CN104975627B - The technique of dredging of Grab - Google Patents

The technique of dredging of Grab Download PDF

Info

Publication number
CN104975627B
CN104975627B CN201410134803.6A CN201410134803A CN104975627B CN 104975627 B CN104975627 B CN 104975627B CN 201410134803 A CN201410134803 A CN 201410134803A CN 104975627 B CN104975627 B CN 104975627B
Authority
CN
China
Prior art keywords
grab
technique
ship
dredging
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410134803.6A
Other languages
Chinese (zh)
Other versions
CN104975627A (en
Inventor
朱德全
赵理志
刘钢石
于德俭
文学超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hailu Yantai Environmental Dredging Co ltd
Original Assignee
CCCC TDC Yantai Environmental Protection Dredging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC TDC Yantai Environmental Protection Dredging Co Ltd filed Critical CCCC TDC Yantai Environmental Protection Dredging Co Ltd
Priority to CN201410134803.6A priority Critical patent/CN104975627B/en
Publication of CN104975627A publication Critical patent/CN104975627A/en
Application granted granted Critical
Publication of CN104975627B publication Critical patent/CN104975627B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention proposes a kind of technique of dredging of Grab, including ship's fix technique and construction technology, in ship's fix technique, gyro compass signal is imported into HYPACK softwares to correct accommodation by compass display, ship type is normally shown in navigation software.Dredger's artistic skill of the Grab of the present invention enough truly shows attitude of ship, is laid the groundwork to construct smoothly to carry out.

