NL2003800C2 - Device for dredging soil material under water. - Google Patents

Device for dredging soil material under water. Download PDF

Info

Publication number
NL2003800C2
NL2003800C2 NL2003800A NL2003800A NL2003800C2 NL 2003800 C2 NL2003800 C2 NL 2003800C2 NL 2003800 A NL2003800 A NL 2003800A NL 2003800 A NL2003800 A NL 2003800A NL 2003800 C2 NL2003800 C2 NL 2003800C2
Authority
NL
Netherlands
Prior art keywords
excavator
pontoon
measuring means
foregoing
soil material
Prior art date
Application number
NL2003800A
Other languages
Dutch (nl)
Inventor
Stefaan Vandycke
Erik Wellen
Original Assignee
Baggerwerken Decloedt & Zn N V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42072812&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=NL2003800(C2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Baggerwerken Decloedt & Zn N V filed Critical Baggerwerken Decloedt & Zn N V
Priority to NL2003800A priority Critical patent/NL2003800C2/en
Priority to DK10190665.9T priority patent/DK2322728T3/en
Priority to EP10190665.9A priority patent/EP2322728B1/en
Priority to RU2010146162/03A priority patent/RU2553814C2/en
Priority to BE2010/0675A priority patent/BE1020103A3/en
Application granted granted Critical
Publication of NL2003800C2 publication Critical patent/NL2003800C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • E02F9/062Advancing equipment, e.g. spuds for floating dredgers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/437Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/907Measuring or control devices, e.g. control units, detection means or sensors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • E02F5/285Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • E02F9/262Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers

Description

Device for dredging soil material under water
This invention relates to a device, such as a backhoe dredger, for dredging soil material under water to a prescribed depth. The invention also relates to a method for dredging 5 soil material under water, as well as to a computer program, comprising program instructions adapted to carry out the method.
A device, such as a backhoe dredger, is generally used to excavate or dredge soil material under water at locations where other dredgers such as trailing suction hopper 10 dredgers and cutter suction dredgers are less suited. Such locations include busy access channels, hard soil types, (very) shallow waters and hard to reach places, for instance harbor entrances. A conventional backhoe dredger typically comprises a (sometimes land based) excavator mounted on a pontoon. The excavator comprises lifting booms, actuated by hydraulic cylinders, and a bucket to dig up soil material from under the 15 water level. The dredged soil material is brought above the water level and dropped in and removed by a barge, located in the vicinity of the pontoon.
A typical dredging cycle using a backhoe dredger involves preparing a survey of the state of the underwater bottom, which state at least includes charting the depth of the 20 bottom and/or the properties of the soil material in the area of interest. A work plan is then made up for the operator of the backhoe dredger and the excavator, roughly taking into account the state of the bottom area to be dredged and the desired state of the bottom area (typically the desired depth profile). The work plan involves determining the lines along which the pontoon should be positioned, as well as giving a rough 25 indication of the excavating depth along said lines. The bottom area is then dredged by the operator, which typically involves the steps of positioning the pontoon onto a line to be excavated, excavate soil material along the line, repositioning the pontoon to another line to be dredged, and repeating the above.
30 However, as the soil properties are only known at very sparse points, this approach is only an average. The actual excavating action is determined by the operators feeling, based on very subjective feedback (response of the excavator in terms of noise, vibrations, motion, etc.) and on its previous experience in similar situations. The efficiency of dredging needs improvement.
5 2
It is an object of the present invention therefore to overcome the drawbacks of the above described prior art device and method, and provide a device and method for dredging soil material under water that permits a higher efficiency of operation.
In one aspect of the invention, there is thus provided a device for dredging soil material under water, the device comprising: a pontoon, provided with an excavator adapted to excavate soil under water; actuating means adapted to control the motion of the pontoon and/or the excavator; 10 - first monitoring means adapted to monitor the position of the excavator; the device further comprising second monitoring means adapted to monitor the forces experienced by the excavator; and computing means adapted to compute, on the basis of data obtained from the first 15 and the second monitoring means, control signals for the actuating means.
The device according to the invention allows to promptly and accurately excavate soil material under water to a predetermined depth profile, whereby the depth and /or the position in the plane of excavation are regulated automatically, depending on the actual 20 position of the excavator and the force values obtained from the second monitoring means. The motion of the pontoon includes leveling of the pontoon.
The invention also relates to a method for dredging soil material under water, the method comprising the steps of: 25 - providing a device according to the invention; positioning the pontoon of the device in a water; controlling the motion of the excavator of the device by the actuator means such that soil is excavated under water; monitoring the position of the excavator and the forces experienced by the 30 excavator during the motion thereof; computing, on the basis of data obtained from the first and the second monitoring means, control signals for the actuating means; the excavator being moved according to these control signals.
3
The method according to the invention is particularly useful in optimizing a dredging operation along one cut line, i.e. in an embodiment when the pontoon is itself in a (temporarily) stationary position. The method of the invention eliminates substantially the variability associated with human action by providing a control loop, in which the 5 excavator motion is controlled in function of its actual position and the actual forces it experiences.
The device and method of the invention allow to lower downtime, due to overloaded mechanical structures, protect against overload, and maintain a more constant quality of 10 dredging over time. Also, the device and method of the invention allow to take into account varying soil sediment properties - the very nature of sedimentation causes such variation - which are not well known, for instance due to the generally rather low grid resolution of taking samples.
15 In a further aspect of the invention, a device is provided wherein the computing means are adapted to compute the control signals for the actuating means such that an optimum criterion is minimized. The optimum criterion can be chosen at will. In a particularly favorable device, the optimum criterion comprises the average power of the excavator used per unit volume excavated soil material. The power of the excavator can readily be 20 obtained by multiplying the momentaneous displacements of the excavator and the forces experienced by the excavator, and summing these products. The power of the excavator can for instance be minimized or kept below a certain threshold value by lowering forces. Lowering forces can be achieved by limiting the excavating velocity and/or the cutting depth of excavation, whereby the cutting depth is the depth over 25 which the bucket is driven into the soil. The forces generally also depend on the soil properties, whereby a denser or harder soil will lead to higher forces, and vice versa.
In another aspect of the invention, a device is provided wherein the optimum criterion comprises the maximum likely expected excavating time per unit volume excavated soil 30 material.
