KR20110022797A - Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint - Google Patents

Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint Download PDF

Info

Publication number
KR20110022797A
KR20110022797A KR1020090080239A KR20090080239A KR20110022797A KR 20110022797 A KR20110022797 A KR 20110022797A KR 1020090080239 A KR1020090080239 A KR 1020090080239A KR 20090080239 A KR20090080239 A KR 20090080239A KR 20110022797 A KR20110022797 A KR 20110022797A
Authority
KR
South Korea
Prior art keywords
water
band
concrete
joint
weight
Prior art date
Application number
KR1020090080239A
Other languages
Korean (ko)
Other versions
KR101102901B1 (en
Inventor
이용진
김경모
장해남
이대성
이종윤
전홍민
장대우
Original Assignee
(주)알씨에스코리아
금호산업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)알씨에스코리아, 금호산업주식회사 filed Critical (주)알씨에스코리아
Priority to KR1020090080239A priority Critical patent/KR101102901B1/en
Publication of KR20110022797A publication Critical patent/KR20110022797A/en
Application granted granted Critical
Publication of KR101102901B1 publication Critical patent/KR101102901B1/en

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K3/00Materials not provided for elsewhere
    • C09K3/18Materials not provided for elsewhere for application to surfaces to minimize adherence of ice, mist or water thereto; Thawing or antifreeze materials for application to surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6812Compressable seals of solid form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B2001/6818Joints with swellable parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE: A waterstop composition and a waterstop band are provided to prevent the leakage and to self-cure cracks by growing insoluble crystals when water leakage occurs due to cracks or gaps at a concrete construction joint. CONSTITUTION: A waterstop composition comprises 100.0 parts by weight of cement, 10-30 parts by weight of zeolite, 5-20 parts by weight of sodium carbonate, 10-30 parts by weight of aluminum sulfate, 10-30 parts by weight of bentonite with a particle size of 1-3 mm, 20-70 parts by weight of silica with a particle size of 100-250 mm, 20-200 parts by weight of silica with a particle size of 1-3 mm, and 3-30 parts by weight of anhydrous gypsum.

Description

지수제 조성물, 지수제 밴드, 지수제 밴드 제조방법, 지수제 밴드를 사용한 컨스트럭션 조인트 구조 및 공법, 컨스트럭션 조인트용 지수판 및 접합철물{Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint}Water stop composition, water stop band, water stop band manufacturing method, construction joint structure and method using water stop band, water stop composition, water stop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint}

본 발명은 지수제 조성물, 지수제 밴드, 지수제 밴드 제조방법, 지수제 밴드를 사용한 컨스트럭션 조인트 구조 및 공법, 컨스트럭션 조인트용 지수판 및 접합철물에 관한 것이다.The present invention relates to an index agent composition, an index agent band, a method for producing an index agent band, a construction joint structure and method using an index agent band, an index plate for a construction joint, and a joining steel.

콘크리트 시공이음부, 즉 컨스트럭션 조인트(construction joint) 부위는 콘크리트 시공시 가장 주의를 요하는 부위의 하나로, 잘못 시공될 경우 콘크리트 구조물 전체에 구조적인 문제가 발생할 수 있다. 특히 시공이음부에서 균열이 발생하거나, 레이턴스(laitance)나 먼지, 돌가루, 기름, 거푸집 박리제 등의 이물질이 제거되지 않은 채 콘크리트가 타설되는 경우에는 누수의 문제도 발생할 수 있다.Concrete construction joints, that is, construction joints (construction joint) is one of the areas that require the most attention when concrete construction, if incorrect construction may cause structural problems throughout the concrete structure. In particular, water leakage may occur in case of cracks in construction joints or when concrete is poured without removing foreign substances such as lattance, dust, stone, oil, formwork remover, and the like.

콘크리트 시공이음부에는 여러 가지 원인으로 균열이 발생할 수 있는데, 이러한 균열 부위에서 누수가 발생하게 되면 구조체 내부의 철근이 부식됨은 물론, 내부 마감재 등을 손상시키고 단열성능을 저하시키게 되며, 이로 인하여 구조물의 수명이 단축되고 보수에 막대한 비용으로 소요되는 문제 등을 초래할 수 있다.Cracks may occur in concrete joints for various reasons. If water leaks occur at these cracks, the reinforcing steel inside the structure may be corroded, and the internal finishing materials may be damaged and the insulation performance may be deteriorated. This can lead to problems such as shortened life and costly maintenance costs.

이를 방지하기 위해 종래에는 지수판, 방수 모르타르 도포, 에폭시 접착제, 벤토나이트 밴드 등 방수를 위한 다양한 방안들이 시도되었으며, 예를 들어 콘크리트 시공이음부에 수용성폴리머로 결합한 벤토나이트 물질을 망으로 감싼 형태인 벤토나이트 밴드를 지수제로서 사용하여 침수를 차단하는 방안의 경우 연속적인 누수에 영구적으로 대처 할 수 없다는 한계가 있었다.In order to prevent this, various methods for waterproofing have been attempted, such as an index plate, waterproof mortar coating, epoxy adhesive, bentonite band, and the like. For example, a bentonite band, which is a form of a bentonite band wrapped with a water-soluble polymer bonded to a concrete construction joint, is covered with a net. In the case of using the water-based system to block the inundation, there was a limitation that it could not permanently cope with continuous leakage.

지하 콘크리트 구조물, 저수지, 터널, 해저터널, 지하철 구축물 등을 구축하는 과정에서, 콘크리트의 선타설 후 설치되는 수팽창 지수제나 벤토나이트 밴드 등은 후타설 공정 이전에 지하구조 내의 빗물이나 지하수 등이 예기치 않게 침수될 경우, 수팽창 지수제가 미리 팽윤하게 되어 후타설시에 구조적인 결함을 초래할 수 있다. 수팽창 지수제가 팽윤함에 따라 콘크리트는 팽윤한 부위를 감싸고 있는 형태로 굳어지게 되는데, 이 부위는 벤토나이트 겔 상태로 긴 띠의 형태가 되며, 후타설시 바이브레이터의 작동이나 강력한 수화작용으로 인하여 후타설 콘크리트가 선타설면에서 이탈되는 등의 문제가 나타날 수 있는 것이다.In the process of constructing underground concrete structures, reservoirs, tunnels, submarine tunnels, subway structures, etc., the water-expanding index agent or bentonite bands installed after pre-casting concrete are unexpectedly exposed to rainwater or groundwater in the underground structure before the post-installation process. When submerged, the water expansion index agent may swell in advance, resulting in structural defects during post-installation. As the water-expansion index agent swells, the concrete hardens in the form of wrapping around the swollen portion, which is in the form of a long band in the form of bentonite gel. There may be problems such as deviating from the stroke.

한편, 콘크리트 시공이음부는 작업여건상 거푸집과 철근이 설치되어 있어서, 일반 합판이나 각목 등으로 거푸집의 측면을 완전히 밀폐하기는 어려운 실정이다. 종래에는 합판과 각목으로 거푸집의 측면을 막고, 발생하는 공극은 천이나 테이프 등으로 밀폐하는 방법이 적용되어 왔으며, 합판 대신 메탈라스(metal lath)를 사용하기도 하였다.On the other hand, the concrete construction joints are provided with formwork and rebar in the working conditions, it is difficult to completely seal the side of the formwork with plywood or lumber. Conventionally, a method of sealing the side of the formwork with plywood and lumber and sealing the voids with a cloth or tape has been applied, and metal lath instead of plywood has been used.

즉, 콘크리트 시공이음부는 콘크리트 공사에서 하자가 가장 많이 발생하는 부위의 하나로서 특히 방수에 취약하다는 문제가 있어, 일반적인 시방서에는 콘크리트 시공이음부에 반드시 지수판을 설치하도록 규정하고 있는 실정이다.In other words, the concrete construction joints are one of the most defects in concrete construction, which is particularly vulnerable to waterproofing, and the general specification requires that the index plate be installed in the concrete construction joints.

지수판은 그 기능과 구조물의 목적에 따라 여러 형태로 제작되어 왔으며, 일반적으로는 신축에 대응할 수 있도록 중앙부에 원통형의 빈공간이 형성되는 형태로 제작되어 왔다. 특히 콘크리트 시공이음부에 매설되는 지수판(8)은, 도 1a에 도시된 것처럼, 신축에 대응할 수 있도록 원통형의 빈공간(도 1a의 'C')의 중심이 이어치기면(6)에 위치하도록 구(舊)콘크리트(2)에 매립, 설치한 후, 신(新)콘크리트(4)를 타설하여야 한다.The index plate has been manufactured in various forms according to its function and purpose of the structure, and in general, it has been produced in the form of a cylindrical hollow space in the center to cope with stretching. In particular, the index plate 8 embedded in the concrete construction joint, as shown in Figure 1a, so that the center of the cylindrical hollow space ('C' in Figure 1a) is located on the connecting surface 6 so as to correspond to the expansion and contraction. After the new concrete (4) is buried and installed in the old concrete (2), the new concrete (4) must be poured.

이 경우, 지수판이 너무 많이 매설되거나, 너무 적게 매설되면, 지수판이 콘크리트의 신축을 흡수하지 못해 파손될 수 있으며, 이는 시공이음부에서의 누수의 원인이 될 수 있다. 특히, 누수가 구조물에 치명적인 하자로 작용하는 지하구조물의 익스팬션 조인트(Expansion Joint) 부위에 지수판과 조인트 필러(Joint Filler)를 설치하는 경우에는 더욱 각별한 주의가 필요하다. 이처럼 지수판이 잘못 시공되는 경우뿐만 아니라, 콘크리트 이어치기면에 지수판을 고정시키기 위해 못이나 철사 등을 사용하는 경우 또한 지수판이 제 기능을 발휘하지 못하도록 하는 주요 하자 요인이 될 수 있다.In this case, if the index plate is buried too much or too little, the index plate may not be able to absorb the expansion and contraction of the concrete and may be broken, which may cause leakage in the construction joint. In particular, special care should be taken in the case of installing the index plate and joint filler at the expansion joint of the underground structure where the leak acts as a fatal defect in the structure. As such, when the index plate is incorrectly constructed, the use of nails or wires to fix the index plate on the concrete joint surface may also be a major defect in preventing the index plate from functioning.

또한, 종래의 컨스트럭션 조인트 부위는, 도 1b에 도시된 것처럼, 구콘크리트(2)의 이어치기면(6)의 굵은 골재 및 레이턴스 부분을 치핑(chipping)하고 시멘트를 바른 후 신콘크리트(4)를 타설하고, 진동기로 다짐, 양생하여 콘크리트가 경 화하면 외벽 마감을 하는 방식으로 시공되었는데, 콘크리트가 양생된 후 신축 효과 및 균열, 누수 방지 효과를 도출하기 위해, 컨스트럭션 조인트 부분에 기계톱 등으로 홈(도 1b의 'S')을 내고 그 내부에 실링재(27)를 채워 넣는 방식으로 시공이 이루어졌다.In addition, the conventional construction joint site, as shown in Figure 1b, the chipping the coarse aggregate and the latency portion of the joint surface 6 of the old concrete (2) and cemented the new concrete (4) After the concrete is cured and cured with concrete and cured, the exterior wall is finished.In order to derive the stretching effect, cracking and leakage prevention effect after curing the concrete, the construction joint part is grooved with a chain saw. ('S' of Figure 1b) and the construction was made by filling the sealing material 27 therein.

그러나, 이와 같은 작업 방식은, 컨스트럭션 조인트의 시공과 컨스트럭션 조인트 부분에 홈을 형성하는 작업이 2중으로 필요하게 되므로, 공기가 길어지고 작업이 난이하고 번거로우며, 홈 부분을 처리하는 과정에서 실링재가 파손되어 균열 및 균열을 통한 누수가 발생할 우려가 있다.However, this type of work requires double construction of the construction joint and the formation of the grooves in the construction joints, so that the air becomes long, the operation is difficult and cumbersome, and the sealing material is damaged in the process of processing the grooves. There is a fear of leaking through cracks and cracks.

전술한 배경기술은 발명자가 본 발명의 도출을 위해 보유하고 있었거나, 본 발명의 도출 과정에서 습득한 기술 정보로서, 반드시 본 발명의 출원 전에 일반 공중에게 공개된 공지기술이라 할 수는 없다.The background art described above is technical information possessed by the inventors for the derivation of the present invention or acquired during the derivation process of the present invention, and is not necessarily a publicly known technique disclosed to the general public before the application of the present invention.

본 발명은, 콘크리트 시공이음부에서 균열이나 틈새로 인하여 누수가 발생할 경우, 그 부위에서 불용성의 결정이 성장하도록 함으로써, 누수를 차단하고 균열을 자가치유할 수 있는 지수제 조성물, 지수제 밴드 및 지수제 밴드 제조방법을 제공하는 것이다.In the present invention, when a leak occurs due to cracks or crevices in the concrete construction joint, insoluble crystals grow at the site, thereby preventing the leak and self-healing the cracks, the index composition, the index band and the index The present invention provides a band manufacturing method.

또한, 지수제 밴드를 용이하게 설치할 수 있도록 개선된 컨스트럭션 조인트용 지수판, 및 지수판 설치작업을 용이하게 하고 차수성능을 강화하여 콘크리트 시 공이음부에서 발생하기 쉬운 누수문제를 해결할 수 있는 컨스트럭션 조인트용 접합철물을 제공하는 것이다.In addition, the index plate for the construction joint improved to facilitate the installation of the water-proof band, and the joint steel for the construction joint, which facilitates the installation work of the index plate and enhances the water-repellent performance, and solves the problem of leaks in the concrete joints. To provide.

