A kind of precast pile head water proof structure Download PDFInfo
- Publication number
- CN209277205U CN209277205U CN201821932186.4U CN201821932186U CN209277205U CN 209277205 U CN209277205 U CN 209277205U CN 201821932186 U CN201821932186 U CN 201821932186U CN 209277205 U CN209277205 U CN 209277205U
- Authority
- CN
- China
- Prior art keywords
- pile
- proof structure
- water proof
- water
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of precast pile head water proof structure, water proof structure main body is square structure, water proof structure lower part is the pile crown of prefabricated pile, and water proof structure successively includes polyurethane water-proof paint layer, concrete cushion, cement based penetration crystallization type water proofing paint layer, MBP coil waterproof layer and concrete floor layer from bottom to top;Reinforcing bar is equipped in the pile body of prefabricated pile, and reinforcing bar stretches out at the top of the pile crown of prefabricated pile, and the reinforcing bar root for stretching out pile crown top section is equipped with water expandable waterstop.Precast pile head water proof structure provided by the utility model uses MBP coiled material waterproof material, impermeability is strong, tensile strength is high, can with pour that concrete structure bonding thereon is closely knit, not channeling water, and convenient and quick construction, waterproof quality can be effectively guaranteed.
Description
Technical field
The utility model belongs to buildings waterproof field, in particular to a kind of precast pile head water proof structure.
Background technique
With the development of underground waterproof technology, waterproof material is continued to bring out, to the water-proofing treatment of building underground thin portion
Directly influence the performance of underground structure.Underground thin portion water proof structure will constantly bring forth new ideas, in technical feasibility, process, guarantee
Practical problem can be improved in the case where quality.
Utility model content
Technical problem: in order to solve the defects of prior art, the utility model provides a kind of precast pile head waterproof structure
It makes.
Technical solution: the utility model provides a kind of precast pile head water proof structure, and water proof structure main body is rectangular knot
Structure, water proof structure lower body part are the pile crown of prefabricated pile, and water proof structure main body successively includes polyurethane water-proof paint from bottom to top
Layer, concrete cushion, cement based penetration crystallization type water proofing paint layer, MBP coil waterproof layer and concrete floor layer;Prefabricated pile
The reinforcing bar root for being equipped with reinforcing bar in pile body, and reinforcing bar stretches out at the top of the pile crown of prefabricated pile, and stretching out pile crown top section, which is equipped with, meets
Water expansion sealing strip.
As a kind of prioritization scheme: polyurethane water-proof paint layer exposes bed course position and is not less than with a thickness of 3mm, pile crown
50mm。
As advanced optimizing scheme: reinforcing bar length is not less than 1m, and draw ratio is not less than 45.
As advanced optimizing scheme: concrete cushion is the bed course of C15 concreting, with a thickness of 100mm.
As advanced optimizing scheme: the coiled material long side lap width of MBP coil waterproof layer is not less than 80mm, short side overlap joint
Width is not less than 50mm.
The utility model has the advantages that precast pile head water proof structure provided by the utility model uses MBP coiled material waterproof material, resist
Infiltration ability is strong, tensile strength is high, can with pour that concrete structure bonding thereon is closely knit, not channeling water, and convenient and quick construction,
Waterproof quality can be effectively guaranteed.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of precast pile head water proof structure of the utility model;
Appended drawing reference: 1- water proof structure main body, 11- polyurethane water-proof paint layer, 12- concrete cushion, 13- cement base are seeped
Saturating crystalline waterproof coating layer, 14-MBP coil waterproof layer, 15- concrete floor layer, 2- prefabricated pile, 21- pile crown, 22- pile body,
3- reinforcing bar, 4- water expandable waterstop.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the utility model is furtherd elucidate, it should be understood that these embodiments are only used for
Illustrate the utility model rather than limitation the scope of the utility model, after having read the utility model, art technology
Personnel fall within the application range as defined in the appended claims to the modification of the various equivalent forms of the utility model.
The utility model provides a kind of precast pile head water proof structure, and water proof structure main body 1 is square structure, waterproof structure
Make 1 lower part of main body be prefabricated pile 2 pile crown 21, water proof structure main body 1 from bottom to top successively include polyurethane water-proof paint layer 11,
Concrete cushion 12, cement based penetration crystallization type water proofing paint layer 13, MBP coil waterproof layer 14 and concrete floor layer 15;In advance
Reinforcing bar 3 is equipped in the pile body 22 of stake 2 processed, and reinforcing bar 3 stretches out 21 top of pile crown of prefabricated pile 2, and stretches out 21 top section of pile crown
3 root of reinforcing bar be equipped with water expandable waterstop 4.
