KR20100033750A - A fixing structure of electric and construction method thereof - Google Patents

A fixing structure of electric and construction method thereof Download PDF

Info

Publication number
KR20100033750A
KR20100033750A KR1020080092766A KR20080092766A KR20100033750A KR 20100033750 A KR20100033750 A KR 20100033750A KR 1020080092766 A KR1020080092766 A KR 1020080092766A KR 20080092766 A KR20080092766 A KR 20080092766A KR 20100033750 A KR20100033750 A KR 20100033750A
Authority
KR
South Korea
Prior art keywords
pole
foundation structure
concrete foundation
electric pole
concrete
Prior art date
Application number
KR1020080092766A
Other languages
Korean (ko)
Inventor
유조웅
Original Assignee
대실종합건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대실종합건설 주식회사 filed Critical 대실종합건설 주식회사
Priority to KR1020080092766A priority Critical patent/KR20100033750A/en
Publication of KR20100033750A publication Critical patent/KR20100033750A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

PURPOSE: A fixing structure of an electric pole and a construction method thereof are provided to securely install the electric pole without using a support column and a ground wire. CONSTITUTION: A fixing structure of an electric pole comprises a concrete foundation structure(10), soil, waterproof mortar(20), an electric pole(30), a fastener(40), and an insertion fixture(50). The concrete foundation structure is buried in the underground. Hollows are formed in the bottom of the concrete foundation structure, and filled with the soil. The top of the soil is filled with the waterproof mortar. The electric pole is inserted into the concrete foundation structure. The fastener fastens the electric pole with the concrete foundation structure. The insertion fixture is inserted into a gap between the concrete foundation structure and the electric pole is filled with the insertion fixture.

Description

전주 정착구조 및 그 시공방법{A fixing structure of electric and construction method thereof}A fixing structure of electric and construction method

본 발명은 전주(電柱)를 설치하는 기둥 정착구조에 관한 것으로서, 더욱 상세하게는 전주의 하부에 설치되는 근가와 전주의 전도방지용 받침기둥이나 지선 등을 구비함이 없이 프리캐스트 콘크리트(PC)로 제작되는 지하 콘크리트 기초 구조물에 전주(電柱)의 하부를 삽입하여 고정하는 것만으로 전주를 설치하므로 견고한 시공을 용이하게 하여 공기의 단축과 시공비용을 현저하게 절감할 수 있는 전주 정착구조 및 그 시공방법에 관한 것이다. The present invention relates to a column anchoring structure for installing electric poles, and more specifically, to precast concrete (PC) without having a base installed in the lower part of the pole and a fall prevention pillar or branch wire, etc. Installation of electric poles by inserting and fixing the lower part of electric poles in the underground concrete foundation structure to be manufactured. It is about.

일반적으로 전기 케이블뿐만 아니라 각종 케이블이 설치되는 전주는 도심의 경우 대부분 인도를 따라 세워지게 되는데 무거운 중량과 길이가 긴 전주 자체의 특성으로 전주의 시공에는 도 1에 도시한 바와 같이 전주(A)의 하부에 설치되는 근가와 별도로 전주(A)의 전도방지용 받침기둥(B)을 설치하거나 지선(E)을 설치하게 되고, 이러한 받침기둥(B)이나 지선(E)을 전주(A)에 설치하기 위한 고정수단(D) 뿐만 아니라 지선(E)의 장력을 조절하기 위해 몸체(1)에 장력 조절용 나사봉(2)이 체결되는 장력조절수단(F)도 필요로 하게 된다.In general, electric poles as well as various cables are installed in the city center is mostly erected along sidewalks in the construction of Jeonju as a heavy weight and long length of the pole itself as shown in Figure 1 In addition to the base installed in the lower portion of the pole (A) to prevent the fall prevention pillar (B) to install or install the branch line (E), such a support pillar (B) or branch line (E) to install in the pole (A) In order to adjust the tension of the branch line (E) as well as the fixing means (D) for the tension adjusting means (F) is fastened to the tension adjusting screw rod (2) to the body (1).

따라서 전주(A)를 하부에서 고정하는 근가 시공과는 별도의 추가적인 받침기둥(B)이나 지선(E)의 설치를 필요로 할 뿐만 아니라 받침기둥(B)이나 지선(C)을 설치하기 위한 고정수단(D), 장력조절수단(F) 및 전주 근가(C)가 필요하게 되므로 그 재료비가 추가로 소요되고, 시공에 많은 작업인력과 시간이 소요되어 경제성이 저하하게 된다.Therefore, it is necessary to install an additional support pillar (B) or branch line (E) separate from the near construction to fix the pole (A) at the bottom, and also to fix the support column (B) or branch line (C). Since the means (D), the tension control means (F) and the pole weight (C) is required, the material cost is additionally required, and a lot of work manpower and time is required for construction, thereby reducing the economic efficiency.