Description

The technique of dredging of Grab
Technical field
The present invention relates to Dredging Technology field, a kind of technique of dredging of Grab is particularly related to.
Background technology
Because the change of ecological environment, soil erosion cause to deposit to rivers and lakes, in order to dredging river, development shipping and Flood etc. is administered, it is necessary to a large amount of dredgers.
Grab is widely used as one kind of dredger, but existing Grab is being worked as during dredging In the case that ground does not have base station, the problem of not receiving differential signal occurs in the DGPS configured on ship, is positioned as piling bar Ship does not have differential signal, can not show correct ship type and accommodation, cause constructional difficulties.
The content of the invention
The present invention proposes a kind of technique of dredging of Grab, and ship type and accommodation can not be shown and lead to not construct by solving Deng the problem of.
The technical proposal of the invention is realized in this way:
A kind of technique of dredging of Grab, including ship's fix technique and construction technology, in ship's fix technique, by electricity Compass signal imports HYPACK softwares to correct accommodation by compass display, ship type is normally shown in navigation software.
Preferred scheme is, in ship's fix technique, after gyro compass display is opened, from making it after signal wire decaptitating Internal green line and red line is connected on the output wiring terminal of gyro compass display, and passes through another signal wire and USB interface Connection;After completing connection, open HYPACK navigation softwares and gyro compass and the driving of PTK signals are added in the hardware setting of main interface Program, PTK signals driver are llq.dll, and gyro compass driver is nmea.dll;After completing addition, signal survey is carried out Examination, need to adjust port if no signal enters, until after having signal input, close software and import construction documents again.
Preferred scheme is, in the construction technology, during rope wirerope use is supported, supports rope wirerope to use After 1200 hours, work of overturning directly is carried out.
Preferred scheme is, in the construction technology, when beach construction is pushed up, first measures outside mud extraction barge bow and leans out this ship Distance, then its preceding mainmast fell after consulting with barge, and adjusting hawser makes the fore of outer spy concordant with stem holding.
Preferred scheme is, in the construction technology, lowering velocity control is at 30 ms/min after water of grabbing bucket.
Preferred scheme is, in the construction technology, control grabs angle and is no more than 20 degree, is designated as in the grab bucket meter that heals up 50 ° are continued to sink to grab to stopping during 0 ° of section.
Preferred scheme is, in the construction technology, when shoal area soil property is closely knit silty sand ground, forward pitch is by 8 meters 10 meters are increased to, row's mode of grabbing takes single-point to excavate, that is, grabs bucket every time in same position excavation, excavated to -2 meters after moving ship During depth, the silt of both sides caves in naturally after being disturbed, and is then excavated successively to both sides successively.
Preferred scheme is, in the construction technology, when shoal area is constructed, takes the fan-shaped technique slotted.
Preferred scheme is, after the dredging of clear table section, the depth of water is controlled within -3 meters;Weak soil lowering velocity of grabbing bucket is 45 M/min, weak soil closes bucket electric current 1.5A;Speed of healing up is 35 ms/min;Lower floor's pan soil lowering velocity is 35 ms/min, the laminated bucket of pan soil Electric current is no more than 2A, and the speed control that heals up is at 30 ms/min;Ship forward pitch is 9 meters.
Preferred scheme is that trim is controlled by way of adjusting ballast.
Beneficial effects of the present invention are:
Dredger's artistic skill of Grab in the present invention enough truly shows attitude of ship, is laid the groundwork to construct smoothly to carry out.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the flow chart of the technique of dredging of Grab of the present invention;
Fig. 2 to Fig. 7 is fan-shaped slot grooving process schematic.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
The technical process of dredging of the Grab of the present invention includes:Ship's fix technique and construction technology.
In ship's fix technique, gyro compass signal is imported into HYPACK softwares to correct accommodation by compass display, made Ship type is normally shown in navigation software.Concrete operations are:After gyro compass display is opened, from 9 pin signal wire decaptitatings Its internal green line and red line is connected on the output wiring terminal of gyro compass display afterwards, and pass through another 9 pin signal wires It is connected with USB interface;Complete connection after, open HYPACK navigation softwares add in the hardware setting of main interface gyro compass with PTK signal drivers, PTK signals driver are llq.dll, and gyro compass driver is nmea.dll;After completing addition, Signal testing is carried out, needs to adjust port if no signal enters, until after having signal input, software is closed and imports construction again File, now, attitude of ship can be truly shown in HYPACK navigation softwares, be laid the groundwork to construct smoothly to carry out.
The Grab of the present embodiment is mainly used in excavating the layer of doing of+2 meters or so of absolute altitude to -3 meters, in order to subsequently lead to Cross strand suction ship to be excavated again, in the construction technology of the Grab, following side is embodied in emphatically with difference in the prior art Face:
First, the use for supporting rope wirerope to overturn
During rope wirerope use is supported, support rope wirerope to use to after 1200 hours, directly carry out work of overturning, will Mark is carried out between the wirerope that cable rolls on to swing changes wheel and using iron wire, now, the cable after overturning is determined and rolls on and do not wear Wirerope effectively releases length, can meet that -10 meters of digging is deep, fully meet the needs of clear top application work, support rope wirerope to use Time limit has reached 2400 hours, effectively reduces the expenditure of production cost.
2nd, push up in the working procedure of beach
In order to prevent that barge is stranded, it need to first measure outside mud extraction barge bow and lean out the distance of this ship, be 26 meters in the present embodiment, Its preceding mainmast was fallen after consulting again with barge, and adjusting hawser makes the fore of outer spy concordant with stem holding, after barge Remove and readjusted stowage order, hopper stem is first depressed 1 meter or so, reduce grab bucket hoisting depth, then successively from back to front Shipped.
3rd, in beach working procedure
Operating personnel strictly control grab bucket lowering velocity during construction, and lowering velocity is controlled at 30 ms/min after water of grabbing bucket, with Reduce and dig deep shallower and grab bucket is lacked the buoyancy of seawater and cause the cracking at each position of bucket body.Fill bucket amount in order to improve and take heavy grab Construction, grab bucket fault rate is reduced, strictly angle is grabbed in control to operating personnel, i.e. control grabs angle no more than 20 degree, is grabbing bucket The meter that heals up is designated as 50 ° to stopping continuing to sink to grab during 0 ° of section, the friction to be formed is grabbed to reduce, so as to ensure rotating machine of grabbing bucket Structure energy normal work, abrasion is reduced, improve the life-span.
When shoal area soil property is closely knit silty sand ground, in work progress, it is contemplated that landslide phenomenon be present in silty sand ground, Forward pitch increases to 10 meters by 8 meters, while grabs phenomenon to reduce, and row's mode of grabbing takes single-point to excavate, that is, is grabbed bucket after moving ship Excavated every time in same position, when excavating to -2 meters of depth, the silt of both sides caves in naturally after being disturbed, then successively Excavated successively to both sides, This effectively reduces the operation that manual control is grabbed, shorten and singly grab the time, extend wirerope With the usage time for leading cable group and pulley bearings.
The scope of operation deficiency when shoal area is constructed, voluntarily slot grooving is needed, this ship takes the fan-shaped technique slotted, voluntarily It can in normal fashion be constructed after fluting, effectively raise Ship production efficiency.As Fig. 2 to Fig. 7 opens for sector Groove work progress schematic diagram.When Fig. 2 to Fig. 4 constructs, first in the parallel beach of start position, applied by the way of spy is grabbed Work, after the completion of excavation, it is labeled according to trajectory on HYPACK softwares, hull is using left back piling bar as origin side-sway to the right Move to the trace line of mark and start to construct.Continue after the completion of excavation using left back piling bar as origin side oscillation to the right until completing one Rotating circulating.After a circulation is completed, Fig. 5 enters ship in normal fashion, and landslide is formed after being disturbed due to sandy soil, is Reduce and grab, forward pitch is 10 meters.Continue after completing to excavate using left back piling bar as the side oscillation to the left of origin hull, until digging After complete second working cycles, the construction of next circulation is carried out according still further to this method.4 working cycles are completed, are excavating out foot After enough scope of operations, then adjust the parallel beach in accommodation and constructed.When digging to dead-centre position, advance reservation goes out substantially 80 meters Position, take wide-angle to visit the mode for grabbing and adjusting accommodation to the flat skew in inner side, excavate the ship nest of next construction in advance, treat Accommodation can be directly adjusted after digging to stop to be constructed.After taking this mode, the efficiency only when terminal is visited and grabs excavation ship nest Decrease, can close to 75% or so of normal construction progress, barge after completing to slot can carry out relying on shorten change refute when Between, improve Ship production efficiency.
4th, quality and safety control
After the dredging of clear table section, the depth of water will be strict controlled within -3 meters, in order to ensure that construction quality avoids the occurrence of greatly Area ultra-deep is, it is specified that grab bucket weak soil lowering velocity is 45 ms/min;Lower floor's pan soil lowering velocity is 35 ms/min, and weak soil closes bucket electric current 1.5A;Speed of healing up is 35 ms/min;The laminated bucket electric current of pan soil is no more than 2A;Speed control heal up at 30 ms/min, ship moves forward Away from being then adjusted to 9 meters by 10 meters, each teams and groups form normalizing operation, effectively reduce grab bucket fault rate.
This ship eliminates trim by way of adjusting ballast, and the depth of water is strictly grasped in construction period, enters ship time piling bar 1 Number hole lifts 0.5 meter away from piling bar well, is undercuted with to reduce steel pile tip and causes hull vibration difficult, avoids cycle hydraulic tube from booster occur The generation of phenomenon.In addition driver controls the dress amount of refuting and barge drinking water change, and pass through observation when dress is refuted according to real time water level The floading condition and cable stress situation of barge, barge is avoided the stranded situation about being stuck in my ship between barge and dry beach of heavy duty occur.
A large amount of floating objects and weeds in clear table section after excavation, around ship side be present, this ship combines the operating mode on periphery A debris net has been installed additional in high-order Sea Chest side, then parcel use is carried out using gauze on the outside of it, effectively prevents that debris from being inhaled Enter into Sea Chest clack box.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection with principle.

