KR101358985B1 - Pillar settling structure and construction method of the same with improved stability and workability - Google Patents

Pillar settling structure and construction method of the same with improved stability and workability Download PDF

Info

Publication number
KR101358985B1
KR101358985B1 KR1020130107053A KR20130107053A KR101358985B1 KR 101358985 B1 KR101358985 B1 KR 101358985B1 KR 1020130107053 A KR1020130107053 A KR 1020130107053A KR 20130107053 A KR20130107053 A KR 20130107053A KR 101358985 B1 KR101358985 B1 KR 101358985B1
Authority
KR
South Korea
Prior art keywords
strut
pile
base plate
foundation pile
foundation
Prior art date
Application number
KR1020130107053A
Other languages
Korean (ko)
Inventor
주 오
김남석
김정현
함충호
Original Assignee
주식회사 에스티오이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에스티오이엔지 filed Critical 주식회사 에스티오이엔지
Priority to KR1020130107053A priority Critical patent/KR101358985B1/en
Application granted granted Critical
Publication of KR101358985B1 publication Critical patent/KR101358985B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/658Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0009PE

Abstract

The present invention relates to a post settling structure and a method for constructing the post settling structure. Provides are a post settling structure and a method for constructing the post settling structure comprising: a foundation pile buried and installed in the ground and having a base plated thereon; and a post structure having a flange in the lower part to be coupled with the base plate. A plurality of wings for head rotation and conduction prevention are symmetrically coupled in the head of the foundation pile buried in the undisturbed ground. A conduit connection pipe for inserting and fixing an ELP conduit is horizontally attached in the disturbed ground in a pipe shape. A wing bottom plate is horizontally provided in the lower end of each wing for pile head rotation and conduction prevention. The bolt hole formed in the base plate has an oval shape so that a connection hole is inserted to be movable. According to the present invention, the post settling structure and the method for constructing the post settling structure can solve problems caused when a concrete structure is used as a foundation, such as slow working speed, high production and construction costs, and generation of waste, by using a tubular pipe as a foundation structure instead of a concrete structure foundation, and can increase construct ability and stability and improve the vertical and horizontal resistivity on the load or conduction of the post by efficiently and stably proceeding conduit connection work.

Description

안정성 및 시공성이 우수한 지주 정착 구조물 및 그 시공 방법{Pillar settling structure and construction method of the same with improved stability and workability}Pillar settling structure and construction method of the same with improved stability and workability
본 발명은 지주 정착 구조물 및 그 시공 방법에 관한 것으로서, 더욱 구체적으로는 콘크리트 구조물 기초를 사용하지 않고 관형 파일(pile)을 기초 구조물로 사용함으로써 콘크리트 구조물을 기초로 사용할 때의 문제점인 더딘 작업 속도, 고 제작 및 시공 비용, 및 폐기물 발생 등의 문제를 해결할 수 있으며, 전선관 연결 작업을 견고하고 효율적으로 진행할 수 있어 시공성과 안정성을 증대시킬 수 있고, 지주의 하중이나 전도에 대한 저항성을 향상시킬 수 있는 지주 정착 구조물 및 그의 시공 방법에 관한 것이다.
The present invention relates to a strut fixing structure and a construction method thereof, and more particularly, a slow working speed, which is a problem when using a concrete structure as a foundation by using a tubular pile as a foundation structure without using a concrete structure foundation, It can solve problems such as high manufacturing and construction cost and waste generation, and it can improve the workability and stability by making the conduit connection work solid and efficient, and can improve the resistance to the load or conduction of props. A support anchorage structure and a construction method thereof.
일반적으로 가로등, 도로 교통 신호등, 도로 표지판, 씨씨티비(CCTV) 등 구조물의 지주를 설치하기 위해서는 먼저 지반에 콘크리트 기초를 매설하고 상기 콘크리트 기초의 둘출된 앵커에 너트로써 지주의 하단 플랜지를 조립하여 정착시키는 방법을 사용한다. In general, in order to install a strut of a structure such as a street lamp, road traffic light, road sign, CTV, first, a concrete foundation is buried in the ground, and then the bottom flange of the strut is assembled by a nut to the raised anchor of the concrete foundation. Use the method to make it.
구체적으로는, 지주 하부에 앵커 볼트를 삽입 체결할 수 있도록 볼트공이 형성된 판형상의 플랜지를 일체로 용접하여 가로등 등의 지주 구조체를 제조하고, 이와 같이 제조된 지주 구조체를 콘크리트 기초 구조물에 삽입 정착된 앵커 볼트에 볼트공을 통해 직립 삽입하고 너트로 체결함으로써 지주 정착 구조물의 설치가 완성된다. Specifically, to form a strut structure such as a street lamp by integrally welding the plate-shaped flange formed with bolt holes to insert and fasten the anchor bolt to the bottom of the strut, and anchored by inserting and fixing the strut structure prepared in this way into the concrete foundation structure Installation of the strut fixing structure is completed by inserting the bolt upright through the bolt hole and tightening with the nut.
종래, 상기 지주 정착 구조물의 설치 방법은 지주 설치시 콘크리트 기초 구조물을 타설하기 위하여 터파기를 하고 터파기한 위치에 거푸집을 설치한 후 거푸집의 양측에서 상부 방향으로 돌출되게 플라스틱 전선관을 끼우고 바닥면에서 상방으로 돌출되게 앵커 볼트를 설치한 후 콘크리트를 타설하고 양생하는 방법을 사용하였다. Conventionally, the installation method of the strut fixing structure is to dig in order to pour the concrete foundation structure when installing the strut, and then install the formwork at the position of the trench, insert the plastic conduit to protrude upward from both sides of the formwork and upward from the bottom surface After installing the anchor bolt to protrude into the concrete was used to pour concrete and cured.
이러한 종래 지주 정착 구조물의 설치 방법은 도 1 및 도 2에 잘 표현되어 있다. 즉, 양생된 콘크리트 기초(7)의 상단에는 다수의 앵커 볼트(6)가 상방으로 돌출되어 형성되고 측면과 상단 중심부가 서로 연결되는 플라스틱 전선관(9)이 형성되어 있으며, 상단이 노출된 콘크리트 기초(7)를 지면까지 매립하고 가로등 지주(2) 플랜지(5)의 볼트공으로 앵커 볼트(6)를 삽입한 후 너트(3)로 체결하여 가로등 지주(2)를 직립시키고 지면에 매설된 전력선을 가로등(1)의 전선과 연결함으로써 가로등(1) 시공이 완료된다.The installation method of such a conventional post anchoring structure is well represented in FIGS. 1 and 2. That is, a plurality of anchor bolts 6 protrude upward and a plastic conduit 9 is formed at the upper end of the cured concrete foundation 7 and the side and the upper center are connected to each other. (7) buried to the ground, insert the anchor bolt (6) into the bolt hole of the street lamp post (2) flange (5), and then tighten it with the nut (3) to erect the street lamp post (2) upright and Construction of the street lamp 1 is completed by connecting with the wire of the street lamp 1.
이 때 앵커 볼트(6)와 너트(3)가 외부에 노출되는 것을 방지하기 위하여 보호 덮개(4)로 덮기도 한다. At this time, the anchor bolt (6) and the nut (3) is also covered with a protective cover (4) to prevent exposure to the outside.
이러한 종래의 가로등과 같은 지주 정착 구조물의 설치 방법은 지주 하단의 플랜지에 형성된 볼트 공의 위치와 콘크리트 기초 구조물의 앵커 볼트 돌출 위치를 정확히 일치시켜야만 기립 설치가 가능한데 콘크리트 기초 제조시 앵커 볼트의 위치가 조금만 달라져도 그 위에 지주를 기립 설치하기가 매우 어려워지는 문제가 있었다. In the conventional installation method of the strut fixing structure such as a street light, the installation of the anchor bolt is possible only when the position of the bolt ball formed in the flange of the bottom of the strut and the anchor bolt protrusion position of the concrete foundation structure can be exactly erected. Even if it changed, there was a problem that it is very difficult to stand up the land.
또한, 터파기 작업 후 거푸집을 설치한 뒤 현장에서 콘크리트 구조물을 양생시켜 기초를 제조해야 하므로 작업 시간이 오래 걸리고 특히 콘크리트 양생에 시간이 과다하게 소모되므로 전체 작업 공기가 지나치게 길어지는 문제점이 있으며, 기 설치된 콘크리트 구조물을 제거하고 터파기 작업을 할 경우에는 폐기물이 많이 발생하고 이를 처리하기 위해서는 별도의 비용이 발생하는 등 비용적인 면에서도 매우 비경제적이었다. In addition, since the foundation must be manufactured by curing concrete structures in the field after installing the formwork, it takes a long time to work, and in particular, excessive time is consumed in curing concrete, so the overall working air is excessively long. When the installed concrete structure was removed and excavated, a lot of waste was generated and additional costs were required to deal with it, which was very uneconomical in terms of cost.
또한, 지주 하단의 플랜지 상부로 앵커 볼트가 돌출되어 보행자가 발에 걸려 넘어지는 사고가 발생할 수 있고, 콘크리트 기초의 부피가 커서 인도로 많이 들어가서 설치해야 하기 때문에 보행자 통로가 좁아지는 문제가 있으며, 도시 미관상으로도 좋지 않은 결과가 발생하였다.In addition, there is a problem that the pedestrian passage is narrowed because the anchor bolt protrudes to the top of the flange of the bottom of the strut, and the pedestrian can be tripped over, and because the volume of the concrete foundation is large and needs to be installed into the sidewalk, the city is narrowed. Aesthetically bad results have occurred.
이러한 기존 거푸집을 이용한 콘크리트 기초 시공법의 문제점을 개선하고자 현장에서 거푸집 작업을 하지 않고 공장에서 규격에 맞게 콘크리트 기초 구조물을 제작한 후 현장에서는 터파기 작업만을 시행하고 공장 생산된 콘크리트 기초 구조물을 반입하여 매립하고 그 위에 지주 구조체를 체결함으로써 전체 시공 공기를 단축하는 방법이 개발 제안되었다. (대한민국 등록특허 제0535826호 등) 이러한 방법은 현장 거푸집 작업을 생략하고 공장에서 일괄적으로 제작한 콘크리트 기초 구조물을 이용한다는 점에서 콘크리트 거푸집 설치, 콘크리트 타설 및 양생과 같은 과정을 현장 작업에서 생략할 수 있으므로 전체 시공 공기를 줄이는 효과는 있으나, 콘크리트 기초 구조물을 공장 생산하더라도 제작비가 많이 들고 공장 생산품의 부피와 중량이 많이 나가기 때문에 현장까지의 운반에 따른 어려움과 비용이 과다하게 발생하며, 현장에서 터파기 작업은 동일하게 진행해야 하므로 터파기시 발생한 폐기물을 처리하기 위한 비용이 과다하게 발생함으로써 전체 비용은 기존 방법에 비해 크게 개선되지 않아 경제성이 여전히 낮은 문제점이 있었다. In order to improve the problems of the concrete foundation construction method using the existing formwork, the concrete foundation structure is manufactured in accordance with the standard at the factory without formwork at the site, and then only the digging work is carried out at the site and the factory produced concrete foundation structure is imported and reclaimed. And a method of shortening the overall construction air by fastening the strut structure thereon has been proposed. (Korea Patent No. 0535826, etc.) This method eliminates the field formwork and uses the concrete foundation structure produced at the factory, so that processes such as concrete formwork, concrete placing and curing can be omitted from the field work. Although it is effective in reducing the overall construction air, even if the factory production of concrete foundation structure is expensive, the production cost is high and the volume and weight of the factory product is high, so the difficulty and cost of transportation to the site is excessively generated. Since the digging work should be carried out in the same way, the cost of treating waste generated during the destruction is excessive, and the overall cost is not significantly improved compared to the existing method, and thus the economical efficiency is still low.
이러한 콘크리트 기초 구조물을 이용하는 방법의 문제점을 해결하기 위하여 대한민국 공개특허 제10-2012-0020738호는 콘크리트 기초 공법을 사용하지 않고 강관 파일을 지중에 매립한 후 그 상부에 지주를 연결함에 의해 지주 정착 구조물을 시공하는 기술에 관하여 제안하고 있다. 이 기술에서는 지주의 하단에 연결되어 지하로 항타되는 지주 기초부, 상기 지주 기초부 상에 고정되어 지주와 지주 기초부를 연결하도록 하는 연결부 및 연결부의 하부에서 지주 기초부로부터 돌출 형성되어 구조체에 작용된 풍하중에 의한 지주의 비틀림에 저항토록 하는 저항부를 포함하는 지주 기초 구조물을 제안한다. 그러나, 이 기술에서는 풍하중에 저항하기 위한 저항부가 구비되도록 하였으나 지주 기초부의 한 쪽 방향으로만 구비되어 있으므로 바람의 방향이 일정하지 않을 경우 상기 저항부가 저항하는 방향이 아닌 다른 방향으로 풍압력이 작용할 경우 전도의 위험성이 있으며, 이를 개선하기 위해 지주 기초부의 외면으로부터 바깥 방향으로 돌출되어 형성된 리브확장판을 추가로 구비토록 하고 있으나 이는 기주 기초부의 상부에서 발생하는 수평 변위에 대한 저항성을 부여하기 위한 것으로서 미교란 지반부의 저항력을 강화하는 기능을 하기는 어려우며, 또한 그 형태도 지주의 외면에 리브 확장판이 용접 등에 의해 단순히 부착되어 있는 것이므로 지주의 하중이 증가하는 경우 하중과 전도에 대한 저항성을 증가시키기는 어려운 한계가 있다. 또한 이 기술에서 적용되는 지주 기초 구조물은 주로 전선을 사용하지 않는 교통 표지판이나 이정표, 방음벽 지주 등을 매립 시공하기 위한 기술로서 전선을 사용하는 지주를 설치하는 것을 목적으로 한 기술이 아니다. 따라서 지주 구조물에 전선을 효율적이고 안정적으로 연결하는 것에 관해서는 고려하고 있지 않다. In order to solve the problem of the method using the concrete foundation structure, Republic of Korea Patent Publication No. 10-2012-0020738 does not use a concrete foundation method landfill the steel pipe pile in the ground and then by connecting the struts to the upper pillar fixing structure It is proposed about construction technology. In this technique, a strut foundation connected to the bottom of the strut and driven underground, a connection portion fixed on the strut foundation to connect the strut and the strut base, and protruded from the strut base at the bottom of the linkage to act on the structure. We propose a strut foundation structure including a resistance part to resist torsion of the strut caused by wind load. In this technique, however, a resistor is provided to resist wind loads. However, since the wind turbine is provided only in one direction of the pillar foundation, when the wind direction is not constant, when the wind pressure acts in a direction other than the direction in which the resistor is resisted. There is a danger of falling, and in order to improve this, a rib extension plate protruding outward from the outer surface of the pillar foundation is additionally provided, but this is to impart resistance to the horizontal displacement occurring at the upper portion of the foundation foundation. It is difficult to function to strengthen the resistance of the ground, and also its shape is that the rib extension plate is simply attached to the outer surface of the support by welding, etc., so it is difficult to increase the resistance against load and conduction when the load of the support increases. There is. In addition, the strut foundation structure applied in this technique is a technology for reclamation of traffic signs, milestones, soundproof wall struts, etc., which are not mainly wires, and are not intended to install struts using wires. Therefore, it is not considered to connect wires efficiently and stably to the strut structure.
종래 가로등 지주와 같은 전선을 사용하는 경량 지주 정착 구조물은 전선관을 연결하기 위하여 콘크리트 기초에 유연한 플라스틱 관으로 전선관(9)을 형성하고 그 내부를 통하여 전선을 연결하는 방법을 사용한다(도 2 참조). 한편, 대한민국 공개특허 제10-2012-0020738호와 같은 강관 기초 파일을 사용하여 지주 정착 구조물을 시공하는 경우에는 강관 파일의 주면부에 전선관홀을 단순히 타공한 상태에서 지중에 매립되는 파상형 경질 폴리에틸렌(ELP) 전선관에서 전선을 인출하여 상부의 지주에 구비된 전선과 연결하는 작업을 진행하는데, 이 때 ELP 전선관은 지중에 방치될 경우 전선이 노출되어 단선의 염려가 있으므로 ELP 전선관은 기초 파일에 고정시킬 필요가 있다. 도 3은 종래 방법으로 강관 파일을 기초 파일로 사용하여 지주 구조체(10)를 설치함에 있어서 ELP 전선관(11)을 테이프(12) 또는 끈(13)으로 묵는 방법으로 고정시키는 것을 나타낸다. 이와 같은 종래의 고정 방법은 ELP 전선관(10)에서 인출된 전선(14)이 지중에서 분리 거동하는 것을 방지하기 위하여 전선 연결 작업시 현장에서 상기 ELP 전선관을 기초 파일의 외주면에 테이프나 끈으로 여러번 묶어서 고정하는 방법을 사용한다. 이 경우 테이프(12)나 끈(13)으로 묶는 추가 작업을 요하므로 시공 시간이 추가되고 추가 작업을 하더라도 전선관과 기초 파일의 완전 일체화가 이루어지지 않으며 전선(14)이 노출되므로 작업 중이나 작업 완료 후에 전선관이 분리되거나 전선이 단선될 위험성은 여전히 내포하고 있다. Conventional lightweight strut fixing structures using electric wires such as street lamp posts use a method of forming conduits 9 with flexible plastic pipes on a concrete foundation to connect conduits and connecting the wires through them (see FIG. 2). . On the other hand, when constructing the support anchoring structure using a steel pipe foundation pile, such as the Republic of Korea Patent Publication No. 10-2012-0020738, wave-shaped hard polyethylene embedded in the ground in the state of simply perforated conduit hole in the main surface of the steel pipe pile (ELP) The cable is drawn from the conduit and connected with the wire provided in the upper pillar.In this case, the ELP conduit is fixed to the foundation pile because the wire may be exposed if the ground is left in the ground. I need to. 3 shows fixing the ELP conduit 11 by the tape 12 or the string 13 in the installation of the strut structure 10 using the steel pipe pile as the foundation pile in a conventional manner. In the conventional fixing method, the wire 14 drawn from the ELP conduit 10 is bundled with tape or string several times on the outer circumference of the foundation pile in the field during the wire connection operation in order to prevent the wire 14 from being separated from the ground. Use the method of fixing. In this case, additional work is required, which is tied with tape 12 or string 13, so the construction time is added, and even if the additional work is performed, complete consolidation of the conduit and the foundation pile is not performed, and the wire 14 is exposed. The risk of disconnecting conduits or breaking wires still holds.
또한, 종래의 강관 기초 파일을 사용하여 시공되는 지주 정착 구조물의 경우에 있어서 하부의 기초 강관 파일과 상부의 지주 구조체를 연결함에 있어서 볼트홀이 서로 대응되는 위치에 있어야 하므로 동일 규격의 제품만 연결할 수 있을 뿐이어서, 상부의 지주 구조물의 직경이 달라지거나 스펙이 변경되는 등의 이유로 볼트홀이 서로 대응되지 않을 경우에는 하부의 기초 파일을 이용할 수 없게 된다. 이 경우 종래에는 동일 규격을 갖는 기초 파일을 다시 매립하여 그 위에 지주 구조체를 설치해야 하므로 규격 변경에 따른 유연한 대응이 어렵고 시공 기간과 비용이 증가하는 문제점이 있었다.
In addition, in the case of the strut fixing structure constructed by using the conventional steel pipe foundation piles, the bolt holes should be located at positions corresponding to each other when connecting the lower foundation steel pipe piles and the upper pillar structures, so that only products of the same standard can be connected. Since there is a difference in the diameter of the upper strut structure or the specification is changed, if the bolt holes do not correspond to each other, the lower foundation piles cannot be used. In this case, since the foundation pile having the same standard is buried again and the strut structure is installed thereon, it is difficult to flexibly respond to the change of the standard and the construction period and the cost increase.
본 발명은 상기와 같은 종래 기술의 문제점 및 한계를 극복하기 위하여 개발된 것으로, 콘크리트 기초 구조물을 사용하지 않으므로 공사비 과다 문제 및 공사 기간 장기화 문제를 해결할 수 있으며, 현장에서 터파기한 흙을 되메우기에 이용하므로 터파기에 따른 폐기물이 발생하지 않아 폐기물 처리 비용을 줄일 수 있으므로 전체 비용을 절감할 수 있는 동시에, 지주의 회전과 전도를 더욱 안정적으로 방지할 수 있으며, 파상형 경질 폴리에틸렌(ELP) 전선관을 이용하여 전선을 연결함에 있어서 원터치 방식으로 빠르고 안정적으로 연결할 수 있고, 상부 지주 구조물의 직경 등 규격이 변경될 경우에도 기존에 매립된 기초 파일을 그대로 사용한 연결이 가능하게 됨으로써 유연한 대응이 가능하고 시공 기간 및 비용을 절감할 수 있는 새로운 개념의 지주 정착 구조물 및 그 시공 방법을 제공하는 것이다.
