on method of high focal plane buoy.It can optimize the dispensing of existing buoy Mode improves the dispensing success rate of buoy especially high focal plane buoy.
To achieve the above object, the present invention takes following technical scheme: a kind of put-on method of high focal plane buoy, feature exist In: specific steps include the preparation before (1) buoy is launched;(2) the main floating body of buoy is launched into water;(3) dan anchor system system cables Enter water;(4) instrument on buoy hawser enters water;(5) weight anchor enters water.The step (2) and step (5) are needed using buoy operation Double crane on ship.
The present invention due to using the technology described above, has the advantage that the present invention by carrying out the preparation before launching Link, it is in advance that hawser disk is good spare, using double methods for hanging and only swinging lifting buoy and being launched, greatly improve buoy work The safety and efficiency of industry, the instrument loss and damaged condition being avoided as much as possible during retrievable buoys, greatly protect behaviour The personal safety for making personnel improves the success rate of buoy operation.
Detailed description of the invention
Fig. 1 is operating process schematic diagram of the invention
Specific embodiment
For the concrete operation step that the present invention will be described in detail, now attached drawing is cooperated to be illustrated.Specific steps of the invention It is as follows:
(1) preparation before buoy is launched.Before buoy operation ship 1 reaches buoy placement position, need to complete on buoy The link of test and anchor system system.By anchor system system cables 6 according to lower end in lower upper end in the upper piecewise disk of mode at disk, it is a whole set of Buoy each section is successively put in sequence above deck, cannot there is intersection from beginning to end.
(2) the main floating body 4 of buoy is launched into water.When starting to launch, buoy operation ship 1 needs to keep low-speed forward, makes at this time The loop wheel machine of the left and right on 2 two is hung with the A shape of stern, while the lifting main floating body 4 of buoy hand in hand, the main floating body of buoy is slowly sling, It is discharged in investment water with release hook 3.
(3) dan anchor system system cables 6 enter water.Keep operation ship lowsteaming to advance, by buoy hawser 6 one disk disk by One is sent into water in sequence, if ship's speed is improper suitably to be adjusted, until ship's speed is almost the same with rope dispensing speed.
(4) instrument 5 on buoy hawser 6 enters water.The instrument 5 of buoy mid-mounting is lifted and is gently sent into water.
(5) weight anchor 7 enters water.Two loop wheel machines on 2 are hung using A shape, the weight anchor of buoy is sling, is discharged and is put into release hook In water.
In conclusion a kind of put-on method of high focal plane buoy, by advance that buoy hawser disk is good spare, hung only using double Method lifting buoy is swung, the safety and efficiency of buoy operation, the instrument being avoided as much as possible during retrievable buoys are greatly improved Device loses and damaged condition, greatly protects the personal safety of operator, improves the success rate of buoy operation.Use this Invention can effectively improve the success rate of buoy observation, reduce the cost of ocean research investigation.

Claims (2)

1. a kind of using double methods hung auxiliary and launch high focal plane buoy, specific steps include the preparation before (1) buoy is launched; (2) the main floating body of buoy is launched into water;(3) dan anchor system system cables enter water;(4) instrument on buoy hawser enters water;(5) weight anchor Enter water.The step (2) and step (5) are needed using the double crane on buoy operation ship.
2. a kind of as described in right 1 utilizes double methods hung auxiliary and launch high focal plane buoy, it is characterised in that before buoy is launched Prepare, needs buoy hawser according to lower end in lower upper end in the upper piecewise disk of mode into disk, a whole set of buoy each section is on deck On successively put in sequence, cannot have intersection from beginning to end.
Above-mentioned implementation method is only used for illustrating inventive concept of the invention, rather than the restriction to rights protection of the present invention, all It is made a non-material change to the present invention using this design, protection scope of the present invention should all be fallen into.
CN201811542442.3A 2018-12-17 2018-12-17 A method of high focal plane buoy is launched using double auxiliary of hanging Pending CN109625187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811542442.3A CN109625187A (en) 2018-12-17 2018-12-17 A method of high focal plane buoy is launched using double auxiliary of hanging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811542442.3A CN109625187A (en) 2018-12-17 2018-12-17 A method of high focal plane buoy is launched using double auxiliary of hanging

Publications (1)

Publication Number Publication Date
CN109625187A true CN109625187A (en) 2019-04-16

Family

ID=66074536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811542442.3A Pending CN109625187A (en) 2018-12-17 2018-12-17 A method of high focal plane buoy is launched using double auxiliary of hanging

Country Status (1)

Country Link
CN (1) CN109625187A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114291213A (en) * 2022-03-09 2022-04-08 自然资源部第一海洋研究所 Underwater submerged buoy fixed-point laying device and laying method
CN114620195A (en) * 2022-02-18 2022-06-14 华能国际电力股份有限公司德州电厂 Device for improving underwater positioning precision of anchoring block for limiting of overwater photovoltaic module
CN115973332A (en) * 2023-03-22 2023-04-18 国家深海基地管理中心 Device and method for launching buoy by adopting unmanned ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079363A (en) * 2009-11-27 2011-06-01 中国科学院海洋研究所 Anchoring ocean observation and research buoy laying system and method based on small-sized ship
CN204675691U (en) * 2015-06-01 2015-09-30 中国船舶工业集团公司第七〇八研究所 A kind of big sea buoy lowering equipment
US20170190387A1 (en) * 2014-05-01 2017-07-06 Christopher Betcher Corrosion-and-chafing-resistant, buoy system and method
CN207972752U (en) * 2018-03-13 2018-10-16 江苏科技大学 A kind of oceanographic buoy lowering equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079363A (en) * 2009-11-27 2011-06-01 中国科学院海洋研究所 Anchoring ocean observation and research buoy laying system and method based on small-sized ship
US20170190387A1 (en) * 2014-05-01 2017-07-06 Christopher Betcher Corrosion-and-chafing-resistant, buoy system and method
CN204675691U (en) * 2015-06-01 2015-09-30 中国船舶工业集团公司第七〇八研究所 A kind of big sea buoy lowering equipment
CN207972752U (en) * 2018-03-13 2018-10-16 江苏科技大学 A kind of oceanographic buoy lowering equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘娜等: "基于"雪龙"船平台的极地锚锭浮标布放----以中国第六次北极科学考察白令海锚锭浮标布放为例", 《海岸工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114620195A (en) * 2022-02-18 2022-06-14 华能国际电力股份有限公司德州电厂 Device for improving underwater positioning precision of anchoring block for limiting of overwater photovoltaic module
CN114291213A (en) * 2022-03-09 2022-04-08 自然资源部第一海洋研究所 Underwater submerged buoy fixed-point laying device and laying method
CN115973332A (en) * 2023-03-22 2023-04-18 国家深海基地管理中心 Device and method for launching buoy by adopting unmanned ship
CN115973332B (en) * 2023-03-22 2023-05-16 国家深海基地管理中心 Device and method for launching buoy by unmanned ship

Similar Documents

Publication Publication Date Title
CN103781698B (en) Anchor cable tensioning method
CN109625187A (en) A method of high focal plane buoy is launched using double auxiliary of hanging
CN103183112B (en) Abutting and lifting device for recovering underwater robot
CN102079363B (en) Anchoring ocean observation and research buoy laying system and method based on small-sized ship
CN103738477B (en) Method for replacing upper anchor cable of mooring anchor legs
CN105711749A (en) Unmanned surface vehicle laying and retrieving method
CN108163149B (en) A kind of unmanned boat lays recovery system
CN103883273B (en) Utilize saturation diving to support the double crane on ship that the method for standpipe is installed
CN109625188A (en) A method of the scientific investigation ship retrievable buoys with dynamic positioning function
US20120048168A1 (en) Multihull fishing vessel and method of use
KR100397362B1 (en) Ships for the production and / or loading / unloading and transportation of hydrocarbons from offshore areas and for carrying out oil well operations
NO20100922L (en) Procedure for establishing and carrying out the towing of a structure underwater
CN105398545B (en) A kind of tensioning method of mooring anchor leg
US6736082B2 (en) Method and system for connecting an underwater buoy to a vessel
CN201834178U (en) Anchoring-type buoy laying apparatus based on small-sized ship
JP4046154B2 (en) Underwater vehicle
CN102219047A (en) Device and method of salvaging underwater mooring system in muddy seabed
RU2417921C2 (en) Method of surfacing and transporting sunken submarines and other objects
CN110435847A (en) A kind of latent calibration method of scientific investigation boat hook salvaging
CN107226173A (en) Delivery device and put-on method for the subsea beacon of data process system sea examination
CN110254642A (en) The method that semi-submerged ship based on far-reaching extra large condition carries cargo
US1368787A (en) Method for recovering sunken vessels
CN103754328B (en) A kind of method of underwater sensor chain Quick distributor
KR20140002178U (en) 4 4 point mooring apparatus of refloat vessel
US4246860A (en) Method for anchor retrieval

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190416