Claims (8)

1. a kind of technique of dredging of Grab, including ship's fix technique and construction technology, it is characterised in that:In ship's fix work In skill, gyro compass signal is imported into HYPACK softwares by compass display and corrects accommodation, make ship type in navigation software just Normal display, in the construction technology, during rope wirerope use is supported, rope wirerope is supported to use to after 1200 hours, Work of overturning directly is carried out, in the construction technology, when shoal area soil property is closely knit silty sand ground, forward pitch is by 8 meters of increasings Greatly to 10 meters, row's mode of grabbing takes single-point to excavate, and grabs bucket every time in same position excavation, is being excavated to -2 meters of depth after moving ship When, the silt of both sides caves in naturally after being disturbed, and is then excavated successively to both sides successively.
2. the technique of dredging of Grab as claimed in claim 1, it is characterised in that:In ship's fix technique, by gyro compass After display is opened, the output connection of gyro compass display is connected to from its internal green line and red line is made after signal wire decaptitating On post, and it is connected by another signal wire with USB interface;After completing connection, HYPACK navigation softwares are opened in main interface Addition gyro compass and PTK signal drivers in hardware setting, PTK signals driver are llq.dll, gyro compass driver For nmea.dll;After completing addition, signal testing is carried out, needs to adjust port if no signal enters, until there is signal input Afterwards, close software and import construction documents again.
3. the technique of dredging of Grab as claimed in claim 1, it is characterised in that:In the construction technology, Yu Dingtan is applied In man-hour, first measure outside mud extraction barge bow and lean out the distance of this ship, then its preceding mainmast fell after consulting with barge, and adjust hawser Make the fore of outer spy concordant with stem holding.
4. the technique of dredging of Grab as claimed in claim 1, it is characterised in that:In the construction technology, grab bucket into water Lowering velocity control is at 30 ms/min afterwards.
5. the technique of dredging of Grab as claimed in claim 4, it is characterised in that:In the construction technology, control is grabbed Angle is no more than 20 degree, is healed up in grab bucket and stops continuing heavy grab when meter is designated as 50 ° to 0 ° of section.
6. the technique of dredging of Grab as claimed in claim 1, it is characterised in that:In the construction technology, shoal area During construction, the fan-shaped technique slotted is taken.
7. the technique of dredging of Grab as claimed in claim 1, it is characterised in that:After the dredging of clear table section, depth of water control Within -3 meters;Weak soil lowering velocity of grabbing bucket is 45 ms/min, and weak soil closes bucket electric current 1.5A;Speed of healing up is 35 ms/min;Lower floor Pan soil lowering velocity is 35 ms/min, and the laminated bucket electric current of pan soil is no more than 2A, and the speed control that heals up is at 30 ms/min;Ship forward pitch For 9 meters.
8. the technique of dredging of Grab according to any one of claims 1 to 7, it is characterised in that:By adjusting ballast Mode controls trim.
CN201410134803.6A 2014-04-03 2014-04-03 The technique of dredging of Grab Active CN104975627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410134803.6A CN104975627B (en) 2014-04-03 2014-04-03 The technique of dredging of Grab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410134803.6A CN104975627B (en) 2014-04-03 2014-04-03 The technique of dredging of Grab