The present invention was developed in order to overcome the problems and limitations of the prior art as described above, because it does not use a concrete foundation structure can solve the problem of excessive construction costs and prolonged period of construction, because it is used to refill the soil cracked in the field Waste disposal costs are not generated because the waste is not generated, so the overall cost can be reduced, and the rotation and conduction of the shore can be more stably prevented, and the corrugated rigid polyethylene (ELP) conduit can be used. It is possible to connect quickly and stably in one-touch method, and even if the diameter of the upper strut structure is changed, it is possible to connect using the existing pile file as it is, so that flexible response is possible and construction period and cost are improved. New concept of savings To provide a mounting structure and the construction method.
상기한 바와 같은 본 발명의 과제를 달성하기 위하여 본 발명은The present invention to achieve the object of the present invention as described above
지반에 매립 설치되며 상부에는 지주 구조체가 정착되는 베이스 플레이트가 부착되어 있고 상기 베이스 플레이트 하부와 기초 파일 외주면에는 파일 두부 회전 및 전도 방지용 날개가 하방으로 복수개 연결되어 있으며 상기 베이스 플레이트에는 상부 지주 구조체를 결합하기 위한 볼트홀이 각 코너에 대칭적으로 형성되어 있는 기초 파일; 및 지주 플랜지를 하단에 구비하며 상기 기초 파일의 베이스 플레이트와 상기 지주 플랜지의 볼트/너트 결합에 의해 상기 베이스 플레이트의 상부에 체결 정착되는 지주 구조체;를 포함하여 구성되며,The base plate is buried in the ground and is fixed to the upper base plate is fixed to the base plate and the lower base plate and the outer circumference of the base pile is connected to the plurality of wings to prevent the pile head rotation and fall down, the base plate is coupled to the upper support structure A foundation pile having bolt holes for symmetrically formed at each corner; And a strut structure having a strut flange at the bottom thereof and fastened and fixed to an upper portion of the base plate by bolt / nut coupling of the base plate and the strut flange of the foundation pile.
상기 기초 파일의 미교란 지반 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개가 복수개 대칭적으로 결합되어 있고, 교란 지반에 속하는 부분에는 파상형 경질 폴리에틸렌(ELP) 전선관 삽입 고정을 위한 전선관 연결관이 수평 방향으로 강관 형태로 부착되어 있고, 상기 파일 두부 회전 및 전도 방지용 날개에는 수평 방향으로 날개 바닥판이 각 날개의 하단에 구비되어 있으며, 상기 베이스 플레이트에 형성되어 있는 상기 볼트홀은 연결 볼트가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되어 있는 것을 특징으로 하는 지주 정착 구조물을 제공한다.
The tip portion embedded in the undisturbed ground of the foundation pile is symmetrically coupled with a plurality of distal end rotation and fall prevention blades, and the conduit ground has a horizontal conduit connector for fixing the wave-shaped hard polyethylene (ELP) conduit insertion. It is attached in the form of a steel pipe in the direction, the blade head rotation and fall prevention wings are provided with a wing bottom plate in the lower direction in the horizontal direction in the horizontal direction, the bolt hole formed in the base plate has a connecting bolt in the inner or outer It provides a strut fixing structure, characterized in that the ratio of the length of the short portion and the long portion to be inserted in the direction of the ellipse is 1: 2 to 1: 5.
또한 본 발명은 상기 지주 정착 구조물의 시공방법으로서,In addition, the present invention is a construction method of the post anchoring structure,
(a) 기주 정착 구조물을 시공할 위치의 지면을 터파기하되 기초 파일에 구비된 파상형 경질 폴리에틸렌(ELP) 전선관 삽입을 위한 전선관 연결관이 노출될 정도로 터파기하고, 터파기한 지점에 기초 파일을 항타하여 매립하되 상기 기초 파일의 최상부는 지면과 수평을 유지토록 하고 상기 기초 파일에 구비된 상기 전선관 연결관 상위 부분은 노출시켜 매립하는 단계;(a) Destroy the ground at the location where the host anchoring structure is to be constructed, and sever enough to expose the conduit connector for insertion of the corrugated hard polyethylene (ELP) conduit provided in the foundation pile, and at the point where Burying and filling the foundation pile so that the top of the foundation pile is flush with the ground and exposes the upper portion of the conduit connector pipe provided in the foundation pile;
(b) 상기 매립된 기초 파일의 측면에 수평으로 형성된 전선관 연결관에 파상형 경질 폴리에틸렌(ELP) 전선관을 삽입 고정하고 전선을 기초 파일 내부를 통해 상부로 인출시키는 단계;(b) inserting and fixing a wave-shaped hard polyethylene (ELP) conduit in a conduit conduit formed horizontally on the side of the embedded foundation pile and drawing the electrical wire upward through the interior of the foundation pile;
(c) 상기 기초 파일의 베이스 플레이트 상부에 지주 구조체의 지주 플랜지를 밀착시켜 지주 구조체를 적재하고 상기 베이스 플레이트 및 지주 플랜지의 볼트홀을 통해 볼트를 삽입하고 너트 고정하여 지주 구조체를 베이스 플레이트 상에 정착시키는 단계; 및(c) Loading the strut structure by closely contacting the strut flange of the strut structure on the base plate of the foundation pile, inserting the bolt through the bolt hole of the base plate and the strut flange, and fixing the strut structure on the base plate. Making a step; And
(d) 상기 (a)에서 터파기한 흙을 되메우고 평탄화하는 단계(d) backfilling and leveling the soil excavated in (a)
를 포함하여 구성되며,And,
상기 기초 파일은 미교란 지반 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개가 복수개 대칭적으로 결합되고, 교란 지반에 속하는 부분에는 파상형 경질 폴리에틸렌(ELP) 전선관 삽입 고정을 위한 전선관 연결관이 수평 방향으로 강관 형태로 부착되며, 상부에는 지주 구조체가 정착되는 베이스 플레이트가 부착되고, 상기 베이스 플레이트 하부와 기초 파일 외주면에는 파일 두부 회전 및 전도 방지용 날개가 하방으로 복수개 연결되며, 상기 두부 회전 및 전도 방지용 날개의 하단에는 수평 방향으로 날개 바닥판이 구비되고, 상기 베이스 플레이트에는 상부 지주 구조체를 결합하기 위한 볼트홀이 각 코너에 대칭적으로 구비되되 상기 볼트홀은 연결 볼트가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되어 있는 기초 파일인 것을 특징으로 하는 지주 정착 구조물의 시공 방법을 제공한다.