또한, 콘크리트 시공이음부에서 누수가 발생하여 지수제 밴드가 지수성능을 발휘한 후, 다시 누수가 발생하더라도 내측에 이중으로 설치된 지수제 밴드 구조에 의하여 계속적인 지수성능을 발휘하도록 함으로써, 공사비 및 유지 관리비를 절감할 수 있는 콘크리트 컨스트럭션 조인트 구조 및 공법을 제공하는 것이다.In addition, after the leak occurs in the concrete construction joints and the water-proof band exhibits the exponential performance, even if the water leaks again, the water-proof band structure is continuously installed by the water-resistant band structure installed on the inside, thereby maintaining the construction cost and maintenance. It is to provide concrete construction joint structure and method that can reduce maintenance cost.

본 발명의 일 측면에 따르면, 시멘트, 시멘트 100 중량부에 대하여, 제오라이트 10 내지 30 중량부, 탄산나트륨 5 내지 20 중량부, 황산알루미늄 10 내지 30 중량부, 입경이 1 내지 3mm인 벤토나이트 10 내지 30 중량부, 입경이 100 내지 250㎛인 실리카 20 내지 70 중량부, 입경이 1 내지 3mm인 규사 20 내지 200 중량부, 및 무수석고 3 내지 30 중량부를 분말상으로 혼합하여 이루어지는 지수제 조성물이 제공된다. 실리카는 평균 입경이 20 내지 50㎛일 수 있다.According to one aspect of the invention, based on cement, 100 parts by weight of cement, 10 to 30 parts by weight of zeolite, 5 to 20 parts by weight of sodium carbonate, 10 to 30 parts by weight of aluminum sulfate, 10 to 30 parts by weight of bentonite having a particle diameter of 1 to 3 mm There is provided a water repellent composition comprising 20 to 70 parts by weight of silica having a particle size of 100 to 250 μm, 20 to 200 parts by weight of silica sand having a particle size of 1 to 3 mm, and 3 to 30 parts by weight of anhydrous gypsum in powder form. Silica may have an average particle diameter of 20 to 50㎛.

한편, 본 발명의 다른 측면에 따르면, 상기 지수제 조성물을 수용성 폴리머 용액과 혼합하고, 그 혼합물을 부직포 또는 망사에 도포하거나, 압출한 후 건조시켜 밴드 형태로 제조되는 것을 특징으로 하는 지수제 밴드가 제공된다.On the other hand, according to another aspect of the present invention, the water-repellent band is characterized in that the water-repellent composition is mixed with a water-soluble polymer solution, the mixture is applied to a nonwoven fabric or a mesh, or extruded and dried to form a band form Is provided.

수용성 폴리머 용액은, 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 수용성 우레탄수지 등을 사용할 수 있으며, 수용성 폴리머 용액 1 내지 90 중량부 에 대하여, 물 10 내지 99 중량부를 더 혼합하여 사용할 수 있다.As the water-soluble polymer solution, polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, water-soluble urethane resin, etc. can be used. With respect to the part, 10 to 99 parts by weight of water may be further mixed and used.

한편, 본 발명의 다른 측면에 따르면, (a) 황산알루미늄 수용액에 제오라이트 및 벤토나이트를 혼합한 후 수용성 폴리머와 혼합하는 단계, (b) 단계 (a)로부터 생성된 혼합물을 압출한 후 건조 및 분쇄하여 펠렛(pellet) 형태로 제조하는 단계, (c) 시멘트 및 시멘트 100 중량부에 대하여, 펠렛 10 내지 50 중량부, 탄산나트륨 5 내지 20 중량부, 입경이 1 내지 3mm인 벤토나이트 10 내지 30 중량부, 입경이 100 내지 250㎛인 실리카 20 내지 70 중량부, 입경이 1 내지 3mm인 규사 20 내지 200 중량부, 및 무수석고 3 내지 30 중량부를 혼합하는 단계, 및 (d) 단계 (c)로부터 생성된 혼합물과 수용성 폴리머 용액을 혼합하는 단계를 포함하는 지수제 밴드 제조방법이 제공된다.Meanwhile, according to another aspect of the present invention, (a) mixing zeolite and bentonite in an aqueous solution of aluminum sulfate, followed by mixing with a water-soluble polymer, (b) extruding the mixture produced from step (a), followed by drying and grinding Step of preparing into a pellet (c), (c) 10 to 50 parts by weight of pellets, 5 to 20 parts by weight of sodium carbonate, 10 to 30 parts by weight of bentonite having a particle size of 1 to 3 mm, particle size per 100 parts by weight of cement and cement 20 to 70 parts by weight of the silica having 100 to 250 μm, 20 to 200 parts by weight of silica sand having a particle diameter of 1 to 3 mm, and 3 to 30 parts by weight of anhydrous gypsum, and (d) the mixture produced from step (c). Provided is a method for preparing an index agent band comprising mixing a water soluble polymer solution.

단계 (d)는 수용성 폴리머 용액 1 내지 90 중량부에 대하여, 물 10 내지 99 중량부를 더 혼합하는 단계를 포함할 수 있으며, 단계 (d) 이후에, (e1) 단계 (d)로부터 생성된 혼합물을 부직포 또는 망사에 도포하거나, 압출한 후 건조시켜 밴드 형태로 제조하는 단계를 더 포함할 수 있다. 수용성 폴리머 용액은, 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 수용성 우레탄수지 등을 사용할 수 있다.Step (d) may comprise further mixing 10 to 99 parts by weight of water, relative to 1 to 90 parts by weight of the water soluble polymer solution, after step (d), (e1) the mixture resulting from step (d) It may further comprise the step of applying a non-woven fabric or mesh, or by extrusion and drying to form a band. As the water-soluble polymer solution, polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, water-soluble urethane resin and the like can be used.

한편, 본 발명의 다른 측면에 따르면, 미리 시공된 콘크리트 구조체에 매설되는 몸체부와, 몸체부에 연결되며, 콘크리트 구조체의 이어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와, 날개부에 형성되며, 상기 지수제 밴드가 삽입되는 밴드홈부를 포함하는 컨스트럭션 조인트(construction joint)용 지수판이 제공된다.On the other hand, according to another aspect of the present invention, a body portion embedded in the pre-constructed concrete structure, a pair of wings connected to the body portion, extending to both sides in a T-shape along the connecting surface of the concrete structure, The index plate for the construction joint (construction joint) is formed in the wing portion, including a band groove portion is inserted into the water-repellent band is provided.

한편, 본 발명의 다른 측면에 따르면, 콘크리트 구조물의 컨스트럭션 조인트 부위에 사용되는 접합철물로서, 거푸집에 연결되며, 콘크리트 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와, 일단부가 조인트홈부에 연결되며, 미리 시공된 콘크리트 구조체의 이어치기면을 커버하도록 설치되는 메탈라스부를 포함하되, 메탈라스부의 타단부는 콘크리트 구조체에 설치된 상기 지수판의 날개부에 결속되는 것을 특징으로 하는 컨스트럭션 조인트용 접합철물이 제공된다. 거푸집의 탈형 후, 조인트홈부 내에는 채움재가 충전될 수 있다.On the other hand, according to another aspect of the present invention, the joint hardware used in the construction joint portion of the concrete structure, the joint groove portion is connected to the formwork, and forms a saw-cut on the surface of the concrete structure, one end of the joint groove portion It is connected to, and includes a metal lass that is installed to cover the connecting surface of the pre-constructed concrete structure, the other end of the metal las joined to the construction joint, characterized in that the binding to the wing of the water plate installed in the concrete structure Hardware is provided. After demoulding the formwork, the filler may be filled in the joint groove portion.

한편, 본 발명의 다른 측면에 따르면, 콘크리트를 이어치기하여 소정 형상의 구조물을 형성하기 위한 조인트 구조로서, 구조물의 외형을 구획하도록 설치되는 거푸집과, 미리 시공되어, 그 표면에 이어치기면이 형성된 선(先)타설 콘크리트 구조체와, 콘크리트 구조체에 매설되는 몸체부와, 몸체부에 연결되며 이어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와, 한 쌍의 날개부에 각각 형성되는 한 쌍의 밴드홈부를 포함하는 지수판과, 한 쌍의 밴드홈부에 각각 삽입되도록 이어치기면에 설치되어, 이어치기면을 따라 침투하는 물을 차단하는 한 쌍의 지수제 밴드와, 거푸집에 연결되며 콘크리트 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와, 일단부는 조인트홈부에 연결되고 타단부는 날개부에 결속되어 이어치기면을 커버하도록 설치되는 메탈라스부를 포함하는 접합철물을 포함하는 콘크리트 컨스트럭션 조인트 구조가 제공된다.On the other hand, according to another aspect of the present invention, as a joint structure for joining concrete to form a structure of a predetermined shape, the formwork is installed to partition the outer shape of the structure, and is pre-constructed, the joint surface is formed on the surface It is formed in the pre-cast concrete structure, the body portion embedded in the concrete structure, a pair of wings connected to the body portion and extending to both sides in a T-shape along the connecting surface, and a pair of wings respectively. Is installed on the joint surface so as to be inserted into each of the index plate including a pair of band grooves, the pair of band grooves, a pair of water-resistant band to block the water penetrates along the joint surface, connected to the formwork The joint groove portion forming a saw-cut on the surface of the concrete structure, one end is connected to the joint groove portion, the other end is bound to the wing portion to cover the seam surface The concrete construction joint structure including a joint comprising locking hardware installed metallic lath portion which is provided.

한편, 본 발명의 다른 측면에 따르면, 소정의 이어치기면을 기준으로 콘크 리트를 이어치기하여 소정 형상의 구조물을 형성하는 공법으로서, 구조물의 외형을 구획하도록 거푸집을 설치하는 단계, 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와, 일단부가 조인트홈부에 연결되는 메탈라스부를 포함하는 접합철물을, 조인트홈부는 상기 거푸집에 연결되고, 메탈라스부는 상기 이어치기면을 커버하도록 설치하는 단계, 몸체부와, 몸체부에 연결되며 이어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와, 한 쌍의 날개부에 각각 형성되는 한 쌍의 밴드홈부를 포함하는 지수판을, 날개부가 메탈라스부의 타단부에 결속되도록 설치하는 단계, 및 몸체부가 매설되도록 이어치기면의 일측에 콘크리트를 선(先)타설하는 단계를 포함하는 콘크리트 컨스트럭션 조인트 공법이 제공된다.On the other hand, according to another aspect of the present invention, as a method of forming a structure of a predetermined shape by connecting the concrete on the basis of a predetermined seaming surface, the step of installing a formwork to partition the appearance of the structure, the surface of the structure Joining hardware including a joint groove forming a saw-cut, and a metal lath one end is connected to the joint groove, the joint groove is connected to the formwork, the metal lath is installed so as to cover the joint surface Step, the body portion, connected to the body portion and the index plate including a pair of wing portions extending to both sides in a T-shape along the connecting surface, and a pair of band grooves respectively formed on the pair of wings, And installing the wing to be coupled to the other end of the metal lath, and pre-casting concrete on one side of the connecting surface to bury the body. The concrete construction joint method is provided.

선타설 이후에, 이어치기면을 따라 침투하는 물을 차단하는 한 쌍의 지수제 밴드를 한 쌍의 밴드홈부에 각각 삽입하여 설치하는 단계를 더 포함할 수 있으며, 지수제 밴드 설치 이후에 이어치기면의 타측에 콘크리트를 후(先)타설하는 단계를 더 포함할 수 있다.After the casting, the method may further include inserting and installing a pair of watertight bands for blocking water penetrating along the joint surface, respectively, in a pair of band grooves, and following installation of the watertight band. The method may further include post-casting concrete on the other side of the face.

전술한 것 외의 다른 측면, 특징, 잇점이 이하의 도면, 특허청구범위 및 발명의 상세한 설명으로부터 명확해질 것이다.Other aspects, features, and advantages other than those described above will become apparent from the following drawings, claims, and detailed description of the invention.

본 발명의 바람직한 실시예에 따르면, 지수제 밴드를 콘크리트 시공이음부에 설치함으로써, 콘크리트 시공이음시 신구(新舊) 콘크리트 구조체 간의 이음조직이 치밀해지고, 콘크리트 구조체의 내외부에 균열이 발생하여 물이 침투하더라도 차수기능이 발휘될 수 있으며, 지수제 밴드에서 불용성 결정들이 생성되어 균열을 자가치유하는 효과가 있다. 이러한 자가치유 기능은 누수에 영구적으로 반응하며 수밀한 콘크리트를 만들어 줄 수 있다.According to a preferred embodiment of the present invention, by installing the water-resistant band in the concrete construction joint, the joint structure between the old and new concrete structures when the concrete construction joint is dense, cracks occur in the interior and exterior of the concrete structure and water is Even if it penetrates, the degree of function can be exerted, and insoluble crystals are formed in the index band, which has the effect of self-healing the cracks. This self-healing function permanently responds to leaks and can produce watertight concrete.

또한, 지수제 밴드를 2중으로 설치할 수 있도록 개선된 지수판과, 지수판의 설치를 용이하게 하고 이어치기면에 대해 거푸집 역할을 할 수 있도록 아연도 강판을 절곡하고 메탈라스부를 형성한 접합철물을 사용함으로써, 지수판의 설치에 따르는 문제점을 해결하고, 컨스트럭션 조인트의 시공을 간편하게 하며, 콘크리트 표면에 쏘컷을 형성하는 과정을 간소화할 뿐만 아니라, 시공이음부에서의 균열 및 누수를 효과적으로 차단할 수 있는 수밀한 콘크리트 구조체를 구현할 수 있다.In addition, by using an improved index plate to install the water-proof band double, and the joining steel bent galvanized steel sheet and formed a metal lath to facilitate the installation of the index plate and to form a form for the joint surface. , A compact concrete structure that solves the problems associated with the installation of the index plate, simplifies the construction of construction joints, simplifies the process of forming saws on the concrete surface, and effectively blocks cracks and leaks in the construction joints. Can be implemented.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.As the invention allows for various changes and numerous embodiments, particular embodiments will be illustrated in the drawings and described in detail in the written description. However, this is not intended to limit the present invention to specific embodiments, it should be understood to include all changes, equivalents, and substitutes included in the spirit and scope of the present invention.

