CN209099428U - A kind of three way ropes position system of cutter suction dredger - Google Patents
A kind of three way ropes position system of cutter suction dredger Download PDFInfo
- Publication number
- CN209099428U CN209099428U CN201821758169.3U CN201821758169U CN209099428U CN 209099428 U CN209099428 U CN 209099428U CN 201821758169 U CN201821758169 U CN 201821758169U CN 209099428 U CN209099428 U CN 209099428U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- positioning
- anchor
- pulley
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of three way ropes position systems of cutter suction dredger, comprising: three cable tube structures, the first anchor winch, the second anchor winch, third anchor winch, the first positioning and guiding pulley, the second positioning and guiding pulley, third positioning and guiding pulley, cylinder promote leading block, the first positioning wire rope, the second positioning wire rope, third positioning wire rope, the 4th positioning wire rope, the first positioning anchor, the second positioning anchor and third positioning anchor;The three cables tube structure, comprising: vertical sliding motion cavity, cylinder, pulley base, cylinder lifting tackle, locking steel pin, fixes device, cylinder lower fixed seat on cylinder at cylinder sliding rail;The lower end of the cylinder lower fixed seat is also connected with shift plate structure, and shift plate structure setting is in the angled curved surface line style of two sides sideband.The utility model is not only able to achieve the free switching of engineering ship or device between navigation and Construction State, while being also convenient for repairing at any time.
Description
Technical field
The utility model relates to engineering ships, more specifically to a kind of three way ropes position system of cutter suction dredger.
Background technique
Cutter suction dredger is the soil that loose river bed or seabed are twisted using the reamer that is rotating, with cement mixing at mud,
The pump housing is sucked by dredging tube and is sent by sludge pipe to sludge discharging area.When cutter suction dredger is constructed, dredge, defeated mud and dump are all
It is integration, itself is completed, and production efficiency is higher.The dredging of small suitable for stormy waves, flow velocity is low inland river lake region and coastal port,
To excavate the soil properties such as sand, sandy loam, mud than conveniently, using can dig clay after reamer with teeth, but work efficiency is lower.
In existing cutter suction dredger, as " day whale number " is ripe by many people in the industry institutes from boat cutter suction dredger
Know, its work capacity, installed power, dredging capacity rank world's first, the provisioned dredging positioning on " day whale number "
System mainly uses piling bar positioning device, this set positioning device is more mature and stablizes, and has on all cutter suction dredgers
It is equipped with.The major function of piling bar positioning device is issued and is instructed by automatic control system, by steel in dredger construction operation
Stake is inserted perpendicularly into the sea bed in construction sea area, and keeps certain depth, for fixing vessel position, for work of dredging lasting below
Industry provides stable state.Meanwhile ship can rotate construction operation around piling bar, it can also be alternately real by main and auxiliary piling bar
" walking " carries out construction operation before and after spot oceangoing ship itself.Task to be onstructed terminates, and packs up positioning piling bar and gantry, ship can horses
It is upper to enter operational configuration.
Although piling bar positioning device effect is good, advantage is more, during use to the geographical conditions of working sea area
And weather sea situation has certain requirement, for example in the biggish sea area of stormy waves (under sea situation) construction operation, piling bar stress is larger
Be easy impaired or fracture, and or because of need of work, it is necessary in the harder sea area operation of sea bed, piling bar, which may can not be successfully, to be beaten
Sea bed is worn, so that piling bar itself stress is damaged.In order to continue to require according to plan in both cases to carry out construction operation, together
When also for protection piling bar, three way ropes position system also just arises, is used in conjunction with each other with piling bar positioning system.
But when dredger needs to convert from working condition to operational configuration, or needing will be in three way ropes position system
When three cable tube structures sling maintenance from hull openings, if two by stern direction are oriented angle position locating for rope pulley
It sets just in the drop shadow spread of cylinder lower fixed seat, then leaning on stern during three cable tube structures are elevated upwards
The two of direction orient rope pulley and are just bound to the interference that collides with cylinder lower fixed seat, and block, and lead to three cables
Tube structure can not normal hoisting to design height, or can not thoroughly hang out hull and repair.
Utility model content
In view of the above defects of the prior art, the purpose of the utility model is to provide a kind of cutter suction dredgers
Three way ropes position system is not only able to achieve the free switching of engineering ship or device between navigation and Construction State, while also just
It is repaired at any time.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of three way ropes position system of cutter suction dredger, comprising: three cable tube structures, the first anchor winch, the second anchor twist
Vehicle, third anchor winch, the first positioning and guiding pulley, the second positioning and guiding pulley, third positioning and guiding pulley, cylinder promote guiding
Pulley, the first positioning wire rope, the second positioning wire rope, third positioning wire rope, the 4th positioning wire rope, the first positioning anchor,
Second positioning anchor and third positioning anchor;
The three cables tube structure, comprising:
Vertical sliding motion cavity, is opened on hull;
Cylinder sliding rail, on the inner wall of vertical sliding motion cavity;
Cylinder is set in vertical sliding motion cavity, and cylinder is hollow design;
Pulley base, is set to cylinder body bottom, and first is respectively equipped on pulley base and orients rope pulley, second orient rope pulley
Rope pulley is oriented with third;
Cylinder lifting tackle has a pair, is symmetrically set in the outside of cylinder, is connected with the 4th positioning wire rope, makes cylinder
It is moved along cylinder sliding rail;
Steel pin is locked, there is a pair, set on the outside of cylinder lower end, and is located at the top of pulley base;
Device is fixed on cylinder, comprising: fixed underpan and Fixed latches, fixed underpan are set to the top of vertical sliding motion cavity
It holds, is also provided with the inner hole passed through for cylinder on fixed underpan, pin hole is offered at the top of cylinder, Fixed latches are set to bolt
In hole;
Cylinder lower fixed seat is set to the intracorporal lower end of vertical sliding motion chamber, is used cooperatively with locking steel pin, to cylinder along cylinder
Positioning when body sliding rail moves down;
One end of the first positioning wire rope is connected with the first anchor winch, and the other end of the first positioning wire rope is around in
On one positioning leading block, and it is fed through cylinder, is around in first and orients on rope pulley, then be connected with the first positioning anchor;
One end of the second positioning wire rope is connected with the second anchor winch, and the other end of the second positioning wire rope is around in
On two positioning and guiding pulleys, and it is fed through cylinder, is around in second and orients on rope pulley, then be connected with the second positioning anchor;
One end of the third positioning wire rope is connected with third anchor winch, and the other end of third positioning wire rope is around in
On three positioning and guiding pulleys, and it is fed through cylinder, is around in third and orients on rope pulley, then is connected with third positioning anchor;
One end of the 4th positioning wire rope is connected with third anchor winch, and the other end of the 4th positioning wire rope is around in cylinder
Body is promoted on leading block, then is connected with cylinder lifting tackle;
The lower end of the cylinder lower fixed seat is also connected with shift plate structure, and shift plate structure setting is angled in two sides sideband
Curved surface line style, and second, third is oriented between rope pulley on pulley base.
The first anchor winch and the second anchor winch is the anchor winch of no loose drum.
The third anchor winch is the anchor winch with loose drum.
The third anchor winch and cylinder, which are promoted, is also wound with goat's horn rolling on the 4th positioning wire rope between leading block
Wheel.
First on the pulley base orient rope pulley, second orient rope pulley and third orient rope pulley by
Hexagonal angle etc. point arrangement.
It is set on the cylinder lower fixed seat there are two aperture anchor ear, two aperture anchor ears are used cooperatively with locking steel pin.
The shift plate structure is made of φ 50mm round steel and the ship plate of 30mm thickness.
First positioning wire rope, the second positioning wire rope and the third positioning wire rope is three cable lay wire ropes.
In the above technical solution, a kind of three way ropes position system of cutter suction dredger provided by the utility model,
Also have the following the utility model has the advantages that
1) three way ropes position system of the utility model is used in combination with piling bar positioning device, cutter suction dredger can be made to adapt to
In the geographical conditions in different operating sea area and weather sea situation environment;
2) the three way ropes position system structure type of the utility model is relatively easy, and production and processing is easy, and cost is relatively low;
3) the three way ropes position system realization cutter suction dredger navigation of the utility model is freely converted convenient with Construction State,
It is also convenient for maintaining.
Detailed description of the invention
Fig. 1 is the complete layout of the three way ropes position system of the utility model;
Fig. 2 is that the first anchor winch in the three way ropes position system of the utility model, the second anchor winch and the first positioning and guiding are sliding
The connection schematic diagram of wheel, the second positioning and guiding pulley;
Fig. 3 is that third anchor winch and third positioning and guiding pulley, cylinder are promoted in the three way ropes position system of the utility model
The connection schematic diagram of leading block;
Fig. 4 is the schematic diagram that three cable tube structures are in running order in the three way ropes position system of the utility model;
Fig. 5 is the schematic diagram that three cable tube structures are in operational configuration in the three way ropes position system of the utility model;
Fig. 6 is the schematic diagram in three directions cable tube structure A-A in Fig. 5;
Fig. 7 is the schematic diagram in three directions cable tube structure B in Fig. 4;
Fig. 8 is the schematic diagram in three directions cable tube structure C in Fig. 4;
Fig. 9 is the schematic diagram in three directions cable tube structure F-F in Fig. 4;
Figure 10 is the schematic diagram in the direction Fig. 9 middle cylinder body lower fixed seat F-1;
Figure 11 is the enlarged diagram of three parts cable tube structure H in Fig. 4;
Figure 12 is the top view of the direction D-D cylinder lower fixed seat in Figure 11;
Figure 13 is the schematic diagram that the direction D-D cylinder lower fixed seat and three orient rope pulley relationship one in Figure 11;
Figure 14 is the schematic diagram that the direction D-D cylinder lower fixed seat and three orient rope pulley relationship two in Figure 11;
Figure 15 is the schematic diagram that the direction D-D cylinder lower fixed seat and three orient rope pulley relationship three in Figure 11;
Figure 16 is the schematic diagram of the direction I shift plate structure in Figure 11;
Figure 17 is the top view of the direction D-D shift plate structure in Figure 11.
Specific embodiment
The technical solution of the utility model is further illustrated with reference to the accompanying drawings and examples.
Incorporated by reference to shown in Fig. 1 to Fig. 3, a kind of three way ropes position system of cutter suction dredger provided by the utility model,
It include: three cable tube structures, the first anchor winch 1, the second anchor winch 2, third anchor winch 3, the first positioning and guiding pulley 4, second
Positioning and guiding pulley 5, third positioning and guiding pulley 6, cylinder promote leading block 7, the first positioning wire rope 8, second positions steel
Cord 9, third positioning wire rope 10, the 4th positioning wire rope 11, the first positioning anchor, the second positioning anchor and third positioning anchor.
Preferably, the three cables tube structure, comprising:
Vertical sliding motion cavity 12 is opened in the upper deck of hull, through upper deck to bottom plating;
Cylinder sliding rail 13, on the inner wall of vertical sliding motion cavity 12;
Cylinder 14 is set in vertical sliding motion cavity 12, and cylinder 14 is arranged in boring;
Pulley base 15 is respectively equipped with first on pulley base 15 and orients rope pulley 16, second set on the bottom of cylinder 14
It orients rope pulley 17 and third orients rope pulley 18;
Cylinder lifting tackle 19 has a pair, is symmetrically set in the outside of cylinder 14, is connected with the 4th positioning wire rope 11,
Cylinder 14 is set to move up and down along cylinder sliding rail 13;
Steel pin 20 is locked, there is a pair, set on the outside of 14 lower end of cylinder, and is located at the top of pulley base 15;
Device is fixed on cylinder, comprising: fixed underpan 21 and Fixed latches 26, fixed underpan 21 are set to vertical sliding motion cavity
12 top, the diameter of fixed underpan 21 need to be greater than the diameter of vertical sliding motion cavity 12, go back on the center of fixed underpan 21
The inner hole passed through for 14 upper end of cylinder is offered, the top of cylinder 14 offers pin hole, and Fixed latches 26 are inserted in pin hole
It is interior.Fixed function when device transfers in running order for three cable tube structures is fixed on cylinder, Fixed latches 26 are used for cylinder
Fixed function when body 14 is in operational configuration after being elevated.
