KR970070352A - New construction method of underground structures under non-installation - Google Patents
New construction method of underground structures under non-installation Download PDFInfo
- Publication number
- KR970070352A KR970070352A KR1019960009996A KR19960009996A KR970070352A KR 970070352 A KR970070352 A KR 970070352A KR 1019960009996 A KR1019960009996 A KR 1019960009996A KR 19960009996 A KR19960009996 A KR 19960009996A KR 970070352 A KR970070352 A KR 970070352A
- Authority
- KR
- South Korea
- Prior art keywords
- tube
- tubes
- steel plates
- small diameter
- diameter pipe
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
스틸과 같은 금속의 대구경 튜브를 먼저 땅속에 수평으로 타설한 후 그 튜브(1)들 사이에 소구경 파이프(2)를 타설하고 그 소구경 파이프(2)와 튜브(1)와 파이프(2)를 덮는 그라우팅부(2')를 설치하여 토사 붕괴 및 동결을 예방하고, 상기 튜브(1)들 모두의 측면일부를 절개한 다음 그 절개된 단부를 철판(4)(4')으로 용접하여 튜브(1)들을 서로 연결한 다음 상기 철판(4)(4') 사이에 스트러트(5)를 설치하고 상기 튜브(1)의 하측 내부 곡면부에는 상기 용접된 철판(4')과 유사한 높이의 스티로폴(7)로 채워 철판과 스티로폴이 거의 완만한 평면이나 곡면을 이루게 한 후 상기 튜브(1) 내부를 콘크리트 타설하여 구조물을 굴착전 축조함으로써 구조물 축조와 굴착 작업을 자주 반복하지 않고도 굴착을 용이하고 완전하게 연속적으로 실시할 수 있게 한 것이다.A large diameter tube of metal such as steel is first horizontally laid in the ground and a small diameter pipe 2 is placed between the tubes 1 and the small diameter pipe 2 and the tube 1 and the pipe 2 are poured, A grouting portion 2 'is provided to cover the tubes 1 and 2 so as to prevent soil disintegration and freezing, and a side portion of all the tubes 1 is cut, and then the cut end is welded to the steel plates 4 and 4' A strut 5 is provided between the steel plates 4 and 4 'after the steel plates 1 are connected to each other and a styrofoam having a height similar to the welded steel plate 4' (7) so that the steel plate and the styrofoam are formed into a flat surface or a curved surface, and then the inside of the tube (1) is poured with concrete to construct the structure before excavation, thereby facilitating excavation without repeatedly constructing and excavating the structure So that it can be continuously performed.
Description
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is a trivial issue, I did not include the contents of the text.
제1도는 본 발명의 제1단계 축조공정을 나타내는 일부 단면도, 제2도는 본 발명의 제2단계 축조공정까지를 완료한 상태의 일부 단면도, 제3도는 본 발명의 제3단계 축조공정까지를 완료한 상태의 일부 단면도, 제4도는 본 발명의 제4단계 축조공정까지를 완료한 상태의 일부 단면도, 제5도는 본 발명에 따른 구조물 축조공정이 완료된 상태의 일부 단면도, 제6도는 본 발명에 따른 구조물 축조공정이 완료된 상태의 콘크리트 타설부 및 대직경 튜브만을 나타낸 일예시 단면도, 제7도는 본 발명에 따른 구조물 축조공정이 완료된 상태의 콘크리트 타설부 및 대직경 튜브만을 나타낸 또다른 일예시 단면도.FIG. 1 is a partial cross-sectional view showing a first stage building process of the present invention, FIG. 2 is a partial cross-sectional view of a state in which the second stage building process of the present invention is completed, and FIG. FIG. 5 is a partial cross-sectional view of a state in which the structure building process according to the present invention is completed. FIG. 6 is a partial cross-sectional view of a state in accordance with the present invention FIG. 7 is a cross-sectional view showing another concrete example of a concrete pouring portion and a large diameter tube in a state where the structure building process according to the present invention is completed; FIG. 7 is an exemplary sectional view showing only a concrete pouring portion and a large diameter pipe in a state in which a structure building process is completed;
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019960009996A KR100217845B1 (en) | 1996-04-03 | 1996-04-03 | Construction process of underground structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019960009996A KR100217845B1 (en) | 1996-04-03 | 1996-04-03 | Construction process of underground structure |
Publications (2)
Publication Number | Publication Date |
---|---|
KR970070352A true KR970070352A (en) | 1997-11-07 |
KR100217845B1 KR100217845B1 (en) | 1999-09-01 |
Family
ID=19454938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019960009996A KR100217845B1 (en) | 1996-04-03 | 1996-04-03 | Construction process of underground structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100217845B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100426320B1 (en) * | 2000-11-28 | 2004-04-08 | 구영숙 | Process for constructing a structure for excavation in underground |