The construction technology of above-mentioned precast pile head water proof structure, comprising the following steps:
Step 1: the top of pile crown 21 of prefabricated pile 2 and side are cleaned out, and substantially smooth, without obvious protruding parts,
Expose the one week polyurethane water-proof brushed with a thickness of 3mm in side at bed course position (expose bed course position and be not less than 50mm) in pile crown
Coating;
Step 2: 3 root of reinforcing bar for stretching out 21 top of pile crown of prefabricated pile 2 being installed by water expandable waterstop 4, this position steel
Muscle 3 is the reinforcing bar 3 in 2 pile body 22 of prefabricated pile with sole plate anchoring, and length is not less than 45 times of 3 diameter of reinforcing bar, and not small
In 1m, water expandable waterstop 4, which has, delays swollen performance, and the expansion rate of 7d is not more than the 60% of final expansion rate, final expansion
Rate is greater than 220%;
Step 3: using the smooth concrete cushion 12 for pouring 100mm thickness of C15 concrete;
Step 4: in 21 top surface of pile crown and side exposed section brushing cement based penetration crystallization type water proofing paint layer 13, and brushing
It extends on concrete cushion 12 at 250mm;
Step 5: the good MBP installation of membrane baseline of bullet on concrete cushion 12, paving MBP coiled material, at any time pay attention to and benchmark
Line alignment, it is first empty to spread MBP coiled material, then MBP coiled material is pasted, MBP coiled material long side lap width is not less than 80mm, short side lap width
Not less than 50mm, completion mats formation after work, is repaired and cleared up to surface;
Step 6: self-waterproof concrete casting concrete backplane level 15, compression strength are not less than C30, and anti-permeability strength is not less than
P6。
Precast pile head water proof structure provided by the utility model uses MBP coiled material waterproof material, impermeability is strong,
Tensile strength is high, can bond closely knit, not channeling water, and convenient and quick construction, waterproof quality with the concrete structure for pouring thereon
It can be effectively guaranteed.
Claims (5)
1. a kind of precast pile head water proof structure, it is characterised in that: the water proof structure main body (1) is square structure, waterproof structure
The pile crown (21) that main body (1) lower part is prefabricated pile (2) is made, water proof structure main body (1) successively includes polyurethane water-proof from bottom to top
Dope layer (11), concrete cushion (12), cement based penetration crystallization type water proofing paint layer (13), MBP coil waterproof layer (14) and
Concrete floor layer (15);Reinforcing bar (3) are equipped in the pile body (22) of the prefabricated pile (2), and the reinforcing bar (3) stretches out prefabricated pile
(2) at the top of pile crown (21), and reinforcing bar (3) root for stretching out pile crown (21) top section is equipped with water expandable waterstop (4).
2. precast pile head water proof structure according to claim 1, it is characterised in that: the polyurethane water-proof paint layer
(11) with a thickness of 3mm, pile crown (21) exposes bed course position and is not less than 50mm.
3. precast pile head water proof structure according to claim 1, it is characterised in that: reinforcing bar (3) length is not less than
1m, and draw ratio is not less than 45.
4. precast pile head water proof structure according to claim 1, it is characterised in that: the concrete cushion (12) is
The bed course of C15 concreting, with a thickness of 100mm.
5. precast pile head water proof structure according to claim 1, it is characterised in that: the MBP coil waterproof layer (14)
Coiled material long side lap width be not less than 80mm, short side lap width be not less than 50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821932186.4U CN209277205U (en) | 2018-11-22 | 2018-11-22 | A kind of precast pile head water proof structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821932186.4U CN209277205U (en) | 2018-11-22 | 2018-11-22 | A kind of precast pile head water proof structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209277205U true CN209277205U (en) | 2019-08-20 |
Family
ID=67602136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821932186.4U Expired - Fee Related CN209277205U (en) | 2018-11-22 | 2018-11-22 | A kind of precast pile head water proof structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209277205U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372027A (en) * | 2018-11-22 | 2019-02-22 | 江苏兴厦建设工程集团有限公司 | A kind of precast pile head water proof structure and its construction technology |
-
2018
- 2018-11-22 CN CN201821932186.4U patent/CN209277205U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372027A (en) * | 2018-11-22 | 2019-02-22 | 江苏兴厦建设工程集团有限公司 | A kind of precast pile head water proof structure and its construction technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104358341B (en) | Building brickwork and masonry construction method of building brickwork | |
CN207987983U (en) | A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip | |
CN101403218A (en) | Processing method for basement water-proof concrete construction joint | |
CN110761322B (en) | Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof | |
CN105862928B (en) | A kind of post-cast strip exterior wall advanced water-stopping processing structure and its construction technology | |
CN106988440B (en) | Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure | |
CN208981531U (en) | A kind of prefabricated assembled parapet connection structure | |
CN110872869A (en) | Waterproof construction method for joints of external wall panels | |
CN204199330U (en) | The overall steel plate for sealing water in a kind of ater-casting | |
CN201224933Y (en) | Frame beam preventing water seepage and crack and wall stuffing structure | |
CN208280185U (en) | A kind of post-cast strip advanced water-stopping construction | |
CN101787742A (en) | Planted roof soil lower deformation joint construction structure and construction method thereof | |
CN102758456A (en) | Construction method of basement waterproofing projects | |
CN104032771A (en) | Underground structure crack control construction method by adding inducing joints | |
CN102912945B (en) | Roof compound seepage-proofing steam exhausting hole detail treatment technology | |
CN209277205U (en) | A kind of precast pile head water proof structure | |
CN101560777A (en) | Waterproof construction method for bottom plate of basement with anti-float anchor rod | |
CN109610665A (en) | Oil depot assembled fire wall construction method | |
KR101102901B1 (en) | Waterstop composition, waterstop band, manufacturing method of waterstop band, structure and method of construction joint using waterstop band, waterstop plate and joint fitting for construction joint | |
CN104805864A (en) | Basement reverse building method outer wall groove and tongue and water-proofing gel combined waterproof construction technology | |
CN101818530A (en) | Regenerative masonry wall system and construction method thereof | |
CN106193120A (en) | Basement is encorbelmented, and base plate is inverse makees structure and construction method | |
CN103628506B (en) | Construction method for waterproof positions of foundation platform and pile head | |
CN205839811U (en) | A kind of post-cast strip exterior wall advanced water-stopping processes structure | |
CN109339355A (en) | The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190820 Termination date: 20201122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |