CN106480920A - Formula grab boat is dug in a kind of automatic side of bridge-type - Google Patents

Formula grab boat is dug in a kind of automatic side of bridge-type Download PDF

Info

Publication number
CN106480920A
CN106480920A CN201610985739.1A CN201610985739A CN106480920A CN 106480920 A CN106480920 A CN 106480920A CN 201610985739 A CN201610985739 A CN 201610985739A CN 106480920 A CN106480920 A CN 106480920A
Authority
CN
China
Prior art keywords
bridge
hull
positioning
dug
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610985739.1A
Other languages
Chinese (zh)
Inventor
熊宽旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HONGHUI HARBOR SERVICE ENGINEERING Co Ltd
Original Assignee
SHANGHAI HONGHUI HARBOR SERVICE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HONGHUI HARBOR SERVICE ENGINEERING Co Ltd filed Critical SHANGHAI HONGHUI HARBOR SERVICE ENGINEERING Co Ltd
Priority to CN201610985739.1A priority Critical patent/CN106480920A/en
Publication of CN106480920A publication Critical patent/CN106480920A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • E02F9/062Advancing equipment, e.g. spuds for floating dredgers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses formula grab boat is dug in a kind of automatic side of bridge-type, including hull, hull spoil hopper bottom is provided with spoil hopper mechanism for opening/closing, hull afterbody deck top is provided with bridge and superstructure, bridge and superstructure bottom are provided with winch with hull spoil hopper forward deck, winch rear is provided with positioning pitching pile and positioning pitching pile winch with bridge and superstructure front portion, portal crane rail is respectively equipped with two side deck of cabin between positioning pitching pile, gantry crane is installed on portal crane rail, crane beam is fixed on gantry crane support body top, rane trolley is installed at crane beam top, hanging grab bucket below rane trolley.Beneficial effects of the present invention:By integrating from navigate, dig certainly, self-contained, self-unloading, the control of Numeric Control Technology computer, using casting anchor, positioning and positioning two kinds of positioning modes of pitching pile and grabbing bucket the measure such as are dredged in ship both sides row's bucket, current dredger inefficiency is solved, the problems such as operation poor continuity and operating condition are restricted big.