제1, 제2 등과 같이 서수를 포함하는 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되지는 않는다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. Terms including ordinal numbers such as first and second may be used to describe various components, but the components are not limited by the terms. The terms are used only for the purpose of distinguishing one component from another.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. When a component is referred to as being "connected" or "connected" to another component, it may be directly connected to or connected to that other component, but it may be understood that other components may be present in between. Should be.

본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.As used herein, the terms "comprise" or "have" are intended to indicate that there is a feature, number, step, action, component, part, or combination thereof described on the specification, and one or more other features. It is to be understood that the present invention does not exclude the possibility of the presence or the addition of numbers, steps, operations, components, components, or a combination thereof.

또한, 첨부 도면을 참조하여 설명함에 있어, 도면 부호에 관계없이 동일한 구성 요소는 동일한 참조부호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구조체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다. In the following description of the present invention with reference to the accompanying drawings, the same components are denoted by the same reference numerals regardless of the reference numerals, and redundant explanations thereof will be omitted. In the following description of the present invention, when it is determined that the structural description of the related known technology may unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted.

본 실시예는 콘크리트 시공이음부에 설치하기 위한 지수제 조성물, 지수제 밴드, 지수판, 접합철물 및 시공이음부의 누수문제를 근원적으로 방지하기 위한 컨스트럭션 조인트 구조 및 공법을 특징으로 한다.This embodiment is characterized by a construction joint structure and method for preventing the leakage problem of the water composition, the water band, the index plate, the joining hardware and the construction joints for installation in concrete construction joints.

본 실시예에 따른 지수제 조성물은, 포틀랜드 시멘트 100 중량부에 대하여, 제오라이트 10~30 중량부, 탄산나트륨 5~20 중량부, 황산알루미늄 10~30 중량부, 입경이 1~3mm인 벤토나이트 10~30 중량부, 입경이 100~250㎛(평균 입경 20~50㎛)인 실리카 20~70 중량부, 입경이 1~3mm인 규사 20~200 중량부, 및 무수석고 3~30 중량부를 분말상으로 혼합하여 이루어질 수 있다.The water repellent composition according to the present embodiment has 10 to 30 parts by weight of zeolite, 5 to 20 parts by weight of sodium carbonate, 10 to 30 parts by weight of aluminum sulfate, and 1 to 3 mm of bentonite with respect to 100 parts by weight of Portland cement. Parts by weight, 20 to 70 parts by weight of silica having a particle size of 100 to 250 μm (average particle size of 20 to 50 μm), 20 to 200 parts by weight of silica sand having a particle size of 1 to 3 mm, and 3 to 30 parts by weight of anhydrous gypsum, Can be done.

탄산나트륨은 콘크리트 구조체의 내부와 표면의 균열이나 틈새로 누수가 발생할 때에 탄산 음이온을 생성시켜, 누수되는 물속에 용해된 칼슘 이온 등의 이온성 물질과 반응하여 불용성의 탄산칼슘을 생성시킴으로써, 균열이나 틈새를 채우는 역할을 한다.Sodium carbonate generates carbonate anions when leakage occurs due to cracks or crevices in the interior and surface of the concrete structure, and reacts with ionic substances such as calcium ions dissolved in the leaked water to form insoluble calcium carbonate. It serves to fill.

시멘트 100 중량부에 대하여 5 중량부 이하로 사용하는 경우 불용성 탄산칼슘의 생성량이 적어서 불용성 고체를 생성하는 역할을 효과적으로 나타내지 못하며, 20 중량부 이상으로 사용하는 경우 탄산칼슘의 생성 반응이 과도하게 진행됨으로써 백화현상과 같은 콘크리트에 유해한 작용을 할 수 있다. 또한 탄산칼슘이 과다하게 생성되면 규산칼슘 결정 생성반응 등의 불용성 결정 생성반응을 저해할 수도 있다.When the amount is less than 5 parts by weight based on 100 parts by weight of cement, the amount of insoluble calcium carbonate is low, which does not effectively represent the role of generating insoluble solids. When the amount is more than 20 parts by weight, the reaction of generating calcium carbonate proceeds excessively. It can be harmful to concrete such as bleaching. In addition, excessively produced calcium carbonate may inhibit insoluble crystal formation reactions such as calcium silicate crystal formation reaction.

황산알루미늄은 제오라이트에 흡착되어 있다가 누수 발생시에 구조체 내에서 불용성의 다양한 결정들의 생성을 촉진시키는 역할을 하는 것으로, 시멘트 100 중량부에 대하여 10 중량부 이하로 사용하는 경우 불용성 결정들이 적게 생성되어 효과적인 방수기능을 나타내지 못하며, 30 중량부 이상으로 사용하는 경우 불용성 결정 생성반응이 과도하게 진행되어 구조체의 물성을 저하시킬 수 있다.Aluminum sulfate is adsorbed by zeolite and promotes the formation of various insoluble crystals in the structure when leakage occurs. When used at less than 10 parts by weight with respect to 100 parts by weight of cement, less insoluble crystals are produced. It does not exhibit a waterproof function, and when used in more than 30 parts by weight, the insoluble crystal formation reaction is excessively progressed may reduce the physical properties of the structure.

벤토나이트는 물이나 습기를 흡수하여 팽윤하는 성질이 커 누수된 물속의 여러 화합물과 반응하여 결정을 성장시키는 역할을 하는 것으로, 시멘트 100 중량 부에 대하여 10 중량부 이하로 사용하는 경우 누수되는 물을 흡수하는 성능과 결정을 성장시키는 작용이 약하여 효과적인 방수기능을 하지 못하며, 30 중량부 이상으로 사용할 경우 누수 초기에 과도한 물의 흡수로 인하여 불용성 결정을 생성시키는 다른 성분들의 반응을 저해하는 작용을 할 수 있다.Bentonite absorbs water or moisture and grows crystals by reacting with various compounds in the leaked water due to its swelling property. Absorption of water leaked when used at 10 parts by weight or less based on 100 parts by weight of cement Its ability to grow and crystallization is weak, so it does not have an effective waterproofing function, and when used at 30 parts by weight or more, it may act to inhibit the reaction of other components that produce insoluble crystals due to excessive water absorption at the initial stage of leakage.

실리카는 평균입경이 20~50㎛인 것을 사용할 수 있으며, 콘크리트 구조체에서의 누수 발생시 누수 속의 여러 가지 이온성 화합물과 반응하여 규산칼슘 등과 같은 불용성 결정들을 생성시키는 역할을 하는 것으로, 불용성 결정 성장 반응을 빠르게 진행시켜 효과적인 방수기능을 나타내는 역할을 한다.Silica may be used having an average particle diameter of 20 ~ 50㎛, and when a leak occurs in the concrete structure, it reacts with various ionic compounds in the leak to generate insoluble crystals such as calcium silicate, insoluble crystal growth reaction It progresses quickly and plays a role in showing effective waterproof function.

시멘트 100 중량부에 대하여 20 중량부 이하로 사용하는 경우 불용성 결정들의 생성량이 적어서 효과적인 방수기능을 나타내기 어렵고, 70 중량부 이상으로 사용하는 경우 생성되는 불용성 결정들의 생성량이 많아서 구조체의 물성을 저해시키며 불용성의 탄산칼슘 생성 반응 등과 같은 다른 반응을 저해할 수 있다.When the amount is less than 20 parts by weight of cement, it is difficult to show an effective waterproofing function due to the small amount of insoluble crystals, and when the amount is more than 70 parts by weight, the amount of insoluble crystals produced is high, thereby inhibiting the physical properties of the structure. Other reactions, such as insoluble calcium carbonate formation reactions.

규사는 평균입경이 1~2mm인 것을 사용할 수 있으며, 실리카에 비하여 입자 크기가 크므로 미세한 실리카에 비하여 콘크리트 속에서 구조적인 골재로써 강도를 유지하고 조직의 치밀하게 하는 역할을 한다. 또한 규사는 콘크리트 구조체로부터 누수되는 물속의 화학성분과 반응하여 불용성의 규산칼슘을 생성시키는 반응을 진행시키는 데에 필요한 규산성분을 제공하는 역할을 하는 것으로, 시멘트 100 중량부에 대하여 20 중량부 이하로 사용하는 경우 구조적인 보강 성능을 나타내기 어렵고, 200 중량부 이상으로 사용하는 경우 지수제의 물성을 저하시킬 수 있다.Silica sand can be used with an average particle diameter of 1 ~ 2mm, and because the particle size is larger than the silica, it maintains the strength as a structural aggregate in the concrete compared to the fine silica and plays a role of compacting the tissue. In addition, the silica sand serves to provide the silicic acid component necessary to proceed with the reaction to generate insoluble calcium silicate by reacting with the chemical component in the water leaked from the concrete structure, 20 parts by weight or less with respect to 100 parts by weight of cement When used, it is difficult to exhibit structural reinforcing performance, and when used at 200 parts by weight or more, the physical properties of the water repellent may be lowered.

무수석고는 콘크리트 타설 후 수화과정에서 콘크리트 구조체의 조직을 치밀 하게 하고 누수 발생시 칼슘이온을 제공하여 불용성의 규산칼슘 결정 성장과 불용성 탄산칼슘을 생성시키는 역할을 하는 것으로, 시멘트 100중량부에 대하여 3 중량부 이하로 사용하는 경우 규산칼슘과 탄산칼슘의 생성량이 적어 효과적인 방수기능을 할 수 없으며, 30 중량부 이상으로 사용하는 경우 규산칼슘과 탄산칼슘의 생성량이 과도하게 많아 콘크리트 구조체의 물성을 저하시킬 수 있다.Anhydrous gypsum serves to create insoluble calcium silicate crystals and insoluble calcium carbonate by densifying the structure of the concrete structure during hydration after concrete pouring and providing calcium ions when leakage occurs. 3 weight per 100 parts by weight of cement If it is used less than the amount of calcium silicate and calcium carbonate produced less effective waterproofing function, when used in more than 30 parts by weight of excessively large amount of calcium silicate and calcium carbonate can be reduced the properties of the concrete structure have.

이러한 지수제 조성물은 시공이음부에 타설되는 모르타르에 혼합하거나, 후술하는 바와 같이 밴드 형태로 제작하여 콘크리트 구조체의 표면에 매설되는 지수판에 결합하여 사용함으로써, 콘크리트 구조체의 균열이나 틈새를 통해 누수가 발생할 경우 불용성 결정들이 성장하여 균열을 자가치유하는 역할을 하며, 그 주요 성분으로는 전술한 바와 같이 시멘트, 지오라이트, 탄산나트륨, 황산알루미늄, 벤토나이트, 규사분말, 규사, 무수석고가 혼합되어 사용되는 것을 특징으로 한다.Such a water repellent composition may be mixed with a mortar to be poured into a construction joint, or used in combination with an index plate embedded in a surface of a concrete structure, which is manufactured in a band form as described below, thereby causing leakage through cracks or crevices of the concrete structure. In this case, insoluble crystals grow and play a role in self-healing of cracks, and as the main component, cement, zeolite, sodium carbonate, aluminum sulfate, bentonite, silica sand, silica sand, and anhydrous gypsum are used. It is done.

본 실시예에 따른 결정성장형 자가치유 지수제 조성물은 펠렛상 또는 분말상으로 사용될 수 있으며, 후술하는 바와 같이 부직포나 망사에 도포된 밴드 형태로도 사용될 수 있다. 분말상의 지수제 조성물은 직접 수용성 폴리머와 혼합하여 사용할 수 있으며, 먼저 펠렛상으로 제조한 후 수용성 폴리머와 혼합함으로써 장기간에 걸쳐 차수성을 효과적으로 나타내도록 할 수도 있다.The crystal growth self-healing index composition according to the present embodiment may be used in a pellet or powder form, and may also be used in the form of a band applied to a nonwoven fabric or a mesh as described below. The powdery water-based composition can be directly mixed with the water-soluble polymer, and may be prepared in a pellet form first and then mixed with the water-soluble polymer so that the water repellency can be effectively exhibited over a long period of time.

분말상 조성물의 경우, 콘크리트와의 혼합 과정에서 곧바로 그 물성이 발현되어 콘크리트 타설시에 조직을 치밀하게 하고 콘크리트 구조체의 강도나 내구성을 향상시키는 역할을 한다. 펠렛상으로 제작하여 콘크리트 타설시 혼합하여 사용하는 경우, 혼합시에는 그 역할을 수행하지 않고 있다가 콘크리트 타설 후 콘크리트 시 공이음부에 균열이 발생한 경우, 그 사이를 통하여 빗물 등의 누수가 있을 때 물에 의해 펠렛의 수용성 폴리머가 용해되면서 결정이 성장하여 균열부위를 자가치유하는 역할을 수행하게 된다.In the case of the powder composition, its physical properties are immediately expressed during mixing with concrete, thereby densifying the structure during concrete placement and improving the strength or durability of the concrete structure. If it is manufactured in pellet form and mixed and used during concrete pouring, it does not play its role during mixing, but if there is a crack in concrete joint after concrete pouring, when there is water leakage, etc. As the water-soluble polymer of the pellet is dissolved by the crystal grows to play a role of self-healing the cracks.

즉, 본 실시예에 따른 지수제 조성물은 콘크리트 타설 후 시공이음부에 균열이 발생한 경우에도 작용을 하는 특징이 있으며, 후술하는 바와 같이 밴드 형태로 제조되어 여러 형태의 콘크리트의 이음부위에 적용될 수 있다.That is, the water repellent composition according to the present embodiment has a characteristic of acting even when a crack occurs in the construction joint after concrete pouring, and is manufactured in a band form as described below, and may be applied to joint portions of various types of concrete. .