본 발명은 상기한 실정을 감안하여 종래 전주의 설치시에 야기 되는 여러 가지 결점 및 문제점 들을 해결하고자 발명한 것으로서, 그 목적은 받침기둥이나 지선을 사용함이 없이 프리캐스트 콘크리트(PC)로 제작되는 지하 콘크리트 기초 구조물에 전주(電柱)의 하부를 삽입하여 고정하는 것만으로 전주를 견고하게 설치할 수 있고, 용이한 시공으로 시공시간과 인력을 감소시켜 시공비용의 절감에 따른 경제성이 탁월한 전주 정착구조 및 그 시공방법을 제공하는 데 있다.The present invention has been invented to solve various defects and problems caused by the installation of conventional poles in view of the above situation, the object of which is to be made of precast concrete (PC) without using a support pillar or branch line Electric pole can be installed firmly by inserting and fixing the lower part of electric pole to concrete foundation structure. Jeonju fixing structure with excellent economic efficiency due to reduction of construction cost by reducing construction time and manpower by easy construction and its To provide a construction method.

본 발명은 지하에 매립되는 콘크리트 기초 구조물(10)과; 콘크리트 기초 구조물(10) 내 하부 중공부에 채워지는 토사(21)와; 상기 토사의 상부에 채워지는 방수몰탈(20)과; 상기 콘크리트 기초 구조물(10) 내에 삽입되어 고정되는 전주(30)와; 상기 콘크리트 기초 구조물(10)에 전주(30)가 끼워진 채로 콘크리트 기초 구조물(10)과 전주(30)를 체결 고정하는 체결수단(40) 및; 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 채워지는 삽입 고정물(50)로 이루어진 것을 특징으로 한다.The present invention is a concrete foundation structure (10) buried underground; Soil (21) is filled in the lower hollow portion in the concrete foundation structure (10); Waterproof mortar 20 is filled in the upper portion of the soil; An electric pole (30) inserted into and fixed in the concrete foundation structure (10); Fastening means 40 for fastening and fixing the concrete base structure 10 and the electric pole 30 while the electric pole 30 is fitted to the concrete base structure 10; Characterized in that the insertion fixture 50 is filled between the concrete foundation structure 10 and the electric pole 30.

본 발명은 관형 지지체가 삽입되어 고정되는 프리캐스트 콘크리트(PC)로 제작되는 콘크리트 기초 구조물에 전주를 삽입 고정함으로써 받침기둥이나 지선을 사용하지 않고도 전주를 견고하게 설치할 수 있으면서 용이한 시공으로 시공시간과 인력을 감소시켜 시공비용의 절감에 따른 경제성이 탁월한 장점이 있다.The present invention, by inserting and fixing the pole in the concrete foundation structure made of precast concrete (PC) is inserted and fixed to the tubular support can be installed firmly without using the support pillar or branch line, while the construction time and easy construction There is an excellent economic feasibility of reducing construction costs by reducing manpower.

이하, 첨부된 도면 및 바람직한 실시예로서 본 발명 기둥 정착구조를 상세하게 설명한다.Hereinafter, the pillar fixing structure of the present invention will be described in detail with the accompanying drawings and preferred embodiments.

도 3는 본 발명 전주 정착구조의 사시도, 도 3은 본 발명 전주 정착구조의 분해 사시도, 도 4는 본 발명 전주 정착구조의 사용상태 단면도, 도 5는 본 발명 전주 정착구조를 시공하는 공정의 순서도로서, 본 발명 전주 정착구조는 지하에 매립되는 콘크리트 기초 구조물(10)과; 콘크리트 기초 구조물(10) 내 하부 중공부에 채워지는 토사(21)와; 상기 토사(21)의 상부에 채워지는 방수몰탈(20)과; 상기 콘크리트 기초 구조물(10) 내에 삽입되어 고정되는 전주(30)와; 상기 콘크리트 기초 구조물(10)에 전주(30)가 끼워진 채로 콘크리트 기초 구조물(10)과 전주(30)를 체결 고정하는 체결수단(40) 및; 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 채워지는 삽입 고정물(50)로 이루어져 있다.Figure 3 is a perspective view of the present invention pole fixing structure, Figure 3 is an exploded perspective view of the present invention pole fixing structure, Figure 4 is a cross-sectional view of the use state of the present invention pole fixing structure, Figure 5 is a flow chart of the process of constructing the present invention pole fixing structure As the present invention, the electric pole anchoring structure includes a concrete foundation structure (10) buried underground; Soil (21) is filled in the lower hollow portion in the concrete foundation structure (10); Waterproof mortar 20 is filled in the upper portion of the earth and sand (21); An electric pole (30) inserted into and fixed in the concrete foundation structure (10); Fastening means 40 for fastening and fixing the concrete base structure 10 and the electric pole 30 while the electric pole 30 is fitted to the concrete base structure 10; It consists of an insertion fixture 50 that is filled between the concrete foundation structure 10 and the electric pole 30.