Description

Formula grab boat is dug in a kind of automatic side of bridge-type
Technical field
The present invention relates to engineering ship technical field, it particularly relates to formula grab boat is dug in a kind of automatic side of bridge-type.
Background technology
In the market with from navigating, dig certainly, the dredger of self-contained, self-unloading one mainly has drag suction dredger and grabs Bucket-ladder dredger, drag suction dredger are particularly suitable for the deep work of dredging in long and narrow navigation channel, but sweep shallow during because needing frequently Turn around, therefore should not use when long and narrow navigation channel sweeps shallow, in dredging operation, as ship is made under navigation and floating state Industry, so excavate later soil layer poor flatness, it is more that other kinds of dredger is compared in the earthwork of backbreaking, and can not dig hard The debris such as matter soil, stone;Grab bucket dredger mostly is non-self-propulsion type, with from navigating, dig certainly, self-contained, self-unloading one but extremely Rare, and traditional grab bucket dredger is to hang grab bucket using the suspension rod of rotary loop wheel machine and steel wire rope, in grab bucket In the presence of body deadweight, riverbed crawl soil is put into.Then bucket rope winch is started, and suspension bucket rope passes through the pulley on suspension rod top, Grab bucket is closed, is risen, is rotated further by loop wheel machine and loads hopper to by mud, loop wheel machine goes back to excavation site again and dredged, so circulate Operation, for Large Copacity dredger, grab claw lifting mechanism needs sufficiently large driving force, and needs to occupy bigger Installing space, it is difficult to realize the requirement of large span and big torque, and operating efficiency and poor continuity.
For the problem in correlation technique, effective solution is not yet proposed at present.
Content of the invention
It is an object of the invention to provide formula grab boat is dug in a kind of automatic side of bridge-type, can solve the problem that existing dredger works Poor continuity, it is impossible to complete alone the overall process that dredges, transport mud, throw mud;Automatically control integration degree not high, need to waste greatly The manpower of amount;And excavation surface poor flatness, super side be big, capacity is little, takes a large amount of waters in operation, needs frequently to reverse end for end, right The problems such as other navigation ship impacts are big.
The purpose of the present invention is achieved through the following technical solutions:
Formula grab boat is dug in a kind of automatic side of bridge-type, and including hull, the initial and end of the hull underwater is respectively arranged at two ends with Vane wheel propeller, the hull stern waterline is to have screw and rudder;The hull spoil hopper bottom is provided with spoil hopper mechanism for opening/closing, The hull afterbody deck top is provided with bridge and superstructure, and the bridge and superstructure bottom are provided with first group of strand Car, the hull spoil hopper forward deck are provided with second group of winch, and the rear of second group of winch is built with bridge and upper strata The front that builds is respectively equipped with positioning pitching pile, is provided with positioning pitching pile winch in front of the positioning pitching pile, positions pitching pile described in front and back Between be respectively equipped with portal crane rail along the deck of cabin both sides, on the portal crane rail install gate-type lifting Crane beam fixed by machine, the gantry crane support body top, and the crane beam includes canned paragraph and the cantilever being connected with canned paragraph Section, the top of the gantry crane support body extends to the top of canned paragraph, between the cantilever segment and gantry crane support body Hydraulic jack is set, and the crane beam top is provided with rane trolley, is hung with grab bucket below the rane trolley.
Further, the portal crane rail is fixed by welding manner with deck in ship structure.
Further, connected using steel wire rope between the rane trolley and grab bucket.
Further, connected by hinged mode between the canned paragraph and cantilever segment.
Further, connected by the way of hinged between the hydraulic jack and cantilever segment and gantry crane support body.
Further, the length of the canned paragraph is not more than the width of the hull.
Beneficial effects of the present invention:By integrating from navigating, dig certainly, self-contained, self-unloading, the process of dredging adopts Numeric Control Technology Computer controls, high degree of automation, solves inefficiency, operation poor continuity, the problem of a large amount of manpowers of waste;Using throwing Positioning of anchor and positioning pitching pile position two kinds of positioning modes, and it is restricted big to solve operating condition, is needed frequently in operation process U-turn, takes a large amount of waters during operation, affect big problem to other navigation ships;Grab bucket is with gantry crane along spoil hopper length Direction is dredged in ship both sides row's bucket, solves excavation surface poor flatness, the big problem of super side.By above measure, dig this Mud ship is greatly improved in terms of applicable performance and energy-conservation.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing for using is needed to be briefly described, it should be apparent that, drawings in the following description are only some enforcements of the present invention Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also obtain according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is that formula grab boat side view is dug in a kind of automatic side of bridge-type described according to embodiments of the present invention;
Fig. 2 is that formula grab boat top view is dug in a kind of automatic side of bridge-type described according to embodiments of the present invention;
Fig. 3 is that formula grab boat gantry crane profile is dug in a kind of automatic side of bridge-type described according to embodiments of the present invention;
In figure:
1st, pitching pile is positioned;2nd, rane trolley;3rd, gantry crane;4th, portal crane rail;5th, hydraulic jack;6th, cut with scissors;7th, grab Bucket;8th, crane beam;81st, canned paragraph;82nd, cantilever segment;9th, hull;10th, bridge and superstructure;11st, screw;12nd, spoil hopper Mechanism for opening/closing;13rd, vane wheel propeller;14th, pitching pile winch is positioned;15th, rudder;16th, first group of winch;17th, second group of winch.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, the every other embodiment obtained by those of ordinary skill in the art, belong to present invention protection Scope.
