MA34562B1 - PROCESS FOR CONSTRUCTING RAILWAY - Google Patents
PROCESS FOR CONSTRUCTING RAILWAYInfo
- Publication number
- MA34562B1 MA34562B1 MA34395A MA34395A MA34562B1 MA 34562 B1 MA34562 B1 MA 34562B1 MA 34395 A MA34395 A MA 34395A MA 34395 A MA34395 A MA 34395A MA 34562 B1 MA34562 B1 MA 34562B1
- Authority
- MA
- Morocco
- Prior art keywords
- train
- track
- platform
- definitive
- road vehicles
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D15/00—Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
- E01B29/17—Lengths of rails assembled into strings, e.g. welded together
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
Abstract
L'INVENTION CONCERNE UN PROCÉDÉ DE CONSTRUCTION D'AU MOINS UNE VOIE DE CHEMIN DE FER (V1, V2) SUR UNE PLATEFORME (5), DANS LEQUEL LES TRAVERSES DÉFINITIVES SONT POSÉES À LEUR EMPLACEMENT SENSIBLEMENT DÉFINITIF ET ESSENTIELLEMENT PAR DES ENGINS ROUTIERS (20,30,40).DES DÉPÔTS (10) DE TRAVERSES SONT AU PRÉALABLE CONSTITUÉS SUR LA PLATEFORME (5) ET LE LONG DE L'AU MOINS UNE VOIE À CONSTRUIRE (V1, V2) GRÂCE À DES ENGINS ROUTIERS.LE PROCÉDÉ COMPORTE ÉGALEMENT LA POSE DE RAILS SUR CES TRAVERSES, LES RAILS ÉTANT POUSSÉS À L'AVANT D'UN WAGON DE POSE POUR LA PREMIÈRE VOIE (V1), ET DÉPOSÉS PAR GLISSEMENT HORS D'UN TRAIN DE STOCKAGE ET DE POSE DE RAILS SELON UNE DIRECTION VERS L'ARRIÈRE DU TRAIN ET EN BIAIS PAR RAPPORT À L'AXE DU TRAIN POUR LA SECONDE VOIE (V2).The invention relates to a method for constructing at least one railroad track (V1, V2) on a platform (5), in which the definitive crossings are placed at their location which is substantially definitive and essentially by road vehicles (20). , 30, 40). DEPOSITS (10) OF TRAVERSES ARE PREFABABLY CONSTITUTED ON THE PLATFORM (5) AND ALONG AT LEAST ONE WAY TO BE CONSTRUCTED (V1, V2) THROUGH ROAD VEHICLES. THE METHOD ALSO INCLUDES LAYING RAILS ON THESE TRAILERS, RAILS PUSHED IN FRONT OF A POSTAGE WAGON FOR THE FIRST TRACK (V1), AND DEPOSITED BY SLIDING OUT OF A RAIL STORAGE AND LAYOUT TRAIN ACCORDING TO DIRECTION TO THE REAR OF THE TRAIN AND THROUGH THE AXIS OF THE TRAIN FOR THE SECOND TRACK (V2).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1059828A FR2968018B1 (en) | 2010-11-29 | 2010-11-29 | PROCESS FOR CONSTRUCTING RAILWAY. |
FR1160621A FR2968017B1 (en) | 2010-11-29 | 2011-11-22 | PROCESS FOR CONSTRUCTING RAILWAY. |
Publications (1)
Publication Number | Publication Date |
---|---|
MA34562B1 true MA34562B1 (en) | 2013-10-02 |
Family
ID=44210097
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MA34377A MA33634B1 (en) | 2010-11-29 | 2011-11-24 | PROCESS FOR CONSTRUCTING RAILWAY |
MA34395A MA34562B1 (en) | 2010-11-29 | 2011-11-28 | PROCESS FOR CONSTRUCTING RAILWAY |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MA34377A MA33634B1 (en) | 2010-11-29 | 2011-11-24 | PROCESS FOR CONSTRUCTING RAILWAY |
Country Status (6)
Country | Link |
---|---|
US (2) | US20130213253A1 (en) |
EP (2) | EP2646621A1 (en) |
CA (2) | CA2816444A1 (en) |
FR (2) | FR2968018B1 (en) |
MA (2) | MA33634B1 (en) |
WO (2) | WO2012072901A1 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2621516T3 (en) * | 2010-09-15 | 2017-07-04 | Knape Gruppe Holding Gmbh | Device for road construction work |
ES2581404B1 (en) * | 2015-03-05 | 2017-06-13 | Ferrovial Agroman, S.A. | Rail unloading procedure |
JP6711226B2 (en) * | 2016-09-28 | 2020-06-17 | 日本製鉄株式会社 | Curved transport mechanism for long rails |
RU2671793C1 (en) * | 2017-09-25 | 2018-11-06 | Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Device for mechanized laying of sleepers for ballast prism |
RU2745765C1 (en) * | 2020-02-27 | 2021-03-31 | Федеральное государственное бюджетное учреждение "3 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Improved device for mechanized railway laying on the ballast layer |
CN112411276B (en) * | 2020-11-11 | 2021-08-31 | 中铁北京工程局集团第二工程有限公司 | Track laying device and method for large-scale track traffic engineering construction |
CN114150541B (en) * | 2021-11-08 | 2023-08-04 | 中铁三局集团线桥工程有限公司 | Full-automatic scanning system for track bed section and operation method |
CN114277624A (en) * | 2022-01-10 | 2022-04-05 | 中铁十一局集团有限公司 | Construction method for laying two adjacent lines of long steel rail |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3330219A (en) * | 1963-09-23 | 1967-07-11 | Plasser Franz | Method and apparatus for replacing an old track by a new track |
US3465687A (en) * | 1966-11-18 | 1969-09-09 | New York Central Railroad Co T | Rail positioning system |
FR2259185B1 (en) * | 1974-01-29 | 1976-12-31 | Scheuchzer Fils Auguste | |
AT351576B (en) * | 1977-06-16 | 1979-08-10 | Plasser Bahnbaumasch Franz | MOBILE DEVICE FOR LAYING TRACKS |
US4205612A (en) * | 1978-03-16 | 1980-06-03 | Dale Luttig | Rail roller |
AT359541B (en) * | 1978-06-28 | 1980-11-10 | Plasser Bahnbaumasch Franz | DEVICE FOR REPLACING THE RAILS AND SLEEPERS OF A TRACK |
AT366435B (en) * | 1978-12-12 | 1982-04-13 | Plasser Bahnbaumasch Franz | EQUIPMENT FOR REPLACEMENT OR RENEWING THE RAILS OF A LAYED TRACK |
IT1232099B (en) * | 1989-05-23 | 1992-01-23 | Valditerra S P A | PROCEDURE FOR THE CONTINUOUS WELDING OF RAIL TRUNKS, ROTABLE AND EQUIPPED FOR ITS IMPLEMENTATION |
DE4104683A1 (en) * | 1991-02-15 | 1992-08-20 | Wayss & Freytag Ag | Rail road bed - uses liq. mortar to form a plate in upper section of the ballast, with structured ballast particles to prevent downwards dispersion |
AU652086B1 (en) * | 1992-12-22 | 1994-08-11 | Macbon Pty. Ltd. | Sleeper laying apparatus |
DE4312964A1 (en) * | 1993-04-21 | 1994-10-27 | Robel Georg Gmbh & Co | Rail loading train for transporting as well as loading and unloading long rails |
DE19524285A1 (en) * | 1995-07-04 | 1997-01-09 | Robel Georg Gmbh & Co | Rail loading wagons |
EP0939849A1 (en) * | 1996-09-09 | 1999-09-08 | Karl Anders Rosenqvist | A method of placing rail sections and a means therefore |
EP0853160B1 (en) * | 1997-01-10 | 2004-05-12 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Wagon for unloading long railway rails from a transport wagon |
SE510322C2 (en) * | 1997-01-22 | 1999-05-10 | Rosenqvist Foervaltnings Ab A | Method for forming a gravel-covered upper surface along a web embankment section and a shaft arrangement therefor |
ES2239562T3 (en) * | 1999-02-12 | 2005-10-01 | Robel Bahnbaumaschinen Gmbh | DEVICE FOR DOWNLOADING RAILS. |
DE10108754A1 (en) * | 2001-02-23 | 2002-09-05 | Walter Heilit Verkehrswegebau | Rail tracklaying as transport procedure involves taking rail pair from rail store for placing on transporter car run to forward track end where drive group grippers place rail to gage in track line. |
AT5769U3 (en) * | 2002-09-05 | 2003-09-25 | Plasser Bahnbaumasch Franz | MACHINE FOR DISASSEMBLING AND LAYING A TRACK AND METHOD |
US6981452B2 (en) * | 2004-02-06 | 2006-01-03 | Herzog Contracting Corp. | Method and apparatus for unloading ribbon rails from rail cars |
GB0406945D0 (en) * | 2004-03-27 | 2004-04-28 | W & D Mcculloch | Rail track handling apparatus and method |