Cylinder lower fixed seat 22, the lower end in vertical sliding motion cavity 12 are used in conjunction with each other with locking steel pin 20, use
Locking positioning when being moved down with cylinder 14 along cylinder sliding rail 13;
Preferably, one end of the first positioning wire rope 8 is connected with the first anchor winch 1, the first positioning wire rope 8 it is another
One end is around on the first positioning and guiding pulley 4, and is fed through 14 boring structure of cylinder, orients rope pulley further around in first
On 16, finally it is connected with the first positioning anchor;
Preferably, one end of the second positioning wire rope 9 is connected with the second anchor winch 2, the second positioning wire rope 9 it is another
One end is around on the second positioning and guiding pulley 5, and is fed through 14 boring structure of cylinder, orients rope pulley further around in second
On 17, finally it is connected with the second positioning anchor;
Preferably, one end of the third positioning wire rope 10 is connected with third anchor winch 3, third positioning wire rope 10
The other end is around on third positioning and guiding pulley 6, and is fed through 14 boring structure of cylinder, is around in third and is oriented rope pulley
On 18, finally it is connected with third positioning anchor;
Preferably, one end of the 4th positioning wire rope 11 is also connected with third anchor winch 3, the 4th positioning wire rope 11
The other end be around in cylinder and promoted on leading block 7, then be connected with cylinder lifting tackle 19;
Preferably, the lower end of the cylinder lower fixed seat 22 is also connected with shift plate structure 23, the setting of shift plate structure 23 is in two sides
The angled curved surface line style of face sideband, and second, third is oriented between rope pulley 17,18 on pulley base 15.
Preferably, the first anchor winch 1 and the second anchor winch 2 is the anchor winch of no loose drum.
Preferably, the third anchor winch 3 is the anchor winch with loose drum.
Preferably, the third anchor winch 3 and cylinder are promoted on the 4th positioning wire rope 11 between leading block 7 also
It is wound with several goat's horn idler wheels 24.
Preferably, first on the pulley base 15 orients rope pulley 16, second orients rope pulley 17 and third
Rope pulley 18 is oriented by hexagonal angle etc. point arrangement.
Preferably, being set on the cylinder lower fixed seat 22 there are two aperture anchor ear 25, a pair of locking steel pin 20 is corresponding to be inserted
Enter in two aperture anchor ears 25, locking positioning when moving down cylinder 14 along cylinder sliding rail 13.
Preferably, the shift plate structure 23 is made of the ship plate of φ 50mm round steel, 30mm thickness.
Preferably, the first positioning wire rope 8, the second positioning wire rope 9 and third positioning wire rope 10 are all made of
Three cable lay wire ropes.
Incorporated by reference to shown in Fig. 4 to Figure 10, when cutter suction dredger is prepared to enter into working condition, the third anchor with loose drum
Control the 4th positioning wire rope 11 decentralization arrival of cylinder 14 of winch 3 is welded in vertical sliding motion cavity 12 under the cylinder of lower end fixed
Seat 22, cylinder 14 by 22 locked and fixed of cylinder lower fixed seat (on cylinder 14 this there are two lock steel pin 20, cylinder lower fixed seat 22
On set there are two aperture anchor ear 25, when cylinder 14 slips down to cylinder lower fixed seat 22 along cylinder sliding rail 13, two locking steel
Pin 20 can smoothly enter into two aperture anchor ears 25, and cylinder 14 is fixed, can not continue to glide), the first anchor winch 1, the second anchor twist
Vehicle 2, third anchor winch 3 transfer the first positioning wire rope 8, the second positioning wire rope 9, third positioning wire rope 10, correspondence of dishing out
The first positioning anchor, the second positioning anchor and third positioning anchor be (at this point, three positioning anchors are with respect to free state, respectively along dishing out
Direction sinks), after throwing three positioning anchors, tighten corresponding first positioning wire rope 8, the second positioning wire rope 9, third positioning
Wirerope 10 can play positioning action, and can be controlled by the first anchor winch 1, the second anchor winch 2, third anchor winch 3
The position of mobile dredger is realized in three wirerope folding and unfoldings.
First orients rope pulley 16, second orients rope pulley 17 and third orients rope pulley 18 on pulley base 15
It is arranged by hexagonal angle, first orients rope pulley 16, second orients rope pulley 17 and third orients rope pulley 18 respective
It can be rotated freely alone with the positioning anchor respectively connected within the scope of hexagonal angle, three are oriented the final locating angle of rope pulley
The orientation at place determines after position is sunk by its corresponding positioning anchor.It orients rope pulley design for three and is mounted on cylinder 14 most
Lower end, whether dredger operational configuration or mud diging working state, these three orient rope pulley apart from dredger baseline
The height value of (the B.L label in such as Fig. 4) is below the height where cylinder lower fixed seat 22, that is to say, that three positioning rope stretchings
Pulley is all located at the lower end of cylinder lower fixed seat 22 always.
When dredger is in mud diging working state, as the entirety of three cable tube structures is transferred, at this point, three are oriented
Rope pulley has stretched out hull bottom plate, and hereinafter, three are oriented rope pulley, locating angle is connected by its corresponding positioning wire rope under water
Position determines after the positioning anchor connect is sunk.
When cutter suction dredger is prepared to enter into operational configuration, the 4th positioning steel of the control of third anchor winch 3 with loose drum
Cord 11 be lifted up the about 1200mm of cylinder 14 height (operational configuration be set to the top of cylinder 14 the first positioning and guiding pulley 4,
It is pushed up away from upper deck 2730mm, working condition set on cylinder 14 at the center of second positioning and guiding pulley 5 and third positioning and guiding pulley 6
The center of the first positioning and guiding pulley 4 in portion, the second positioning and guiding pulley 5 and third positioning and guiding pulley 6 is away from upper deck
1530mm), other first anchor winches 1, the second anchor winch 2 and third anchor winch 3 also recycle corresponding positioning anchor simultaneously, when three
It orients rope pulley and three positioning anchors is all elevated and is recovered in vertical sliding motion cavity 12, effectively reduce when dredger navigates by water
Water resistance.
Incorporated by reference to shown in Figure 11, orients in rope pulley for three and orient the swing model of rope pulley by two of stern direction
It is with a part to be overlapped with the projection of cylinder lower fixed seat 22, orients rope pulley and be located at cylinder lower fixed seat 22 due to three
Lower end, when dredger need from working condition to operational configuration convert when, or need by entire three cables tube structure upwards from
When slinging maintenance in hull, if two by stern direction are oriented angle locating for rope pulley just in cylinder lower fixed seat
In 22 drop shadow spreads, then two positioning rope stretchings during three cable tube structures are elevated upwards, by stern direction
Pulley is just bound to the interference that collides with cylinder lower fixed seat 22, and blocks, and three cable tube structures is caused not mention normally
It is raised to design height, or can not thoroughly hang out hull and repair.Therefore, 23 erecting and welding of shift plate structure is fixed under cylinder
The lower end of seat 22, meanwhile, shift plate structure 23 is located at the centres that rope pulley is oriented by two of stern direction again, cylinder 14 by
When upper promotion, cylinder can be avoided safely by orienting rope pulley by two of stern and being pushed to rotate to ship's head by shift plate structure 23
The angle of body lower fixed seat 22, cylinder 14, which can be realized, is freely promoted or is transferred 1200mm, or cylinder 14 is hung out hull
Repair and replace pulley.
Incorporated by reference to shown in Figure 12, cylinder lower fixed seat 22 only has 10mm by the circular arc sealing plate of forward end and 14 gap of cylinder,
Only guarantee cylinder 14 and cylinder lower fixed seat 22 not frictional interference.
Incorporated by reference to shown in Figure 13 to Figure 14, first orients rope pulley 16, second orients rope pulley 17 and third positioning
Rope pulley 18 is arranged on pulley base 15 by hexagonal angle out, and first orients rope pulley 16, second orients rope pulley 17 and the
Three orient rope pulley 18 rotates within the scope of respective hexagonal angle, and second orients rope pulley 17 and third orients rope pulley 18
Be very easy in rotating range with 22 interference and collision of cylinder lower fixed seat, even if second orients rope pulley 17 and has avoided cylinder
Lower fixed seat 22, and third orients rope pulley 18 and 22 interference and collision of cylinder lower fixed seat, cylinder 14 also can not normal hoisting,
First orients rope pulley 16 will not be with 22 interference and collision of cylinder lower fixed seat.
Only when second orients rope pulley 17 and third orients rope pulley 18 while in as shown in figure 15 this
Angle or be slightly larger than this angle state when (orient rope pulley from tail portion extreme position to ship's head rotate 120 °), cylinder
14 and all rope pulleys of orienting could avoid cylinder lower fixed seat 22 completely, realize the function of cylinder 14 normal hoisting and decentralization
Can, it is just able to satisfy freely converting for dredger operational configuration and working condition in this way.
Incorporated by reference to shown in Figure 16 to Figure 17, on the shift plate Alignment Design of shift plate structure 23, first by understanding three cables
The working principle of positioning system, simulation lean on two of tail portion to orient the rotational trajectory of rope pulley 17,18 and avoid solid under cylinder
Minimum angles needed for reservation 22 simulate shift plate line style according to rotational trajectory.
