KR100426320B1 - Process for constructing a structure for excavation in underground - Google Patents
Process for constructing a structure for excavation in underground Download PDFInfo
- Publication number
- KR100426320B1 KR100426320B1 KR10-2000-0071185A KR20000071185A KR100426320B1 KR 100426320 B1 KR100426320 B1 KR 100426320B1 KR 20000071185 A KR20000071185 A KR 20000071185A KR 100426320 B1 KR100426320 B1 KR 100426320B1
- Authority
- KR
- South Korea
- Prior art keywords
- large diameter
- pipes
- ring beam
- welding
- basement
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
스틸과 같은 금속으로된 대구경관을 비개착의 지하에 관의 내부(중공부)가 정면에서 보이도록 나란히 설치하되 그 관들의 다수개가 축조형 구조물 형태인 원형이나 각형을 이루게 설치한 후 그 인접한 관 측면의 절개부끼리 금속판으로 용접한 다음 그 인접한 관 사이를 소형관이나 벽돌을 놓고 그라우팅부를 형성하여 굴착용 구조물을 축조함에 있어서, H빔이나 I빔이 호형 단편을 용접하거나, 볼트와 너트로 체결하여 원통형으로된 링빔(Ring Beam)을 형성하되, 그 링빔의 외경이 상기 대구경관의 내경과 일치하도록 형성된 원통형 링빔을 얻고 상기 기존 공정중 절개부끼리 금속판으로 용접하기 직전에, 상기 원통형 링빔을 상기 대구경 관내에 일정간격으로 용접에 의해 내접시켜 관을 지지하게하므로써 관의 절단 및 용접시에나 관 사이에 그라우팅부 형성시에 대구경관이 토압에 의해 찌그러지거나 변형되지 않고 원형을 유지하게되는 것이다.Large diameter pipes made of metal, such as steel, are installed side by side so that the inside (hollow part) of the pipe is visible from the front in an unattached basement. In the construction of the excavation structure by welding the side cuts with a metal plate and then placing a small pipe or brick between adjacent pipes and forming a grouting part, the H-beam or I-beam welds the arc-shaped pieces, or fastens them with bolts and nuts. To form a cylindrical ring beam, and the cylindrical ring beam is obtained just before welding the incisions to the metal plate in the existing process, and obtaining a cylindrical ring beam formed so that the outer diameter of the ring beam coincides with the inner diameter of the large diameter tube. Grouting part during cutting, welding or between pipes by supporting the pipes by internal welding at regular intervals in large diameter pipes. The Burg would be to keep the circle is not distorted or deformed due to the earth pressure cod scenery.
Description
본 발명은 비개착의 지하에 굴착용 구조물을 축조하는 방법에 관한 것으로서, 특히 대구경관을 이용하여 비개착의 지하에 굴착용 구조물을 축조함에 있어서 대구경관 속에 링형 빔(Ring Beam)을 등간격으로 먼저 설치한 후 굴착용 구조물을 축조하는 방법에 관한 것이다.The present invention relates to a method for constructing an excavation structure in an unattached basement. In particular, in constructing an excavation structure in an unattached basement using a large diameter tube, a ring beam is uniformly spaced in the large diameter tube. It first relates to a method of constructing an excavation structure after installation.
종래에는 비개착의 지하에 굴착용 구조물을 축조함에 있어서, 도4에 도시된 바와같이, 다수개의 대구경관(튜브)(1)을 땅속에 관의 내부(중공부)가 보이도록 나란히 설치하되 그 설치된 관의 다수개의 단면(중공부)들이 모여 소정의 굴착용 구조물 형태의 원형이나 각형을 이루도록 설치한 후 상기 대구경관의 측면들을 절개하여 절개부(30)(30')를 형성한 다음 그 인접한 관들의 절개부(30)(30')끼리 금속판(40)으로 연결되도록 용접한 후, 상기 인접한 대구경관(1)들 사이의 상면에 벽돌이나 소구경관(20)을 얹어 놓은 후 그라우팅부(20')를 형성하여 다수개의 관들을 고정시키는 방법으로 구조물을 축조하였었다.Conventionally, in constructing an excavation structure in an unattached basement, as shown in Figure 4, a plurality of large diameter tube (tube) (1) is installed side by side so that the inside (hollow part) of the tube in the ground, A plurality of end faces (hollow parts) of the installed tube are gathered and installed to form a circular or rectangular shape of a predetermined excavation structure, and then the sides of the large diameter tube are cut to form cutouts 30 and 30 'and then adjacent After welding the incisions 30, 30 ′ of the pipes to be connected to the metal plate 40, the brick or small-diameter pipe 20 is placed on the upper surface between the adjacent large-diameter pipes 1 and then the grouting part 20. ') Was used to build the structure by fixing multiple tubes.