상기 콘크리트 기초 구조물(10)은 프리캐스트 콘크리트(PC)로 제작되는 내부가 상하로 관통된 원통형 중공부를 갖는 다각형관으로서, 상부 중공부의 직경이 하부 중공부의 직경 보다 길게 되도록 중앙부가 단차부(10a)를 이루고, 상부에 상하 로 교차하는 다수의 관통공(10b)이 형성되며, 관통공(10b) 아래쪽에 내부면에서 외주연을 향해 하향 경사지게 관통된 다수의 접지공(10c)이 형성되어 지하에 매설시 고정 강도를 높일 수 있도록 4-12의 다각형관으로 구성되어 있다.The concrete foundation structure 10 is a polygonal tube having a cylindrical hollow portion penetrating up and down inside made of precast concrete (PC), the center portion of the step portion 10a so that the diameter of the upper hollow portion is longer than the diameter of the lower hollow portion And a plurality of through holes 10b intersecting up and down at an upper portion thereof, and a plurality of ground holes 10c penetrated downwardly from the inner surface downward toward the outer periphery at the bottom of the through hole 10b to form a basement. It is composed of 4-12 polygonal tubes to increase the fixed strength when buried.

여기서 상기 방수몰탈(20)은 상기 콘크리트 기초 구조물(10)의 하부 중공부에는 채워지는 무수축 콘크리트 방수몰탈 또는 수지몰탈이며, 상기 콘크리트 기초 구조물(10)의 중공부의 하부에 토사(21)를 채우고 상기 토사(21)의 위에 방수몰탈(20)의 상부면이 상기 단차부(10a)와 일치하도록 방수몰탈(20)이 채워지게 된다.Wherein the waterproof mortar 20 is a non-condensed concrete waterproof mortar or resin mortar filled in the lower hollow portion of the concrete foundation structure 10, filling the soil (21) in the lower portion of the hollow portion of the concrete foundation structure (10) The waterproof mortar 20 is filled so that the upper surface of the waterproof mortar 20 coincides with the stepped portion 10a on the earth and sand 21.

상기 방수몰탈은 습기나 물이 전주 내로 침투하여 합선, 누전이 발생하는 것을 방지한다.The waterproof mortar prevents moisture or water from penetrating into electric poles and short circuits or short circuits.

또한 상기 전주(30)는 내후성 강관주 또는 프리캐스트 콘크리트주로서, 긴 원통관(31)과, 상기 콘크리트 기초 구조물(10)에 삽입시 관통공(10b)과 맞닿는 부위에 형성된 관통공(32) 및, 상기 관통공(32) 아래에 관통되어 형성된 다수의 접지공(33)으로 이루어져 있다.In addition, the electric pole 30 is a weatherproof steel pipe column or precast concrete column, the long cylindrical tube 31 and the through-hole 32 formed in the contact with the through-hole (10b) when inserted into the concrete base structure (10) And a plurality of ground holes 33 formed through the through holes 32.

상기 전주는 상부의 직경이 하부의 직경보다 약간 작은 테이퍼진 형상이 일반적이지만 상부의 직경이 하부의 직경과 동일하여도 상관없다.The pole is generally in a tapered shape where the diameter of the upper part is slightly smaller than the diameter of the lower part, but the diameter of the upper part may be the same as the diameter of the lower part.

상기 콘크리트 기초 구조물(10)은 내부에 중공부를 갖는 프리캐스트 콘크리트주 또는 내후성 강관주로서 상기 전주(30)는 콘크리트 기초 구조물(10)에 삽입되는 하측부 부분만 원통관의 형상을 이루면 되므로 이 부분을 제외한 전주(30)의 상부 부분은 특별한 형상 및 구조로 제한되지 않는다.The concrete foundation structure 10 is a precast concrete column or weather resistant steel pipe column having a hollow portion therein, so the electric pole 30 only needs to form a cylindrical tube in a lower portion inserted into the concrete foundation structure 10. Except for the upper portion of the pole 30 is not limited to a particular shape and structure.

예를 들면, 콘크리트 기초 구조물(10)에 삽입되는 부분을 제외한 전주(30) 상부 부분은 6각기둥, 8각기둥 등 다각 기둥이어도 된다.For example, the upper part of the electric pole 30 except the part inserted into the concrete foundation structure 10 may be a polygonal column, such as a hexagonal pillar and an octagonal pillar.

따라서, 본 발명의 전주(30)는 전주의 특정 기둥에 한정되지 않고, 지하에 매립되는 전주(30)의 하부를 콘크리트 기초 구조물(10)에 삽입되어 고정될 수 있도록 구성하면, 그 외는 기둥의 형상이나 구조 및 용도에 관계없이 채용하여 사용할 수 있다.Therefore, the electric pole 30 of the present invention is not limited to a specific pole of the pole, and if the lower portion of the electric pole 30 buried underground is configured to be inserted into the concrete foundation structure 10 can be fixed, the other Regardless of the shape, structure and use, it can be adopted and used.

그리고 상기 체결수단(40)은 락볼트(41)와 너트(42)로 이루어져 콘크리트 기초 구조물(10)에 전주(30)가 삽입되어 콘크리트 기초 구조물(10)의 관통공(10b)과 전주(30)의 관통공(32)이 일치한 상태에서 락볼트(41)가 상기 관통공(10b)과 관통공(32)을 통해 전주(30)를 관통한 상태에서 락볼트(41)에 너트(42)가 체결되어 콘크리트 기초 구조물(10)에 전주(30)가 고정되도록 되어 있다.And the fastening means 40 is composed of a lock bolt 41 and the nut 42 is inserted into the electric pole 30 in the concrete foundation structure 10, the through hole (10b) and pole pole 30 of the concrete foundation structure (10) In the state in which the through-hole 32 of the () through the lock bolt 41 penetrates the electric pole 30 through the through-hole (10b) and the through-hole 32, the nut 42 to the lock bolt (41) ) Is fastened so that the electric pole 30 is fixed to the concrete foundation structure 10.

상기 삽입 고정물(50)은 콘크리트 기초 구조물(10)과 전주(30) 사이에 충진되어 콘크리트 기초 구조물(10)에 전주(30)를 고착시키는 것으로서, 무수축 고강도 콘크리트 조성물 또는 에폭시계 접착제를 바람직하게 사용할 수 있다.The insert 50 is filled between the concrete foundation structure 10 and the pole 30 to fix the pole 30 to the concrete foundation structure 10, preferably a non-shrink high strength concrete composition or epoxy-based adhesive Can be used.

한편, 본 발명 전주 정착구조의 시공방법은 프리캐스트 콘크리트(PC)로 콘크리트 기초 구조물(10)을 제작하는 콘크리트 기초 구조물 제작공정(S1단계)과; 상기 콘크리트 기초 구조물(10)의 중공부에 삽입되는 전주(30)을 제작하는 전주 제작공정(S2단계)과; 상기 전주(30)를 설치할 곳의 지면을 굴착기로 굴착하는 굴착공정(S3단계)과; 상기 굴착공정(S3단계)에서 굴착된 곳에 콘크리트 기초 구조물(10)을 넣어 단차부(10a) 아래 하부 중공부에 토사(21)를 채우고, 상기 토사(21)의 상부에 방수몰탈(20)을 채우며, 구조물의 하부를 매립하는 기초 구조물 시공단계(S4 단계)와; 기초구조물(10)의 접지공(10c)과 접지공(33)을 통해 콘크리트 기초 구조물(10)의 내부로 인출된 접지선을 전주(30)내의 접지선과 연결한 다음 상기 콘크리트 기초 구조물(10)의 상부 중공부에 전주(30)를 삽입하는 전주 삽입공정(S5단계)와; 상기 콘크리트 기초 구조물(10)의 관통공(10b)과 전주(30)의 관통공(32)을 일치시켜 락볼트(41)를 끼우고 락볼트(41)에 너트를 체결하는 전주 고정공정(S6단계) 및; 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 삽입 고정물(50)을 채우고 콘크리트 기초 구조물(10)의 상부를 매립하는 구조물 매립공정(S7단계)로 이루어지는 것을 특징으로 한다.On the other hand, the construction method of the electric pole anchoring structure of the present invention is a concrete foundation structure manufacturing process (S1 step) for producing the concrete foundation structure 10 with precast concrete (PC); Jeonju manufacturing process (S2 step) for producing the electric pole 30 is inserted into the hollow portion of the concrete foundation structure (10); An excavation process (step S3) for digging the ground of the place where the electric pole 30 is installed with an excavator; Put the concrete foundation structure 10 in the excavation process (step S3) excavated to fill the soil (21) in the lower hollow portion below the stepped portion (10a), waterproof mortar 20 in the upper portion of the soil (21) Filling, the base structure construction step (S4 step) for embedding the lower part of the structure; The ground wire drawn out into the interior of the concrete foundation structure 10 through the ground hole 10c and the ground hole 33 of the foundation structure 10 is connected to the ground line in the electric pole 30, and then A pole inserting step (S5) of inserting the pole 30 into the upper hollow portion; The pole pole fixing step of fitting the nut to the lock bolt 41 by inserting the lock bolt 41 by matching the through hole (10b) and the through hole 32 of the pole 30 of the concrete foundation structure (S6) Step) and; Filling the insertion fixture 50 between the concrete foundation structure 10 and the electric pole 30, characterized in that consisting of a structure buried process (S7 step) to bury the upper portion of the concrete foundation structure (10).

상기 구조물 제작공정(S1단계)에는 상부 중공부의 직경이 하부 중공부의 직경 보다 길게 되도록 중앙부에 단차부(10a)를 형성하고, 상부에 다수의 관통공(10b)을 형성하며, 상기 관통공(10b) 아래쪽에 내부면에서 외주연을 향해 하향 경사지게 관통된 다수의 접지공(10c)을 형성하는 단계를 포함하고, 상기 전주 제작공정(S2단계)에는 전주의 하부에 관통공(32)과 접지공(33)을 형성하는 단계를 포함하고 있다.In the structure fabrication process (step S1), the stepped portion 10a is formed in the center portion so that the diameter of the upper hollow portion is longer than the diameter of the lower hollow portion, and a plurality of through holes 10b are formed on the upper portion, and the through hole 10b ) Forming a plurality of ground holes 10c which are inclined downwardly toward the outer periphery from the inner surface at the bottom thereof, and in the production of the pole pole (S2), the through holes 32 and the ground hole in the lower pole of the pole pole 33, forming a step.

다음에는 상기한 바와 같이 구성된 본 발명 전둥 정착구조를 이용하여 전주를 설치하는 시공에 대하여 설명한다.Next, a description will be given of the construction to install the electric pole using the present invention electric pole anchoring structure configured as described above.

본 발명에서 콘크리트 기초 구조물(10)은 프리캐스트 콘크리트(PC)로 제작하여 지하에 매립하여 사용하는 것으로서, 구조물 제작공정(S1단계)에서 지하 콘크리트 기초 구조물(10)을 제작하고, 전주 제작공정(S2단계)에서 전주(30)를 제작한다.In the present invention, the concrete foundation structure 10 is made of precast concrete (PC) to be embedded in the basement, and used to produce the underground concrete foundation structure (10) in the structure manufacturing process (step S1), and fabrication pole ( In step S2) to produce a pole (30).

이어서 도 5에 도시한 바와 같이 전주(30)을 설치할 곳의 지면을 굴착기로 굴착하는데(S3단계), 상기 굴착기는 스크류 오거를 이용하여 굴착하는 것이 가장 바람직하다.Subsequently, as shown in Figure 5 to excavate the ground of the place to install the electric pole 30 with an excavator (step S3), the excavator is most preferably excavated using a screw auger.

상기 S1단계의 구조물 제작공정에서 제작한 콘크리트 기초 구조물(10)을 상기 굴착공정(S4단계)에서 굴착된 곳에 넣어 단차부(10a) 아래 하부 중공부에 토사(21)를 채우고, 토사(21) 상부에 방수몰탈(20)을 채우며, 구조물의 하부를 매립한다(S4단계).  The concrete foundation structure 10 manufactured in the structure fabrication process of the step S1 is put in the excavated in the excavation process (step S4) to fill the earth and sand (21) in the lower hollow portion below the stepped portion (10a), earth and sand (21) Filling the waterproof mortar 20 in the upper portion, buried the lower portion of the structure (S4 step).

다음에는 콘크리트 기초 구조물(10)의 접지공(10c)과 전주(30)의 접지공(33)을 통해 전주(30)의 내부로 인출되어 있는 외부 접지선을 전주(30) 내의 접지선과 연결한 다음 상기 콘크리트 기초 구조물(10)의 상부 중공부에 전주(30)를 삽입한다(S5단계).Next, the external ground wire drawn out into the interior of the electric pole 30 through the ground hole 10c of the concrete foundation structure 10 and the ground hole 33 of the electric pole 30 is connected with the ground wire in the electric pole 30. The electric pole 30 is inserted into the upper hollow portion of the concrete foundation structure 10 (step S5).

다음, 상기 콘크리트 기초 구조물(10)의 관통공(10b)과 전주(30)의 관통공(32)을 일치시켜 락볼트(41)를 끼우고 락볼트(41)에 너트를 체결하여 콘크리트 기초 구조물(10)에 전주(30)을 고정시킨다(S6단계).Next, the through hole 10b of the concrete foundation structure 10 and the through hole 32 of the electric pole 30 to fit the lock bolt 41 and tighten the nut to the lock bolt 41 to the concrete foundation structure Fix the electric pole 30 to (10) (step S6).

이와 같은 작업은 전주(30)가 고 중량물이므로 크레인 등을 사용하여 시공하게 되며, 그 다음 공정에서 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 삽입 고정물(50)을 채우고 콘크리트 기초 구조물(10)의 상부와 굴착부 사이에 토사를 매립함으로써(S7단계)전주의 시공을 완료하게 된다.This operation is constructed by using a crane or the like because the electric pole 30 is a heavy object, and then fills the insert 50 between the concrete base structure 10 and the electric pole 30 in the next step and the concrete base structure ( By filling the earth and sand between the top of the 10 and the excavation (step S7), the construction of the pole is completed.

일반적으로 전주가 설치되는 종래의 콘크리트 기초 구조물은 도 2a, 도 2b와 같이 상부가 좁고 하부가 넓은 사각뿔형 프리캐스트 콘크리트(PC)가 사용됨으로 인하여 전주가 인도로 많이 들어가 보도를 걷는 보행자를 불편하게 하므로 본 발명의 도 3과 같이 스크류 오거로 비교적 깊게 굴착한 다음, 상하 크기가 같고 비교적 길이가 긴 다각형 프리캐스트 콘크리트(PC)의 콘크리트 기초 구조물(10)을 사용하면 상기 전주를 인도상에서 차도에 매우 가깝게 설치할 수 있다.In general, a concrete foundation structure in which a pole is installed is uncomfortable for a pedestrian walking on a sidewalk due to a large number of poles entering a sidewalk due to the use of a narrow pyramid-shaped precast concrete (PC) with a narrow upper portion and a lower portion as shown in FIGS. 2A and 2B. Therefore, excavation relatively deep with a screw auger as shown in FIG. 3 of the present invention, and then using the concrete foundation structure 10 of polygonal precast concrete (PC) having the same size and length, the above pole is very useful to driveway on the sidewalk. Can be installed closely.

그리고, 본 발명의 전주(30)는 금속제 이외에 합성수지로도 제작할 수 있으며, 상기 전주(30)는 광고물을 부착할 수 없도록 전주(30) 외측에 하단부로 부터 일정 높이까지 요철부를 형성할 수도 있다.In addition, the electric pole 30 of the present invention may be made of synthetic resin in addition to the metal, the electric pole 30 may be formed in the uneven portion from the lower end to a certain height on the outer side of the electric pole 30 so as not to attach the advertisement. .

지금까지 본 발명을 바람직한 실시예로서 설명하였으나, 본 발명은 이에 한정되지 않고 발명의 요지를 이탈하지 않는 범위 내에서 다양하게 변형하여 실시할 수 있음은 물론이다.While the present invention has been described as a preferred embodiment, the present invention is not limited thereto, and various modifications can be made without departing from the gist of the invention.

도 1은 종래 전주의 기울임 방지용 고정장치의 전체 설치도,1 is an overall installation view of the conventional device for preventing tilting poles;

도 2는 본 발명 전주 정착구조의 사시도,2 is a perspective view of the present invention pole fixing structure,

도 3은 본 발명 전주 정착구조의 분해 사시도,3 is an exploded perspective view of the present invention pole fixing structure,

도 4는 본 발명 전주 정착구조의 사용상태 단면도,Figure 4 is a cross-sectional view of the use state of the present invention pole fixing structure,

도 5는 본 발명 전주 정착구조를 시공하는 공정의 순서도 이다.5 is a flowchart of a process for constructing the present invention pole fixing structure.

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10 : 콘크리트 기초 구조물 10a : 단차부10: concrete foundation structure 10a: stepped portion

10b : 관통공 10c : 접지공10b: through hole 10c: ground hole

20 : 방수몰탈 21 : 토사20: waterproof mortar 21: earth and sand

30 : 전주 31 : 원통관 30: Jeonju 31: cylinder tube

32 : 관통공 33 : 접지공 32: through hole 33: ground hole

40 : 체결수단 41 : 락볼트40: fastening means 41: rock bolt

42 : 너트 50 : 삽입 고정물42: nut 50: insertion fixture

Claims (8)

지하에 매립되는 콘크리트 기초 구조물(10)과; 콘크리트 기초 구조물(10) 내 하부 중공부에 채워지는 토사(21)와; 상기 토사(21) 상부에 채워지는 방수몰탈(20)과; 상기 콘크리트 기초 구조물(10) 내에 삽입되어 고정되는 전주(30)와; 상기 콘크리트 기초 구조물(10)에 전주(30)가 끼워진 채로 콘크리트 기초 구조물(10)과 전주(30)를 체결 고정하는 체결수단(40) 및; 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 채워지는 삽입 고정물(50)로 이루어진 것을 특징으로 하는 전주 정착구조.A concrete foundation structure (10) buried underground; Soil (21) is filled in the lower hollow portion in the concrete foundation structure (10); Waterproof mortar 20 is filled in the top of the soil (21); An electric pole (30) inserted into and fixed in the concrete foundation structure (10); Fastening means 40 for fastening and fixing the concrete base structure 10 and the electric pole 30 while the electric pole 30 is fitted to the concrete base structure 10; Electric pole anchoring structure, characterized in that consisting of the insert 50 is filled between the concrete base structure 10 and the pole 30. 제 1항에 있어서, 상기 콘크리트 기초 구조물(10)은 프리캐스트 콘크리트(PC)로 제작되는 내부가 상하로 관통된 원통형 중공부를 갖는 다각형관으로서, 상기 중공부의 상부직경이 중공부의 하부직경 보다 길어지도록 중앙부가 단차부(10a)를 이루고, 상부에 상하로 교차하는 다수의 관통공(10b)이 형성되며, 상기 관통공(10b) 아래쪽에 내부면에서 외주연을 향해 하향 경사지게 관통된 다수의 접지공(10c)이 형성된 것을 특징으로 하는 전주 정착구조.According to claim 1, wherein the concrete foundation structure 10 is a polygonal tube having a cylindrical hollow portion penetrated up and down inside made of precast concrete (PC), so that the upper diameter of the hollow portion is longer than the lower diameter of the hollow portion The central portion forms a stepped portion 10a, and a plurality of through holes 10b intersecting up and down are formed on the upper portion, and a plurality of ground holes penetrated downward from the inner surface downward toward the outer circumference below the through hole 10b. An electric pole fixing structure, characterized in that (10c) is formed. 제 1항 또는 제 2항에 있어서, 상기 방수몰탈(20)은 상기 콘크리트 기초 구조물(10)의 하부 중공부에는 채워지는 무수축 콘크리트 몰탈 또는 수지몰탈이며, 상기 콘크리트 기초 구조물(10)의 하부 중공부에 토사(21)를 채우고 상기 토사(21) 위에 상부면이 단차부(10a)와 일치하도록 상기 방수몰탈(20)이 채워지는 것을 특징으로 하는 전주 정착구조.According to claim 1 or claim 2, wherein the waterproof mortar 20 is a non-condensed concrete mortar or resin mortar filled in the lower hollow portion of the concrete foundation structure 10, the lower hollow of the concrete foundation structure 10 Filling the earth and sand (21) in the portion, and the waterproofing mortar 20 is characterized in that the waterproof mortar (20) is filled so that the upper surface on the soil (21) to match the step (10a). 제 1항 또는 제 2항에 있어서, 상기 전주(30)는 내후성 강관주 또는 프리캐스트 콘크리트주 중 어느 하나인 것을 특징으로 하는 전주 정착구조.3. The electric pole fixing structure according to claim 1 or 2, wherein the electric pole (30) is either weather resistant steel pipe column or precast concrete column. 제 1항 또는 제 2항에 있어서, 상기 체결수단(40)은 락볼트(41)와 너트(42)로 이루어져 콘크리트 기초 구조물(10)에 전주(30)가 삽입되어 콘크리트 기초 구조물(10)의 관통공(10b)과 전주(30)의 관통공(32)이 일치한 상태에서 락볼트(41)가 상기 관통공(10b)과 관통공(32)을 통해 전주(30)를 관통한 상태에서 락볼트(41)에 너트(42)가 체결되어 콘크리트 기초 구조물(10)에 전주(30)가 고정되도록 구성되어 있는 것을 특징으로 하는 전주 정착구조.According to claim 1 or 2, The fastening means 40 is composed of a lock bolt 41 and the nut 42, the electric pole 30 is inserted into the concrete foundation structure 10 to the concrete foundation structure 10 of the In the state where the through-hole 10b and the through-hole 32 of the pole 30 coincide, the lock bolt 41 penetrates the pole 30 through the through-hole 10b and the through-hole 32. Nut pole 42 is fastened to the lock bolt 41, the pole pole fixing structure, characterized in that the pole pole 30 is configured to be fixed to the concrete foundation structure (10). 제 1항 또는 제 2항에 있어서, 상기 삽입 고정물(50)은 콘크리트 기초 구조물(10)과 전주(30) 사이에 충진되어 콘크리트 기초 구조물(10)에 전주(30)를 고착시키는 것으로서, 무수축 고강도 콘크리트 조성물 또는 에폭시계 접착제 중 어느 하나 인 것을 특징으로 하는 전주 정착구조.The method of claim 1 or 2, wherein the insertion fixture 50 is filled between the concrete foundation structure 10 and the pole 30 to fix the pole 30 to the concrete foundation structure 10, the non-shrinkage An electric pole fixing structure, characterized in that any one of a high strength concrete composition or an epoxy-based adhesive. 프리캐스트 콘크리트(PC)로 콘크리트 기초 구조물(10)를 제작하는 콘크리트 기초구조물 제작공정(S1단계)과; 상기 콘크리트 기초 구조물(10)의 중공부에 삽입 되는 전주(30)을 제작하는 전주 제작공정(S2단계)과; 상기 전주(30)를 설치할 곳의 지면을 굴착기로 굴착하는 굴착공정(S3단계)과; 상기 굴착공정(S3단계)에서 굴착된 곳에 콘크리트 기초구조물(10)을 넣어 단차부(10a) 아래쪽 하부 중공부에 토사(21)를 채우고, 토사(21) 상부에 방수몰탈(20)을 채우는 콘크리트 기초구조물 시공단계(S4단계)와; 콘크리트 기초구조물(10)의 접지공(10c)과 전주(30)의 접지공(33)을 통해 전주(30)의 내부로 인출되어 있는 외부 접지선을 전주(30)내의 접지선과 연결한 다음 상기 콘크리트 기초 구조물(10)의 상부 중공부에 전주(30)를 삽입하는 전주 삽입공정(S5단계)과; 상기 콘크리트 기초 구조물(10)의 관통공(10b)과 전주(30)의 관통공(32)을 일치시켜 락볼트(41)를 끼우고 락볼트(41)에 너트를 체결하는 전주 고정공정(S6단계) 및; 상기 콘크리트 기초 구조물(10)과 전주(30) 사이에 삽입 고정물(50)을 채우고 콘크리트 기초 구조물(10)과 굴착부의 사이를 매립하는 구조물 매립공정(S7단계)로 이루어지는 것을 특징으로 하는 전주 정착구조의 시공방법.A concrete foundation structure manufacturing process (S1 step) of manufacturing the concrete foundation structure 10 from precast concrete (PC); Jeonju fabrication process (S2 step) for manufacturing the electric pole 30 is inserted into the hollow portion of the concrete foundation structure (10); An excavation process (step S3) for digging the ground of the place where the electric pole 30 is installed with an excavator; Concrete to be filled in the excavation process (step S3) to the concrete foundation structure (10) to fill the earth and sand (21) in the lower hollow portion below the stepped portion (10a), the concrete to fill the waterproof mortar (20) on the earth (21) Foundation structure construction step (S4 step); Through the ground hole 10c of the concrete foundation structure 10 and the ground hole 33 of the electric pole 30, an external ground wire drawn out into the electric pole 30 is connected with the ground wire in the electric pole 30, and then the concrete An electric pole insertion process (step S5) of inserting the electric pole 30 in the upper hollow portion of the foundation structure 10; The pole pole fixing step of fitting the nut to the lock bolt 41 by inserting the lock bolt 41 by matching the through hole (10b) and the through hole 32 of the pole 30 of the concrete foundation structure (S6) Step); Jeonju fixing structure comprising a structure filling process (step S7) to fill the insertion fixture 50 between the concrete foundation structure 10 and the electric pole 30 and to fill between the concrete foundation structure 10 and the excavation portion Construction method. 제 7항에 있어서, 상기 구조물 제작공정(S1단계)에는 상부 중공부의 직경이 하부 중공부의 직경 보다 길어지도록 중앙부에 단차부(10a)를 형성하고, 상부에 다수의 관통공(10b)을 형성하며, 상기 관통공(10b) 아래쪽에 내부면에서 외주연을 향해 하향 경사지게 관통된 다수의 접지공(10c)을 형성하는 단계를 더 포함하는 것을 특징으로 하는 전주 정착구조의 시공방법.The method of claim 7, wherein the structure manufacturing process (step S1) to form a stepped portion (10a) in the center so that the diameter of the upper hollow portion is longer than the diameter of the lower hollow portion, and forms a plurality of through holes (10b) in the upper And forming a plurality of ground holes (10c) inclined downward from the inner surface downward toward the outer circumference under the through hole (10b).
KR1020080092766A 2008-09-22 2008-09-22 A fixing structure of electric and construction method thereof KR20100033750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080092766A KR20100033750A (en) 2008-09-22 2008-09-22 A fixing structure of electric and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080092766A KR20100033750A (en) 2008-09-22 2008-09-22 A fixing structure of electric and construction method thereof