For the angle design of shift plate structure 23, rubbing between rope pulley 17,18 and pulley base 15 is oriented in measuring and calculating two
Power is wiped, measuring and calculating shift plate structure 23 orients the thrust and pressure of the generation of rope pulley 17,18 to two;Wherein 23 both sides of shift plate structure
The thrust for orienting the generation of rope pulley 17,18 to two respectively promotes two to orient rope pulley 17,18 in the process being elevated
In simultaneously to ship's head rotate;The pressure that shift plate structure 23 orients the generation of rope pulley 17,18 to two will increase two and determine
Position goes out the frictional force between rope pulley 17,18 and pulley base 15, therefore from mechanics principle analysis 23 liang of flank side surfaces of shift plate structure
All-pair two thrusts for orienting the generation of rope pulley 17,18 have to be larger than two frictional force for orienting rope pulley 17,18
The sum of with water resistance.
Line style fairing for shift plate structure 23 is oriented the promotion of rope pulley 17,18 and is rotated and avoids cylinder according to two
The angle design on 23 two sides side of the motion profile of lower fixed seat 22 and required angle and shift plate structure, is oriented at two
Some spatial points are chosen within the scope of rope pulley 17,18 motion profiles and are linked to be space curve, form a space curved surface, it is then sharp
Surface smoothing is carried out for 23 curved surface of shift plate structure with " hull 3D fairing " principle.
Shift plate structure 23 can push two by stern direction to orient rope pulley simultaneously and rotate to energy to ship's head
Enough safety avoids the angle of cylinder lower fixed seat 22, finally meets the use function of three way ropes position system.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate that this is practical new
Type, and be not used as the restriction to the utility model, as long as in the spirit of the utility model, to the above
Variation, the modification of embodiment will all be fallen in the Claims scope of the utility model.
Claims (8)
1. a kind of three way ropes position system of cutter suction dredger, characterized by comprising: three cable tube structures, the first anchor winch,
Second anchor winch, third anchor winch, the first positioning and guiding pulley, the second positioning and guiding pulley, third positioning and guiding pulley, cylinder
Promote leading block, the first positioning wire rope, the second positioning wire rope, third positioning wire rope, the 4th positioning wire rope, first
Positioning anchor, the second positioning anchor and third positioning anchor;
The three cables tube structure, comprising:
Vertical sliding motion cavity, is opened on hull;
Cylinder sliding rail, on the inner wall of vertical sliding motion cavity;
Cylinder is set in vertical sliding motion cavity, and cylinder is hollow design;
Pulley base, is set to cylinder body bottom, and first is respectively equipped on pulley base and orients rope pulley, second orient rope pulley and the
Three orient rope pulley;
Cylinder lifting tackle has a pair, is symmetrically set in the outside of cylinder, is connected with the 4th positioning wire rope, makes cylinder along cylinder
Body sliding rail is mobile;
Steel pin is locked, there is a pair, set on the outside of cylinder lower end, and is located at the top of pulley base;
Device is fixed on cylinder, comprising: fixed underpan and Fixed latches, fixed underpan are set to the top of vertical sliding motion cavity, Gu
Determine to be also provided with the inner hole passed through for cylinder on chassis, pin hole is offered at the top of cylinder, Fixed latches are set in pin hole;
Cylinder lower fixed seat is set to the intracorporal lower end of vertical sliding motion chamber, is used cooperatively with locking steel pin, sliding along cylinder to cylinder
Positioning when dynamic rail road moves down;
One end of the first positioning wire rope is connected with the first anchor winch, and it is fixed that the other end of the first positioning wire rope is around in first
On the leading block of position, and it is fed through cylinder, is around in first and orients on rope pulley, then be connected with the first positioning anchor;
One end of the second positioning wire rope is connected with the second anchor winch, and it is fixed that the other end of the second positioning wire rope is around in second
On the leading block of position, and it is fed through cylinder, is around in second and orients on rope pulley, then be connected with the second positioning anchor;
One end of the third positioning wire rope is connected with third anchor winch, and it is fixed that the other end of third positioning wire rope is around in third
On the leading block of position, and it is fed through cylinder, is around in third and orients on rope pulley, then be connected with third positioning anchor;
One end of the 4th positioning wire rope is connected with third anchor winch, and the other end of the 4th positioning wire rope is around in cylinder and mentions
It rises on leading block, then be connected with cylinder lifting tackle;
The lower end of the cylinder lower fixed seat is also connected with shift plate structure, and shift plate structure setting is in the angled curved surface of two sides sideband
Line style, and second, third is oriented between rope pulley on pulley base.
2. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: first anchor
Winch and the second anchor winch are the anchor winch of no loose drum.
3. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: the third anchor
Winch is the anchor winch with loose drum.
4. a kind of three way ropes position system of cutter suction dredger as claimed in claim 3, it is characterised in that: the third anchor
Winch and cylinder are promoted and are also wound with goat's horn idler wheel on the 4th positioning wire rope between leading block.
5. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: the pulley base
On first orient rope pulley, second orient rope pulley and third orients rope pulley by hexagonal angle etc. point arrangement.
6. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: under the cylinder
It is set in fixing seat there are two aperture anchor ear, two aperture anchor ears are used cooperatively with locking steel pin.
7. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: the shift plate knot
Structure is made of the ship plate of φ 50mm round steel, 30mm thickness.
8. a kind of three way ropes position system of cutter suction dredger as described in claim 1, it is characterised in that: described first is fixed
Position wirerope, the second positioning wire rope and third positioning wire rope are three cable lay wire ropes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758169.3U CN209099428U (en) | 2018-10-29 | 2018-10-29 | A kind of three way ropes position system of cutter suction dredger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758169.3U CN209099428U (en) | 2018-10-29 | 2018-10-29 | A kind of three way ropes position system of cutter suction dredger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209099428U true CN209099428U (en) | 2019-07-12 |
Family
ID=67156954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821758169.3U Withdrawn - After Issue CN209099428U (en) | 2018-10-29 | 2018-10-29 | A kind of three way ropes position system of cutter suction dredger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209099428U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252560A (en) * | 2018-10-29 | 2019-01-22 | 上海振华重工(集团)股份有限公司 | A kind of three way ropes position system of cutter suction dredger |
-
2018
- 2018-10-29 CN CN201821758169.3U patent/CN209099428U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252560A (en) * | 2018-10-29 | 2019-01-22 | 上海振华重工(集团)股份有限公司 | A kind of three way ropes position system of cutter suction dredger |
CN109252560B (en) * | 2018-10-29 | 2023-10-10 | 上海振华重工(集团)股份有限公司 | Three-cable positioning system of cutter suction dredger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109506044A (en) | A kind of pipeline under the ocean construction technology | |
WO2009027825A2 (en) | Work-over rig assembly and methods thereof | |
CN106193161A (en) | A kind of strand is inhaled boat landing forward position and is surpassed low coverage ship dredging construction method | |
CN109372047A (en) | A kind of three way ropes position system suitable for cutter suction dredger | |
CN209099428U (en) | A kind of three way ropes position system of cutter suction dredger | |
CN209099415U (en) | A kind of three way ropes position system suitable for cutter suction dredger | |
CN209099429U (en) | A kind of three way ropes position system applied to cutter suction dredger | |
CN209162919U (en) | A kind of three way ropes position system on cutter suction dredger | |
CN107458541B (en) | A kind of built-in positioning system applied to engineering ship | |
CN109252560A (en) | A kind of three way ropes position system of cutter suction dredger | |
CN109252559A (en) | A kind of three way ropes position system applied to cutter suction dredger | |
CN109183873A (en) | A kind of three way ropes position system on cutter suction dredger | |
CN206157803U (en) | Formula grab dredger is dug to automatic side of bridge type | |
CN207295707U (en) | New marine guidance piling ship | |
CN110576945A (en) | Scientific investigation drilling ship | |
CN213109699U (en) | Small-size barrier cleaning device in shallow water sea area | |
CN210887375U (en) | Inland river mud blowing boat | |
CN208982681U (en) | A kind of slide rail type bypass butterfly door gear for cutter suction dredger | |
TWI834746B (en) | Work platform vessel equipped with crane and method of using the crane | |
CN208949945U (en) | It is dumpable to mention pile frame | |
CN106480920A (en) | Formula grab boat is dug in a kind of automatic side of bridge-type | |
CN207499030U (en) | A kind of vertical lifting of all-around mobile reamer arm is from navigating cutter suction dredger | |
RU93416U1 (en) | EXCAVATOR SQUARE | |
CN2393816Y (en) | Special apparatus for moving heavy equipment on seabeach | |
CN2604377Y (en) | Seabeach self-navigating steel bottom base floating well site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190712 Effective date of abandoning: 20231010 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190712 Effective date of abandoning: 20231010 |