As Figure 1-3, formula grab boat is dug in a kind of automatic side of bridge-type, including hull 9,9 underwater of the hull Initial and end be respectively arranged at two ends with vane wheel propeller 13,9 stern waterline of the hull is to have screw 11 and rudder 15;Described 9 spoil hopper bottom of hull is provided with spoil hopper mechanism for opening/closing 12, and 9 afterbody deck top of the hull is provided with bridge and superstructure 10, institute State bridge and 10 bottom of superstructure is provided with first group of winch 16,9 spoil hopper forward deck of the hull is provided with second group of strand Car 17, the rear of second group of winch 17 are respectively equipped with positioning pitching pile 1 with the front of bridge and superstructure 10, described fixed Pitching pile 1 front in position is provided with positioning pitching pile winch 14, positions and set along the deck of cabin both sides respectively between pitching pile 1 described in front and back There is portal crane rail 4, gantry crane 3 is installed on the portal crane rail 4, on 3 support body of the gantry crane Crane beam 8 is fixed in portion, and the crane beam 8 includes canned paragraph 81 and the cantilever segment 82 being connected with canned paragraph 81, the gate-type lifting The top of 3 support body of machine extends to the top of canned paragraph 81, arranges hydraulic oil between the cantilever segment 82 and 3 support body of gantry crane Cylinder 5,8 top of the crane beam are provided with rane trolley 2, and 2 lower section of the rane trolley is hung with grab bucket 7.
The portal crane rail 4 is fixed by welding manner with deck in ship structure.
It is connected using steel wire rope between the rane trolley 2 and grab bucket 7.
Connected by hinged mode between the canned paragraph 81 and cantilever segment 82.
It is connected by the way of hinged between the hydraulic jack 5 and cantilever segment 82 and 3 support body of gantry crane.
The length of the canned paragraph 81 is not more than the width of the hull 9.
Understand the technique scheme of the present invention for convenience, below by way of above-mentioned skill of the specifically used mode to the present invention Art scheme is described in detail.
When specifically used, vane wheel propeller 13 is respectively arranged at two ends with by the initial and end in 9 underwater of hull so that Whole ship maneuverability, can spot turn, high working efficiency, wind and wave resistance power be strong, strong environmental adaptability, 9 afterbody water of hull To have screw 11 and rudder 15, rudder 15 is mainly used to control direction of ship travel line, and propeller 16 is by the high speed of its blade Rotate to be ship and propulsive force is provided, the spoil hopper bottom of hull 9 is provided with spoil hopper mechanism for opening/closing 12, it is full-automatic that mud form thrown by the dredger Change bottom opened and mud is thrown, operating personnel are manipulated spoil hopper mechanism for opening/closing 12, open hull bottom door by operating instrument, start to throw Mud, throws after mud terminates, then by operating instrument, closes spoil hopper mechanism for opening/closing, 9 afterbody deck top of hull be provided with bridge and on Layer building 10, is respectively equipped with first group of winch 16 and the on bridge and 10 bottom of superstructure and 9 spoil hopper forward deck of hull Two groups of winches 17, can complete the receipts of anchor hawser and put by operating its instrument, because being respectively provided with winch in front and back, can be without tune when fixing Head, the front of the rear of second group of winch 17 and bridge and superstructure 10 are provided with positioning pitching pile 1 and determining of being matched therewith Position pitching pile winch 14, positions the liter that the positioning pitching pile winch 14 that pitching pile 1 arranged in deck in ship structure completes guide pile by operation Drop, for fixing dredger during operation, the dredger is using positioning and the positioning pitching pile two kinds of positioning modes of positioning of casting anchor so that should Dredger outside the suitable cruiseway of coastal waters, headway, port with harbor channel, anchorage, turning basin, basin and waterborne The regions such as the foundation trench of building can operation, be not required to frequently turn around, to other navigation ships impact less, close in ship navigation The cruiseway of collection and long and narrow waters, using positioning pitching pile positioning, are not take up a large amount of waters, compared with dredging for other forms during operation Ship has more superiority, especially when the depth of water is deeper, when positioning pitching pile length is unsatisfactory for requiring, can be using positioning of casting anchor, front and back Portal crane rail 4 is provided with along two side deck of cabin between positioning pitching pile 1, gate-type is installed on portal crane rail 4 and is risen Heavy-duty machine 3, gantry crane 3 can be walked along the portal crane rail 4 of spoil hopper both sides, by limiting at 4 two ends of crane runway Position device, it is to avoid the risk of crane derailing, gantry crane 3 support body top fix crane beam 8, crane beam 8 includes to fix Section 81 and the cantilever segment 82 hinged with canned paragraph 81, the cantilever of the 10-15m or so that encorbelmented to spoil hopper both sides respectively by crane beam 8 Section 82, under non-job state or operational configuration, cantilever segment can be by 5 pushing tow of hydraulic jack on door frame to vertical state, with ship Body width is close, and does not affect shippping traffic, arranges hydraulic jack 5, crane beam between cantilever segment 82 and 3 support body of gantry crane 8 tops are provided with rane trolley 2, and 2 lower section of rane trolley is hung with grab bucket 7, and grab bucket 7 is with gantry crane 3 along spoil hopper length side To dredging in ship both sides row's bucket, process of dredging is controlled using Numeric Control Technology computer, high degree of automation, and row's bucket is uniform, excavates Surface evenness is good, and super side is few, cost-effective, can match different types of grab bucket according to different soil properties, and dig deep regulation simplicity, Soil property is limited less with digging deeply.The automatic side of the bridge-type dig formula grab boat integrate from navigating, dig certainly, self-contained, self-unloading, Grab bucket specification and volume of compartment general all larger, high working efficiency, operation have continuity, be not required to be equipped with hopper just can complete to dredge, Transport mud, the overall process of mud is thrown, and the dredger is equipped with DGPS and GPS-RTK high-accuracy position system, dynamic positioning and follows automatically Mark system(DP/DT), draft and loading instrument, automatic fixing depth dredge, automate advanced instrument and the equipment such as dynamic tracked instrument, dredge Ship automatically controls integration degree height, in control room, only need to be equipped with 1 operator, click the mouse slightly, you can complete to include ship It is positioned at a series of interior relevant operation sequences, it is not necessary to spend more manpower again.
Formula grab boat is dug in a kind of automatic side of bridge-type of the present invention, by collecting from navigating, dig certainly, self-contained, self-unloading in Integrally, Numeric Control Technology computer controls, positions using casting anchor and positions pitching pile and positions two kinds of positioning modes and grab bucket in ship two Side row's bucket is dredged and waits invention, solves current dredger inefficiency, and operation poor continuity and operating condition are restricted greatly The problems such as.
Presently preferred embodiments of the present invention is the foregoing is only, not in order to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvement that is made etc., should be included within the scope of the present invention.