Publications (1)

Publication Number Publication Date
KR20100033750A true KR20100033750A (en) 2010-03-31

Family

ID=42182537

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080092766A KR20100033750A (en) 2008-09-22 2008-09-22 A fixing structure of electric and construction method thereof

Country Status (1)

Country Link
KR (1) KR20100033750A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200449445Y1 (en) * 2010-04-02 2010-07-09 유재현 Ground for electric pole using round type concrete earthing electrode
CN105257072A (en) * 2015-10-21 2016-01-20 华巧波 Cable fixing device applied to electric power industry
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower
CN113863761A (en) * 2021-11-06 2021-12-31 重庆顺泰铁塔制造有限公司 Composite high-strength concrete electric pole and manufacturing method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200449445Y1 (en) * 2010-04-02 2010-07-09 유재현 Ground for electric pole using round type concrete earthing electrode
CN105257072A (en) * 2015-10-21 2016-01-20 华巧波 Cable fixing device applied to electric power industry
CN112664034A (en) * 2020-12-10 2021-04-16 上海市机械施工集团有限公司 Integral installation method of wind power generation tower
CN113863761A (en) * 2021-11-06 2021-12-31 重庆顺泰铁塔制造有限公司 Composite high-strength concrete electric pole and manufacturing method thereof

Similar Documents

Publication Publication Date Title
US6672023B2 (en) Perimeter weighted foundation for wind turbines and the like
US9745712B2 (en) Cementitious foundation cap with post-tensioned helical anchors and method of making the same
CA2844373C (en) Perimeter pile anchor foundation
US7004683B1 (en) Helice pierhead mounting plate and bolt assembly
US6722821B1 (en) Helice pier post and method of installation
EP0793754B1 (en) Tensionless pier foundation
CN101487355B (en) Telegraph pole and its mounting and fixing method
KR101358985B1 (en) Pillar settling structure and construction method of the same with improved stability and workability
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR101253678B1 (en) Pile foundation and method for constucting the same
KR101137974B1 (en) Method for foundation construction structure of pedestal
KR20100033750A (en) A fixing structure of electric and construction method thereof
EP3420138A1 (en) Anchoring device for a fence
KR20080092639A (en) Pedestal
KR20110137644A (en) A fixing structure of pillar and construction method thereof
KR101326574B1 (en) Foundation structure for pillar
KR101085796B1 (en) A foundation integr al-type fixing structure of pillar
KR100776620B1 (en) Bar Type Anchor
KR200479516Y1 (en) The spiral-shaped support structure
CN108951652B (en) Bridge-tunnel connection section deep foundation pit supporting structure and construction method
KR20140029675A (en) Earth anchor apparatus with integrated anchor cap
KR101019735B1 (en) The overthrow preventive construction of high pressure electricity steel tower
KR20080002652U (en) Iron Pole Base
KR20120114078A (en) A fixing structure of pillar and construction method thereof
KR101307403B1 (en) The slope reinforcement method using a blocks of natural stone texture

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application