A typical backhoe dredger is equipped with an excavator comprising a boom, pivotably provided on a substructure present on the deck of the pontoon, a stick, pivotable provided at one extremity of the boom, and a bucket, pivotably provided at one 4 extremity of the stick. The pivoting movement of the boom with respect to the pontoon, of the stick with respect to the boom, and of the bucket, relative to the stick are brought about by hydraulic cylinders, provided on the substructure of the pontoon, on the boom, and on the stick respectively. The backhoe dredger preferably has the following degrees 5 of freedom to perform its tasks: - 3 rotations of the excavator around a horizontal axis (corresponding to the 3 pivoting points of the main and stick, and the bucket: these allow to position the bucket under water, to dig into the soil (haul) and to lift the material above the water; 10 - 1 rotation around a vertical axis: this degree of freedom enables the rotational positioning of the bucket, as well as the transport from the soil material to the barge aside; - 1 horizontal translation (step): when the digging of soil within the reach of the excavator has been finished, the pontoon needs to be moved to the next position, 15 this is called stepping and is achieved by moving one of the spuds of the pontoon; - 3 vertical translations providing lift and stability and enabling leveling of the pontoon (acquiring a horizontal position).
In specific conditions, trimming tanks may be used to distribute the weight to achieve 20 horizontal leveling of the pontoon for instance. The specific rotations around a vertical axis locally lead to a typical circular digging pattern around a central point that corresponds to the pivot of the boom. Due to the stepping nature of the pontoon, the global patterns are cut lines next to each other at the same or varying depth along the center line or off the center line.
25
The device and method according to the invention allow to accurately excavate soil under water according to a predermined depth profile. When excavating a water bottom such as a sea floor or a navigation route near a quay, it is, generally speaking, extremely dangerous to excavate the sea floor or the navigation route beyond a prescribed 30 excavation depth because such a deep excavation may destroy the foundation of the quay or walls formed in the sea floor. When excavating too deep, it becomes necessary to reload such an over-excavated portion, which however requires additional man power 5 and time. The device and method according to the invention help in preventing this disadvantage.
In another aspect of the invention, a device is provided wherein the excavator comprises 5 lifting booms, actuated by hydraulic cylinders, that are part of an hydraulic circuit, and the second monitoring means comprise hydraulic pressure sensors adapted to measure the pressure in the hydraulic circuit and/or cylinders. Hydraulic pressure sensors are known per se but not in the context of controlling the movement of for instance a backhoe dredger.
10
In still another aspect of the invention, a device is provided wherein the excavator comprises lifting booms, actuated by hydraulic cylinders, that are part of a hydraulic circuit, and the first monitoring means comprise displacement sensors adapted to measure the relative displacement of the lifting booms.
15
Although in principle providing first and second monitoring means is sufficient to carry out the method according to the invention, a device comprising third monitoring means adapted to monitor the position of the pontoon is preferred. In this way, the movement of the excavator can be related to the state of the underwater bottom as charted by a 20 survey, which state at least includes the depth profile of the bottom and/or the properties of the soil material in the area of interest. Indeed a survey carried out before the actual start of the dredging operation yields an initial depth profile. After passage of the backhoe dredger, and with knowledge of the amount of soil material dredged, the new local depth can be calculated. By monitoring the position of the pontoon apart from the 25 position of the excavator, an updated depth profile is obtained.
In an aspect of the invention, a device is provided wherein the third monitoring means comprise a global positioning system.
30 In yet another aspect of the invention, the device comprises an input/output device adapted to transfer the signals from the first monitoring means to the computing means.
6
In yet another aspect of the invention, the device comprises an input/output device adapted to transfer the signals from the second and/or third monitoring means to the computing means.
5 In still another aspect of the invention, the device comprises display units adapted to display the position of the excavator and/or of the pontoon, as well as the forces experienced by the excavator.
In still another aspect of the invention, the device comprises a display unit adapted to 10 display the depth of the soil under water.
The above and other objects, features and advantages of the present invention will become apparent from the following description and the appended claims, taken in conjunction with the accompanying drawings, in which: 15 Figure 1 is a side view of the outline structure of a hydraulic backhoe ship;
Figure 2 is a top view of the backhoe ship shown in figure 1;
Figure 3 is a schematic diagram of the device according to an embodiment of the invention; and
Figure 4 schematically represents the degrees of freedom of an excavator according to 20 an embodiment of the invention;
With reference to figure 1, a hydraulic backhoe ship 1 is schematically shown. The backhoe ship 1 comprises a pontoon 6 that is positioned in water 2 above a water bottom 3 to be dredged. Pontoon 6 is provided with a number of spuds 4 than can take 25 support onto the water bottom 3. The pontoon 6 is held on the spuds 4 by a number of swivels 7 in such a way that the pontoon 6 is slidable up and down in the vertical direction 5 along the spuds 4, but is substantially restrained from moving horizontally across the water 2. The pontoon 6 ascends along the spuds 4 as the tidal level rises, and descends along the spuds 4 as the tidal level lowers. The depth hi of the water bottom 3 30 (and also the distance between the water bottom 3 and the pontoon 5) may therefore change in accordance with the tidal level. The backhoe ship 1 is further equipped with a bridge 8 that comprises at least the actuating means adapted to control the motion of the pontoon 6, and a backhoe excavator 10.
7
Backhoe excavator 10 comprises a boom 11 hingedly supported on the deck of pontoon 6, a stick 12 supported swingably on the boom 11 around hinge 13, an a bucket 14 supported tumably on the stick 12 around hinge 15. The lifting booms (11, 12) and bucket 14 of excavator 10 are actuated by hydraulic cylinders (16, 17 and 18), that are 5 part of a hydraulic circuit (not shown). In the embodiment shown the degrees of freedom of the backhoe dredger 10 to perform its tasks comprise 3 rotations of the excavator around a horizontal axis, corresponding to the 3 pivoting points of the boom 11, the stick 12, and the bucket 14, and actuated by hydraulic cylinders (16, 17 and 18). These allow to position the bucket 14 under water, as shown by the position in dotted 10 line in figure 1, to dig into the soil of bottom 3 by hauling, and to lift the soil material above the water 2. Another degree of freedom comprises the rotation of the boom 11 around a turntable 19. This degree of freedom enables the rotational positioning of the bucket 14, as well as the transport of the dredged soil material 20 to a barge 21, lying aside the pontoon 6, as shown in figure 2. Another degree of freedom comprises the 15 horizontal translation of the pontoon 6 (a ‘step’). When the digging of soil material 20 within the reach 22 of the excavator 10 has been finished, the pontoon 6 needs to be moved to a next position, a process referred to as ‘stepping’. This is achieved by retracting at least one of the spuds 4 of the pontoon 6 from the bottom 3, moving (or swinging) the pontoon 6 and lowering the spud 4 into the bottom 3 again to fix the 20 pontoon 6 in its new position. It is also possible to add 3 other degrees of freedom, being vertical translations of the pontoon 6 along the spuds 4, providing lift and stability and enabling leveling of the pontoon 6 in a substantially horizontal position.