Publications (2)

Publication Number Publication Date
CN104975627A CN104975627A (en) 2015-10-14
CN104975627B true CN104975627B (en) 2018-02-16

Family

ID=54272560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410134803.6A Active CN104975627B (en) 2014-04-03 2014-04-03 The technique of dredging of Grab

Country Status (1)

Country Link
CN (1) CN104975627B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1632244A (en) * 2005-01-18 2005-06-29 刘振东 City internal river watercourse desilting construction process
CN2904062Y (en) * 2006-05-30 2007-05-23 陈华平 Automatic driving instrument for ship
CN101870546A (en) * 2010-06-01 2010-10-27 广州市保明莱环保科技有限公司 River surge silt harmless and recycling treatment method
EP2322728A2 (en) * 2009-11-13 2011-05-18 Baggerwerken Decloedt en Zoon N.V. Backhoe dredger for dredging soil material under water

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1632244A (en) * 2005-01-18 2005-06-29 刘振东 City internal river watercourse desilting construction process
CN2904062Y (en) * 2006-05-30 2007-05-23 陈华平 Automatic driving instrument for ship
EP2322728A2 (en) * 2009-11-13 2011-05-18 Baggerwerken Decloedt en Zoon N.V. Backhoe dredger for dredging soil material under water
CN101870546A (en) * 2010-06-01 2010-10-27 广州市保明莱环保科技有限公司 River surge silt harmless and recycling treatment method

Also Published As

Publication number Publication date
CN104975627A (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN104846787B (en) Construction method for carrying out sand-blowing sea-filling land-making in shallow sea area by using cutter suction dredger
CN105672195B (en) Suction Dredging Construction engineering method is twisted under a kind of urban ecology urban river water
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN1773022A (en) Fast soft foundation dyke building method and technology
CN105421286B (en) A kind of backhoe type dredger is combined with rig ship digs rock construction method
CN110512593A (en) Ultra-deep diaphragm wall structure in sea reclamation area and construction method thereof
CN109281707A (en) A kind of advanced control method of face roof absciss layer water damage
CN109137943A (en) A kind of earthwork filling construction technique of Perioperative cardiac events
CN102561379A (en) Novel bridge installation foundation and construction method thereof
CN104406471B (en) The diversion blasting construction method of intertidal zone explosive replacement fill
CN108532546B (en) Method for reversed-order excavation of harbor basin and channel
CN110093971A (en) The Combined water pump house and its construction method of subterranean tunnel
CN101929162B (en) Construction method for three-stay mudflat earthwork diker
CN104975627B (en) The technique of dredging of Grab
CN106400807B (en) Extra large work barge grouting method and its equipment
CN101555692A (en) Dewatering earth-taking construction method for foundation pit on water
CN102561454B (en) Water intake method utilizing pipe jacking vertically
CN105220701A (en) Vertical film-inserting anti-seepage method
CN104831742B (en) The Method on Dewatering of Foundation Pit that adjacent two layers low pressure water layer is not cut off by water barrier
CN105064373B (en) Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof
CN203876952U (en) Pontoon system for immersed pipes to pass through rivers
CN106400745B (en) A kind of sea work barge operational method and equipment
CN206752413U (en) A kind of extra large work barge implement
CN201843077U (en) Pile casing used on high-oblique rocky river bed of shallow soil covering layer
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 264000 Huan Hai Road, Zhifu District, Yantai, Shandong Province, No. 80

Patentee after: Hailu (Yantai) Environmental Dredging Co.,Ltd.

Country or region after: China

Address before: 264000 Huan Hai Road, Zhifu District, Yantai, Shandong Province, No. 80

Patentee before: CCCC TDC ENVIRONMENTAL PROTECTION DREDGING Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address