그러나 상기와 같은 지하 굴착을 위한 구조물 축조방법에 있어서는 인접한 대구경관의 측면을 절개하여 그 절개부위끼리 연결되도록 금속판(40)으로 용접하거나 그 인접한 대구경관(1)사이를 그라우팅하게되면 대구경관이 절개부위에 의하여 주저 앉거나 찌그러지거나 일그러지게되고 절개부가 없더라도 그라우팅 및 용접시에 관이 변형되어 작업이 불가능하거나 어렵게 되는 결점이 있었다.However, in the method of constructing a structure for underground excavation as described above, when the side surface of the adjacent large diameter tube is cut and welded with the metal plate 40 or grouted between the adjacent large diameter tube 1 so that the incisions are connected, the large diameter tube is cut. Even if the site is hesitant, squashed or distorted by the site and there is no incision, the tube is deformed during grouting and welding, which makes the operation impossible or difficult.
본 발명은 상기한 바와같은 비개착의 지하에 굴착용 구조물을 축조함에 있어서의 결점을 개선하여 대구경관의 원형을 완벽하게 유지하면서 그라우팅이나 절개 및 그 절개부끼리의 연결 용접이 원활하게 이루어지도록한 비개착의 지하에 굴착용 구조물을 축조하는 방법을 제공코저하는 것으로서 이를 첨부된 도면을 참조하면서 상세히 설명하면 다음과 같다.The present invention is to improve the defects in the construction of the excavation structure in the basement of the non-adhesive base as described above, so that the grouting or incision and the connection welding between the incisions are smoothly maintained while maintaining the circular shape of the large diameter. The present invention provides a method of constructing an excavation structure in an unattached basement, which will be described in detail with reference to the accompanying drawings.
도 1 은 본 발명 방법에 의한 축조공정의 초기단계 구조물의 일부 단면도.1 is a partial cross-sectional view of the initial stage structure of the construction process according to the method of the present invention.
도 2 는 본 발명 방법에 의한 축조공정의 완성단계 구조물의 일부 단면도.Figure 2 is a partial cross-sectional view of the structure of the completion stage of the construction process according to the present invention method.
도 3 은 본 발명 방법에 사용되는 대구경 관내에 링빔을 설치한 상태의 사시 도.3 is a perspective view of a state in which a ring beam is installed in a large diameter tube used in the method of the present invention.
도 4 는 종래의 방법에 의한 구조물 축조 상태의 단면도.4 is a cross-sectional view of a structure building state by a conventional method.
*도면 중 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
1 : 대구경관 2 : 링빔1: Daegu scenery 2: Ring beam
3 : 호형 단편(세그먼트) 4 : 연결부3: arc-shaped fragment (segment) 4: connection part
금속으로된 다수개의 대구경관(1)을 비개착의 지하에 관 내부(중공부)가 정면에서 보이도록 나란히 나열하여 그 나열된 관들이 소정의 원통형이나 각통형의 굴착부 구조물과 같은 형태를 이루도록 설치한 후 그 각각의 대구경관(1)의 측면을 절개하여 절개부(30)(30')를 형성한 다음 그 절개부(30)(30')끼리 금속판(40)으로 용접 연결한 후 인접한 대구경관(1) 사이에 소형관이나 벽돌(20)을 올려놓은 상태에서 그 위에 그라우팅부(20')를 형성하여 지하에 굴착용 구조물을 축조하는 방법에 있어서,별도로 H형 빔(Beam)이나 I형 빔의 호형 단편(3) 다수개를 용접에 의하거나 볼트와 너트에 의한 연결부(4)에 의하여 연결하여 원통형 링빔(2)을 형성하되, 그 링빔(2)의 외경이 상기 대구경관(1)의 내경과 일치하도록 형성된 원통형 링빔(2)을 얻은 다음, 상기 기존의 굴착용 구조물 축조공정중 절개부(30)(30')끼리 금속판(40)으로 용접 연결하는 공정을 실시하기 직전에 상기에서 얻어진 원통형 링빔(2)을 상기 대구경관(1)들의 내부에 등간격으로 내접되게 용접 설치한 후, 다음의 상용되는 공정인 절개부(30)(30')끼리의 금속판(40) 용접공정과 소형관이나 벽돌(20)을 내장한 그라우팅부(20') 형성공정을 행하는 것으로 구성된다.이상과 같은 방법으로 비개착의 지하게 굴착용 구조물을 축조함에 있어서는, 먼저 기존의 방법으로 다수개의 대구경관(1)을 관의 내부(중공부;관의 단부)가 보이도록 서로 나란하게 배열하되, 그 배열되는 관들이 원통형이나 각형의 소정의 굴착용 구조물 형태를 이루도록 배열 설치한 다음, 기존의 상용되는 굴착용 구조물 축조공정중 인접하는 대구경관(1)의 측면에 절개부(30)(30')를 형성하여 그 절개부를 금속판(40)으로 연결하기 직전에, 별도로 H형이나 I형 빔의 호형단편(3) 다수개를 용접에 의하거나 볼트와 너트에 의한 연결부(4)에 의하여 연결하여 얻은 대구경관(1)의 내경과 동일한 외경을 갖는 링빔(2)을 상기 배열 설치된 대구경관(1)들의 내부에 등간격으로 내접되게 용접 설치한 후, 그 다음 상용되는 공정인 인접한 대구경관(1)의 측면에 절개부(30)(30')를 형성하여 그 절개부를 금속판(40)으로 용접하여 연결하거나 소형관이나 벽돌(20)을 대구경관(1)들 사이에 얹고 그라우팅부(20')를 형성하는 공정을 실시하므로써, 대구경관(1)이 찌그러지거나 변형되지 않고 완벽한 원형을 유지하면서 균일한 축조공정이 이루어지게되는 것이다.A large number of large diameter pipes (1) made of metal are arranged side by side so that the inside of the pipe (hollow part) can be seen from the front in an unattached basement so that the listed pipes can be shaped like a cylindrical or rectangular drill structure. Then, the side of each large diameter tube 1 is cut to form cutouts 30 and 30 ', and then the cutouts 30 and 30' are welded to the metal plate 40 and then adjacent to the cod. In the method of constructing the excavation structure in the basement by forming a grouting portion 20 'on the small pipe or brick 20 between the landscape (1), H-beam (Beam) or I separately A plurality of arc-shaped pieces (3) of the shape beam are connected by welding or by connecting parts (4) by bolts and nuts to form a cylindrical ring beam (2), and the outer diameter of the ring beam (2) is the large diameter tube (1). After obtaining a cylindrical ring beam (2) formed so as to match the inner diameter of The cylindrical ring beam 2 obtained above is inscribed at equal intervals inside the large-diameter tube 1 just before performing the process of welding the cutouts 30 and 30 'to the metal plate 40 during the molding construction process. After the welding installation, the process of welding the metal plate 40 between the cut portions 30 and 30 'and the grouting portion 20' containing the small pipe or the brick 20 are performed. In constructing a non-adherent deeply excavated structure by the above-described method, first, a plurality of large-diameter pipes (1) by the conventional method to each other so that the interior (hollow portion; end of the pipe) is visible. Arranged side by side, the arranged pipes are arranged so as to form a predetermined excavation structure of a cylindrical or angular shape, and then incisions on the side of the adjacent large-diameter tube 1 during the existing commercial excavation structure construction process ( 30) 30 'to form the incision Immediately before connecting to the plate 40, a plurality of arc-shaped pieces 3 of H-shaped or I-shaped beams are separately connected by welding or by connecting portions 4 by bolts and nuts. After the ring beam 2 having the same outer diameter as the inner diameter is welded to the inside of the arrayed large-diameter tube 1 at equal intervals, the cut beam is then cut to the side of the adjacent large-diameter tube 1, which is a commonly used process. 30) (30 ') to form a grouting portion (20') by forming a small pipe or brick 20 between the large diameter pipe (1) by connecting the incision to the metal plate 40 by welding By doing so, the large diameter tube 1 is not uniformly deformed or deformed, and thus, a uniform construction process is made.