Claims (6)

1. formula grab boat is dug in a kind of automatic side of bridge-type, including hull(9), it is characterised in that the hull(9)Waterline with Under initial and end be respectively arranged at two ends with vane wheel propeller(13), the hull(9)Stern waterline is to have screw(11)And rudder (15);The hull(9)Spoil hopper bottom is provided with spoil hopper mechanism for opening/closing(12), the hull(9)Afterbody deck top is provided with bridge And superstructure(10), the bridge and superstructure(10)Bottom is provided with first group of winch(16), the hull(9)Spoil hopper Forward deck is provided with second group of winch(17), second group of winch(17)Rear and bridge and superstructure(10)'s Front is respectively equipped with positioning pitching pile(1), the positioning pitching pile(1)Front is provided with positioning pitching pile winch(14), fixed described in front and back Position pitching pile(1)Between be respectively equipped with portal crane rail along the deck of cabin both sides(4), the portal crane rail (4)Upper installation gantry crane(3), the gantry crane(3)Crane beam is fixed on support body top(8), the crane beam(8)Bag Include canned paragraph(81)And with canned paragraph(81)The cantilever segment of connection(82), the gantry crane(3)The top of support body extends to Canned paragraph(81)Top, between cantilever segment (82) and gantry crane (3) support body arrange hydraulic jack(5), the row Bicycle beam(8)Top is provided with rane trolley(2), the rane trolley(2)Lower section is hung with grab bucket(7).
2. formula grab boat is dug in a kind of automatic side of bridge-type according to claim 1, it is characterised in that the gate-type lifting Machine track(4)Fixed by welding manner with deck in ship structure.
3. formula grab boat is dug in a kind of automatic side of bridge-type according to claim 1, it is characterised in that the rane trolley (2)With grab bucket(7)Between using steel wire rope connect.
4. formula grab boat is dug in a kind of automatic side of bridge-type according to claim 1, it is characterised in that the canned paragraph (81)And cantilever segment(82)Between connected by hinged mode.
5. formula grab boat is dug in a kind of automatic side of bridge-type according to claim 1, it is characterised in that the hydraulic jack (5)With cantilever segment(82)And gantry crane(3)Connected by the way of hinged between support body.
6. formula grab boat is dug in a kind of automatic side of bridge-type according to claim 1, it is characterised in that the canned paragraph (81)Length be not more than the hull(9)Width.
CN201610985739.1A 2016-11-09 2016-11-09 Formula grab boat is dug in a kind of automatic side of bridge-type Pending CN106480920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610985739.1A CN106480920A (en) 2016-11-09 2016-11-09 Formula grab boat is dug in a kind of automatic side of bridge-type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610985739.1A CN106480920A (en) 2016-11-09 2016-11-09 Formula grab boat is dug in a kind of automatic side of bridge-type