The backhoe dredger 1 comprises actuating means (7, 16, 17, 18, 19) adapted to control 25 the motion of the pontoon 6 and of the excavator 10. The actuating means among others comprise the swivels 7 for the spuds 4 and driving means (not shown) for positioning the pontoon 6, as well as turntable 19 and hydraulic cylinders (16, 17, 18) that form part of a hydraulic circuit controlling the motion of the excavator 10. The actuating means (7, 16, 17, 18, 19) are controlled by computing means as will be described in more 30 detail further below.
With reference to figure 3, the backhoe dredger 1 is equipped with first monitoring means (30, 35) adapted to monitor the position of the excavator 10, and in particular the position of the bucket 14 thereof, second monitoring means 31, adapted to monitor the 8 forces experienced by the excavator 10, third monitoring means 32 adapted to monitor the position of the pontoon 6, and computing means 33 adapted to compute, on the basis of data obtained from the first and the second monitoring means (30, 31), control signals for the actuating means (7, 16, 17, 18, 19). To transfer the excavator position 5 signals from the first monitoring means to the computing means.
The first monitoring means (30, 35) comprise a number of position and/or angular sensors (not shown), mounted at several positions on the excavator 10. Figure 4 schematically shows a typical configuration, showing the fulcrum A of the boom 11 10 supported on the deck of the pontoon 6, the fulcrum B of the stick 12 supported on the boom 11, the fulcrum C of the bucket 14 supported on the stick 12 and the leading edge D of the bucket 14. Also shown are the length Li of line A-B, the length L2 of line B-C, the length L3 of line C-D, the angle a between a vertical line and the line A-B, the angle P between the line A-B and the line B-C and the angle y between the line B-C and the 15 line C-D. Furthermore, hi defines the present depth of the bottom 3 and h2 the height of fulcrum A relative to the water level. To illustrate, the excavated depth hi from the water level can easily be expressed in function of the angles a, |3 and y, and the lengths Li, L2, L3 as well as height h2. Since the lengths Li, L2, L3 and height h2 are known, the excavated depth hi relative to the water level can be determined when one detects the 20 relative angles a, P and y by suitable angle detectors. The angular signals 34 generated by the angular sensors are transmitted through a suitable input/output device 35 to a first monitoring means processing unit 30, at least comprising a memory for storing the angular signal data. If desired, the position of the excavator 10 can be visualized for the operator of the backhoe dredger 1 on a display 40.
25
The third monitoring means (32, 36) adapted to monitor the position of the pontoon 6 comprise a dynamic positioning/dynamic tracking (DP/DT) system 32, an input/output device 36 adapted to transfer position and/or force signals from the second and/or the third monitoring means to the computing means, and a number of pontoon position 30 sensors (not shown). The DP/DT system 32 allows the backhoe dredge operator to view on-line through a display device 38 a chart of the bottom depth profile. Such a profile is obtained by inputting bathymetric data obtained beforehand in the DP/DT system 32. The depth profile of the bottom 3 is updated in real time as a result of the dredging 9 operation. The DP/DT system 32 also comprises a global positioning system, enabling to locate the global position of the pontoon 6. When a backhoe dredger is manually operated, it generally relies on the above described set of monitoring equipment. As the operator is working underneath the water level, visibility of the bucket 14 is zero. The 5 operator therefore needs to rely on a real-time visualization of the pontoon 6 and in particular excavator 10. The first monitoring means (30, 35) based on sensors for monitoring the boom/stick/bucket and slew/swing angles provide part of the input. This information is combined with the system dimensions to reconstruct the bucket position. When combining this information with a global positioning system signal from the 10 DP/DT system 32, a real-time visualization of the position of the bucket 14 with respect to the bottom 3 is obtained.
According to the invention, the second monitoring means 31 are adapted to monitor the forces experienced by the excavator 10, and comprise a number of pressure or force 15 transducers (not shown), typically incorporated in the hydraulic cylinders (16, 17, 18). The force signals 39 originating from the transducers are transmitted via the input/output device 36 to the computing means (31, 33) for further processing. If desired, a display unit 41 adapted to display the force signals 39 as experienced by the excavator 10 can be provided. Control signals (42, 43), generated by the computing 20 means (33) may also be displayed on display unit 41.
The computing means (33) are adapted to compute, on the basis of the position signal data (34, 37), obtained from the first and the third monitoring means (30, 32), as well as on the basis of the force signal data (39), obtained from the second monitoring means 25 31 control signals (42, 43) for the actuating means (7, 16, 17, 18, 19).
The parameters involved in dredging a bottom 3 are many. Typically, a survey of the depth profile of the water bottom 3 is carried out first by taking bathymetric data and store these in the DP/DT system 32. A desired dredge profile depends on many 30 properties such as underwater stability of the bottom 3 and the rheological properties of the soil material. Other factors that may be important include structural aspects of the dredging equipment (maximum load levels and the like), vessel stability, position control, tidal and water current behavior, and more. The device according to the invention allows to take into account a major part of these parameters by providing a 10 closed loop control system wherein position and force data are combined to compute optimum actuator signals. The force data are the result of the action of a considerable number of relevant parameters related to the bottom and soil properties, which makes considering these force data particularly useful for the present purpose. The invention is 5 not limited to the choice of a particular optimum criterion and may actually use any criterion that appears to be useful. Preferably, the optimum criterion comprises the average power of the excavator used per unit volume excavated soil material, or the maximum likely expected excavating time per unit volume excavated soil material. Typical limitations include dynamic limitations, such as power and force restrictions.