ES2319953B1 (en) * | 2008-10-21 | 2010-07-07 | Tecsa Empresa Constructora, S.A. | DEVICE FOR DISCHARGE AND PLACEMENT OF RAILS ON A PARALLEL ROAD TO ANOTHER EXISTING. |
-
2010
- 2010-11-29 FR FR1059828A patent/FR2968018B1/en active Active
-
2011
- 2011-04-22 CA CA2816444A patent/CA2816444A1/en not_active Abandoned
- 2011-04-22 EP EP11723504.4A patent/EP2646621A1/en not_active Withdrawn
- 2011-04-22 US US13/822,310 patent/US20130213253A1/en not_active Abandoned
- 2011-04-22 WO PCT/FR2011/050941 patent/WO2012072901A1/en active Application Filing
- 2011-11-22 FR FR1160621A patent/FR2968017B1/en active Active
- 2011-11-24 MA MA34377A patent/MA33634B1/en unknown
- 2011-11-25 WO PCT/FR2011/052760 patent/WO2012072921A1/en active Application Filing
- 2011-11-25 US US13/823,273 patent/US20130206031A1/en not_active Abandoned
- 2011-11-25 EP EP11802509.7A patent/EP2646622A1/en not_active Withdrawn
- 2011-11-25 CA CA2816557A patent/CA2816557A1/en not_active Abandoned
- 2011-11-28 MA MA34395A patent/MA34562B1/en unknown
Also Published As
Publication number | Publication date |
---|---|
MA33634B1 (en) | 2012-10-01 |
FR2968017A1 (en) | 2012-06-01 |
US20130206031A1 (en) | 2013-08-15 |
EP2646622A1 (en) | 2013-10-09 |
FR2968018B1 (en) | 2013-08-16 |
CA2816557A1 (en) | 2012-06-07 |
FR2968017B1 (en) | 2013-08-16 |
EP2646621A1 (en) | 2013-10-09 |
WO2012072921A1 (en) | 2012-06-07 |
FR2968018A1 (en) | 2012-06-01 |
WO2012072901A1 (en) | 2012-06-07 |
CA2816444A1 (en) | 2012-06-07 |
US20130213253A1 (en) | 2013-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MA34562B1 (en) | PROCESS FOR CONSTRUCTING RAILWAY | |
FR2532968A1 (en) | TOOL ARRANGEMENT FOR BOTTOM UNDER BOTTOM, LEVELING AND LATERAL DRESSING OF A RAILWAY | |
Zwanenburg | Modelling degradation processes of switches & crossings for maintenance & renewal planning on the Swiss railway network | |
RU2447220C1 (en) | Method to apply polymer coats onto ballast layer | |
US7882787B2 (en) | Machine for renovation of a track | |
ATE482862T1 (en) | RAIL-BOUND CONVEYOR SYSTEM | |
US10385517B2 (en) | Method for track renewal | |
KR102197762B1 (en) | A Special train for replacing gravel ballast to concrete ballast | |
DE502007002402D1 (en) | DRIVEN WORKING DEVICE | |
RU2297934C1 (en) | Transport system "metrobus" | |
ATE424335T1 (en) | RAIL VEHICLE WITH A CAR BODY AND RAIL RUNNING GEARS TO ACCOMMODATE A MACHINE ARRANGEMENT FOR MECHANICALLY PROCESSING THE RAILS OF A TRACK | |
RU2634059C1 (en) | Frontal type machine for cutting out soil surface layer | |
FR2983877B1 (en) | WAGON POUSSEUR DE RAILS. | |
JP6207267B2 (en) | Wheel guard device | |
Kovtanets et al. | Increase of coupling characteristics and profitability of the locomotive modernization of system of supply of sand | |
CN205347900U (en) | Railway railway ballast car that paves | |
CN201232144Y (en) | Plough apparatus on ballast vehicle | |
RU2357034C2 (en) | Joint bar (versions) and method of its application | |
FR2926049B1 (en) | TROLLEY FOR INSTALLATION AND MAINTENANCE MACHINE OF RAILWAY | |
CN110512476A (en) | Soft base two-wire track laying method in a kind of Double Multi-Arch rich water tunnel | |
KR101175347B1 (en) | Railroad separator | |
RU2009138627A (en) | SPEED RAILWAY FOR TRANSPORTATION OF LARGE-BULK CARGOES AND METHOD OF ITS OPERATION | |
RU2382843C2 (en) | Rail road and method of its operation | |
Gisterek et al. | Changeable fate of covered tram track applications | |
WO2009092896A3 (en) | Railway track renewal train element comprising a ballast clearing system |