KR100439968B1 (en) * | 2002-02-02 | 2004-07-15 | 백상현 | A method of constrution method for tunnel of structure pipe |
KR100505011B1 (en) * | 2002-05-17 | 2005-07-29 | 주식회사 제일종합통상 | Costruction method for reinforcing ground at lower position of ballast of railway in cross area of road and railway |
KR100794609B1 (en) * | 2006-01-13 | 2008-01-14 | 신일씨엔아이(주) | Construction method of underground structure using concrete filled pipe roof and concrete wall |
KR100834076B1 (en) * | 2006-09-18 | 2008-06-04 | 김현경 | None open cut tunnelling method and tunnel |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101140726B1 (en) * | 2009-10-30 | 2012-05-03 | 주식회사 젬콘 | Ecological underwater protection retaining wall using ecological space formed by continuous connection of concrete piles and construction method thereof |
KR101140725B1 (en) * | 2009-10-30 | 2012-05-15 | 주식회사 젬콘 | Vegetation retaining wall using vegetation spaces formed by continuous connection of concrete piles and constructing method thereof |
-
1996
- 1996-04-03 KR KR1019960009996A patent/KR100217845B1/en not_active IP Right Cessation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100426320B1 (en) * | 2000-11-28 | 2004-04-08 | 구영숙 | Process for constructing a structure for excavation in underground |
KR100439968B1 (en) * | 2002-02-02 | 2004-07-15 | 백상현 | A method of constrution method for tunnel of structure pipe |
KR100505011B1 (en) * | 2002-05-17 | 2005-07-29 | 주식회사 제일종합통상 | Costruction method for reinforcing ground at lower position of ballast of railway in cross area of road and railway |
KR100794609B1 (en) * | 2006-01-13 | 2008-01-14 | 신일씨엔아이(주) | Construction method of underground structure using concrete filled pipe roof and concrete wall |
KR100834076B1 (en) * | 2006-09-18 | 2008-06-04 | 김현경 | None open cut tunnelling method and tunnel |
Also Published As
Publication number | Publication date |
---|---|
KR100217845B1 (en) | 1999-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109723065A (en) | Deep basal pit freezing partly reinforced construction method in bracing means and rich water sandy pear variety | |
CN103510540B (en) | Mortar flag stone retaining wall reinforcement construction method and structure thereof | |
US3226933A (en) | Sheeting wall system and method of constructing same | |
CN101117800A (en) | Method for one-pile-three-use in underground engineering | |
CN106193644B (en) | Basement reconstruction structure with raft foundation building | |
JPH039277B2 (en) | ||
KR970070352A (en) | New construction method of underground structures under non-installation | |
US5893254A (en) | Brick wall on piers | |
JPH1060817A (en) | Constructing method of annexing structure | |
JPH11193641A (en) | Reconstruction method of structure | |
JP2000352296A (en) | Method o constructing passage just under underground structure | |
CN203559419U (en) | Prestressed concrete precast pile | |
GB2084227A (en) | Culvert retaining wall | |
US3195311A (en) | Wall construction | |
JPS6158640B2 (en) | ||
KR100753140B1 (en) | Steel pipe roof assembly and the construction method for tunnel using thereof | |
GB511080A (en) | Improvements relating to the construction of tunnels | |
CN105604099B (en) | A kind of waterproof roll basic unit | |
CN110318419A (en) | The construction method of the lining door opening supporting of underpass type piping lane one | |
JPS59429A (en) | Foundation structure and its construction for building on soft ground | |
JPH0584773B2 (en) | ||
CN215562584U (en) | Pre-tensioning method prestress anti-floating anchor rod construction node | |
JPS61186623A (en) | Method of building foundation of building | |
RU2250962C2 (en) | Tunnel | |
KR20010019079A (en) | Precast steel Plate &Concrete Pile Structure of Semi Down Wall Construction System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
J206 | Request for trial to confirm the scope of a patent right | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20060630 Effective date: 20061107 |
|
FPAY | Annual fee payment |
Payment date: 20130607 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20140617 Year of fee payment: 16 |
|
LAPS | Lapse due to unpaid annual fee |