The foundation pile is a plurality of symmetrical coupling of the tip rotation and fall prevention blades are symmetrically coupled to the tip portion embedded in the undisturbed ground, and the conduit connection tube for fixing the wave-shaped hard polyethylene (ELP) conduit inserted in the portion belonging to the disturbed ground Is attached in the form of a steel pipe, the base plate is attached to the upper support structure is fixed, the base plate lower and the base pile outer circumference is connected to the plurality of blade head rotation and fall prevention wings downward, the head rotation and fall prevention wings At the bottom of the wing bottom plate is provided in a horizontal direction, the base plate is provided with a bolt hole for coupling the upper strut structure symmetrically provided at each corner, the bolt hole is inserted so that the connecting bolt is movable in the inner or outer direction So that it can be short and long Provided is a construction method for a strut fixing structure, characterized in that the foundation pile is provided in the form of an ellipse in which the ratio of the length is 1: 2 to 1: 5.
본 발명에 따른 지주 정착 구조물 및 그 시공 방법의 특징 및 장점은 다음과 같다.Features and advantages of the strut fixing structure and the construction method according to the present invention are as follows.
1. 우선, 콘크리트 기초 구조물을 사용하지 않으므로 콘크리트 기초 구조물을 제작함에 따른 시공 기간 장기화 및 제작 비용 과다 발생 등의 문제를 해결할 수 있다. 기존 현장 콘크리트 타설을 이용한 지주 구조물 시공 방법의 경우 현장에서 터파기 작업하고 거푸집을 설치한 후 콘크리트 타설 및 양생 등의 과정을 거쳐 지주 구조물을 시공해야 하기 때문에 전체 공정에 드는 시간이 지주 구조물 1본당 최소 48시간 이상 소요되었다. 이를 개선하기 위하여 콘크리트 기초를 공장에서 제작하여 현장에서는 이를 기초로 지주 구조물을 설치하기만 하면 되므로 설치 시간이 가로등 1본당 25분 이하로 줄어드는 효과는 있었으나, 이 방법을 이용하더라도 공장 콘크리트 기초 제작에 드는 비용과 이의 운반비용, 폐기물 발생에 따른 수수료/운반비 등을 합하면 실질적으로 지주 정착 구조물 1본을 완성하는데 드는 비용은 크게 절감되지 않았다. 그러나, 본 발명에 의할 경우에는 현장 타설이든 공장 생산이든 콘크리트 기초를 제작할 필요가 없으므로 자재 제작비를 절감할 수 있고, 강관이나 주철관과 같은 관형 기초 파일을 0.2m3 이하와 같은 소형 장비를 이용하여 매립하고 이후 베이스 플레이트와 지주 구조체를 체결 정착하면 모든 과정이 완료되므로 지주 구조체 1본당 시공 시간을 10분 이하로 줄일 수 있는 등 공사 시간을 획기적으로 단축할 수 있다. 1. First of all, since concrete foundation structures are not used, problems such as prolonged construction period and excessive production cost can be solved. In the case of the construction method of the strut structure using the existing site concrete casting, since the strut structure must be constructed after the process of digging in the field, installing the formwork, and placing the concrete, curing, etc. It took over 48 hours. In order to improve this, the concrete foundation was manufactured at the factory, and the site only needs to install the strut structure. Therefore, the installation time was reduced to 25 minutes or less per street lamp. When combined with the costs, its transportation costs, and the fees / transportation costs associated with waste generation, the costs of completing one prop anchor structure were not substantially reduced. However, according to the present invention, it is not necessary to manufacture concrete foundations, whether it is in-site casting or factory production, so that the material manufacturing cost can be reduced, and tubular foundation piles such as steel pipes or cast iron pipes can be reduced by using small equipment such as 0.2 m 3 or less. After reclamation and fastening and fixing the base plate and the strut structure, the whole process is completed. Therefore, the construction time can be drastically shortened by reducing the construction time per ten strut structure.
2. 또한, 현장에서 터파기 작업을 최소화할 수 있고 터파기한 흙은 나중에 다시 되메우기에 사용하므로 폐기되는 흙을 최소화할 수 있어 폐기물을 처리하는데 드는 비용이 절약될 수 있다. 가로등과 같은 지주 정착 구조물에 있어서 폐기물 처리 비용은 매우 중요한 공사비 과다 발생의 원인이 된다. 즉 현장에서 터파기/되메우기 등의 토목공사 비용이 1이라면, 폐기물 운반과 처리에 따른 수수료 비용을 합하면 약 9 정도 발생하므로 이러한 폐기물 처리에 따른 비용은 공사비가 증가하는 주요 원인이 되었는데 본 발명에 따르면 이러한 비용을 거의 발생시키지 않는 장점이 있다. 2. In addition, it is possible to minimize the excavation work in the field, and since the excavated soil is used for refilling later, the waste to be minimized can be minimized, thereby reducing the cost of treating waste. In landscaping structures such as street lights, the cost of waste disposal is a very important cause of excessive construction costs. In other words, if the cost of civil works such as digging / backfilling at the site is 1, the fee costs for transporting and processing waste are about 9, so the cost of processing such waste has been a major cause of the increase in construction costs. There is an advantage that generates little such cost.
3. 또한, 지주 기초 구조물을 모두 지면 아래로 매립할 수 있고 지면 위에는 가로등 지주만 보이므로 인도에서 차지하는 면적을 최소화할 수 있고 지상에 별도 구조물이 노출되지 않으므로 도시 미관상으로도 유리하다. 3. In addition, since all the foundation structures can be buried under the ground, and only the street lamps are visible on the ground, the area occupied by the side can be minimized and it is advantageous in terms of urban aesthetics because no separate structures are exposed on the ground.
4. 또한, 지중에 매설된 ELP 전선관에서 전선을 지주에 구비된 전선과 연결함에 있어서 기존에는 연결 작업후 ELP 전선관을 테이프나 끈을 이용하여 기초 파일에 단단히 고정되도록 하는 작업을 진행하였으므로 이에 드는 시간과 비용이 추가되고 상기 고정 작업이 완전하지 않아 작업 중이나 작업 후에도 단선의 가능성이 상존하고 있었는데 본 발명에서는 ELP 전선관을 기초 파일에 부착 구비되어 있는 강재 전선관 삽입홀에 끼워 넣기만 하면 ELP 전선관이 분리될 염려 없이 안정적으로 고정될 수 있으며 원스텝(one-step) 체결 작업이 가능하므로 시공성도 매우 우수하다. 4. In addition, in connecting the electric wire with the wire provided in the pillar in the ELP conduit buried underground, the existing work was performed to fix the ELP conduit firmly to the foundation pile using tape or string after the connection work. In the present invention, the ELP conduit can be separated by simply inserting the ELP conduit into the steel conduit insertion hole provided with the foundation pile. It can be fixed stably without any concern, and its workability is also very good because it allows one-step fastening work.
