CN216920352U - Basement outer wall structure in deep foundation pit decoration stage - Google Patents
Basement outer wall structure in deep foundation pit decoration stage Download PDFInfo
- Publication number
- CN216920352U CN216920352U CN202123200876.5U CN202123200876U CN216920352U CN 216920352 U CN216920352 U CN 216920352U CN 202123200876 U CN202123200876 U CN 202123200876U CN 216920352 U CN216920352 U CN 216920352U
- Authority
- CN
- China
- Prior art keywords
- wall body
- plastic plate
- basement
- interlayer plastic
- basement outer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a basement exterior wall structure in a deep foundation pit decoration stage, which comprises: the basement exterior wall body is cast at the inner side to form a bottom plate, a drainage ditch is formed at the intersection of the bottom plate and the basement exterior wall body, and a water collecting pit is formed in the bottom plate; the cement-based permeable crystallization type waterproof layer is coated on the inner side of the basement outer wall body; the first interlayer plastic plate is laid on the bottom plate, a first mortar protective layer is poured on the upper portion of the first interlayer plastic plate, and the first interlayer plastic plate is arranged in a gap with the basement exterior wall body; and the permanent guide and exhaust layer comprises a second interlayer plastic plate arranged on the inner side of the basement outer wall body and a decorative surface layer poured on one side of the second interlayer plastic plate, which is far away from the basement outer wall body, and the lower end of the second interlayer plastic plate extends into a gap between the first interlayer plastic plate and the basement outer wall body. The utility model solves the problems of large indoor space occupation and high construction cost of the traditional waterproof method for the basement exterior wall.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to an underground outdoor wall structure in a deep foundation pit decoration stage.
Background
With the development of economy and human society, the building functions gradually tend to be diversified, and the basement becomes one of the necessary important structures of the current building. Due to the unique stratum position, the problem of outer wall leakage becomes an important factor influencing the engineering quality and the use function of the basement. Especially in coastal areas, it is most common. How to effectively control the water leakage of the outer wall in the decoration stage becomes a problem to be solved urgently.
The traditional waterproof method of the basement outer wall is a conventional drainage method of additionally arranging an inner lining wall and a drainage blind ditch on the inner side of the basement outer wall, so that the traditional basement outer wall occupies a large indoor space, and is high in construction cost.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the prior art, an underground outdoor wall structure in a deep foundation pit decoration stage is provided so as to solve the problems of large indoor space occupation and high construction cost in the traditional method of basement outer wall waterproofing.
In order to realize above-mentioned purpose, provide a basement outer wall structure in deep basal pit decoration and finishing stage, include:
the method comprises the following steps:
the basement outer wall comprises a basement outer wall body, wherein a bottom plate is formed on the inner side of the basement outer wall body in a pouring mode, a drainage channel is formed at the junction of the bottom plate and the basement outer wall body, and a water collecting pit is formed in the bottom plate;
the cement-based capillary crystalline waterproof layer is coated on the inner side of the basement outer wall body;
the first interlayer plastic plate is laid on the bottom plate, a first mortar protective layer is poured on the upper portion of the first interlayer plastic plate, and the first interlayer plastic plate and the basement outer wall body are arranged in a clearance mode; and
the permanent guide and exhaust layer comprises a second interlayer plastic plate and a decorative surface layer, the second interlayer plastic plate is installed on the inner side of the basement outer wall body, the decorative surface layer is poured on one side, far away from the basement outer wall body, of the second interlayer plastic plate, and the lower end of the second interlayer plastic plate extends into a gap between the first interlayer plastic plate and the basement outer wall body.
Further, the thickness of the interlayer plastic plate is 10 mm.
Furthermore, a steel wire mesh is laid on the inner side of the basement outer wall body, and the second interlayer plastic plate pad is arranged between the steel wire mesh and the basement outer wall body.
The underground outdoor wall structure has the beneficial effects that the permanent drainage cavity is arranged between the plastering layer and the underground outdoor wall body to guide the leakage water to reach the floor of the bottom plate to a ditch through the drainage cavity, and the leakage water of the outer wall is discharged through the floor drainage system of the bottom plate, so that the drainage is taken as the leading factor in the whole construction, and the leakage plugging amount is greatly reduced; through the arrangement of the permanent drainage voids, the defects of flatness and verticality deviation of the wall surface of the outer wall structure can be overcome, micro water leakage points which do not influence stress safety are allowed to exist in the structure, and the workload of cleaning and repairing a base layer on the surface of the wall before plastering construction of decoration and finishing is reduced; the permanent drainage space is small in thickness of only about 10mm, so that the usage amount of building materials is reduced, and the utilization rate of basement space is improved.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
fig. 1 is a schematic structural view of an underground outdoor wall structure at a deep foundation pit decoration stage according to an embodiment of the present invention.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and are not limiting of the utility model. It should be noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Referring to fig. 1, the present invention provides a basement exterior wall structure at a deep foundation pit decoration stage, including: the basement outer wall comprises a basement outer wall body 1, a cement-based capillary crystalline waterproof layer 3, a first interlayer plastic plate 4 and a permanent guide and drainage layer 5.
Wherein, the cement-based permeable crystallization type waterproof layer 3 is coated on the inner side of the basement exterior wall body 1. The inner side of the basement outer wall body 1 is poured to form a bottom plate 2. A drainage ditch 20 is formed at the intersection of the bottom plate 2 and the basement exterior wall body 1. A water collecting pit is formed in the bottom plate 2;
the first interlayer plastic plate 4 is laid on the bottom plate 2. The first mortar protective layer 41 is poured on the upper part of the first interlayer plastic plate 4. The first interlayer plastic plate 4 is arranged in a clearance with the basement outer wall body 1.
The permanent drainage layer 5 includes a second interlayer plastic sheet 51 and a finishing layer 52. Specifically, the second interlayer plastic plate 51 is mounted on the inner side of the basement exterior wall body 1. The finish coat 52 is poured on one side of the second interlayer plastic plate 51 far away from the basement exterior wall body 1, and the lower end of the second interlayer plastic plate 51 extends into the gap between the first interlayer plastic plate 4 and the basement exterior wall body 1.
In a preferred embodiment, the thickness of the laminated plastic plate is 10 mm.
In this embodiment, a steel wire mesh is laid on the inner side of the basement exterior wall body 1, and the second interlayer plastic plate 51 is laid between the steel wire mesh and the basement exterior wall body 1.
According to the underground outdoor wall structure in the decoration stage of the deep foundation pit, the permanent drainage cavity is arranged between the plastering layer and the basement outer wall body, so that the leakage water is guided to reach the floor of the bottom plate to the ditch through the drainage cavity, the leakage water of the outer wall is discharged through the floor drainage system of the bottom plate, the drainage is taken as the leading factor in the whole construction, and the leakage plugging amount is greatly reduced; through the arrangement of the permanent drainage voids, the defects of flatness and verticality deviation of the wall surface of the outer wall structure can be overcome, micro water leakage points which do not influence stress safety are allowed to exist in the structure, and the workload of cleaning and repairing a base layer on the surface of the wall before plastering construction of decoration and finishing is reduced; the permanent drainage space is small in thickness, only about 10mm, and compared with the conventional drainage method that the lining wall and the drainage blind ditch are additionally arranged in the traditional basement, the usage amount of building materials is reduced, and meanwhile, the utilization rate of the basement space is improved.
The underground outdoor wall structure at the decoration stage of the deep foundation pit adopts the cement-based permeable crystallization type waterproof coating as the waterproof layer of the underground outdoor wall. The coating contains a plurality of active chemical substances, utilizes the inherent chemical characteristics and porosity of cement concrete, takes water as a carrier, and is transmitted and filled in concrete micropores and capillaries by virtue of osmosis to catalyze the incompletely hydrated components in the concrete to be hydrated again to form water-insoluble dendritic crystals which are combined with the concrete into a whole, thereby blocking water and other liquid in any direction. Because the special catalyst is activated when meeting water, new fine gaps are generated due to vibration or other reasons after a plurality of years, and once water permeates, new crystals are generated to block the water. The said concrete can reach the effects of preventing water and moisture, protecting reinforcing steel bar and strengthening concrete structure.
On the other hand, the underground outdoor wall structure in the deep foundation pit decoration stage achieves the purpose of draining water through the floor drainage ditch provided with the second interlayer plastic plate and the bottom plate. The space between the second interlayer plastic plate with the pivot and the outer wall and the bottom plate is utilized to make a permanent hollow layer, namely, a drainage layer is guided, a drainage passage is formed to drain water and prevent moisture, the basement water seepage can be guided to a diversion trench, finally the water seepage is guided into a water collecting pit, and the water is discharged through a water pump, so that the purpose that the outer wall surface and the ground of the basement have no seepage points and watermarks is achieved, and the dryness of the basement is ensured.
According to the basement outer wall structure in the deep foundation pit decoration stage, the expansion bolts and the accessories thereof are adopted to fix the second interlayer plastic plate and the steel wire mesh sheet at one time, so that materials and labor are saved, and the construction period is shortened; the method of combining water proofing and drainage is comprehensively utilized, the water seepage condition of the outer wall of the basement is effectively avoided, and secondary reworking caused by improper construction method is also avoided.
The underground outdoor wall structure in the decoration stage of the deep foundation pit is simple in composition, so that compared with other traditional outer wall waterproof construction methods, the underground outdoor wall structure has the advantages that less construction waste is generated in the construction process, the variety is more single, and the centralized treatment is facilitated.