전술한 지수제 조성물은, 수용성 폴리머와 혼합한 후 그 혼합물을 부직포 또는 망사에 도포하거나, 압출한 후 건조시켜 밴드 형태로 성형함으로써 지수제 밴드로 제조될 수 있다.The above-mentioned water repellent composition can be prepared into a water repellent band by mixing with a water-soluble polymer and then applying the mixture to a nonwoven fabric or a mesh, or extruding and drying to form a band.

이러한 지수제 밴드는 콘크리트 속에 매설되어, 포틀랜드 시멘트가 물과 화합할 때 성분이 다른 수산화칼슘과 실리카, 알루미나 등 포졸란이 물에 의하여 서서히 화합되어 물에 녹지 않는 규산화칼슘 등을 생성하도록 함으로써, 콘크리트 조직을 치밀하게 하고, 차수막을 형성하여 시공이음부에서 흔히 발생되는 크랙을 스스로 메꾸어 누수현상을 근원적으로 차단하는 역할을 한다.The index band is embedded in concrete, so that when Portland cement is combined with water, the calcium hydroxide, which is different in composition, and pozzolan such as silica and alumina are gradually combined with water to produce calcium silicate that is insoluble in water. By densely forming a water curtain, it fills the cracks common in construction joints by itself and serves to block leakage.

지수제 밴드의 제조에 사용되는 수용성 폴리머 용액으로는, 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 수용성 우레탄수지 등이 사용될 수 있으며, 나아가 수용성 폴리머 용액 1~90 중량부에 대하여, 물 10~99 중량부를 더 혼합하여 사용할 수도 있다.As the water-soluble polymer solution used in the preparation of the water index band, polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, water-soluble urethane resin, etc. may be used. Moreover, 10-99 weight part of water can also be mixed and used with respect to 1-90 weight part of water-soluble polymer solutions.

도 2는 본 발명의 일 실시예에 따른 지수제 밴드 제조방법 나타낸 순서도이다. 이하, 도 2를 참조하여 전술한 지수제 밴드를 제조하는 과정에 대해 상세하게 설명한다.Figure 2 is a flow chart showing a method for producing a water band band according to an embodiment of the present invention. Hereinafter, a process of manufacturing the above-mentioned water-solvent band will be described in detail with reference to FIG. 2.

본 실시예에 따른 지수제 밴드는 콘크리트에 매설하여 사용되며, 밴드 구성물질 중 시멘트와 규사는 모르타르와 결합되어 신구 콘크리트와 더불어 견고한 콘크리트 이음부를 형성하는 역할을 한다. 밴드 내부의 분말상의 화합물은 이온상의 칼슘과 결합하여 불용성의 고체 결정을 형성하며, 제오라이트 및 벤토나이트와 황산알루미늄 혼합물은 펠렛 형태로 제조되어 전술한 물질들과 혼합하여 사용될 수도 있다.The index band according to the present embodiment is used to embed in concrete, cement and silica sand of the band material is combined with the mortar serves to form a solid concrete joint with the old and new concrete. The powdery compound inside the band combines with the ionic calcium to form insoluble solid crystals, and the zeolite and bentonite and aluminum sulfate mixture may be prepared in pellet form and mixed with the aforementioned materials.

이를 위해, 먼저 황산알루미늄 수용액에 제오라이트 및 벤토나이트를 혼합한 후 수용성 폴리머와 혼합하고(S10), 이를 통해 생성된 혼합물을 압출한 후 건조 및 분쇄하여 펠렛 형태로 제조한다(S20).To this end, first, zeolite and bentonite are mixed in an aqueous solution of aluminum sulfate and then mixed with a water-soluble polymer (S10), and the resulting mixture is extruded, dried and pulverized to prepare a pellet (S20).

제오라이트, 벤토나이트, 황산알루미늄 및 소량의 지방산을 수용성 폴리머 용액으로 교반하고 이를 압출, 건조시켜 펠렛 형태로 제조하여 사용할 수 있으며, 시멘트, 무수석고, 규사분말 등으로 이루어진 분말상 혼합물과 펠렛을 혼합형으로 사용할 수도 있다.Zeolite, bentonite, aluminum sulfate, and a small amount of fatty acid may be stirred in a water-soluble polymer solution, extruded, and dried to form pellets. The powder mixture and pellets made of cement, anhydrous gypsum, and silica sand powder may also be used in a mixed form. have.

예를 들어, 시멘트, 시멘트 100 중량부에 대하여, 상기 펠렛 10~50 중량부, 탄산나트륨 5~20 중량부, 입경이 1~3mm인 벤토나이트 10~30 중량부, 입경이 100~250㎛인 실리카 20~70 중량부, 입경이 1~3mm인 규사 20~200 중량부, 및 무수석고 3~30 중량부를 혼합하여 사용할 수 있다(S30).For example, with respect to cement and 100 parts by weight of cement, 10 to 50 parts by weight of the pellet, 5 to 20 parts by weight of sodium carbonate, 10 to 30 parts by weight of bentonite having a particle size of 1 to 3 mm, and a silica having a particle size of 100 to 250 μm. 70 parts by weight, 20 to 200 parts by weight of silica sand having a particle diameter of 1 to 3 mm, and 3 to 30 parts by weight of anhydrous gypsum may be mixed and used (S30).

한편, 제오라이트와 벤토나이트 10~60 중량%, 황산알루미늄 20~60 중량%, 고급지방산 분말 20~70 중량%로 이루어진 혼합물에, 수용성 폴리머 1~90 중량%와 물 10~99 중량%로 이루어진 수용성 폴리머 용액 1~50 중량부를 혼합하여 사용할 수도 있다.On the other hand, in the mixture consisting of 10 to 60% by weight of zeolite and bentonite, 20 to 60% by weight of aluminum sulfate, and 20 to 70% by weight of high fatty acid powder, a water-soluble polymer consisting of 1 to 90% by weight of water-soluble polymer and 10 to 99% by weight of water You may use it by mixing 1-50 weight part of solutions.

다음으로, 이와 같이 생성된 혼합물과 수용성 폴리머 용액을 혼합하고(S40), 그 혼합물을 부직포 또는 망사에 도포하거나, 압출한 후 건조 및 절단하여 밴드 형태로 제조한다(S50). 이와 같이 제조된 밴드에 수용성 폴리머 용액을 도포하여 사용할 수도 있다.Next, the mixture thus produced and the water-soluble polymer solution are mixed (S40), and the mixture is applied to a nonwoven fabric or a mesh, or extruded, dried and cut to prepare a band form (S50). The water-soluble polymer solution may be applied to the band thus prepared.

수용성 폴리머 용액으로는, 전술한 바와 같이 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 수용성 우레탄수지 등이 사용될 수 있으며, 나아가 수용성 폴리머 용액 1~90 중량부에 대하여, 물 10~99 중량부를 혼합하여 사용할 수도 있다(S42).As the water-soluble polymer solution, polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, water-soluble urethane resin, etc. may be used as described above. It is also possible to mix and use 10-99 weight part of water with respect to 1-90 weight part of polymer solutions (S42).

한편, 본 실시예에 따른 지수제 밴드는 시멘트, 지오라이트, 카오린, 활성백토, 규조토, 벤토나이트 및 황산알미늄과 유기산의 복합 화합물 등을 미세한 입자로 분말화하고 이를 소정의 중량비로 혼합한 후, 수용성 접착제를 가하여 부직포나 시트 등의 표면에 2~25mm 두께로 도포하거나 고착시켜 10~50mm 폭으로 절단하여 제조될 수도 있으며, 이와 같이 제조된 지수제 밴드는 콘크리트 시공이음부에 신(新) 콘크리트를 타설하기 전에 설치될 수 있다.On the other hand, the index agent band according to the present embodiment is powdered into fine particles of cement, zeolite, kaolin, activated clay, diatomaceous earth, bentonite and a compound of aluminum sulfate and organic acid and mixed in a predetermined weight ratio, and then water-soluble It can also be manufactured by cutting or applying a thickness of 2 to 25mm to the surface of a nonwoven fabric or sheet by applying an adhesive and cutting it to a width of 10 to 50mm. It can be installed before pouring.

이러한 지수제 밴드는 롤 형태로 제조될 수 있으며, 콘크리트 이음 시공시 종래의 지수판이나 벤토나이트 밴드를 대신하여 콘크리트 타설 전에 미리 설치해 둠으로써 누수를 근원적으로 차단하는 역할을 한다.Such a water-proof band can be manufactured in roll form, and serves to fundamentally block leakage by pre-installing the concrete in place of the conventional water plate or bentonite band during concrete joint construction.

본 실시예에 따른 지수제 밴드를 구(舊) 콘크리트의 시공이음부에 매설하고 신(新) 콘크리트를 타설함으로써, 구콘크리트와 신콘크리트 사이에서 밴드에 포함된 시멘트 성분과 규사 세분말이 수화작용을 하여 콘크리트 상호간의 접착을 좋게 하여 일체화시키는 역할을 한다. 즉, 본 실시예에 다른 밴드와 콘크리트 페이스트의 결합은 이질재 간의 결합이 아니라, 수화작용에 의해 콘크리트와 일체화되기 때문에 구조적인 분리현상이 발생하지 않는다는 특징이 있다.Cement component and silica sand powder included in the band between the old concrete and the new concrete are hydrated by embedding the water stopper band according to the present embodiment in the construction joint of the old concrete and placing the new concrete. To improve the adhesion between the concrete to play a role of integration. That is, in the present embodiment, the combination of the other bands and the concrete paste is characterized by the fact that the structural separation does not occur because it is integrated with the concrete by the hydration action, not between the foreign materials.

콘크리트의 신축에 따라 균열이 발생하여 물이 콘크리트 틈새나 균열부로 침입하게 되면, 본 실시예에 따른 지수제 밴드의 구성성분 중 벤토나이트는 침입한 물과 반응하여 팽윤함으로써 차수막을 형성하게 된다. 이와 같이 생성된 복합 화합물은 겔 상태로 되어 물을 흡수, 차단하는 기능을 수행하며, 지오라이트 등에 흡착된 수분과 염은 불용성 고체 결정을 생성하여 균열을 메꾸는 역할을 하기도 한다.When the crack occurs as the concrete expands and breaks into the crack or crack of the concrete, bentonite among the components of the water stopper band according to the present embodiment reacts with the intruded water and swells to form a membrane. The composite compound thus formed is in a gel state to absorb and block water, and water and salt adsorbed to the zeolite may form insoluble solid crystals to fill cracks.

특히, 지수제 밴드의 구성재료 중에는, 일반적인 콘크리트 수화작용 과정에서 모두 반응하여 소모되지 않도록, 수용성 폴리머로 코팅된 화합물을 포함하고 있어서 일반적인 차수층 기능을 수행할 뿐만 아니라, 차후에 콘크리트에서 균열이 발생되어 물이 균열의 틈새로 들어올 경우에도 다시 반응하여 차수성능을 발휘한다는 특징이 있다. 또한, 본 구성재료는 유, 무기복합 화합물로 구성되어 콘크리트 속에서 물과 반응하여 불용성 고체 결정을 생성함으로서, 누수 부위를 막고 균열부를 자가치유하는 성능을 발휘한다.In particular, the constituent material of the water-repellent band contains a compound coated with a water-soluble polymer so as not to react and consume all in the general concrete hydration process, so that it does not only perform a general order layer function, but also cracks in concrete afterwards. Even when the crack enters the gap, it reacts again and exhibits order performance. In addition, the constituent material is composed of an organic and inorganic compound compound to react with water in concrete to form insoluble solid crystals, thereby exhibiting the ability to prevent leaks and self-healing cracks.

이상으로, 콘크리트 컨스트럭션 조인트에 사용될 수 있는 지수제 조성물 및 지수제 밴드에 대해 설명하였으며, 이하, 도 3 내지 도 5를 참조하여 본 실시예에 따른 콘크리트 컨스트럭션 조인트 구조에 대해 상세하게 설명한다.As described above, the water-repellent composition and the water-repellent band that can be used for the concrete construction joint have been described. Hereinafter, the concrete construction joint structure according to the present embodiment will be described in detail with reference to FIGS. 3 to 5.

본 실시예는 콘크리트 구조물의 컨스트럭션 조인트에서 발생하기 쉬운 방수하자, 균열, 구조적인 문제점, 시공적인 애로점 등을 해결하기 위한 것으로, 전술한 결정성장형 지수제 밴드와 특수 형태로 고안된 지수판 및 메탈라스부를 형성한 전용 접합철물을 결합하여 컨스트럭션 조인트 구조를 구현한 것을 특징으로 한다.This embodiment is to solve the water-resistant, cracks, structural problems, construction difficulties, etc., which are likely to occur in the construction joint of the concrete structure, forming the above-described crystal growth index band and the index plate and metallas part designed in a special form It is characterized by implementing a construction joint structure by combining a dedicated joint hardware.

이처럼, 지수제 밴드, 지수판 및 접합철물을 결합하여 사용함으로써 콘크리트 컨스트럭션 조인트에 요구되는 수밀 성능 및 수축팽창 흡수 성능을 모두 만족시킬 수 있다.As such, by using a combination of the water stop band, the water stop plate, and the joining hardware, it is possible to satisfy both the watertight performance and the shrinkage expansion absorption performance required for the concrete construction joint.

또한, 필요에 따라서는, 지수판의 설치가 필요 없는 시공이음부에서도 본 실시예에 따른 접합철물(메탈라스)과 결정성장형 지수제 밴드를 사용함으로써 시공이음부에서의 거푸집 역할 및 방수 효과를 얻을 수 있다. 즉, 본 실시예에 따른 전용 접합철물은 그 자체로서도 거푸집 및 지수판의 역할을 할 수 있으며, 결정성장형 지수제 밴드와 함께 사용하여, 누수시에 결정성장을 통하여 공극을 막음으로써 하자를 예방할 수 있다.In addition, if necessary, in the construction joints that do not require the installation of the index plate, by using the joining hardware (metallas) and the crystal growth type index agent band according to the present embodiment, it is possible to obtain a form role and a waterproof effect on the construction joints. have. In other words, the dedicated joint hardware according to the present embodiment can serve as a die and an index plate as such, and can be used together with a crystal growth index band to prevent defects through crystal growth when leaking, thereby preventing defects. .

도 3은 본 발명의 일 실시예에 따른 컨스트럭션 조인트용 지수판을 나타낸 단면도이다. 도 3을 참조하면, 지수제 밴드(7), 지수판(10), 몸체부(12), 날개부(14), 밴드홈부(16)가 도시되어 있다.3 is a cross-sectional view showing the index plate for the construction joint according to an embodiment of the present invention. Referring to FIG. 3, a water stop band 7, a water stop plate 10, a body 12, a wing 14, and a band groove 16 are illustrated.

본 실시예에 따른 지수판(10)은 전체적으로 'T'자 형태로 형성되며, 구콘크리트에 매설되는 몸체부(12)의 상부에 양측으로 날개부(14) 및 밴드홈부(16)를 형성함으로써 지수제 밴드(7)를 용이하게 설치할 수 있으며, 신콘크리트 타설시 지수제 밴드(7)의 위치가 변경되지 않고 설치된 위치에 고정되도록 하는 역할을 한다.The index plate 10 according to the present embodiment is formed in a 'T' shape as a whole, the index by forming the wing 14 and the band groove 16 on both sides on the upper portion of the body portion 12 embedded in the old concrete The band 7 can be easily installed, and serves to fix the fixed band at the installed position without changing the position of the water stop band 7 when new concrete is poured.

즉, 본 실시예에 따른 지수판(10)은 구콘크리트 구조체에 매설되는 몸체부(12)와, 몸체부(12)에 연결되며, 콘크리트 구조체의 이어치기면을 따라 양측으로 연장되는 한 쌍의 날개부(14)로 이루어져 전체적으로 T자 형태로 형성된다.That is, the index plate 10 according to the present embodiment is connected to the body portion 12 and the body portion 12 embedded in the old concrete structure, a pair of wings extending along both sides along the connecting surface of the concrete structure Consists of the portion 14 is formed in the overall T-shape.

한 쌍의 날개부(14)에는 밴드홈부(16)가 형성되어, 지수제 밴드(7)를 밴드홈부(16)에 삽입하는 것만으로 용이하게 지수제 밴드(7)를 설치할 수 있도록 한 것을 특징으로 한다. 도 3에 도시된 것처럼, 지수판(10)의 몸체부(12)의 양측으로 형성되는 한 쌍의 밴드홈부(16) 각각에 지수제 밴드(7)를 삽입함으로써, 콘크리트 시공이음부에 한 쌍의 지수제 밴드(7)가 설치되게 된다.A pair of wing portions 14 is formed with a band groove portion 16, it is characterized in that it is easy to install the water stop band (7) simply by inserting the water stop band (7) in the band groove portion 16 It is done. As shown in Figure 3, by inserting the water-resistant band (7) in each of the pair of band grooves 16 formed on both sides of the body portion 12 of the water plate 10, a pair of concrete construction joints The water band 7 is provided.

지수제 밴드(7)는 시공이음부를 통해 침수되는 물과 반응하여 결정성장을 통해 공극을 막는 역할을 하므로, 한 쌍의 지수제 밴드(7)를 설치함으로써 시공이음부를 통한 누수를 2중으로 차단할 수 있다. 즉, 컨스트럭션 조인트에서의 일반적인 차수 기능을 수행할 뿐만 아니라, 차후에 콘크리트에서 균열이 발생되어 다시 침수가 발생하더라도 2중으로 설치된 지수제 밴드(7)가 재차 차수 성능을 발휘할 수 있다.The anti-water band 7 reacts with the water submerged through the construction joints to prevent voids through the growth of crystals. Thus, by installing a pair of anti-water bands 7, the leakage through the construction joints is doubled. You can block. That is, in addition to performing a general order function in the construction joint, even if the crack is generated in the concrete later submerged again, the double-made water-made band 7 can exhibit the order performance again.

도 4는 본 발명의 일 실시예에 따른 컨스트럭션 조인트용 접합철물을 나타낸 단면도이다. 도 4를 참조하면, 거푸집(5), 지수판(10), 접합철물(20), 조인트홈부(22), 메탈라스부(24)가 도시되어 있다.Figure 4 is a cross-sectional view showing a joint for construction joints according to an embodiment of the present invention. Referring to FIG. 4, the formwork 5, the index plate 10, the joining hardware 20, the joint groove part 22, and the metal lath part 24 are illustrated.

본 실시예에 따른 접합철물(20)은 코너비드 등에 사용되는 메탈라스를 변형시킨 형태로서, 콘크리트 구조물의 외측으로는 구조물의 표면에 쏘컷(saw-cut)을 형성하기 위해 거푸집(5)에 긴결되는 조인트홈부(22)가 결합되며, 내측으로는 지수판(10)(날개부(14))에 결속되어 설치된 지수판(10)을 튼튼하게 고정시키는 역할을 할 수 있다.The joining hardware 20 according to the present embodiment is a form in which metal laths used for corner beads and the like are deformed and tightly formed on the formwork 5 to form a saw-cut on the surface of the structure outside the concrete structure. The joint groove portion 22 is coupled to the inside, and may serve to firmly fix the water discharge plate 10 installed by being bound to the water discharge plate 10 (the wing portion 14).

콘크리트 구조체의 표면에 쏘컷을 형성하기 위한 조인트홈부(22)는 거푸집(5)에 긴결됨으로써 콘크리트 타설 중에 변형되지 않아야 하며, 지수판(10) 역시 그 중간 부분이 이어치기면에 정확히 고정되어 타설 과정에서 변형되거나 위치가 옮겨지지 않아야 콘크리트의 신축에 대응할 수 있다.The joint groove portion 22 for forming the saw cut on the surface of the concrete structure should not be deformed during concrete pouring by being tightly connected to the formwork 5, and the index plate 10 will also be fixed to the joining surface of the middle part in the pouring process. It should not be deformed or repositioned to cope with the expansion of concrete.

이를 위해 본 실시예에 따른 접합철물(20)은 조인트홈부(22)와 메탈라스부(24)를 결합시킨 구조로 구성함으로써, 메탈라스부(24)의 일단부는 조인트홈부(22)가 거푸집(5)에 긴결된 상태로 변형되지 않도록 잡아주는 역할을 하고, 메탈라스부(24)의 타단부는 지수판(10)이 제 위치에 정확히 고정되어 있도록 잡아주는 역할을 하며, 메탈라스부(24) 자체는 이어치기면을 커버하여 마감하기 위한 거푸집 역할을 하도록 할 수 있다.To this end, the joining hardware 20 according to the present exemplary embodiment has a structure in which the joint groove 22 and the metal lath 24 are coupled to each other, so that one end of the metal lath 24 has a joint groove 22 formed in the die ( 5) and the other end of the metal lass part 24 serves to hold the index plate 10 is fixed in place exactly, and the metal lass part 24 It can itself serve as a formwork for covering and covering the seam.

도 4에 도시된 것처럼, 본 실시예에 따른 접합 철물(20)은 아연도 강판을 절곡하여 제작될 수 있는 것으로, 한쪽에는 조인트홈부(22)를 형성하여 그 내부에 백업재(26a) 및 실링재(26b)를 채워 넣을 수 있도록 하고, 다른 한쪽에는 자름금을 내어 벌림으로써 메탈라스 형태의 메탈라스부(24)를 형성한 일체형의 철물로 제작될 수 있다.As shown in FIG. 4, the joining hardware 20 according to the present embodiment may be manufactured by bending a galvanized steel sheet, and a joint groove part 22 is formed at one side thereof to form a backup material 26a and a sealing material therein. (26b) can be filled, and the other side can be made of an integral piece of metal forming the metal lath portion 24 by spreading a cutting edge.

한편, 본 실시예에 따른 조인트홈부(22)는 지수제 밴드(7)를 삽입하여 설치할 수 있도록 아연도 강판을 절곡하여 형성할 수도 있다. 즉, 조인트홈부(22)의 외측(콘크리트 표면측)에는 채움재, 즉 백업재(26a)나 실링재(26b)가 끼워지도록 홈이 형성되며, 내측에는 지수제 밴드(7)를 설치할 수 있도록 홈이 형성되는 형태로 제작될 수 있다. 이러한 형태의 조인트홈부(22)를 사용하여 본 실시예에 따른 접합철물(20)을 구성할 경우, 아연도 강판 절곡부에 지수제 밴드(7)를 더 설치할 수 있어 방수 성능을 극대화시킬 수 있다.On the other hand, the joint groove portion 22 according to the present embodiment may be formed by bending the galvanized steel sheet so that the water-proof band 7 can be inserted and installed. That is, a groove is formed on the outer side (concrete surface side) of the joint groove portion 22 so that the filling material, that is, the backing material 26a or the sealing material 26b, is fitted, and the groove is provided on the inner side so that the water-proof band 7 can be installed. It may be manufactured in the form to be formed. When using the joint groove portion 22 of this type to configure the joining hardware 20 according to the present embodiment, it is possible to further install the water stop band (7) in the bent galvanized steel sheet can maximize the waterproof performance. .

메탈라스부(24) 자체는 이어치기면을 마감하기 위한 거푸집 역할을 하도록 할 수 있다.The metal lath 24 itself may serve as a formwork for closing the splice surface.

콘크리트 시공이음부에서 신구(新舊) 콘크리트가 서로 밀실하게 결합되기 위해서는 약 6mm 정도의 조면(粗面) 처리가 요구되며, 바탕재와 방수재와의 접착력을 강화시키고 내구성을 확보하기 위해 시공 전에 방수 모르타르나 에폭시 접착제 등을 콘크리트 표면에 도포하기도 한다.In order to tightly combine new and old concrete in concrete joints, roughness of about 6mm is required, and it is waterproof before construction to strengthen the adhesion between the base material and the waterproofing material and to ensure durability. Mortar or epoxy adhesive may be applied to the concrete surface.

본 실시예에 따른 접합철물(20)의 메탈라스부(24)는 그 자체로서 표면에 요철(凹凸)이 형성되어 있으므로, 선콘크리트 타설시 이어치기면을 마감하는 거푸집 역할을 하여 별도의 측면 마감재를 사용하지 않아도 되도록 할 수 있으며, 이어치 기면이 조면(粗面)이 되도록 함으로써 후콘크리트가 선콘크리트와 일체화되도록 하는 역할을 할 수 있다.Since the metal lath 24 of the joining hardware 20 according to the present embodiment is formed with irregularities on its surface, the side surface finishing material serves as a formwork for finishing the splice surface when placing the concrete. It is possible to avoid the use of, and by the surface of the ear surface roughness (粗 面) can play a role that the after-concrete is integrated with the sun concrete.

메탈라스부(24)의 타단부는 클립이나 결속선 등을 사용하여 지수판(10)의 날개부(14)에 결합될 수 있으며, 선콘크리트 타설 과정에서 메탈라스부(24)에 가해지는 측압에 견딜 수 있도록 메탈라스부(24)는 각목이나 거푸집 등으로 보강될 수 있다.The other end of the metal lath 24 may be coupled to the wing 14 of the index plate 10 using a clip or a binding line, and is applied to the side pressure applied to the metal lath 24 in the process of placing the concrete. To withstand the metal lath 24 may be reinforced with wood or formwork.

예를 들어, 도 4에 도시된 것처럼, 접합 철물(20)의 메탈라스부(24)의 끝부분을 접고 지수판(10)의 날개부(14)와 접하도록 한 상태에서, 별도의 홈을 내거나 자르지 않고, PVC나 철제류로 제작된 클립 형태의 보조물(11)로 끼움으로써 접합 철물(20)과 지수판(10)을 결합시킬 수 있다.For example, as shown in FIG. 4, in the state where the end of the metal lath 24 of the joining hardware 20 is folded and in contact with the wing 14 of the water stop plate 10, a separate groove is made or Without cutting, the joining hardware 20 and the index plate 10 can be joined by fitting into the auxiliary material 11 in the form of a clip made of PVC or iron.

본 실시예에 따른 접합철물(20)은 그 양단부가 각각 거푸집(5) 및 지수판(10)에 연결되도록 설치되며, 이로써 조인트홈부(22) 및 지수판(10)과 거푸집(5)을 정위치에 고정시키는 역할과, 선콘크리트 타설 과정에서 콘크리트 페이스트가 흘러나오지 않고, 타설 후에도 콘크리트면을 조면으로 유지시켜 후콘크리트와 일체화시키는 역할을 할 수 있다.The joining hardware 20 according to the present embodiment is installed so that both ends thereof are connected to the formwork 5 and the index plate 10, respectively, whereby the joint groove portion 22 and the index plate 10 and the formwork 5 are in place. The role of fixing and the concrete paste does not flow out during the process of sun-concrete, it may play a role of maintaining the concrete surface as a rough surface after the casting to integrate with the post-concrete.

본 실시예에 따른 접합철물(20)을 사용하여 콘크리트를 이음 시공한 후에는 거푸집(5)을 탈형하며, 거푸집(5) 탈형 후 구조물의 표면으로 노출되는 조인트홈부(22) 내에는 전술한 바와 같이 백업재(26a) 및/또는 실링재(26b)가 충전될 수 있다.After joining the concrete using the joining hardware 20 according to the present embodiment, the mold 5 is demolded, and after the mold 5 is demolded, the joint groove 22 exposed to the surface of the structure is as described above. Likewise, the backup material 26a and / or the sealing material 26b may be filled.

도 5는 본 발명의 일 실시예에 따른 콘크리트 컨스트럭션 조인트 구조를 나타낸 단면도이다. 도 5를 참조하면, 구조체(1), 이어치기면(3), 거푸집(5), 지수제 밴드(7), 지수판(10), 접합철물(20)이 도시되어 있다.5 is a cross-sectional view showing a concrete construction joint structure according to an embodiment of the present invention. Referring to FIG. 5, there is shown a structure 1, a splice surface 3, a formwork 5, an index band 7, an index plate 10, and a joining hardware 20.