이상과 같은 방법으로 지하 굴착용 대구경관(1)내에 링빔을 내접 설치한 다음 기타 통상의 방법으로 굴착용 구조물을 축조하므로서 대구경관이 그라우팅이나 용접시에 일그러지거나 찌그러지지 않고 원형을 유지하면서 완전하고 완벽한 시공을 할 수 있는 장점과 효과가 있는 것이다.In the same way as above, the ring beam is internally installed in the large-diameter pipe for underground excavation, and then the excavating structure is constructed by other conventional methods. There is an advantage and effect to perfect construction.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0071185A KR100426320B1 (en) | 2000-11-28 | 2000-11-28 | Process for constructing a structure for excavation in underground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0071185A KR100426320B1 (en) | 2000-11-28 | 2000-11-28 | Process for constructing a structure for excavation in underground |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20010016251A KR20010016251A (en) | 2001-03-05 |
KR100426320B1 true KR100426320B1 (en) | 2004-04-08 |
Family
ID=19701882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0071185A KR100426320B1 (en) | 2000-11-28 | 2000-11-28 | Process for constructing a structure for excavation in underground |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100426320B1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02200917A (en) * | 1989-01-31 | 1990-08-09 | Nippon Steel Corp | Landslide suppressing well cylinder and its building method |
JPH03250195A (en) * | 1990-01-11 | 1991-11-07 | Shimizu Corp | Large sectional tunnel and construction method thereof |
JPH0462298A (en) * | 1990-06-29 | 1992-02-27 | Shimizu Corp | Construction of tunnel structure body |
JPH0462292A (en) * | 1990-06-29 | 1992-02-27 | Shimizu Corp | Diameter widening method and reducing method of tunnel |
KR930023576A (en) * | 1992-05-01 | 1993-12-21 | 강병산 | Beam subsidence prevention method for underground tunnel construction |
KR940021890A (en) * | 1993-03-23 | 1994-10-19 | 전준명 | Repair of old tunnels |
KR970070352A (en) * | 1996-04-03 | 1997-11-07 | 김기수 | New construction method of underground structures under non-installation |
KR19980014364A (en) * | 1996-08-10 | 1998-05-25 | 김기수 | New installation method of temporary structures for tunnel formation |
-
2000
- 2000-11-28 KR KR10-2000-0071185A patent/KR100426320B1/en not_active IP Right Cessation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02200917A (en) * | 1989-01-31 | 1990-08-09 | Nippon Steel Corp | Landslide suppressing well cylinder and its building method |
JPH03250195A (en) * | 1990-01-11 | 1991-11-07 | Shimizu Corp | Large sectional tunnel and construction method thereof |
JPH0462298A (en) * | 1990-06-29 | 1992-02-27 | Shimizu Corp | Construction of tunnel structure body |
JPH0462292A (en) * | 1990-06-29 | 1992-02-27 | Shimizu Corp | Diameter widening method and reducing method of tunnel |
KR930023576A (en) * | 1992-05-01 | 1993-12-21 | 강병산 | Beam subsidence prevention method for underground tunnel construction |
KR940021890A (en) * | 1993-03-23 | 1994-10-19 | 전준명 | Repair of old tunnels |
KR970070352A (en) * | 1996-04-03 | 1997-11-07 | 김기수 | New construction method of underground structures under non-installation |
KR19980014364A (en) * | 1996-08-10 | 1998-05-25 | 김기수 | New installation method of temporary structures for tunnel formation |
Also Published As
Publication number | Publication date |
---|---|
KR20010016251A (en) | 2001-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2002227204A (en) | Earth retaining method of excavation section | |
KR101901392B1 (en) | A Micropile and Retaining Wall Method by using Micropile | |
KR101381325B1 (en) | The non-open cut tunnel construction method using the multistage small diameter steel pipe | |
KR100426320B1 (en) | Process for constructing a structure for excavation in underground | |
KR20080034424A (en) | A constructing method of underground structure with supporting beam for steel pipe | |
KR101667377B1 (en) | Freestanding temporary retaining of deep excavations and its construction method | |
KR20050066024A (en) | Construction method of temporary apparatus of thnnel for direct digging | |
KR101431623B1 (en) | Mehod for constructing underground wall in extension of undergound parking lot | |
KR100217845B1 (en) | Construction process of underground structure | |
CN111854549B (en) | Blasting excavation system for large-scale rock foundation pit and construction method | |
JP2009150061A (en) | Sheet pile type support construction method of open-cut trench | |
JP2003232039A (en) | Waling structure of earth retaining wall | |
KR100235237B1 (en) | The construction method of the structure for forming tunnel | |
JP3014623B2 (en) | Anchor construction method for steel tube column retaining wall | |
JP3500446B2 (en) | Earth retaining method for earth excavation and earth retaining structure | |
CN219175261U (en) | Water stop structure for through-wall construction of horizontal steel pipe support in foundation pit | |
JPS62220616A (en) | Construction work for underground space | |
CN210262915U (en) | Integrated configuration of revetment pipe groove plank road | |
JPH0559215B2 (en) | ||
CN110952993B (en) | Semi-assembly type pipe curtain structure based on steel reinforced concrete connection and construction process | |
KR102645823B1 (en) | Top-down and bottom-up parallel decommissioning of existing building | |
CN114319400B (en) | Assembling and lowering process of steel cofferdam for underwater bearing platform construction | |
JP3809340B2 (en) | Reverse strike method | |
CN116084428A (en) | Water stopping structure for through-wall construction of horizontal steel pipe support in foundation pit and construction method thereof | |
JP3969090B2 (en) | Cutting beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120629 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |