KR20090083965A - Sectional base for construction body in wind turbine - Google Patents

Sectional base for construction body in wind turbine Download PDF

Info

Publication number
KR20090083965A
KR20090083965A KR1020080009855A KR20080009855A KR20090083965A KR 20090083965 A KR20090083965 A KR 20090083965A KR 1020080009855 A KR1020080009855 A KR 1020080009855A KR 20080009855 A KR20080009855 A KR 20080009855A KR 20090083965 A KR20090083965 A KR 20090083965A
Authority
KR
South Korea
Prior art keywords
wind turbine
foundation
body installation
core member
prefabricated
Prior art date
Application number
KR1020080009855A
Other languages
Korean (ko)
Inventor
유형주
유성권
Original Assignee
유형주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유형주 filed Critical 유형주
Priority to KR1020080009855A priority Critical patent/KR20090083965A/en
Publication of KR20090083965A publication Critical patent/KR20090083965A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

A prefabricated foundation for installing a body of an aero-generator is provided to cut down construction cost and to minimize inconvenience of pedestrian caused by foundation construction. A prefabricated foundation for installing a body of an aero-generator comprises a core member(1) and a supporting member(2). The core member performs a pillar role. The supporting member is connected in order to support the core member. The core and supporting members are made of the concrete or the ferroconcrete. An anchor(3) connected to the body is inserted inside the core member. A piping(31) for wiring is installed inside the core member. In the lower part of the core member, a connecting member(11) for connecting to the supporting member is integrated. In the core member, a coupling part(12) for connecting to the supporting member is installed. The outer circumference of the core member comprises a unit(4) which is place by a crane.

Description

풍력발전기의 바디설치용 조립식 기초{Sectional base for construction body in wind turbine}Sectional base for construction body in wind turbine

일반적으로 풍력발전기, 전봇대, 신호등, 가로등, 현수막 등을 설치시키기 위해서는 지중에 기초를 매립시켜야 한다. 이러한 기초가 견고하고 확고하게 시설물을 지탱하기 위해서는 기초가 지중에 견고하게 매립 설치되어야 함은 물론이다.In general, in order to install wind turbines, power poles, traffic lights, street lights, banners, etc., the foundation must be buried underground. In order for these foundations to be firmly and firmly supported, the foundation must be firmly installed in the ground.

종래 상기와 같은 기초를 설치함에 있어서는 기초가 설치될 곳에 구덩이를 파고, 그 구덩이의 내부에 거푸집을 설치하고, 상기 거푸집의 내부에 콘크리트를 타설하여 기초를 형성시키며, 기초의 상부에 바디와 연결되는 앵커를 매립시켜 기초를 형성시켜 왔다.In the conventional installation of the foundation as described above, digging a pit where the foundation is to be installed, installing the formwork in the interior of the pit, pouring the concrete into the interior of the formwork to form a foundation, and is connected to the body at the top of the foundation Anchors have been embedded to form the foundation.

그러나 이와 같은 종래의 기초 형성방법은 별도의 거푸집을 필요로 하고, 타설된 콘크리트가 양생되는 동안 기초의 주변에 파헤쳐진 구덩이를 그대로 유지하다가 콘크리트의 양생이 완료되면 거푸집을 제거하고 구덩이를 다시 되메우기를 하여야 하 는 등 상당한 공사기간이 소요됨은 물론 기초공사기간 내내 공사현장을 운행하는 차량과 보행자의 통행에 많은 불편함을 전가 시키거나 작업장 주변의 환경 미관을 해치는 문제점이 있었다.However, the conventional method of forming the foundation requires a separate formwork, while maintaining the pit dug around the foundation while the poured concrete is being cured, removing the formwork and refilling the pit when curing of the concrete is completed. Not only does it take a considerable period of construction, but it also causes a lot of inconvenience in the traffic of vehicles and pedestrians operating the construction site throughout the basic construction period or has a problem of damaging the environmental aesthetics around the workplace.

본 발명은 전술한 문제점을 해결하기 위해 안출된 것으로서, 본 발명은 풍력발전기가 설치되는 작업현장에서 기초를 미리 준비된 부재를 조립하여 완성시키고, 곧바로 매립할 수 있게 하여 기초 형성작업을 신속하고 편리하게 할 수 있게 하는 풍력발전기의 바디설치용 조립식 기초를 제공함에 그 목적이 있다.The present invention has been made to solve the above-described problems, the present invention is to assemble the completed base member prepared in advance at the work site where the wind turbine is installed, and to be immediately buried to form the foundation work quickly and conveniently Its purpose is to provide a prefabricated foundation for body installation of a wind turbine.

본 발명의 또 다른 목적은 지중에 매립 설치되는 기초가 지중에 보다 확고하게 설치될 수 있게 하여 기초에 설치되는 바디를 견고하게 지지할 수 있게 하는 풍력발전기의 바디설치용 조립식 기초를 제공함에 있다.Still another object of the present invention is to provide a prefabricated foundation for body installation of a wind power generator, which allows the foundation installed in the ground to be installed more firmly in the ground, thereby enabling to firmly support the body installed in the foundation.

본 발명은 상기와 같은 목적을 달성하기 위해서 다음과 같이 구성된다.The present invention is configured as follows to achieve the above object.

기본적으로Basically

지주역할을 하는 중심부재(1)와;A core member (1) serving as a prop;

상기 중심부재(1)를 지지하기 위하여 고정 연결되는 지지부재(2);A support member (2) fixedly connected to support the center member (1);

로 이루어지며,It consists of

또한,Also,

상기 부재(1,2)는 콘크리트 또는 철근콘크리트로 제작이 될 수 있으며,The members 1 and 2 may be made of concrete or reinforced concrete,

또한,Also,

상기 중심부재(1)는 The core member 1 is

내부에 바디(8)와 연결되는 앵커(3)가 삽입되며, 상기 배선용 배관(31)이 설치되고; An anchor 3 connected to the body 8 is inserted therein, and the wiring pipe 31 is installed;

하부에 상기 지지부재(2)와 연결하기 위한 연결부재(11)가 일체로 제작되고, 상기 지지부재(2)와 고정 연결하기 위한 체결부(12)가 설치되며;A connecting member (11) is formed integrally with the supporting member (2) at a lower portion thereof, and a fastening portion (12) for fixedly connecting with the supporting member (2) is provided;

외주연에 크레인 등에 의해 옮길 수 있는 수단(4);Means (4) capable of moving by a crane or the like on the outer periphery;

이 더 포함되기도 하며,May be included,

또한,Also,

상기 지지부재(2)는 The support member 2 is

내측에 상기 중심부재(1)와 연결하기 위한 연결부재(21)가 일체로 제작되고, 상기 중심부재(1)와 고정 연결하기 위한 체결부(22)가 설치되며; A connecting member 21 is formed integrally with the central member 1 and connected to the central member 1, and a fastening part 22 is fixedly connected to the central member 1;

외측에 크레인 등에 의해 옮길 수 있는 수단(4);Means 4 which can be moved by a crane or the like on the outside;

이 더 포함되기도 하며,May be included,

또한,Also,

상기 지지부재(2)는The support member 2 is

바디(8)의 크기에 따라 2개 이상으로 분할하여 제작이 되며, 기본적으로는 3개로 분할 제작될 수 있으며,Depending on the size of the body (8) is divided into two or more, can be basically divided into three,

또한,Also,

상기 분할되어 있는 지지부재(2)는 상호간에 서로 고정 연결될 수 있도록 하는 체결부(23)를 더 포함하기도 하며,The divided support member 2 may further include a fastening portion 23 to be fixedly connected to each other,

또한,Also,

상기 앵커(3)는The anchor 3 is

상부는 상기 중심부재(1)의 위 즉 지반(6) 위로 일정부분이 노출되게 설치되며, 바디(8)와 고정 연결할 수 있는 체결부(32)가 설치되며;The upper part is installed so that a predetermined portion is exposed on the center 6, that is, above the ground 6, and a fastening part 32 which can be fixedly connected to the body 8 is installed;

하부는 상기 중심부재(1)에 삽입되어 설치되며, 콘크리트가 침투할 수 있는 통공(33)이 설치되며, 상기 배선용 배관(31)이 통과할 수 있는 구멍(35);A lower part is inserted into the central material 1 and is installed, a through hole 33 through which concrete can penetrate is installed, and a hole 35 through which the wiring pipe 31 can pass;

이 더 포함되기도 하며,May be included,

또한,Also,

상기 앵커(3)는 강관 파이프로 제작될 수도 있으며,The anchor 3 may be made of a steel pipe pipe,

또한,Also,

상기 체결부(12,22,23,32)는 볼트와 너트로 제작되기도 한다.The fastening parts 12, 22, 23, and 32 may be made of bolts and nuts.

이상에서와 같이 본 발명에 따르면 풍력발전기를 설치하고자 할 때 그 바디를 기초에 설치하고자하는 현장에서 기초를 미리 준비된 부재를 조립하여 완성시키고, 곧바로 매립할 수 있게 하여 기초공사의 공기를 단축시킴은 물론, 크레인 등의 장비 를 1회 사용하여 기초부터 풍력발전기 설치까지 모든 것을 한 번에 할 수 있게 되므로 공사비용을 절감시킬 수 있을 뿐만 아니라, 기초공사로 인한 보행자등의 통행 불편도 최소화할 수 있는 효과가 있다.As described above, according to the present invention, when the wind turbine generator is to be installed on the site where the body is to be installed on the foundation, the foundation is prepared by completing a member prepared in advance, and the landfill can be immediately reclaimed to shorten the air of the foundation construction. Of course, it is possible to reduce the construction cost as well as to minimize the inconvenience of pedestrians due to the foundation work, since it is possible to do everything from the foundation to the wind turbine installation at once by using equipment such as a crane. It works.

또한, 지중에 매립 설치되는 기초가 지중에 보다 확고하게 설치될 수 있게 하여 기초에 설치되는 바디를 견고하게 지지할 수 있는 효과가 있다.In addition, there is an effect that can be firmly supported on the body to be installed in the foundation can be installed in the ground more firmly installed in the ground.

이하에서는 첨부 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명인 조립식 기초(100)의 사시도이고, 도 2는 본 발명인 조립식 기초(100)의 분할사시도이고, 도 3은 본 발명의 조립식 기초(100)가 지중에 설치되는 것을 보여주는 정면도이고, 도 4는 본 발명인 조립식 기초(100)의 단면도이고, 도 5는 본 발명인 조립식 기초(100)의 분리평면도이고, 도 6은 본 발명인 바디연결부를 보여주는 단면도이다.1 is a perspective view of the present inventors of the prefabricated base 100, Figure 2 is a perspective view of the present invention of the prefabricated base 100, Figure 3 is a front view showing that the prefabricated base 100 of the present invention is installed in the ground, Figure 4 is a cross-sectional view of the present inventors of the prefabricated base 100, Figure 5 is a separate plan view of the present inventors of the prefabricated base 100, Figure 6 is a cross-sectional view showing the body connection of the present invention.

도 1 과 도 2 에 도시된 바와 같이, 본 발명인 풍력발전기의 바디설치용 기초를 형성함에 있어서, 크게 중심부재(1)와 지지부재(2)로 구성이 되며, 이들은 현장에서 조립하기 전에 미리 제작이 되어서 현장에서는 이들을 조립만 함으로서 간단히 기초를 형성하게 된다.As shown in Figures 1 and 2, in forming the body installation base of the present invention wind turbine, it is composed of the central member (1) and the support member (2), these are pre-fabricated before assembly in the field In the field, they simply form the foundation by simply assembling them.

도 3 내지 도 5 에 도시된 바와 같이, 본 발명인 바디설치용 기초를 형성하는 과정은 As shown in Figure 3 to 5, the process of forming the body mounting base of the present invention is

먼저, 내부에 앵커(3)의 일부가 삽입되며 지주역할을 하는 중심부재(1)와 상기 중심부재(1)를 지지하기 위한 지지부재(2) 즉 조립식 기초(100)를 미리 제작하고, First, a part of the anchor 3 is inserted therein and prepares in advance a central member 1 serving as a prop and a supporting member 2 for supporting the central member 1, that is, a prefabricated base 100.

지반(6)을 터파기하여 조립식 기초(100)를 설치할 수 있는 매립홀(7)을 형성하며,Breaking the ground (6) to form a buried hole (7) for installing the prefabricated foundation (100),

상기 매립홀(7)에 기초콘크리트(버림작업)(5)를 한 후 상기 중심부재(1)를 중심을 정확히 잡아서 설치를 하고, After the foundation concrete (abandon work) (5) in the buried hole (7) is installed by holding the center member (1) exactly the center,

상기 중심부재(1)를 중심으로 외주연에 상기 지지부재(2)를 고정 연결하여 설치를 하고,The support member 2 is fixedly connected to an outer circumference of the center member 1 so as to be installed.

상기 중심부재(1) 및 지지부재(2)를 매립하고,Embedding the central member 1 and the support member 2;

매립된 상기 부재(1,2)의 상부인 지반(6)을 다지고 정리하여 마무리를 한다.The ground 6, which is the upper part of the embedded members 1 and 2, is compacted and arranged to finish.

상기 중심부재(1)는 바디(8)와 연결하기 위한 앵커(3)가 설치가 되며, 외측에 크레인 등에 의해 옮길 수 있는 수단(4)을 설치하고, 상기 중심부재(1)의 하부는 지지부재(2)와 연결하기 위하여 연결부재(11)를 일체로 형성하여 체결부(12,22)를 이용하여 상기 지지부재(2)와 고정 연결한다.The center member 1 is provided with an anchor 3 for connecting with the body 8, and a means 4 for moving by a crane or the like is installed on the outside, and the lower portion of the center member 1 is supported. In order to connect with the member 2, the connecting member 11 is integrally formed and fixedly connected to the support member 2 using the fastening parts 12 and 22.

상기 지지부재(2)는 상기 중심부재(1)를 지지하기 위하여 고정 연결되며, 내측에는 상기 중심부재(1)와 연결하기 위한 연결부재(21)가 일체로 제작되고, 상기 중심부재(1)와 고정 연결하기 위한 체결부(22)가 설치되며, 외측에 크레인 등에 의해 옮길 수 있는 수단(4)이 설치가 된다.The supporting member 2 is fixedly connected to support the central member 1, and a connecting member 21 for connecting with the central member 1 is integrally manufactured at the inner side, and the central member 1 And a fastening part 22 for fixedly connecting with each other, a means 4 which can be moved by a crane or the like is installed outside.

또한, 상기 지지부재(2)는 바디(8)의 크기에 따라 2개 이상으로 분할하여 제작이 되며, 기본적으로는 3개로 분할 제작함이 제작 및 이동에 있어 편리하다. 또한, 상기 분할되어 있는 지지부재(2)는 상호간에 서로 고정 연결될 수 있도록 하는 체결부(23)가 설치되어 진다.In addition, the supporting member 2 is manufactured by dividing the support member 2 into two or more according to the size of the body 8, and basically, the production of the divided member into three is convenient for manufacturing and moving. In addition, the divided support member 2 is provided with a fastening portion 23 to be fixedly connected to each other.

도 6 에 도시된 바와 같이, 상기 앵커(3)는 상부는 상기 중심부재(1)의 위 즉 지반(6) 위로 일정부분이 노출되게 설치되며, 바디(8)와 고정 연결할 수 있는 체결부(32)가 설치되며, 하부는 상기 중심부재(1)내에 삽입되어 설치되며, 이 부분에는 통공(33)이 설치가 되어 미리 중심부재(1)를 제작하는 과정에서 콘크리트가 앵커(3)의 내부로 스며들 수 있게 된다. 또한 앵커(3)의 내부에는 배선용 배관(31)을 미리 설치하여 풍력발전기로부터 나오는 배선을 통과시킬 수 있게 한다. 또한, 상기 앵커(3)는 기본적으로 강관 파이프로 제작이 된다.As shown in FIG. 6, the anchor 3 is installed so that an upper portion of the anchor 3 is exposed to the upper portion of the center member 1, that is, the ground 6, and a fastening portion that can be fixedly connected to the body 8 ( 32 is installed, the lower part is inserted into the central material (1) is installed, the through hole 33 is installed in this portion of the concrete in the process of manufacturing the central material (1) in advance of the interior of the anchor (3) You can seep into. In addition, the inside of the anchor 3, the wiring pipe 31 is installed in advance to allow the wiring from the wind generator to pass through. In addition, the anchor 3 is basically made of a steel pipe.

상기 체결부(12,22,23,32)는 볼트와 너트로 제작함이 가장 적당하다 할 것이나 이에 국한되지 않고 체결함에 있어 편리하고 작업에 효과적인 여러 다양한 방법으로 도 가능하다 할 것이다.The fastening parts 12, 22, 23, and 32 will be most suitable to be made of bolts and nuts, but is not limited thereto, and may be possible in various ways that are convenient and effective for fastening.

상기 중심부재(1) 또는 지지부재(2)는 콘크리트 또는 철근콘크리트로 구성되는 것이 바람직하나 이에 국한되지 않고 합성수지, 금속 등 다양한 재질의 것으로도 가능하다. 또한, 그 형상에 있어서도 원통 형상으로 제작되는 것이 바람직하나 설치공간이나 그 외의 어떤 이유에 의해서 삼각형, 원호형, 사각형 등과 같은 다양한 형상으로 현장에 맞게 변경시킬 수 있고, 그 크기와 높이 또한 자유자재로 조정할 수 있는 것이다.The core member 1 or the support member 2 is preferably composed of concrete or reinforced concrete, but is not limited thereto, and may be made of various materials such as synthetic resin and metal. In addition, it is preferable that the shape is made in a cylindrical shape, but it can be changed to various shapes such as triangle, arc shape, square, etc. according to the installation space or any other reason, and the size and height can be freely changed. It can be adjusted.

본 발명은 전술한 실시 예에 국한되지 않고 본 발명의 기술사상이 허용하는 범위 내에서 다양하게 변형하여 실시할 수가 있다.The present invention is not limited to the above embodiments, and various modifications can be made within the scope of the technical idea of the present invention.

도 1은 본 발명인 조립식 기초의 사시도.1 is a perspective view of the present inventors assembled base.

도 2는 본 발명인 조립식 기초의 분할사시도.Figure 2 is a perspective perspective view of the present inventors assembled base.

도 3은 본 발명의 조립식 기초가 지중에 설치되는 것을 보여주는 정면도.Figure 3 is a front view showing that the prefabricated foundation of the present invention is installed in the ground.

도 4는 본 발명인 조립식 기초의 단면도.4 is a cross-sectional view of the present inventors assembled base.

도 5는 본 발명인 조립식 기초의 분리평면도.Figure 5 is an exploded plan view of the present inventors assembled base.

도 6은 본 발명인 바디연결부를 보여주는 단면도.Figure 6 is a cross-sectional view showing the body connection of the present invention.

*** 도면의 주요부분에 대한 부호의 설명 ****** Explanation of symbols for main parts of drawing ***

1. 중심부재 2. 지지부재 3. 앵커 1. Core material 2. Support member 3. Anchor

4. 수단 5. 기초콘크리트 6. 지반 4. Means 5. Foundation concrete 6. Soil

7. 매립홀 8. 바디 11. 연결부재 7. Recessed hole 8. Body 11. Connecting member

12. 체결부 21. 연결부재 22. 체결부 12. Fastening part 21. Connecting member 22. Fastening part

23. 체결부 31. 배선용 배관 32. 체결부 23. Fastening part 31. Wiring piping 32. Fastening part

33. 통공 34. 외주연 35. 구멍 33. Through hole 34. Outer periphery 35. Hole

81. 체결부 82. 내주연 83. 구멍 81. Fastening part 82. Inner circumference 83. Hole

84. 외주연 100. 기초84. Outer Cast 100. Basics

Claims (9)

지주역할을 하는 중심부재(1)와;A core member (1) serving as a prop; 상기 중심부재(1)를 지지하기 위하여 고정 연결되는 지지부재(2);A support member (2) fixedly connected to support the center member (1); 로 이루어지는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초Prefabricated base for body installation of a wind turbine, characterized in that consisting of 제 1 항에 있어서,The method of claim 1, 상기 부재(1,2)는 콘크리트 또는 철근콘크리트로 제작이 되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초The member (1, 2) is a prefabricated foundation for body installation of the wind turbine, characterized in that the production of concrete or reinforced concrete 제 1 항에 있어서,The method of claim 1, 상기 중심부재(1)는 The core member 1 is 내부에 바디(8)와 연결되는 앵커(3)가 삽입되며, 상기 배선용 배관(31)이 설치되고; An anchor 3 connected to the body 8 is inserted therein, and the wiring pipe 31 is installed; 하부에 상기 지지부재(2)와 연결하기 위한 연결부재(11)가 일체로 제작되고, 상기 지지부재(2)와 고정 연결하기 위한 체결부(12)가 설치되며;A connecting member (11) is formed integrally with the supporting member (2) at a lower portion thereof, and a fastening portion (12) for fixedly connecting with the supporting member (2) is provided; 외주연에 크레인 등에 의해 옮길 수 있는 수단(4);Means (4) capable of moving by a crane or the like on the outer periphery; 이 더 포함된 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초Prefabricated base for body installation of the wind turbine, characterized in that further comprises 제 1 항에 있어서,The method of claim 1, 상기 지지부재(2)는 The support member 2 is 내측에 상기 중심부재(1)와 연결하기 위한 연결부재(21)가 일체로 제작되고, 상기 중심부재(1)와 고정 연결하기 위한 체결부(22)가 설치되며; A connecting member 21 is formed integrally with the central member 1 and connected to the central member 1, and a fastening part 22 is fixedly connected to the central member 1; 외측에 크레인 등에 의해 옮길 수 있는 수단(4);Means 4 which can be moved by a crane or the like on the outside; 이 더 포함된 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초Prefabricated base for body installation of the wind turbine, characterized in that further comprises 제 1항에 있어서, The method of claim 1, 상기 지지부재(2)는The support member 2 is 바디(8)의 크기에 따라 2개 이상으로 분할하여 제작이 되며, 기본적으로는 3개로 분할 제작되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초According to the size of the body (8) is divided into two or more, the basic assembly for the body installation of the wind turbine, characterized in that divided into three basically 제 5 항에 있어서,The method of claim 5, wherein 상기 분할되어 있는 지지부재(2)는 상호간에 서로 고정 연결될 수 있도록 하는 체결부(23)를 더 포함되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초The divided support member 2 is a prefabricated base for body installation of the wind turbine, characterized in that it further comprises a fastening portion 23 to be fixedly connected to each other. 제 1 항에 있어서,The method of claim 1, 상기 앵커(3)는The anchor 3 is 상부는 상기 중심부재(1)의 위 즉 지반(6) 위로 일정부분이 노출되게 설치되며, 바디(8)와 고정 연결할 수 있는 체결부(32)가 설치되며;The upper part is installed so that a predetermined portion is exposed on the center 6, that is, above the ground 6, and a fastening part 32 which can be fixedly connected to the body 8 is installed; 하부는 상기 중심부재(1)에 삽입되어 설치되며, 콘크리트가 침투할 수 있는 통공(33)이 설치되며, 상기 배선용 배관(31)이 통과할 수 있는 구멍(35);A lower part is inserted into the central material 1 and is installed, a through hole 33 through which concrete can penetrate is installed, and a hole 35 through which the wiring pipe 31 can pass; 이 더 포함되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초Prefabricated base for body installation of the wind turbine, characterized in that it further comprises 제 1 항 내지 제 7 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 7, 상기 앵커(3)는 강관 파이프로 제작되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초The anchor (3) is a prefabricated foundation for body installation of the wind turbine, characterized in that made of steel pipe pipe 제 3 항, 제 4 항, 제 6 항 또는 제 7 항 중 어느 한 항에 있어서,The method according to any one of claims 3, 4, 6 or 7, 상기 체결부(12,22,23,32)는 볼트와 너트로 제작되는 것을 특징으로 하는 풍력발전기의 바디설치용 조립식 기초The fastening part (12, 22, 23, 32) is a prefabricated base for body installation of the wind turbine, characterized in that made of bolts and nuts
KR1020080009855A 2008-01-31 2008-01-31 Sectional base for construction body in wind turbine KR20090083965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080009855A KR20090083965A (en) 2008-01-31 2008-01-31 Sectional base for construction body in wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080009855A KR20090083965A (en) 2008-01-31 2008-01-31 Sectional base for construction body in wind turbine

Publications (1)

Publication Number Publication Date
KR20090083965A true KR20090083965A (en) 2009-08-05

Family

ID=41204589

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080009855A KR20090083965A (en) 2008-01-31 2008-01-31 Sectional base for construction body in wind turbine

Country Status (1)

Country Link
KR (1) KR20090083965A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866783A (en) * 2014-03-24 2014-06-18 赵正义 Support positioning structure of concrete gravity element of assembly type tower crane foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866783A (en) * 2014-03-24 2014-06-18 赵正义 Support positioning structure of concrete gravity element of assembly type tower crane foundation

Similar Documents

Publication Publication Date Title
KR100588445B1 (en) Method for installation of environment friendly electric utility pole
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR101358985B1 (en) Pillar settling structure and construction method of the same with improved stability and workability
KR200435077Y1 (en) Hock Strut Assembly Structure and Foundation Lid
KR101137974B1 (en) Method for foundation construction structure of pedestal
KR100991886B1 (en) A fixing structure of pillar
KR100775816B1 (en) Support of streetlights which has a easy assembling system
KR100719950B1 (en) Fabricated baseplate for post
KR101837951B1 (en) Pile for securing the post of the road facility
KR20090120296A (en) Joint structure betweeen street lighting pole and base
KR20110137644A (en) A fixing structure of pillar and construction method thereof
KR200433150Y1 (en) upholder for street lamppost
KR20090083978A (en) Method of constructing sectional base for body in wind turbine
KR20090083965A (en) Sectional base for construction body in wind turbine
KR101663374B1 (en) Streetlight Foundation Structure
CN203729605U (en) Inter-column reinforcing structure for preventing historic building from collapsing continuously
KR100920128B1 (en) A support structure object for a road traffic equipment and construction method
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR20100033750A (en) A fixing structure of electric and construction method thereof
KR100686939B1 (en) Sleeve for connecting post and footing of traffic safety sign board and footing structure using the same
KR101028002B1 (en) Device for connecting body in wind turbine
KR20090084038A (en) A fabric of pillar and method for executing thereof
KR100395172B1 (en) Method for constructing basic concrete structure of pole in electric railroads by using disposable form and concrete structure thereof
KR100920127B1 (en) A support structure object for a road traffic equipment and construction method
CN203213687U (en) Flagpole connection structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
J501 Disposition of invalidation of trial