10
The algorithms loaded in the computing means are now described. Once the pontoon is substantially stable in its starting position, the excavation model, loaded in the computing means, is executed. The excavation model comprises a continuous path geometric trajectory algorithm, known per se. Such an algorithm is based on 15 trajectories, as suggested by best practice training manuals and/or constructor’s power tables for a given excavator set up (i.e. a boom/stick/bucket combination). The input for the algorithm is provided by the results of a bottom survey and a first best guess of a trajectory for the excavator, including the depth and reach of the bucket. With reach is meant the distance from the pivot point of the excavator to the position where the 20 bucket touches the soil. The output of the algorithm provides the excavator kinematics that produces the needed boom/stick/bucket-joint angles at each stage of the excavation.
A second algorithm uses soil cutting theory to compute the forces experienced by the excavator components as a result of the interaction between the bucket and the soil 25 (when the bucket is actually moving through the soil), and drag theory to compute the forces exerted by water currents on submerged parts of the excavator. This model yields the total expected forces, encountered by the excavator whilst digging. The output gives the overall model a starting point from which to proceed.
The starting point is preferably selected base don a most suitable combination cutting 30 depth, cutting speed and reach or scraping length. Typically, the scraping length is chosen around 65% of the maximum reach at a particular depth, with a generally accepted minimum of 6 m.
11
When the above two algorithms are loaded in the computing means and an excavation is started, the measurements of forces and kinematical parameters allow to recalculate operational parameters, preferably the depth of excavation, the velocity of excavation, and the reach of the bucket. With the knowledge of the above two models output, as 5 well as of the power ratings of the individual hydraulic components of the excavator, the excavating operation may be optimised by the operator of the excavator by means of at each stage of operation limiting the forces in the excavator by turning back on the actuator settings, so as not to exceed the maximum tolerable power ratings. The maximum tolerable power settings for the hydraulic components, such as the hydraulic 10 cylinders, are known from the manufacturer of these components and for a hydraulic cylinder for instance are given in terms of the product of maximum pressure p and flow Q. Given the speed at which forces vary in the hydraulic system, such a rather static system (controlled by an operator) would always try to intervene too late. In addition the combination of actuators, hydraulic system and excavator system/real world 15 interaction will result in a highly non-linear system.
As such, prior to operations a number of open loop experiments that correlate actuator settings with hydraulic system characteristics (pressure p and flow rate Q measurements) and readings from the geometric measurement devices (i.e. the standard 20 angle measurement devices that measure boom/stick/bucket-joint angles) is preferably conducted. These will serve as input for the refined instrument variable identification that will result in a proportional integral plus control algorithm for each joint in the excavator system. Once the parameters are known, the non-linear control algorithm (i.e. the proportional integral plus algorithm) can control the joint angles using the feedback 25 from the angle measurement devices on the joint without the need for extra pressure or discharge sensors whilst remaining as close as possible to the permissible hydraulic settings for each system component.
The invention is not limited to any optimization algorithm and many may be used. Such 30 algorithms are generally known to the skilled person and generally minimize some function f(x) subject to a condition such as h(x) > 0. In the present embodiment the function f(x) may comprise the average power of the excavator used per unit volume excavated soil material for instance. The condition h(x) > 0 may for instance comprise 12 the condition that the depth h(x) of the bucket 14 has to be larger than a certain depth hi. The condition then becomes hi - h(x) > 0 (when depths are given in negative numbers). An optimization scheme is initiated by choosing initial values for x, and compute search directions Ax, using numerical algorithms such as the well known Newton’s method.
5 A step to a new point is then taken and the calculations repeated until the minimum is found. In the context of the present invention, the output of the optimization scheme yields a next movement of the bucket 14 of the excavator 10, including horizontal and vertical movement, tilt angles, defining the angle of attack, and speed of movement. It thus becomes possible to maximize throughput and obtain a more even quality. An 10 additional advantage is that by obtaining the force data, data are also obtained on the soil properties during dredging. The method and device according to the invention therefore also allows to continuously update the soil properties, previously obtained by the bathymetric data.
15 The computing means 33 substantially control the movement of the excavator 10, and in particular the bucket 14 thereof, as well as the movement of the pontoon 6, by generating control signals (42, 43) for the excavator 10 and pontoon 6 respectively. In particular, after having positioned the pontoon 6, a zone is dredged within reach of the excavator booms (11, 12) by automatically lowering the bucket 14 to a calculated depth, 20 by positioning the bucket 14 and scrape soil material 20 to fill the bucket 14 to a desired level, and then lifting the bucket 14, and swing it to empty its content in barge 21. In the meantime a new position is calculated through the optimization routine and the bucket 14 swung back to this optimal next position. After having dredged a zone within the reach of the excavator 10, the pontoon 6 is ‘stepped’ to a next position, that is also 25 calculated by the optimization algorithm, and the cycle repeated.
The foregoing disclosure has been set forth merely to illustrate the invention and is not intended to be limiting. Since modifications of the disclosed embodiments incorporating the spirit and substance of the invention may occur to persons skilled in the art, the 30 invention should be construed to include everything within the scope of the appended claims and equivalents thereof.

Claims (17)

1. Inrichting voor het baggeren van grondmateriaal onder water, de inrichting omvattende: een ponton, voorzien van een graafwerktuig ingericht om grond onder water uit te graven; 5. aandrijfmiddelen ingericht om de beweging van het ponton en/of het graafwerktuig te sturen; - eerste meetmiddelen ingericht om de positie van het graafwerktuig te bepalen; waarbij de inrichting verder omvat: tweede meetmiddelen ingericht om de door het graafwerktuig ervaren krachten te bepalen; 10 en - rekenmiddelen ingericht om, op basis van gegevens verkregen van de eerste en de tweede meetmiddelen, stuursignalen voor de aandrijfmiddelen te berekenen.An apparatus for dredging ground material under water, the apparatus comprising: a pontoon, provided with an excavator adapted to excavate ground under water; 5. drive means adapted to control the movement of the pontoon and / or the excavator; - first measuring means adapted to determine the position of the excavator; the device further comprising: second measuring means adapted to determine the forces experienced by the excavator; 10 and - computing means adapted to calculate control signals for the driving means on the basis of data obtained from the first and the second measuring means. 2. Inrichting volgens conclusie 1, waarin de rekenmiddelen zijn ingericht om de 15 stuursignalen voor de aandrijfmiddelen dusdanig te berekenen dat een optimum criterium wordt geminimaliseerd.2. Device as claimed in claim 1, wherein the calculating means are adapted to calculate the control signals for the driving means in such a way that an optimum criterion is minimized. 3. Inrichting volgens conclusie 2, waarin het optimum criterium het gemiddelde vermogen per eenheidsvolume uitgegraven grondmateriaal van het toegepaste graafwerktuig omvat. 20Device according to claim 2, wherein the optimum criterion comprises the average power per unit volume of excavated soil material of the excavator used. 20 4. Inrichting volgens conclusie 2, waarin het optimum criterium de langst verwachte uitgraaftijd per eenheidsvolume uitgegraven grondmateriaal omvat.Device according to claim 2, wherein the optimum criterion comprises the longest expected excavation time per unit volume of excavated soil material. 5. Inrichting volgens één der voorgaande conclusies, waarin het graafwerktuig hijsbomen 25 omvat, welke worden aangedreven door hydraulische cilinders, die deel uitmaken van een hydraulisch circuit, en de tweede meetmiddelen hydraulische druksensoren omvatten die zijn ingericht om de druk te bepalen in het hydraulische circuit en/of cilinders.5. Device as claimed in any of the foregoing claims, wherein the excavator comprises hoists 25, which are driven by hydraulic cylinders forming part of a hydraulic circuit, and the second measuring means comprise hydraulic pressure sensors which are adapted to determine the pressure in the hydraulic circuit and / or cylinders. 6. Inrichting volgens één der voorgaande conclusies, waarin het graafwerktuig hijsbomen 30 omvat, welke worden aangedreven door hydraulische cilinders, die deel uitmaken van een hydraulisch circuit, en de eerste meetmiddelen verplaatsingssensoren omvatten die zijn ingericht om de relatieve verplaatsing van de hijsbomen te bepalen.Device as claimed in any of the foregoing claims, wherein the excavator comprises hoists 30, which are driven by hydraulic cylinders that form part of a hydraulic circuit, and the first measuring means comprise displacement sensors which are adapted to determine the relative displacement of the hoists. 7. Inrichting volgens één der voorgaande conclusies, waarbij de inrichting derde meetmiddelen omvat die zijn ingericht om de positie van het ponton te bepalen.Device as claimed in any of the foregoing claims, wherein the device comprises third measuring means which are adapted to determine the position of the pontoon. 8. Inrichting volgens conclusie 7, waarin de derde meetmiddelen een globaal 5 positioneersysteem omvatten.8. Device as claimed in claim 7, wherein the third measuring means comprise a global positioning system. 9. Inrichting volgens één der voorgaande conclusies, waarbij de inrichting een input/output inrichting omvat die is ingericht om de signalen van de eerste meetmiddelen naar de rekenmiddelen over te brengen. 109. Device as claimed in any of the foregoing claims, wherein the device comprises an input / output device which is adapted to transfer the signals from the first measuring means to the calculating means. 10 10. Inrichting volgens één der voorgaande conclusies, waarbij de inrichting een input/output inrichting omvat die is ingericht om de signalen van de tweede en/of derde meetmiddelen naar de rekenmiddelen over te brengen.Device as claimed in any of the foregoing claims, wherein the device comprises an input / output device which is adapted to transfer the signals from the second and / or third measuring means to the calculating means. 11. Inrichting volgens één der voorgaande conclusies, waarbij de inrichting beeldschermen omvat die zijn ingericht om de positie van het graafwerktuig en/of van het ponton weer te geven, evenals de door het graafwerktuig ervaren krachten.11. Device as claimed in any of the foregoing claims, wherein the device comprises displays adapted to display the position of the excavator and / or the pontoon, as well as the forces experienced by the excavator. 12. Inrichting volgens één der voorgaande conclusies, waarbij de inrichting een 20 beeldscherm omvat dat is ingericht om de diepte van de grond onder water weer te geven.12. Device as claimed in any of the foregoing claims, wherein the device comprises a screen adapted to display the depth of the ground under water. 13. Werkwijze voor het baggeren van grondmateriaal onder water, de werkwijze omvattende de stappen van: het verschaffen van een inrichting volgens een der conclusies 1-12; 25. het positioneren van het ponton in een watermassa; - het dusdanig door de aandrijfmiddelen sturen van de beweging van het graafwerktuig dat grond onder water wordt uitgegraven; - het bepalen van de positie van het graafwerktuig en de door het graafwerktuig tijdens haar beweging ervaren krachten; 30. het op basis van gegevens verkregen van de eerste en de tweede meetmiddelen berekenen van stuursignalen voor de aandrijfmiddelen; waarna het graafwerktuig volgens deze stuursignalen wordt bewogen.A method for dredging ground material underwater, the method comprising the steps of: providing a device according to any of claims 1-12; 25. positioning the pontoon in a body of water; - controlling the movement of the excavator in such a way that soil is dug under water by the driving means; - determining the position of the excavator and the forces experienced by the excavator during its movement; 30. calculating control signals for the drive means on the basis of data obtained from the first and the second measuring means; after which the excavator is moved according to these control signals. 14. Werkwijze volgens conclusie 13, waarin de stuursignalen voor de aandrijfmiddelen dusdanig worden berekend dat een optimum criterium wordt geminimaliseerd.A method according to claim 13, wherein the control signals for the drive means are calculated such that an optimum criterion is minimized. 15. Werkwijze volgens conclusie 14, waarin het optimum criterium het gemiddelde 5 vermogen per eenheids volume uitgegraven grondmateriaal van het toegepaste graafwerktuig omvat.15. Method as claimed in claim 14, wherein the optimum criterion comprises the average power per unit volume of excavated soil material of the excavator used. 16. Werkwijze volgens conclusie 14, waarin het optimum criterium de langst verwachte uitgraaftijd per eenheidsvolume uitgegraven grondmateriaal omvat. 10The method of claim 14, wherein the optimum criterion comprises the longest expected excavation time per unit volume of excavated soil material. 10 17. Computerprogramma dat programma instructies omvat die na laden in een computer de werkwijze volgens één der conclusies 13-16 uitvoert.A computer program comprising program instructions which after loading into a computer performs the method according to any one of claims 13-16.
NL2003800A 2009-11-13 2009-11-13 Device for dredging soil material under water. NL2003800C2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
NL2003800A NL2003800C2 (en) 2009-11-13 2009-11-13 Device for dredging soil material under water.
DK10190665.9T DK2322728T3 (en) 2009-11-13 2010-11-10 Excavator with depth for excavation of soil material under water
EP10190665.9A EP2322728B1 (en) 2009-11-13 2010-11-10 Backhoe dredger for dredging soil material under water
RU2010146162/03A RU2553814C2 (en) 2009-11-13 2010-11-12 Device for soil material excavation under water
BE2010/0675A BE1020103A3 (en) 2009-11-13 2010-11-15 DEVICE FOR DAGGING GROUND MATERIAL UNDER WATER.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2003800A NL2003800C2 (en) 2009-11-13 2009-11-13 Device for dredging soil material under water.
NL2003800 2009-11-13

Publications (1)

Publication Number Publication Date
NL2003800C2 true NL2003800C2 (en) 2011-05-16

Family

ID=42072812

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2003800A NL2003800C2 (en) 2009-11-13 2009-11-13 Device for dredging soil material under water.

Country Status (5)

Country Link
EP (1) EP2322728B1 (en)
BE (1) BE1020103A3 (en)
DK (1) DK2322728T3 (en)
NL (1) NL2003800C2 (en)
RU (1) RU2553814C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480920A (en) * 2016-11-09 2017-03-08 上海宏辉港务工程有限公司 Formula grab boat is dug in a kind of automatic side of bridge-type

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013104278B4 (en) * 2013-04-26 2018-05-09 BITEK Bergungsdienst GmbH Floating work platform with a lifting system and method for performing underwater work
CN103352485B (en) * 2013-06-26 2017-02-01 合肥汇众知识产权管理有限公司 Dredger driving control mechanism and control method thereof
CN103452161B (en) * 2013-08-20 2016-02-03 中交广州航道局有限公司 A kind of trailing suction hopper dredger essence digs control method
NL2012302C2 (en) 2014-02-21 2015-08-25 Ihc Holland Ie Bv Bottom leveller system.
CN104975627B (en) * 2014-04-03 2018-02-16 中交烟台环保疏浚有限公司 The technique of dredging of Grab
JP6429489B2 (en) * 2014-05-12 2018-11-28 東洋建設株式会社 浚 渫 Working system and 浚 渫 working method
CN104499522B (en) * 2014-12-27 2016-07-06 贵州师范大学 Small-sized riverway sludge descaling machine
CN104912144A (en) * 2015-06-19 2015-09-16 宁波海辰液压有限公司 Multifunctional dredge boat
CN105064443B (en) * 2015-07-13 2017-10-27 南通港闸船舶制造有限公司 The steel rake grab boat hydraulic system of boat certainly of favorable working performance
CN105507355B (en) * 2016-01-08 2017-10-20 浙江水利水电学院 A kind of free floating suction dredge(r)
CN106592672B (en) * 2016-11-01 2019-12-06 浙江双林环境股份有限公司 Water body cleaning device and method for high lake wetland pond reservoir
CN109339137A (en) * 2018-09-27 2019-02-15 四川达虹宇建筑工程有限公司 A kind of water conservancy construction device
CN109881730A (en) * 2019-02-27 2019-06-14 上海海事大学 A kind of multi-functional dredging machinery of digging suction
CN111021454A (en) * 2019-12-26 2020-04-17 山东良耘生态科技有限公司 Bohai sea water area port silt cleaning device
CN111321771B (en) * 2020-02-26 2022-05-20 广东华茂水电生态集团有限公司 Black and odorous river treatment equipment and method
CN112127407A (en) * 2020-09-10 2020-12-25 中国水产科学研究院东海水产研究所 Silt remover of facility is bred to large-scale rail
WO2022086512A1 (en) * 2020-10-21 2022-04-28 Cashman Dredging And Marine Contracting, Co., Llc Lidar loading system
CN112486021B (en) * 2020-12-07 2021-10-08 燕山大学 Low-complexity control method for asymmetric servo hydraulic position tracking system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6076030A (en) * 1998-10-14 2000-06-13 Carnegie Mellon University Learning system and method for optimizing control of autonomous earthmoving machinery
WO2003023152A2 (en) * 2001-09-11 2003-03-20 Rocksaw Technology, Inc. Apparatus and methods for trenching
US20080010869A1 (en) * 2006-07-14 2008-01-17 Cable Arm, Inc. Underwater dredging system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4212121A (en) * 1978-07-31 1980-07-15 Mitsubishi Jukogyo Kabushiki Kaisha Method and apparatus for dredging having bow-stern movement of the suction means
FR2511148A1 (en) * 1981-08-05 1983-02-11 Mannesmann Ag METHOD FOR MEASURING LOADED QUANTITIES OR PERFORMANCE OF HYDRAULIC EXCAVATORS OR SIMILAR ENGINES
JPS6483107A (en) * 1987-09-25 1989-03-28 Koden Electronics Co Ltd Method and apparatus for measuring excavating amount of soil
JPH01314915A (en) * 1988-06-15 1989-12-20 Kokudo Sogo Kensetsu Kk Pontoon positioning method
JPH0215659U (en) * 1988-07-11 1990-01-31
JP2916957B2 (en) * 1991-05-28 1999-07-05 株式会社小松製作所 Automatic control method of excavator
EP0736752B1 (en) * 1995-04-03 2001-07-25 Ascorel Controle Et Regulation Electronique Method of weighing and lifting vehicle for performing the method
JP3907858B2 (en) * 1999-01-19 2007-04-18 株式会社小島組 Work amount display device of hydraulic excavator
US6518519B1 (en) * 2000-08-30 2003-02-11 Caterpillar Inc Method and apparatus for determining a weight of a payload
CA2462821A1 (en) * 2001-10-03 2003-04-10 Kenneth L. Martin System for tracking and monitoring vessels
JP2004169393A (en) * 2002-11-20 2004-06-17 Koden Electronics Co Ltd Method for positioning dredging-start place
US6836982B1 (en) * 2003-08-14 2005-01-04 Caterpillar Inc Tactile feedback system for a remotely controlled work machine
US8311738B2 (en) * 2006-04-27 2012-11-13 Caterpillar Inc. Boom-mounted machine locating system
NZ555187A (en) * 2007-05-15 2010-01-29 Actronic Ltd Weight estimation for excavator payloads

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6076030A (en) * 1998-10-14 2000-06-13 Carnegie Mellon University Learning system and method for optimizing control of autonomous earthmoving machinery
WO2003023152A2 (en) * 2001-09-11 2003-03-20 Rocksaw Technology, Inc. Apparatus and methods for trenching
US20080010869A1 (en) * 2006-07-14 2008-01-17 Cable Arm, Inc. Underwater dredging system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480920A (en) * 2016-11-09 2017-03-08 上海宏辉港务工程有限公司 Formula grab boat is dug in a kind of automatic side of bridge-type

Also Published As

Publication number Publication date
BE1020103A3 (en) 2013-05-07
EP2322728B1 (en) 2013-08-21
RU2553814C2 (en) 2015-06-20
EP2322728A3 (en) 2011-06-01
RU2010146162A (en) 2012-05-20
DK2322728T3 (en) 2013-11-18
EP2322728A2 (en) 2011-05-18

Similar Documents

Publication Publication Date Title
NL2003800C2 (en) Device for dredging soil material under water.
US5311682A (en) Hybrid dredge
JP5519414B2 (en) Construction machinery
US7079931B2 (en) Positioning system for an excavating work machine
CN108055855A (en) Work machine
US6823616B1 (en) Method of excavating
JP7361186B2 (en) Control device, loading machine, and control method
CN108699802A (en) Work machine
JPH04507271A (en) Automatic excavation control device and method
CN109563698A (en) Work machine
CN109757113A (en) Work machine
NL2005095C2 (en) Device for dredging soil material under water.
US20070044980A1 (en) System for controlling an earthworking implement
CN108779614A (en) Work machine
US7113105B2 (en) Work machine display system
JP4960402B2 (en) Dredging method by grab dredger
JP2011043002A (en) Excavation support device
AU2015279986A1 (en) Operator assist features for excavating machines based on perception system feedback
JP4700761B1 (en) Water bottom leveling device
EP3108069B1 (en) Bottom leveller system during dredging
JP2007070988A (en) Pump-dredging method
JP7103907B2 (en) Dredging construction management system and dredging construction management method
JP2021152275A (en) Working machine
US7627966B2 (en) Off-fall control for a trenching operation
WO2023276421A1 (en) Construction machine

Legal Events

Date Code Title Description
MM Lapsed because of non-payment of the annual fee

Effective date: 20171201