콘크리트 시공이음부, 즉 컨스트럭션 조인트는 콘크리트 구조물에서 콘크리트를 한번에 타설하지 못하여 이어치기를 할 때, 반드시 발생하게 되는 조인트 부분으로서, 이 부분은 이음매 없이 후콘크리트를 타설하여 일체화하는 방법과, 컨트랙션 조인트(Contration Joint)나 익스팬션 조인트(Expansion Joint)의 기능을 추가하여 조절 이음을 위한 홈을 형성하기 위해 조인트홈을 끼우거나 조인트 필러(Joint Filler)재를 개재시킨 후 콘크리트를 타설하기도 한다.Concrete construction joints, that is, construction joints, are the joints that must occur when the concrete can not be cast at one time in the concrete structure. (Contration Joint) or expansion joint (Expansion Joint) to add the function to form a groove for the adjustment joints to insert the joint groove or to insert the joint filler (Joint Filler) material and then cast concrete.

콘크리트는 양생되는 과정에서 발생하게 되는 수화열과 태양열의 온도 등에 의해 수축 또는 팽창을 하게 되며, 이러한 콘크리트의 수축, 팽창에 대비하여 미리 콘크리트에 수축, 팽창 조인트를 설치할 경우, 그러한 조인트 부위로 균열이 유도되어 구조물의 임의의 위치에서 크랙(Random Crack)이 발생하는 것을 예방할 수 있다.Concrete shrinks or expands due to the heat of hydration and solar heat generated during curing, and in case of installation of expansion joints or expansion joints in advance in preparation for shrinkage and expansion of such concrete, cracks are induced to such joints. This can prevent the occurrence of random cracks at any position of the structure.

이를 위해 콘크리트 시공이음부에 지수판(10)이 설치될 수 있는데, 본 실시예에 따른 컨스트럭션 조인트 구조에서는 지수판(10)을 정위치에 고정시키기 위해 특수형태로 절곡, 성형된 아연도 강판(조인트홈부(22)와 메탈라스부(24))을 접합철물(20)로 사용하여 지수판(10)을 고정하고, 아울러 지수판(10)에는 2중으로 지수제 밴드(7)를 삽입, 설치함으로써 지수판(10) 고정과 방수 문제를 모두 해결한 것을 특징으로 한다. 이러한 컨스트럭션 조인트 구조는 이음매 없이 후콘크리트를 타설 하여 일체화하는 구조 및 수축, 팽창 조인트를 설치하는 구조에 모두 적용할 수 있다.To this end, the index plate 10 may be installed in the concrete construction joint, in the construction joint structure according to the present embodiment bent, molded galvanized steel sheet (joint groove part) in a special shape to fix the index plate 10 in place The water stop plate 10 is fixed by using the 22 and the metal laths 24 as the joining hardware 20, and the water stop plate 10 is inserted into and installed in the water stop plate 10 in duplicate. It is characterized by solving both fixing and waterproofing problems. Such a construction joint structure can be applied to both a structure in which the post-concrete is integrated without a seam and a structure in which a contraction and expansion joint are installed.

콘크리트의 컨스트럭션 조인트 구조는 연속적인 콘크리트 타설이 요구되는 구간에서 이어치기를 하는 부위를 지칭하는데, 연속되는 옹벽이나 슬래브의 수직 시공이음부와, 기둥이나 벽체에서 후속 콘크리트와 이어지는 수평 시공이음부 등을 들 수 있다. 예를 들어, 컨스트럭션 조인트는 통상 하루 이내에 콘크리트 타설을 마무리하는 부분이라 할 수 있는데, 여러 층으로 이루어진 건물의 콘크리트 공사는 한 층의 바닥판 콘크리트의 타설과 양생이 끝나야 그 다음 층을 위한 후속 작업이 시작되며, 이 경우 바닥판의 타설은 상부 벽체나 기둥의 수평 시공이음부가 되는 것이다.The construction joint structure of concrete refers to the portion of the joint where the continuous concrete is to be poured. The vertical joints of continuous retaining walls or slabs, and the horizontal joints of subsequent concrete and subsequent concrete columns or walls Can be mentioned. For example, a construction joint is usually a part of finishing a concrete cast within a day. A concrete construction of a multi-storey building must be finished and cured of the floor slab of one floor before subsequent work for the next floor. In this case, the pouring of the bottom plate is the horizontal joint of the upper wall or column.

일반적으로 건축용 또는 토목용 구조물의 콘크리트 치기에 대한 시공계획에서, 콘크리트를 타설하였다가 조절 형편 등으로 인하여 시간 간격(3시간 이상)을 두고 다시 타설하는 것을 이어치기라 한다. 컨스트럭션 조인트는 이어친 부분에서 신구 콘크리트가 완벽하게 일체화가 되지 않아 강도가 약해지고 방수층에서의 누수 및 마무리재의 균열 등이 발생할 우려가 있는 부분이다.In general, in the construction plan for the concrete stroke of building or civil engineering structures, it is said that concrete is poured and then re-placed at a time interval (more than 3 hours) due to adjustment circumstances. The construction joint is a part where the old and new concrete is not completely integrated at the joints, and thus the strength is weakened, and leakage in the waterproof layer and cracking of the finishing material may occur.

한편, 컨스트럭션 조인트 구조는, 구조물의 건조수축, 외력 등에 의한 변형, 수화열, 온도, 습도에 의한 수축에 대응하기 위해 구조체에 단면 결손부를 설치하여 균열을 유도하는 줄눈 부분으로서, 이러한 줄눈의 위치를 정확하게 선정하기 어렵고, 도면상에도 표시만 있을 뿐 상세한 설명이 없으며, 실제 시공시에도 이 부분에서 신축에 관한 문제가 많이 발생하고, 시공불량에 의한 균열 및 누수가 많 은 부분이기도 하다.On the other hand, the construction joint structure is a joint portion that induces cracks by providing cross-sectional defects in the structure in order to cope with deformation caused by dry shrinkage, external force, etc., shrinkage due to hydration heat, temperature, and humidity. It is difficult to select, there is only a description on the drawing, there is no detailed description, and even in actual construction, there are many problems regarding expansion and contraction, and there are many cracks and leaks due to poor construction.

본 실시예에서는 건축용 또는 토목용 구조물의 이어치기 부분에 별도로 고안된 접합철물(20)을 거푸집(5)에 연결하여 설치함으로써, 이어치기면(3)을 커버하는 거푸집 역할 및 콘크리트 타설시 페이스트가 새어나오지 못하도록 마감하는 역할을 할 수 있으며, 거푸집(5)에 연결되는 부분에는 조인트홈부(22)를 결합하여 구조물의 신축에 대응하도록 한 것이다. 또한, 접합철물(20)의 양단부를 거푸집(5) 및 지수판(10)에 용이하게 결합, 고정시킬 수 있어 시공성이 향상될 수 있다.In this embodiment, by connecting the formwork 5 separately designed in the joint portion of the building or civil engineering structures connected to the formwork (5), the role of the formwork to cover the joint surface (3) and paste leaks during concrete pouring It may serve to prevent coming out, and the part connected to the formwork (5) is to cope with the expansion and contraction of the structure by combining the joint groove (22). In addition, since both ends of the joining hardware 20 can be easily coupled and fixed to the formwork 5 and the index plate 10, the workability can be improved.

즉, 본 실시예에 따른 컨스트럭션 조인트는, 구조물의 외형을 구획하도록 거푸집(5)을 설치한 상태에서, 거푸집(5)에는 접합철물(20)이 결합되고, 접합철물(20)에는 지수판(10)이 결속되는 구조로 이루어진다.That is, in the construction joint according to the present embodiment, in the state in which the formwork 5 is installed to partition the outline of the structure, the joining hardware 20 is coupled to the formwork 5, and the index plate 10 is connected to the joining hardware 20. ) Is made of a binding structure.

접합철물(20)은 조인트홈부(22)와, 조인트홈부(22)에 연결되는 메탈라스부(24)로 이루어지는데, 조인트홈부(22)는 거푸집(5)에 연결되어 콘크리트 타설 후 구조체(1)의 표면에 쏘컷이 형성되도록 하며, 메탈라스부(24)는 이어치기면(3)을 커버하여 이어치기면(3)에 대한 거푸집 역할을 할 수 있다.The joining hardware 20 is composed of a joint groove 22 and a metal lath 24 connected to the joint groove 22. The joint groove 22 is connected to the formwork 5 to form a structure after casting 1 The saw cut is formed on the surface of the), the metal lath 24 may serve as a formwork for the connecting surface (3) by covering the connecting surface (3).

지수판(10)은 타설되는 콘크리트에 매설되는 몸체부(12)와, 몸체부(12)에 연결되며 이어치기면(3)을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부(14)로 이루어지는데, 날개부(14)는 전술한 접합철물(20)과 결속되어 지수판(10)이 콘크리트 타설 과정에서 틀어지지 않고 정위치에 고정된다.The index plate 10 includes a body portion 12 embedded in the concrete to be poured, and a pair of wings 14 connected to the body portion 12 and extending to both sides in a T-shape along the joint surface 3. The wing portion 14 is coupled to the above-described joining hardware 20 so that the index plate 10 is fixed in place without being twisted in the concrete pouring process.

한 쌍의 날개부(14) 각각에는 밴드홈부(16)가 형성되는데, 밴드홈부(16)에는 전술한 지수제 밴드(7)가 삽입, 설치될 수 있다. 날개부(14)는 콘크리트 이어치 기면(3)을 따라 T자의 양 날개 형태로 연장되므로, 밴드홈부(16)에 삽입되는 지수제 밴드(7) 또한 이어치기면(3)을 따라 2중으로 설치되며, 따라서 이어치기면(3)을 따라 침투하는 물에 대해 2중의 방수 기능을 수행하게 된다.A band groove portion 16 is formed in each of the pair of wings 14, and the band groove portion 16 may be inserted into and installed with the above-described water stop band 7. Since the wing portion 14 extends in the form of two wings of the T along the concrete ear surface 3, the water stop band 7 inserted into the band groove 16 is also installed in duplicate along the ear surface 3. Thus, the water penetrating along the joint surface (3) performs a double waterproof function.

조인트홈부(22)는 아연도 강판을 절곡하여 제작될 수 있는데, 나사를 체결하여 조인트홈부(22)를 거푸집(5)에 고정하고 콘크리트를 이어치기 부분까지 타설하고 콘크리트가 경화된 후, 거푸집(5) 제거시 나사 부분만 커터로 잘라주면 된다. 거푸집(5) 제거 후 콘크리트 구조체(1)의 표면으로 노출된 조인트홈부(22)에는 방수제를 부착한 압축 패킹재 등을 채워 넣음으로써 신축, 팽창 조인트를 구현할 수 있다.The joint groove portion 22 may be manufactured by bending a galvanized steel sheet. The joint groove portion 22 is fixed to the formwork 5 by fastening a screw, and the concrete groove is poured to the portion where the concrete is joined and the concrete is cured. 5) When removing, only the screw part needs to be cut with a cutter. After the formwork 5 is removed, the joint groove part 22 exposed to the surface of the concrete structure 1 may be filled with a compression packing material having a waterproofing agent, and thus, the expansion and expansion joint may be realized.

압축 패킹재는 탄성력을 가진 제품으로서 구조물의 신축작용을 원활히 하도록 하며, 압축 패킹재에 접착제로 부착된 방수제는 유도된 물이 균열을 타고 흘러가지 못하게 흡수함으로서 완벽한 수밀의 구조체를 만들어 주는 역할을 할 수 있다.Compression packing material is a product with elasticity, which facilitates the stretching and contraction of the structure, and the waterproofing agent attached to the compression packing material as an adhesive absorbs the induced water from cracking and flows, thus making a perfect watertight structure. have.

도 6은 본 발명의 일 실시예에 따른 콘크리트 컨스트럭션 조인트 공법을 나타낸 순서도이다. 이하, 컨스트럭션 조인트 구조를 시공하기 위한 공법에 대해 상세히 설명한다.Figure 6 is a flow chart showing a concrete construction joint method according to an embodiment of the present invention. Hereinafter, the construction method for constructing a construction joint structure is demonstrated in detail.

먼저, 구조물의 외형을 구획하도록 거푸집(5)을 설치하고(P10), 이어치기면(3)을 따라 접합철물(20), 지수판(10)을 설치한다(P20). 접합철물(20)은 조인트홈부(22)와 그에 연결된 메탈라스부(24)로 이루어지는데, 조인트홈부(22)는 거푸 집(5)에 연결하고 메탈라스부(24)는 이어치기면(3)을 커버하여 거푸집 역할을 하도록 설치한다(P22).First, the formwork 5 is installed so as to partition the external shape of the structure (P10), and the joining hardware 20 and the index plate 10 are installed along the joining surface 3 (P20). The joining hardware 20 is composed of a joint groove 22 and a metal lath 24 connected thereto. The joint groove 22 is connected to the formwork 5 and the metal lath 24 is connected to the joint surface 3. Cover) and install to act as a formwork (P22).

조인트홈부(22)는 기존에 콘크리트 구조체(1)의 표면에 홈(쏘컷)을 파는 공정을 대신하기 위한 것으로, 채움재, 즉 백업재(26a)나 실링재(26b)를 삽입하기 위한 커버 역할을 할 수 있다. 또한 메탈라스부(24)는 선타설 콘크리트에 매립되어 구콘크리트의 표면(이어치기면(3))에 조면이 형성되도록 함으로써, 신구 콘크리트가 완벽히 일체화되도록 하는 역할을 할 수 있다.The joint groove 22 is to replace the process of digging a groove (cut) on the surface of the concrete structure 1, and serves as a cover for inserting the filling material, that is, the backup material 26a or the sealing material 26b. Can be. In addition, the metal lass 24 may be embedded in the precast concrete so that the rough surface is formed on the surface of the old concrete (earring surface 3), thereby allowing the old and new concrete to be completely integrated.

지수판(10)은 콘크리트에 매설되는 몸체부(12)와 이어치기면(3)을 따라 몸체부(12)의 양측으로 연장되는 날개부(14)를 포함하여 전체적으로 T자형으로 이루어지는 부재로서, 날개부(14)가 전술한 메탈라스부(24)에 결속되도록 설치한다(P24). 이처럼, 접합철물(20)을 사용하여 거푸집(5) 및 지수판(10)을 연결함으로써, 접합철물(20) 및 지수판(10)이 정위치에 고정될 수 있으며, 이어치기면(3)에 대해 별도의 거푸집 공사를 하지 않더라도 이어치기면(3)을 마감할 수 있다.The index plate 10 is a member made of a T-shape as a whole, including a body portion 12 embedded in concrete and a wing portion 14 extending to both sides of the body portion 12 along the connecting surface 3. The unit 14 is installed to be bound to the metal lass 24 described above (P24). As such, by connecting the formwork 5 and the index plate 10 using the joining hardware 20, the joining hardware 20 and the index plate 10 can be fixed in place, with respect to the joint surface (3) If you do not need a separate formwork, it can be finished (3).

이와 같이 거푸집(5)에 접합철물(20) 및 지수판(10)이 결합되도록 설치된 상태에서 이어치기면(3)의 일측에 콘크리트를 선타설한다(P30). 지수판(10)의 몸체부(12)는 콘크리트에 매설되는 부분이므로, 이어치기면(3)을 기준으로 몸체부(12)가 돌출된 쪽에 콘크리트를 타설한다. 이로써, 선타설 콘크리트에 지수판(10)(몸체부(12))이 매설되고, 이어치기면(3)은 메탈라스부(24)에 의해 마감되며, 거푸집(5)으로부터 이어치기면(3)을 따라 조인트홈부(22), 메탈라스부(24), 지수판(10)이 연결된 본 실시예에 따른 컨스트럭션 조인트 구조가 구현된다.Thus, the concrete is placed on one side of the joint surface 3 in the state in which the joining hardware 20 and the index plate 10 are coupled to the formwork 5 (P30). Since the body part 12 of the index plate 10 is a part embedded in concrete, the concrete part is poured on the side where the body part 12 protrudes based on the joint surface 3. Thereby, the index plate 10 (body portion 12) is embedded in the precast concrete, and the joining surface 3 is finished by the metal lath 24, and the joining surface 3 from the formwork 5 is formed. A construction joint structure according to the present embodiment in which the joint groove portion 22, the metal lath portion 24, and the index plate 10 are connected is implemented.

콘크리트 선타설 과정에서 콘크리트가 지수제 밴드와 접촉하여 반응함으로써 지수제 밴드의 기능이 상실되는 것을 방지하기 위하여, 콘크리트 선타설한 후 후타설 콘크리트를 치기 전에, 지수판(10)의 밴드홈부(16)의 이물질 등을 제거하고 밴드홈부(16)에 지수제 밴드(7)를 삽입하여 설치한다(P35).In order to prevent the concrete from losing its function by contacting with the water stopper band during the concrete casting process, the band groove 16 of the water stop plate 10 before hitting the post-casting concrete after the concrete start placing Remove the foreign matters of the band groove portion 16 is inserted into the water stop band (7) is installed (P35).

즉, 지수판(10)에 구비된 한 쌍의 날개부(14) 각각에는 밴드홈부(16)가 형성되는데, 도 5에 도시된 것처럼, 밴드홈부(16)는 이어치기면(3)을 따라 2중으로 배치되므로, 밴드홈부(16)에 지수제 밴드(7)를 삽입, 설치함으로써, 지수제 밴드(7)가 이어치기면(3)을 따라 2중으로 설치되며, 이어치기면(3)을 통한 침수에 대해 2중의 방수 기능을 수행할 수 있다.That is, each of the pair of wings 14 provided in the index plate 10 is formed with a band groove 16, as shown in Figure 5, the band groove 16 is along the connecting surface (3) 2 Since it is arranged in the middle, by inserting and installing the water stop band (7) in the band groove portion 16, the water stop band (7) is installed in double along the joining surface (3), through the joining surface (3) It can perform double waterproof function against immersion.

한편, 지수제 밴드(7)를 설치하기 위하여 반드시 지수판(10)을 사용해야 하는 것은 아니며, 못 등의 간단한 고정 철물을 사용하여 이어치기면(3)에 지수제 밴드(7)를 고정시킴으로써, 수평 또는 수직 컨스트럭션 조인트 부분에 지수제 밴드(7)를 설치할 수 있다.On the other hand, it is not necessary to use the water stop plate 10 in order to install the water stop band (7), it is horizontal by fixing the water stop band (7) to the connecting surface (3) using a simple fixing hardware such as nails, Alternatively, the water-proof band 7 can be installed in the vertical construction joint portion.

도 5에는 지수판이 사용된 수직 컨스트럭션 조인트 부분을 예시하였으나, 수평 컨스트럭션 조인트 부분의 경우에는 전술한 바와 같이 지수판 없이도 지수제 밴드를 적용할 수 있다.Although FIG. 5 illustrates a vertical construction joint portion in which an index plate is used, the horizontal construction joint portion may be applied to the index agent band without the index plate as described above.

다음으로, 이어치기면(3)의 타측에 콘크리트를 후타설함으로써(P40), 콘크리트 이어치기가 완료되며, 시공이음부마다 이상과 같은 공법을 반복하여 전체 콘크리트 구조물을 시공할 수 있다.Next, by post-casting the concrete on the other side of the joint surface (3), the concrete joint is completed, it is possible to construct the entire concrete structure by repeating the above-described method for each construction joint.

본 실시예는 연속된 콘크리트 공사에서 불가피하게 발생되는 컨스트럭션 조 인트 부분에 신축조절 기능과 거푸집 막음의 작업성을 개선하고, 누수의 우려가 큰 부위에 대한 방수 성능을 개선한 것으로서, 특수 형태로 고안된 접합철물(20)과 지수판(10)을 사용하고 지수제 밴드(7)를 2중으로 설치함으로써, 신축조절, 거푸집 측면 막음조치, 견고한 고정, 방수성능의 제고 등의 효과를 도출할 수 있다.This embodiment improves the elasticity control function and the workability of the formwork blocking in the construction joint part inevitably generated in the continuous concrete construction, and improves the waterproofing performance on areas with a high risk of leakage. By using the joining hardware 20 and the water stop plate 10 and installing the water stop band 7 in duplicate, effects such as elastic control, form side blocking action, firm fixing, and improvement of waterproof performance can be derived.

또한 본 실시예에 따른 컨스트럭션 조인트는 수축, 팽창 조인트의 역할도 겸할 수 있어서 균열을 저감시킬 수 있으며, 콘크리트 외관을 아름답게 할 수 있다. 작업성 측면에서도, 조인트홈부(22)를 거푸집(5)에 고정시키는 것만으로 구조체(1)의 표면에 홈을 만드는 번거로운 작업을 생략할 수 있고, 조인트홈부(22) 내에 신축성이 있는 백업재(26a)를 설치하여 작업성을 높일 수 있으며, 이어치기면(3)을 메탈라스부(24)로 마감할 수 있어 이어치기면(3)에 대한 별도의 측면 막음재가 필요하지 않다는 장점이 있다.In addition, the construction joint according to the present embodiment may also serve as a shrinkage and expansion joint, thereby reducing cracks and beautifying the concrete appearance. Also in terms of workability, the troublesome work of making grooves in the surface of the structure 1 can be omitted only by fixing the joint grooves 22 to the formwork 5, and the backing material having elasticity in the joint grooves 22 ( It is possible to increase the workability by installing 26a), and the joint surface 3 can be finished with the metal lath part 24, so there is no need for a separate side blocking material for the joint surface 3.

접합철물(20)은 지수판(10)과 쉽게 결합하여 지수판(10)을 견고하게 고정시킬 있으며, 특수 형태로 고안된 지수판(10)에는 결정성장형 지수제 밴드(7)를 2중으로 설치하여 방수 하자를 미연에 방지할 수 있다.The joining hardware 20 is easily combined with the index plate 10 to firmly fix the index plate 10. The index plate 10, which is designed in a special form, is provided with double crystal growth type bands (7) to provide a waterproof defect. It can prevent it beforehand.

상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술분야에서 통상의 지식을 가진 자라면 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It will be understood that the invention may be varied and varied without departing from the scope of the invention.

도 1a 및 도 1b는 종래기술에 따른 콘크리트 컨스트럭션 조인트 부분을 나타낸 단면도.1a and 1b are cross-sectional views showing a concrete construction joint portion according to the prior art.

도 2는 본 발명의 일 실시예에 따른 지수제 밴드 제조방법 나타낸 순서도.Figure 2 is a flow chart showing a method for producing a water agent band according to an embodiment of the present invention.

도 3은 본 발명의 일 실시예에 따른 컨스트럭션 조인트용 지수판을 나타낸 단면도.Figure 3 is a cross-sectional view showing the index plate for the construction joint according to an embodiment of the present invention.

도 4는 본 발명의 일 실시예에 따른 컨스트럭션 조인트용 접합철물을 나타낸 단면도.Figure 4 is a cross-sectional view showing a joint for construction joints according to an embodiment of the present invention.

도 5는 본 발명의 일 실시예에 따른 콘크리트 컨스트럭션 조인트 구조를 나타낸 단면도.5 is a cross-sectional view showing a concrete construction joint structure according to an embodiment of the present invention.

도 6은 본 발명의 일 실시예에 따른 콘크리트 컨스트럭션 조인트 공법을 나타낸 순서도.Figure 6 is a flow chart showing a concrete construction joint method according to an embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 구조체 3 : 이어치기면1: Structure 3: Continuous Surface

5 : 거푸집 7 : 지수제 밴드5: die 7: water-based band

10 : 지수판 12 : 몸체부10: index plate 12: body

14 : 날개부 16 : 밴드홈부14: wing portion 16: band groove portion

20 : 접합철물 22 : 조인트홈부20: joining hardware 22: joint groove

24 : 메탈라스부24: metal lath

Claims (18)

시멘트; 상기 시멘트 100 중량부에 대하여,cement; With respect to 100 parts by weight of the cement, 제오라이트 10 내지 30 중량부;10 to 30 parts by weight of zeolite; 탄산나트륨 5 내지 20 중량부;5 to 20 parts by weight of sodium carbonate; 황산알루미늄 10 내지 30 중량부;10 to 30 parts by weight of aluminum sulfate; 입경이 1 내지 3mm인 벤토나이트 10 내지 30 중량부;10 to 30 parts by weight of bentonite having a particle diameter of 1 to 3 mm; 입경이 100 내지 250㎛인 실리카 20 내지 70 중량부;20 to 70 parts by weight of silica having a particle diameter of 100 to 250 µm; 입경이 1 내지 3mm인 규사 20 내지 200 중량부; 및20 to 200 parts by weight of silica sand having a particle diameter of 1 to 3 mm; And 무수석고 3 내지 30 중량부를 분말상으로 혼합하여 이루어지는 지수제 조성물.A water repellent composition comprising 3 to 30 parts by weight of anhydrous gypsum in a powder form. 제1항에 있어서,The method of claim 1, 상기 실리카는 평균 입경이 20 내지 50㎛인 것을 특징으로 하는 지수제 조성물.The silica is an index composition, characterized in that the average particle diameter of 20 to 50㎛. 제1항의 조성물을 수용성 폴리머 용액과 혼합하고, 그 혼합물을 부직포 또는 망사에 도포하여 밴드 형태로 제조되는 것을 특징으로 하는 지수제 밴드.The water repellent band of claim 1, wherein the composition of claim 1 is mixed with a water-soluble polymer solution and the mixture is applied to a nonwoven fabric or a mesh to form a band. 제1항의 조성물을 수용성 폴리머 용액과 혼합하고, 그 혼합물을 압출한 후 건조시켜 밴드 형태로 성형되는 것을 특징으로 하는 지수제 밴드.The water band of claim 1, wherein the composition of claim 1 is mixed with a water-soluble polymer solution, and the mixture is extruded and dried to form a band. 제3항 또는 제4항에 있어서,The method according to claim 3 or 4, 상기 수용성 폴리머 용액은, 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 및 수용성 우레탄수지로 이루어진 군으로부터 선택된 하나 이상인 것을 특징으로 하는 지수제 밴드.The water-soluble polymer solution is at least one selected from the group consisting of polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, and water-soluble urethane resin. Exponential band. 제3항 또는 제4항에 있어서,The method according to claim 3 or 4, 상기 수용성 폴리머 용액 1 내지 90 중량부에 대하여, 물 10 내지 99 중량부를 더 혼합한 것을 특징으로 하는 지수제 밴드.10 to 99 parts by weight of water is further mixed with respect to 1 to 90 parts by weight of the water-soluble polymer solution. (a) 황산알루미늄 수용액에 제오라이트 및 벤토나이트를 혼합한 후 수용성 폴리머와 혼합하는 단계;(a) mixing zeolite and bentonite in an aqueous aluminum sulfate solution followed by mixing with a water-soluble polymer; (b) 상기 단계 (a)로부터 생성된 혼합물을 압출한 후 건조 및 분쇄하여 펠렛(pellet) 형태로 제조하는 단계;(b) extruding the mixture produced from step (a), drying and pulverizing to prepare pellets; (c) 시멘트 및 상기 시멘트 100 중량부에 대하여, 상기 펠렛 10 내지 50 중량부, 탄산나트륨 5 내지 20 중량부, 입경이 1 내지 3mm인 벤토나이트 10 내지 30 중량부, 입경이 100 내지 250㎛인 실리카 20 내지 70 중량부, 입경이 1 내지 3mm인 규사 20 내지 200 중량부, 및 무수석고 3 내지 30 중량부를 혼합하는 단계; 및(c) 10 to 50 parts by weight of the pellet, 5 to 20 parts by weight of sodium carbonate, 10 to 30 parts by weight of bentonite having a particle size of 1 to 3 mm, and a particle size of 100 to 250 µm with respect to cement and 100 parts by weight of the cement. To 70 parts by weight, 20 to 200 parts by weight of silica sand having a particle diameter of 1 to 3 mm, and 3 to 30 parts by weight of anhydrous gypsum; And (d) 상기 단계 (c)로부터 생성된 혼합물과 수용성 폴리머 용액을 혼합하는 단계를 포함하는 지수제 밴드 제조방법.(d) a method for producing an index band comprising mixing a mixture produced from the step (c) with a water-soluble polymer solution. 제7항에 있어서,The method of claim 7, wherein 상기 단계 (d)는 상기 수용성 폴리머 용액 1 내지 90 중량부에 대하여, 물 10 내지 99 중량부를 더 혼합하는 단계를 포함하는 것을 특징으로 하는 지수제 밴드 제조방법.The step (d) is a method for producing a water repellent band comprising the step of further mixing 10 to 99 parts by weight of water with respect to 1 to 90 parts by weight of the water-soluble polymer solution. 제7항에 있어서, 상기 단계 (d) 이후에,The method of claim 7, wherein after step (d), (e1) 상기 단계 (d)로부터 생성된 혼합물을 부직포 또는 망사에 도포하여 밴드 형태로 제조하는 단계를 더 포함하는 지수제 밴드 제조방법.(e1) The method of producing a water repellent band further comprising the step of applying the mixture produced in step (d) to a non-woven fabric or mesh to form a band. 제7항에 있어서, 상기 단계 (d) 이후에,The method of claim 7, wherein after step (d), (e2) 상기 단계 (d)로부터 생성된 혼합물을 압출한 후 건조시켜 밴드 형태로 성형하는 단계를 더 포함하는 지수제 밴드 제조방법.(e2) a method of producing a water repellent band further comprising the step of extruding and drying the mixture resulting from the step (d) into a band form. 제7항에 있어서,The method of claim 7, wherein 상기 수용성 폴리머 용액은, 폴리에틸렌옥시드, 폴리비닐파이롤리돈, 셀룰로즈수지, 폴리비닐알콜, 폴리비닐아세테이트, 수용성 에폭시수지, 수용성 실리콘수지, 및 수용성 우레탄수지로 이루어진 군으로부터 선택된 하나 이상인 것을 특징으로 하는 지수제 밴드 제조방법.The water-soluble polymer solution is at least one selected from the group consisting of polyethylene oxide, polyvinylpyrrolidone, cellulose resin, polyvinyl alcohol, polyvinylacetate, water-soluble epoxy resin, water-soluble silicone resin, and water-soluble urethane resin. Process for producing water-based bands. 미리 시공된 콘크리트 구조체에 매설되는 몸체부와;A body part embedded in a concrete structure previously constructed; 상기 몸체부에 연결되며, 상기 콘크리트 구조체의 이어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와;A pair of wings connected to the body part and extending to both sides in a T-shape along the joint surface of the concrete structure; 상기 날개부에 형성되며, 제3항 또는 제4항의 지수제 밴드가 삽입되는 밴드홈부를 포함하는 컨스트럭션 조인트(construction joint)용 지수판.The index plate for the construction joint (construction joint) is formed on the wing portion, and comprising a band groove portion into which the water repellent band of claim 3 or 4. 콘크리트 구조물의 컨스트럭션 조인트 부위에 사용되는 접합철물로서,Bonded steel used in construction joints of concrete structures, 거푸집에 연결되며, 상기 콘크리트 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와;A joint groove portion connected to the formwork and forming a saw-cut on the surface of the concrete structure; 일단부가 상기 조인트홈부에 연결되며, 미리 시공된 콘크리트 구조체의 이어치기면을 커버하도록 설치되는 메탈라스부를 포함하되,One end is connected to the joint groove, and includes a metal lath that is installed to cover the joint surface of the pre-constructed concrete structure, 상기 메탈라스부의 타단부는 상기 콘크리트 구조체에 설치된 제12항의 지수판의 날개부에 결속되는 것을 특징으로 하는 컨스트럭션 조인트용 접합철물.The other end of the metal las joined to the construction joint, characterized in that the binding to the wing of the index plate of claim 12 provided in the concrete structure. 제13항에 있어서,The method of claim 13, 상기 거푸집의 탈형 후, 상기 조인트홈부 내에 채움재가 충전되는 것을 특징으로 하는 컨스트럭션 조인트용 접합철물.After demolding the formwork, the joining iron for a construction joint, characterized in that the filler is filled in the joint groove portion. 콘크리트를 이어치기하여 소정 형상의 구조물을 형성하기 위한 조인트 구조로서,As a joint structure for joining concrete to form a structure of a predetermined shape, 상기 구조물의 외형을 구획하도록 설치되는 거푸집과;A formwork installed to partition the outer shape of the structure; 미리 시공되어, 그 표면에 이어치기면이 형성된 선(先)타설 콘크리트 구조체와;A pre-placed concrete structure which is constructed in advance and has a surface joined to the surface thereof; 상기 콘크리트 구조체에 매설된 몸체부와, 상기 몸체부에 연결되며 상기 이 어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와, 상기 한 쌍의 날개부에 각각 형성되는 한 쌍의 밴드홈부를 포함하는 지수판과;A body portion embedded in the concrete structure, a pair of wings connected to the body portion and extending to both sides in a T-shape along the perforated surface, and a pair of bands respectively formed on the pair of wing portions An index plate comprising a groove portion; 상기 한 쌍의 밴드홈부에 각각 삽입되도록 상기 이어치기면에 설치되어, 상기 이어치기면을 따라 침투하는 물을 차단하는 한 쌍의 지수제 밴드와;A pair of water stop bands installed on the joint surface to be inserted into the pair of band grooves, respectively, to block water penetrating along the joint surface; 상기 거푸집에 연결되며 상기 콘크리트 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와, 일단부는 상기 조인트홈부에 연결되고 타단부는 상기 날개부에 결속되어 상기 이어치기면을 커버하도록 설치되는 메탈라스부를 포함하는 접합철물을 포함하는 콘크리트 컨스트럭션 조인트 구조.A joint groove portion connected to the formwork and forming a saw-cut on a surface of the concrete structure, one end of which is connected to the joint groove portion and the other end of which is coupled to the wing portion to cover the seaming surface; Concrete construction joint structure including a joining hardware including a metal lath. 소정의 이어치기면을 기준으로 콘크리트를 이어치기하여 소정 형상의 구조물을 형성하는 공법으로서,As a method of forming a structure of a predetermined shape by connecting concrete on the basis of a predetermined seaming surface, 상기 구조물의 외형을 구획하도록 거푸집을 설치하는 단계;Installing a formwork to partition the outer shape of the structure; 상기 구조물의 표면에 쏘컷(saw-cut)을 형성하는 조인트홈부와, 일단부가 상기 조인트홈부에 연결되는 메탈라스부를 포함하는 접합철물을, 상기 조인트홈부는 상기 거푸집에 연결되고, 상기 메탈라스부는 상기 이어치기면을 커버하도록 설치하는 단계;A joint hardware including a joint groove forming a saw-cut on a surface of the structure and a metal lath having one end connected to the joint groove, wherein the joint groove is connected to the formwork, and the metal las is connected to the formwork. Installing to cover the seam surface; 몸체부와, 상기 몸체부에 연결되며 상기 이어치기면을 따라 T자형으로 양측으로 연장되는 한 쌍의 날개부와, 상기 한 쌍의 날개부에 각각 형성되는 한 쌍의 밴드홈부를 포함하는 지수판을, 상기 날개부가 상기 메탈라스부의 타단부에 결속되 도록 설치하는 단계; 및A water plate including a body portion, a pair of wing portions connected to the body portion and extending to both sides in a T-shape along the seaming surface, and a pair of band groove portions respectively formed on the pair of wing portions; And installing the wing to be coupled to the other end of the metal lath; And 상기 몸체부가 매설되도록 상기 이어치기면의 일측에 콘크리트를 선(先)타설하는 단계를 포함하는 콘크리트 컨스트럭션 조인트 공법.Concrete construction joint method comprising the step of placing concrete on one side of the connecting surface so that the body portion is embedded. 제16항에 있어서,The method of claim 16, 상기 선타설 단계 이후에, 상기 이어치기면을 따라 침투하는 물을 차단하는 한 쌍의 지수제 밴드를 상기 한 쌍의 밴드홈부에 각각 삽입하여 설치하는 단계를 더 포함하는 콘크리트 컨스트럭션 조인트 공법.After the casting step, concrete construction joint method further comprising the step of installing by inserting a pair of water-resistant band to block the water penetrating along the connecting surface to each of the pair of band grooves. 제17항에 있어서,The method of claim 17, 상기 지수제 밴드 설치 단계 이후에, 상기 이어치기면의 타측에 콘크리트를 후(先)타설하는 단계를 더 포함하는 콘크리트 컨스트럭션 조인트 공법.After the step of installing the water-based band, concrete construction joint method further comprising the step of pre-cast concrete on the other side of the joint surface.
KR1020090080239A 2009-08-28 2009-08-28 Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint KR101102901B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090080239A KR101102901B1 (en) 2009-08-28 2009-08-28 Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090080239A KR101102901B1 (en) 2009-08-28 2009-08-28 Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint

Publications (2)

Publication Number Publication Date
KR20110022797A true KR20110022797A (en) 2011-03-08
KR101102901B1 KR101102901B1 (en) 2012-01-10

Family

ID=43931005

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090080239A KR101102901B1 (en) 2009-08-28 2009-08-28 Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint

Country Status (1)

Country Link
KR (1) KR101102901B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101325522B1 (en) * 2011-06-23 2013-11-07 안광훈 Selective soluble composition for coating and the bentonite waterstops coated with the same compositon
KR101478755B1 (en) * 2014-03-31 2015-01-02 주식회사 이에스피소재 Compositions water stop for concrete structures and manufacturing method and waterproof and repair method for concrete structures using the same
KR20210009167A (en) * 2019-07-16 2021-01-26 한국파라마운트 주식회사 Bentotex, bentosheet, geosynthetic clay liner, bentoseal, sealstrap, bentomastic, and cover, water, root proofing facility, method using them
CN115506416A (en) * 2022-09-26 2022-12-23 华北水利水电大学 Lining grouting waterproof structure for joint of new concrete and old concrete in underground engineering and construction process

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102524623B1 (en) 2023-01-20 2023-04-24 홍종화 A water barrier plate for blocking water to be pressurized at the concrete joint between floors of a building and the construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100828149B1 (en) 2006-05-18 2008-05-08 강성탁 Self-curable crystal growth waterproof material

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101325522B1 (en) * 2011-06-23 2013-11-07 안광훈 Selective soluble composition for coating and the bentonite waterstops coated with the same compositon
KR101478755B1 (en) * 2014-03-31 2015-01-02 주식회사 이에스피소재 Compositions water stop for concrete structures and manufacturing method and waterproof and repair method for concrete structures using the same
KR20210009167A (en) * 2019-07-16 2021-01-26 한국파라마운트 주식회사 Bentotex, bentosheet, geosynthetic clay liner, bentoseal, sealstrap, bentomastic, and cover, water, root proofing facility, method using them
CN115506416A (en) * 2022-09-26 2022-12-23 华北水利水电大学 Lining grouting waterproof structure for joint of new concrete and old concrete in underground engineering and construction process
CN115506416B (en) * 2022-09-26 2024-03-12 华北水利水电大学 Lining grouting waterproof structure of junction between new concrete and old concrete of underground engineering and construction process

Also Published As

Publication number Publication date
KR101102901B1 (en) 2012-01-10

Similar Documents

Publication Publication Date Title
KR101102901B1 (en) Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint
CN113186985B (en) Anti-seepage treatment method for basement bottom plate construction joint
CN107574842A (en) Basement post-pouring zone advance water stop construction method
CN108374566B (en) Repairing process for leakage water on back water surface
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN205653900U (en) Waterproof construction of basement bottom plate
CN113754467A (en) Inorganic aqueous permeable crystallization type waterproof material and preparation method and use method thereof
CN109707058A (en) A kind of cast-in-place concrete fireproof heat insulating compound external mold plate and its application method
AU2005247966B2 (en) Method and system for constructing a concrete waterstop joint and use of a cementitious and reactive waterproofing grout strip
JP2020138384A (en) Precast residual form panel that suppresses salt damage and frost damage of the precast residual form panel, and manufacturing method of the precast residual form panel
CN214462853U (en) Self-healing concrete micro-crack repairing structure
CN209568552U (en) A kind of concrete joint water stop structure
CN211774656U (en) Basement stagnant water screw rod hole antiseep block structure
CN209277205U (en) A kind of precast pile head water proof structure
CN209891256U (en) Basement outer wall post-cast strip structure
CN110528593A (en) The heat insulating and water proof structure and construction method of station main body and accessory structure top plate seam
CN113503056A (en) Building deformation joint leakage maintenance method
CN207700402U (en) A kind of precast concrete connecting sewing waterproof construction
EP3368494B1 (en) Mineral sealing mortar
CN111365030A (en) Tunnel concrete lining structure gap water leakage treatment device and treatment method
CN220747020U (en) Self-healing concrete structure of permeable crystalline concrete post-pouring belt
KR200280440Y1 (en) Water protecting parts and penel with film layer for disolving by adding water of concrete mortar
CN215888346U (en) Basement outer wall post-cast strip waterproof construction
CN217974500U (en) Basement dampproofing and waterproofing structure
CN216920352U (en) Basement outer wall structure in deep foundation pit decoration stage

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141223

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151228

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170120

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180129

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190701

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200129

Year of fee payment: 9