The basement outer wall structure at the decoration stage of the deep foundation pit adopts the cement-based permeable crystalline waterproof coating, so that cracks formed at the later stage can be sealed, the waterproof property of the structure is enhanced, and the repairing material for the base layer is saved.
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be understood by those skilled in the art that the scope of the present invention is not limited to the specific combination of the above-mentioned features, but also covers other embodiments formed by any combination of the above-mentioned features or their equivalents without departing from the spirit of the present invention. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.
Claims (3)
1. The utility model provides an underground outdoor wall structure of deep basal pit decoration and finishing stage which characterized in that includes:
the basement outer wall comprises a basement outer wall body, wherein a bottom plate is formed on the inner side of the basement outer wall body in a pouring mode, a drainage channel is formed at the junction of the bottom plate and the basement outer wall body, and a water collecting pit is formed in the bottom plate;
the cement-based capillary crystalline waterproof layer is coated on the inner side of the basement outer wall body;
the first interlayer plastic plate is laid on the bottom plate, a first mortar protective layer is poured on the upper portion of the first interlayer plastic plate, and the first interlayer plastic plate and the basement outer wall body are arranged in a clearance mode; and
the permanent guide and exhaust layer comprises a second interlayer plastic plate and a decorative surface layer, the second interlayer plastic plate is installed on the inner side of the basement outer wall body, the decorative surface layer is poured on one side, far away from the basement outer wall body, of the second interlayer plastic plate, and the lower end of the second interlayer plastic plate extends into a gap between the first interlayer plastic plate and the basement outer wall body.
2. An exterior wall structure of a deep foundation pit at the finishing stage of decoration according to claim 1, wherein the thickness of the interlayer plastic plate is 10 mm.
3. The deep foundation pit exterior wall structure at the decoration stage of the deep foundation pit as claimed in claim 1, wherein a steel wire mesh is laid on the inner side of the basement exterior wall body, and the second interlayer plastic plate pad is arranged between the steel wire mesh and the basement exterior wall body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123200876.5U CN216920352U (en) | 2021-12-20 | 2021-12-20 | Basement outer wall structure in deep foundation pit decoration stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123200876.5U CN216920352U (en) | 2021-12-20 | 2021-12-20 | Basement outer wall structure in deep foundation pit decoration stage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216920352U true CN216920352U (en) | 2022-07-08 |
Family
ID=82252676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123200876.5U Active CN216920352U (en) | 2021-12-20 | 2021-12-20 | Basement outer wall structure in deep foundation pit decoration stage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216920352U (en) |
-
2021
- 2021-12-20 CN CN202123200876.5U patent/CN216920352U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201280725Y (en) | Post-casting construction precast slab for basement of buildings | |
CN113186985B (en) | Anti-seepage treatment method for basement bottom plate construction joint | |
CN213952303U (en) | Basement outer wall post-cast strip assembled protection wall construction structures | |
WO2014138717A1 (en) | Method of basement construction | |
CN110593321B (en) | Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system | |
CN208777468U (en) | A kind of kitchen and bath's water-proofing anticracking structure | |
CN216920352U (en) | Basement outer wall structure in deep foundation pit decoration stage | |
CN112761158B (en) | Green construction method of integral three-wall-in-one outer wall of reverse engineering steel concrete key pin meshed row pile | |
CN110670638A (en) | Seamless construction method for expansion reinforcing belt of prefabricated house basement structure | |
JPH08269984A (en) | Construction of basement in outside waterproofing construction method | |
CN109518769A (en) | A kind of method and structure using PVC waterstop joint installation sewer pipe | |
CN212104215U (en) | Post-cast strip for bottom plate of underground chamber | |
CN107989205A (en) | The plugging system of toilet bath room floor sewer pipe preformed hole | |
CN211665866U (en) | Caisson type toilet secondary drainage pipeline | |
CN209412856U (en) | A kind of assembled integral basement structure meeting stability against floating requirement | |
CN208380086U (en) | A kind of toilet internal drainage standpipe through-flooring structure | |
CN209277205U (en) | A kind of precast pile head water proof structure | |
CN111779157A (en) | Underground outdoor wall structure and construction method thereof | |
CN109779319A (en) | A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole | |
CN221118813U (en) | Toilet caisson water-proof structure | |
CN211898575U (en) | Post-cast strip for bottom plate of underground chamber | |
CN214116723U (en) | Assembled basement drainage structures | |
CN216379657U (en) | Super long basement formula post-cast strip structure that sinks | |
CN213358886U (en) | Assembled escape canal | |
CN217379300U (en) | Concrete post-cast strip waterproof construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |