PROCESS FOR CONSTRUCTING RAILWAY

Info

Publication number
MA34562B1
MA34562B1 MA34395A MA34395A MA34562B1 MA 34562 B1 MA34562 B1 MA 34562B1 MA 34395 A MA34395 A MA 34395A MA 34395 A MA34395 A MA 34395A MA 34562 B1 MA34562 B1 MA 34562B1
Authority
MA
Morocco
Prior art keywords
train
track
platform
definitive
road vehicles
Prior art date
Application number
MA34395A
Other languages
French (fr)
Inventor
Emmanuel Mange
Original Assignee
Etf S A S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Etf S A S filed Critical Etf S A S
Publication of MA34562B1 publication Critical patent/MA34562B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D15/00Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining

Abstract

L'INVENTION CONCERNE UN PROCÉDÉ DE CONSTRUCTION D'AU MOINS UNE VOIE DE CHEMIN DE FER (V1, V2) SUR UNE PLATEFORME (5), DANS LEQUEL LES TRAVERSES DÉFINITIVES SONT POSÉES À LEUR EMPLACEMENT SENSIBLEMENT DÉFINITIF ET ESSENTIELLEMENT PAR DES ENGINS ROUTIERS (20,30,40).DES DÉPÔTS (10) DE TRAVERSES SONT AU PRÉALABLE CONSTITUÉS SUR LA PLATEFORME (5) ET LE LONG DE L'AU MOINS UNE VOIE À CONSTRUIRE (V1, V2) GRÂCE À DES ENGINS ROUTIERS.LE PROCÉDÉ COMPORTE ÉGALEMENT LA POSE DE RAILS SUR CES TRAVERSES, LES RAILS ÉTANT POUSSÉS À L'AVANT D'UN WAGON DE POSE POUR LA PREMIÈRE VOIE (V1), ET DÉPOSÉS PAR GLISSEMENT HORS D'UN TRAIN DE STOCKAGE ET DE POSE DE RAILS SELON UNE DIRECTION VERS L'ARRIÈRE DU TRAIN ET EN BIAIS PAR RAPPORT À L'AXE DU TRAIN POUR LA SECONDE VOIE (V2).The invention relates to a method for constructing at least one railroad track (V1, V2) on a platform (5), in which the definitive crossings are placed at their location which is substantially definitive and essentially by road vehicles (20). , 30, 40). DEPOSITS (10) OF TRAVERSES ARE PREFABABLY CONSTITUTED ON THE PLATFORM (5) AND ALONG AT LEAST ONE WAY TO BE CONSTRUCTED (V1, V2) THROUGH ROAD VEHICLES. THE METHOD ALSO INCLUDES LAYING RAILS ON THESE TRAILERS, RAILS PUSHED IN FRONT OF A POSTAGE WAGON FOR THE FIRST TRACK (V1), AND DEPOSITED BY SLIDING OUT OF A RAIL STORAGE AND LAYOUT TRAIN ACCORDING TO DIRECTION TO THE REAR OF THE TRAIN AND THROUGH THE AXIS OF THE TRAIN FOR THE SECOND TRACK (V2).

MA34395A 2010-11-29 2011-11-28 PROCESS FOR CONSTRUCTING RAILWAY MA34562B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1059828A FR2968018B1 (en) 2010-11-29 2010-11-29 PROCESS FOR CONSTRUCTING RAILWAY.
FR1160621A FR2968017B1 (en) 2010-11-29 2011-11-22 PROCESS FOR CONSTRUCTING RAILWAY.