Publications (1)

Publication Number Publication Date
CN106480920A true CN106480920A (en) 2017-03-08

Family

ID=58272303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610985739.1A Pending CN106480920A (en) 2016-11-09 2016-11-09 Formula grab boat is dug in a kind of automatic side of bridge-type

Country Status (1)

Country Link
CN (1) CN106480920A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166556A (en) * 2018-02-07 2018-06-15 广州市昊力工具有限公司 Reducing mechanism and the dredger with reducing mechanism
CN109208684A (en) * 2017-06-30 2019-01-15 中洁惠能科技(北京)有限公司 One kind is floating to cross operation-control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2003800C2 (en) * 2009-11-13 2011-05-16 Baggerwerken Decloedt & Zn N V Device for dredging soil material under water.
CN104085497A (en) * 2014-07-10 2014-10-08 姜立平 Anti-collision vessel with elastic frame structure
EP2876215A1 (en) * 2013-11-22 2015-05-27 Ondernemingen Jan De Nul, naamloze vennootchap Vessel
CN105604183A (en) * 2016-01-12 2016-05-25 广州机施建设集团有限公司 Construction method of rear welded joints of a truss
CN206157803U (en) * 2016-11-09 2017-05-10 上海宏辉港务工程有限公司 Formula grab dredger is dug to automatic side of bridge type

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2003800C2 (en) * 2009-11-13 2011-05-16 Baggerwerken Decloedt & Zn N V Device for dredging soil material under water.
EP2876215A1 (en) * 2013-11-22 2015-05-27 Ondernemingen Jan De Nul, naamloze vennootchap Vessel
CN104085497A (en) * 2014-07-10 2014-10-08 姜立平 Anti-collision vessel with elastic frame structure
CN105604183A (en) * 2016-01-12 2016-05-25 广州机施建设集团有限公司 Construction method of rear welded joints of a truss
CN206157803U (en) * 2016-11-09 2017-05-10 上海宏辉港务工程有限公司 Formula grab dredger is dug to automatic side of bridge type

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208684A (en) * 2017-06-30 2019-01-15 中洁惠能科技(北京)有限公司 One kind is floating to cross operation-control system
CN108166556A (en) * 2018-02-07 2018-06-15 广州市昊力工具有限公司 Reducing mechanism and the dredger with reducing mechanism

Similar Documents

Publication Publication Date Title
US4073078A (en) Adjustable dredging and trenching apparatus
EP1709256B1 (en) Marine backhoe dredge
CN102776910B (en) Engineering machine for dredging and cleaning river course
CN113152558A (en) River channel dredging ship capable of adjusting dredging depth
CN206157803U (en) Formula grab dredger is dug to automatic side of bridge type
CN109944287B (en) Dredging operation system under wharf
CN104452852A (en) Operating mechanism of bucket-wheel dredger
CN106480920A (en) Formula grab boat is dug in a kind of automatic side of bridge-type
CN107458541B (en) A kind of built-in positioning system applied to engineering ship
CN210797606U (en) Open caisson foundation integration device of fetching earth
CN109372047B (en) Three-cable positioning system suitable for cutter suction dredger
CN102874384B (en) Simple dredger for gravels in flowing water and method for dredging gravels
AU2010201474A1 (en) Method and a cutter device for excavation of material from a bottom situated under water
CN203546782U (en) Cutter-suction device
CN107090904B (en) Long-distance sludge digging and transporting device
EP2871292A2 (en) Cutting device for dislodging an underwater bottom and corresponding method
CN210887375U (en) Inland river mud blowing boat
CN211113818U (en) Cutter suction dredger
CN201633883U (en) Shiftable pile positioning device of engineering ship
CN209099429U (en) A kind of three way ropes position system applied to cutter suction dredger
CN209099415U (en) A kind of three way ropes position system suitable for cutter suction dredger
CN209099428U (en) A kind of three way ropes position system of cutter suction dredger
JP2962690B2 (en) Rock excavation method using guide poles installed on offshore workbench
CN109252559B (en) Three-cable positioning system applied to cutter suction dredger
CN109252560B (en) Three-cable positioning system of cutter suction dredger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20190705

AD01 Patent right deemed abandoned