Publications (1)

Publication Number Publication Date
MA34562B1 true MA34562B1 (en) 2013-10-02

Family

ID=44210097

Family Applications (2)

Application Number Title Priority Date Filing Date
MA34377A MA33634B1 (en) 2010-11-29 2011-11-24 PROCESS FOR CONSTRUCTING RAILWAY
MA34395A MA34562B1 (en) 2010-11-29 2011-11-28 PROCESS FOR CONSTRUCTING RAILWAY

Family Applications Before (1)

Application Number Title Priority Date Filing Date
MA34377A MA33634B1 (en) 2010-11-29 2011-11-24 PROCESS FOR CONSTRUCTING RAILWAY

Country Status (6)

Country Link
US (2) US20130213253A1 (en)
EP (2) EP2646621A1 (en)
CA (2) CA2816444A1 (en)
FR (2) FR2968018B1 (en)
MA (2) MA33634B1 (en)
WO (2) WO2012072901A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2621516T3 (en) * 2010-09-15 2017-07-04 Knape Gruppe Holding Gmbh Device for road construction work
ES2581404B1 (en) * 2015-03-05 2017-06-13 Ferrovial Agroman, S.A. Rail unloading procedure
JP6711226B2 (en) * 2016-09-28 2020-06-17 日本製鉄株式会社 Curved transport mechanism for long rails
RU2671793C1 (en) * 2017-09-25 2018-11-06 Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации Device for mechanized laying of sleepers for ballast prism
RU2745765C1 (en) * 2020-02-27 2021-03-31 Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации Improved device for mechanized railway laying on the ballast layer
CN112411276B (en) * 2020-11-11 2021-08-31 中铁北京工程局集团第二工程有限公司 Track laying device and method for large-scale track traffic engineering construction
CN114150541B (en) * 2021-11-08 2023-08-04 中铁三局集团线桥工程有限公司 Full-automatic scanning system for track bed section and operation method
CN114277624A (en) * 2022-01-10 2022-04-05 中铁十一局集团有限公司 Construction method for laying two adjacent lines of long steel rail

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3330219A (en) * 1963-09-23 1967-07-11 Plasser Franz Method and apparatus for replacing an old track by a new track
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system
FR2259185B1 (en) * 1974-01-29 1976-12-31 Scheuchzer Fils Auguste
AT351576B (en) * 1977-06-16 1979-08-10 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR LAYING TRACKS
US4205612A (en) * 1978-03-16 1980-06-03 Dale Luttig Rail roller
AT359541B (en) * 1978-06-28 1980-11-10 Plasser Bahnbaumasch Franz DEVICE FOR REPLACING THE RAILS AND SLEEPERS OF A TRACK
AT366435B (en) * 1978-12-12 1982-04-13 Plasser Bahnbaumasch Franz EQUIPMENT FOR REPLACEMENT OR RENEWING THE RAILS OF A LAYED TRACK
IT1232099B (en) * 1989-05-23 1992-01-23 Valditerra S P A PROCEDURE FOR THE CONTINUOUS WELDING OF RAIL TRUNKS, ROTABLE AND EQUIPPED FOR ITS IMPLEMENTATION
DE4104683A1 (en) * 1991-02-15 1992-08-20 Wayss & Freytag Ag Rail road bed - uses liq. mortar to form a plate in upper section of the ballast, with structured ballast particles to prevent downwards dispersion
AU652086B1 (en) * 1992-12-22 1994-08-11 Macbon Pty. Ltd. Sleeper laying apparatus
DE4312964A1 (en) * 1993-04-21 1994-10-27 Robel Georg Gmbh & Co Rail loading train for transporting as well as loading and unloading long rails
DE19524285A1 (en) * 1995-07-04 1997-01-09 Robel Georg Gmbh & Co Rail loading wagons
EP0939849A1 (en) * 1996-09-09 1999-09-08 Karl Anders Rosenqvist A method of placing rail sections and a means therefore
EP0853160B1 (en) * 1997-01-10 2004-05-12 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Wagon for unloading long railway rails from a transport wagon
SE510322C2 (en) * 1997-01-22 1999-05-10 Rosenqvist Foervaltnings Ab A Method for forming a gravel-covered upper surface along a web embankment section and a shaft arrangement therefor
ES2239562T3 (en) * 1999-02-12 2005-10-01 Robel Bahnbaumaschinen Gmbh DEVICE FOR DOWNLOADING RAILS.
DE10108754A1 (en) * 2001-02-23 2002-09-05 Walter Heilit Verkehrswegebau Rail tracklaying as transport procedure involves taking rail pair from rail store for placing on transporter car run to forward track end where drive group grippers place rail to gage in track line.
AT5769U3 (en) * 2002-09-05 2003-09-25 Plasser Bahnbaumasch Franz MACHINE FOR DISASSEMBLING AND LAYING A TRACK AND METHOD
US6981452B2 (en) * 2004-02-06 2006-01-03 Herzog Contracting Corp. Method and apparatus for unloading ribbon rails from rail cars
GB0406945D0 (en) * 2004-03-27 2004-04-28 W & D Mcculloch Rail track handling apparatus and method
ES2319953B1 (en) * 2008-10-21 2010-07-07 Tecsa Empresa Constructora, S.A. DEVICE FOR DISCHARGE AND PLACEMENT OF RAILS ON A PARALLEL ROAD TO ANOTHER EXISTING.

Also Published As

Publication number Publication date
MA33634B1 (en) 2012-10-01
FR2968017A1 (en) 2012-06-01
US20130206031A1 (en) 2013-08-15
EP2646622A1 (en) 2013-10-09
FR2968018B1 (en) 2013-08-16
CA2816557A1 (en) 2012-06-07
FR2968017B1 (en) 2013-08-16
EP2646621A1 (en) 2013-10-09
WO2012072921A1 (en) 2012-06-07
FR2968018A1 (en) 2012-06-01
WO2012072901A1 (en) 2012-06-07
CA2816444A1 (en) 2012-06-07
US20130213253A1 (en) 2013-08-22

Similar Documents

Publication Publication Date Title
MA34562B1 (en) PROCESS FOR CONSTRUCTING RAILWAY
FR2532968A1 (en) TOOL ARRANGEMENT FOR BOTTOM UNDER BOTTOM, LEVELING AND LATERAL DRESSING OF A RAILWAY
Zwanenburg Modelling degradation processes of switches & crossings for maintenance & renewal planning on the Swiss railway network
RU2447220C1 (en) Method to apply polymer coats onto ballast layer
US7882787B2 (en) Machine for renovation of a track
ATE482862T1 (en) RAIL-BOUND CONVEYOR SYSTEM
US10385517B2 (en) Method for track renewal
KR102197762B1 (en) A Special train for replacing gravel ballast to concrete ballast
DE502007002402D1 (en) DRIVEN WORKING DEVICE
RU2297934C1 (en) Transport system "metrobus"
ATE424335T1 (en) RAIL VEHICLE WITH A CAR BODY AND RAIL RUNNING GEARS TO ACCOMMODATE A MACHINE ARRANGEMENT FOR MECHANICALLY PROCESSING THE RAILS OF A TRACK
RU2634059C1 (en) Frontal type machine for cutting out soil surface layer
FR2983877B1 (en) WAGON POUSSEUR DE RAILS.
JP6207267B2 (en) Wheel guard device
Kovtanets et al. Increase of coupling characteristics and profitability of the locomotive modernization of system of supply of sand
CN205347900U (en) Railway railway ballast car that paves
CN201232144Y (en) Plough apparatus on ballast vehicle
RU2357034C2 (en) Joint bar (versions) and method of its application
FR2926049B1 (en) TROLLEY FOR INSTALLATION AND MAINTENANCE MACHINE OF RAILWAY
CN110512476A (en) Soft base two-wire track laying method in a kind of Double Multi-Arch rich water tunnel
KR101175347B1 (en) Railroad separator
RU2009138627A (en) SPEED RAILWAY FOR TRANSPORTATION OF LARGE-BULK CARGOES AND METHOD OF ITS OPERATION
RU2382843C2 (en) Rail road and method of its operation
Gisterek et al. Changeable fate of covered tram track applications
WO2009092896A3 (en) Railway track renewal train element comprising a ballast clearing system