5. 또한, 미교란 지반에 매립되는 기초 파일의 선단에는 선단부 회전 및 전도 방지용 날개를 3개 이상 복수개로 복수개를 대칭적으로 접합함으로써 바람의 방향에 상관없이 횡압력에 대한 기초 파일의 저항성을 향상시키며, 또한 기초 파일의 교란 부분에 해당하는 위치에는 베이스 플에이트 하부와 기초 파일 외주면에 걸쳐 두부 회전 및 전도 방지용 날개를 하방으로 복수개 연결시키고 상기 두부 회전 및 전도 방지용 날개의 하단에는 수평 방향으로 날개 바닥판을 구비함으로써 하중 및 풍압력에 대한 저항성을 극대화시킴으로써 지주의 하중이 증가하거나 풍압력이 집중될 경우에도 지주가 회전하거나 전도되는 것을 방지할 수 있다. 5. In addition, by symmetrically joining three or more plural blades to prevent the tip rotation and fall prevention at the tip of the foundation pile embedded in the undisturbed ground, it improves the resistance of the foundation pile to the lateral pressure regardless of the wind direction. In addition, at a position corresponding to the disturbing portion of the foundation pile, a plurality of head rotation and fall prevention wings are connected downwards across the base plate lower portion and the outer circumferential surface of the foundation pile, and a wing bottom plate is horizontally formed at the bottom of the head rotation and fall prevention wings. By providing a resistance to the load and wind pressure by maximizing the load of the shore or even when the wind pressure is concentrated can prevent the shore to rotate or fall.
6. 또한, 상부 지주 구조물의 직경 등 크기가 달라져서 볼트/너트의 체결 위치가 달라질 경우에 대응되는 크기의 새로운 기초 파일을 매설할 필요 없이 기존에 매립된 기초 파일에서 볼트의 체결 위치를 이동시켜 그대로 사용할 수 있으므로 시공이 용이하고 시공 비용을 절감할 수 있다.
6. In addition, if the size of the upper strut structure is changed and the bolt / nut fastening position is changed, there is no need to bury the new foundation file of the corresponding size without moving the fastening position of the bolt from the existing pile file. Because it can be used, construction is easy and construction cost can be reduced.
도 1은 종래 콘크리트 기초 구조물에 설치된 지주 구조체의 사용 상태 예시도이다.
도 2는 종래 방법으로 콘크리트 기초 구조물에 설치된 지주 구조체의 설치 상태를 나타낸 사시도이다.
도 3은 종래 방법으로 강관 파일을 기초 파일로 사용하여 지주 구조체를 설치함에 있어서 ELP 전선관을 테이프(a) 또는 끈(b)으로 묵는 방법으로 고정시키는 것을 나타낸다.
도 4는 본 발명의 일 실시예에 따른 지주 정착 구조물 중 하부 기초 파일의 구조를 나타내는 사시도이다.
도 5는 본 발명의 일 실시예에 따른 지주 정착 구조물이 설치된 상태를 나타내는 정단면도이다.
도 6은 본 발명의 일 실시예에 따른 지주 정착 구조물에 있어서, 전선관 연결관에 ELP 전선관이 삽입되어 고정된 것을 나타내는 정단면도이다.
도 7은 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일에 구비된 상부 베이스 플레이트를 도 6의 “A" 방향으로 바라본 것을 나타낸다.
도 8a는 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일에 선단부 회전 및 전도 방지용 날개가 구비된 것을 나타내는 정면도이고, 도 8b는 “B” 방향으로 바라본 것을 나타낸다.
도 9는 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일부를 도 6의 A-A 방향에서 바라본 것을 나타낸다.
1 is a view illustrating a state of use of a strut structure installed in a conventional concrete foundation structure.
Figure 2 is a perspective view showing the installation state of the strut structure installed on the concrete foundation structure by a conventional method.
Fig. 3 shows fixing the ELP conduit by the method of staying with tape (a) or string (b) in installing the strut structure using the steel pipe pile as the foundation pile in the conventional method.
Figure 4 is a perspective view showing the structure of the lower foundation pile of the strut fixing structure according to an embodiment of the present invention.
5 is a front sectional view showing a state in which a support fixing structure is installed according to an embodiment of the present invention.
6 is a front sectional view showing that the ELP conduit is inserted and fixed in the conduit connector in the support fixing structure according to an embodiment of the present invention.
FIG. 7 illustrates the upper base plate provided in the foundation pile of the support fixing structure according to the exemplary embodiment of the present invention as viewed in the direction “A” of FIG. 6.
Figure 8a is a front view showing the tip end rotation and fall prevention blades are provided in the foundation pile of the strut fixing structure according to an embodiment of the present invention, Figure 8b shows that viewed from the "B" direction.
FIG. 9 illustrates the foundation pile of the support fixing structure according to the embodiment of the present invention as viewed from the direction AA of FIG. 6.
이하 본 발명에 관하여 도면을 참조하여 더욱 구체적으로 설명한다.
Hereinafter, the present invention will be described more specifically with reference to the drawings.
도 4는 본 발명의 일 실시예에 따른 지주 정착 구조물 중 하부 기초 파일의 구조를 나타내는 사시도이다. 또한, 도 5는 본 발명의 일 실시예에 따른 지주 정착 구조물이 설치된 상태를 나타내는 정단면도이다. Figure 4 is a perspective view showing the structure of the lower foundation pile of the strut fixing structure according to an embodiment of the present invention. 5 is a front sectional view showing a state in which a support fixing structure is installed according to an embodiment of the present invention.
도 4 및 도 5에 도시된 바와 같이, 본 발명에 따른 지주 정착 구조물은 지중에 매립 설치되는 기초 파일(10)과 상기 기초 파일 상에 고정, 정착되는 지주 구조체(20)를 포함하며 이루어진다. As shown in Figures 4 and 5, the strut fixing structure according to the present invention comprises a base pile 10 embedded in the ground and a strut structure 20 fixed and fixed on the foundation pile.
이 중 상기 기초 파일을 더욱 상세하게 설명하면, 지면 터파기 작업과 항타 작업에 의해 지반에 매립 설치되며, 교란되지 않은 미교란 지반(G1) 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개(15)가 복수개, 바람직하게는 3~4개 결합되어 있고, 교란 지반(G2)에 속하는 부분에는 파상형 경질 폴리에틸렌(다른 말로 파상형 지중 전선관), 즉 EPL 전선관 삽입 고정을 위한 전선관 연결관(16)이 수평 방향으로 강관 형태로 부착되어 있으며, 상기 기초 파일(10)의 상부에는 지주 구조체(20)가 정착되는 베이스 플레이트(17)가 부착되어 있고, 상기 베이스 플레이트(17) 하부와 기초 파일(10)의 외주면에는 파일 두부 회전 및 전도 방지용 날개(18)가 하방으로 복수개, 바람직하게는 3~4개 연결되어 있으며, 상기 두부 회전 및 전도 방지용 날개(18)의 하단에는 수평 방향으로 날개 바닥판(19)이 구비되어 있는 것을 특징으로 한다. 또한, 상기 기초 파일(10)의 베이스 플레이트(17)에는 상부 지주 구조체(20)를 결합하기 위한 볼트홀(21)이 구비되는데 이러한 볼트홀은 상기 베이스 플레이트(17)의 각 코너에 대칭적으로 설치되어 있되, 상기 볼트홀은 연결 볼트(22)가 삽입되고 내측 또는 외측 방향으로 연결 볼트(22)의 이동이 가능하도록 긴 타원 형태, 바람직하게는 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되는 것을 특징으로 한다. In detail, the foundation pile is embedded in the ground by the ground excavation and driving work, the tip portion embedded in the undisturbed undisturbed ground (G1) to the tip end rotation and fall prevention wings (15) Plural, preferably 3 to 4, are combined, and the part belonging to the disturbed ground (G2) is a corrugated hard polyethylene (in other words, a corrugated underground conduit), that is, a conduit connector 16 for fixing the EPL conduit insertion It is attached in the form of a steel pipe in the horizontal direction, the base plate 17 is attached to the upper portion of the foundation pile 10 is fixed, the base plate 17 and the base pile 10 The outer circumferential surface of the pile head rotation and fall prevention blades 18 are connected to the plurality of downwards, preferably three to four, downward, horizontal to the bottom of the head rotation and fall prevention blades 18 It characterized in that the wing bottom plate 19 is provided in the direction. In addition, the base plate 17 of the foundation pile 10 is provided with a bolt hole 21 for coupling the upper strut structure 20, the bolt hole is symmetrically at each corner of the base plate 17 The bolt hole has a long oval shape, preferably a ratio of a length of a short part to a long part, so that the connection bolt 22 is inserted and the connection bolt 22 can be moved in an inward or outward direction. It is characterized in that it is provided in the form of an ellipse becomes 2 to 1: 5.
파상형 경질 폴리에틸렌 전선관, 즉 ELP전선관은 가로등이나 건물 등의 전력간선에 주로 사용되고 있으며 내부에 코팅된 철선이 들어있고 주름이 깊게 있어서 압력에 견디는 힘이 강하며 매설 후 외압에 의해 변형될 우려가 없는 것이 특징이다. 또한, 굴곡성이 매우 뛰어나고 파상형 형태로 지하의 각종 장애물에 구애됨이 없이 우회 시공이 가능하고 폴리에틸렌 수지로 무게가 가벼워 운반 및 시공이 간편하며 내구성이 뛰어나고 내식성 및 내약품성이 우수하며, 온도에 따른 변화가 없고 내화학성도 우수하며 입선과 절단이 용이한 특징을 갖는 전선관이다. The corrugated rigid polyethylene conduit, or ELP conduit, is mainly used for power trunks such as street lamps and buildings, and has coated iron wires inside and deeply corrugated so that it has a strong resistance to pressure and does not have to be deformed by external pressure after laying. Is characteristic. In addition, it has excellent bendability and has a wavy shape, so it can be bypassed without being bound by various obstacles in the basement, and it is lightweight with polyethylene resin, so it is easy to transport and construct, has excellent durability, excellent corrosion resistance and chemical resistance, and It is a conduit with no change, excellent chemical resistance, and easy to run and cut.
위에서 설명된 바와 같이 본 발명에 따른 지주 정착 구조물에 ELP 전선관을 사용할 경우에 종래에는 ELP 전선관에서 전선을 인출하여 지주 구조체의 전선과 연결시키면서 ELP 전선관은 주로 기초 파일의 외주면에 테이프나 끈을 이용하여 묶는 수준이었다. 이 경우 테이프나 끈으로 묶는 작업을 추가로 진행해야 하고 ELP 전선관을 기초 파일 외주면에 묶더라도 전선은 외부에 노출되기 때문에 작업 중이나 지중에 매립된 상태에서 단선의 가능성은 상존하고 있었다. As described above, in the case of using the ELP conduit in the strut fixing structure according to the present invention, while drawing the electric wire from the ELP conduit and connecting the electric wire of the strut structure, the ELP conduit mainly uses tape or a string on the outer circumferential surface of the foundation pile. It was tied level. In this case, it was necessary to perform additional work of tying with tape or string, and even if the ELP conduit was tied to the outer circumferential surface of the foundation pile, the wires were exposed to the outside, so the possibility of disconnection remained during work or in the ground.
본 발명에서는 이러한 종래 기술의 문제점을 해결하여 ELP 전선관을 기초 파일에 원스텝(one-step)으로 고정시키는 것을 특징으로 한다. 이를 위하여 본 발명에서는 기초 파일(10)의 외주면 양쪽에 수평 방향으로 내경이 작은 강관을 접합시켜 이 강관 형태의 전선관 연결관(16)을 통해 전선(14)을 연결하고 ELP 전선관(11)을 삽입하여 고정한다. 상기 ELP 전선관(11)은 신축성이 좋기 때문에 전선관 연결관(16)에 탄력적으로 고정될 수 있는데, 일반적으로 사용되는 ELP 전선관의 지름을 감안하여 본 발명에서 상기 전선관 연결관(16)은 그 직경이 10~40 mm 정도인 것이 바람직하고, 그 길이는 ELP 전선관이 탈리되지 않도록 하고 작업성에 지장이 없도록 하기 위해 20~100 mm 범위인 것이 바람직하다. The present invention is to solve the problems of the prior art is characterized in that the ELP conduit fixed to the foundation pile in one-step (one-step). To this end, in the present invention, by joining the steel pipe having a small inner diameter in the horizontal direction on both sides of the outer peripheral surface of the foundation pile 10 to connect the electric wire 14 through the conduit connector 16 of this steel pipe type and insert the ELP conduit 11 To fix it. The ELP conduit 11 may be elastically fixed to the conduit conduit 16 because of its good elasticity. In view of the diameter of an ELP conduit generally used, the conduit conduit 16 has a diameter in the present invention. It is preferably about 10 to 40 mm, and the length is preferably in the range of 20 to 100 mm so as not to detach the ELP conduit and to prevent workability.
본 발명에서 사용될 수 있는 상기 기초 파일(10)은 강재나 주철로 이루어진 파일, 아연 도금된 강재 파일 또는 아연 도금된 주철 파일 등과 같은 금속관을 사용하는 것이 바람직하나 반드시 이에 한정하는 것은 아니며, 상부 기둥의 전단 응력을 견딜 수 있는 재료로서 관형 구조물은 제한 없이 포함될 수 있다. 상기 기초 파일의 단면 형태는 반드시 원형일 필요는 없으나, 원형 단면의 경우 그 직경은 상부의 지주 구조체보다 작거나 클 수 있으며, 전단력을 유지하기 위해서는 상부 지주 구조체와 유사한 정도의 직경을 갖는 것을 사용하는 것이 좋다. 또한, 상기 기초 파일을 지중에 매립하는 깊이는 상부 지주 구조체의 중량, 바람의 세기 등에 따라 적절히 변경 가능하며, 통상적으로는 약 1 ~ 3m의 범위에서 조절될 수 있다. The foundation pile 10 that can be used in the present invention is preferably a metal tube such as steel or cast iron pile, galvanized steel pile or galvanized cast iron pile, but is not necessarily limited to this, Tubular structures may be included without limitation as materials capable of withstanding shear stress. The cross-sectional shape of the foundation pile does not necessarily need to be circular, but in the case of a circular cross section, its diameter may be smaller or larger than that of the upper strut structure, and in order to maintain shear force, a diameter having a diameter similar to that of the upper strut structure is used. It is good. In addition, the depth of embedding the foundation pile in the ground can be appropriately changed according to the weight of the upper strut structure, the wind strength, etc., can be usually adjusted in the range of about 1 to 3m.
본 발명에서 상기 베이스 플레이트(17) 하부와 기초 파일(10)의 외주면에서 파일 두부의 회전 및 전도를 방지하기 위한 날개(18)가 하방으로 복수개, 바람직하게는 3개 이상 연결되어 있다. 이러한 두부 회전 전도 방지용 날개(18)는 교란 지반(G2)에서 상부의 풍하중에 견디는 힘을 제공한다. 그러나, 이러한 두부 회전 전도 방지용 날개(18)만으로는 교란 지반 풍하중에 견디는 힘과 지주 구조체의 큰 하중에 견디기 위한 수직 저항력이 크게 발휘되기 어렵다. 따라서 본 발명에서는 교란 지반의 풍하중에 견디는 힘과 수직 저항력을 증가시키기 위해 상기 두부 회전 전도 방지용 날개(18)의 하단에 날개 바닥판(19)을 추가로 부착하였다. 이러한 날개 바닥판(19)으로 인해 날개 바닥판 하부의 토사가 다져지거나 암반에 지지되기 때문에 수직 저항력이 증가하고, 수직 저항력이 증가함에 따라 풍압력에 대한 수평 저항력도 함께 상승한다. 본 발명에서 상기 날개 바닥판(19)은 크기가 클수록 큰 저항력을 발휘하나 너무 크게 되면 작업성이 저하될 수 있으므로 인근의 날개 바닥판과 간섭되지 않는 범위에서 적당한 크기로 구비하는 것이 바람직하다.
In the present invention, the base plate 17 and the outer circumferential surface of the foundation pile 10, the plurality of wings 18 for preventing the rotation and fall of the head of the pile is connected downward, preferably three or more. This head anti-rotation vane 18 provides a force to withstand the wind load of the upper portion in the disturbing ground (G2). However, only the head 18 for the prevention of head rotation conduction can hardly exert the force to withstand the disturbing ground wind load and the vertical resistance to withstand the large load of the strut structure. Therefore, in the present invention, the wing bottom plate 19 is further attached to the lower end of the head rotation fall prevention blade 18 to increase the force and the vertical resistance to withstand the wind load of the disturbing ground. Due to the wing bottom plate 19, the soil under the wing bottom plate is compacted or supported by the rock, so that the vertical resistance increases, and as the vertical resistance increases, the horizontal resistance against the wind pressure also increases. In the present invention, the wing bottom plate 19 exhibits a greater resistance as the size is larger, but if the wing bottom plate 19 is too large, the workability may be degraded.
도 6은 본 발명의 일 실시예에 따른 지주 정착 구조물에 있어서, 전선관 연결관(16)에 ELP 전선관(11)이 삽입되어 고정된 것을 나타내는 정단면도이다. 6 is a front sectional view showing that the ELP conduit 11 is inserted into and fixed to the conduit connector 16 in the support fixing structure according to the embodiment of the present invention.
본 발명에서는 상기 기초 파일(10)의 내주면에 접지선(25) 연결을 위한 접지용 볼트(26)를 추가로 구비할 수 있다. 종래에 지주 정착 구조물에서 접지를 하기 위해서는 접지선을 별도의 관을 통해 외부로 인출하는 방법을 사용하였는데 본 발명에서는 기초 파일의 내주면에 접지용 볼트(26)를 체결하여 여기를 통해 접지선을 연결함으로써 간단하게 접지를 완료할 수 있다.
In the present invention, the ground bolt 26 for connecting the ground wire 25 may be further provided on the inner circumferential surface of the foundation pile 10. Conventionally, in order to ground in the support anchorage structure, a method of drawing the ground wire to the outside through a separate pipe was used. In the present invention, the ground wire 26 is fastened to the inner circumferential surface of the foundation pile to connect the ground wire through it. Grounding can be completed.
도 7은 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일에 구비된 상부 베이스 플레이트를 도 6의 “A" 방향으로 바라본 것을 나타낸다. FIG. 7 illustrates the upper base plate provided in the foundation pile of the support fixing structure according to the exemplary embodiment of the present invention as viewed in the direction “A” of FIG. 6.
도 7에 도시된 바와 같이, 본 발명의 기초 파일(10) 상부에 구비된 베이스 플레이트(17)에는 상부 지주 구조체(20)를 결합하기 위한 볼트홀(21)이 각 코너에 대칭적으로 형성되어 있는데, 상기 볼트홀(21)은 연결볼트(22)가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 긴 타원 형태로 구비되는 것이 바람직하며, 더 구체적으로는 상기 볼트홀(21)의 형태는 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되도록 하는 것이 바람직하다. 예컨대, 상기 연결볼트(22)가 상기 볼트홀(21)의 내측에서 체결될 경우에는 직경 200 mm의 지주 구조체를 설치할 수 있고, 직경이 230 mm에 해당하는 지주 구조체를 연결할 경우에는 상기 연결볼트(22)를 상기 볼트홀(21)의 외측으로 이동시켜 체결하는 방식으로 규격이 다른 여러 종류의 지주 구조체를 상기 베이스 플레이트(17) 상에 결합할 수 있다.
As shown in FIG. 7, a bolt hole 21 for coupling the upper support structure 20 is symmetrically formed at each corner in the base plate 17 provided on the base pile 10 of the present invention. The bolt hole 21 is preferably provided in a long oval shape so that the connecting bolt 22 can be inserted to be moved inward or outward, and more specifically, the bolt hole 21 may have a shape. It is preferable to make ratio of the length of a short part and a long part become 1: 2-1: 5. For example, when the connecting bolt 22 is fastened inside the bolt hole 21, a support structure having a diameter of 200 mm may be installed, and when connecting the support structure having a diameter of 230 mm, the connecting bolt ( 22 may be coupled to the base plate 17 by various types of strut structures having different specifications in a manner of moving by moving the bolt hole 21 to the outside of the bolt hole 21.
도 8a는 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일에 선단부 회전 및 전도 방지용 날개가 구비된 것을 나타내는 정면도이고, 도 8b는 “B” 방향으로 바라본 것을 나타낸다. Figure 8a is a front view showing the tip end rotation and fall prevention blades are provided in the foundation pile of the strut fixing structure according to an embodiment of the present invention, Figure 8b shows that viewed from the "B" direction.
도 8a 및 도 8b에 도시된 바와 같이, 본 발명에서 상기 기초 파일(10)의 미교란 지반(G1) 중에 매립되는 파일 선단부에는 선단부의 회전 및 전도를 방지하기 위한 날개(15)가 3개 이상 복수개 대칭적으로 결합되는데, 상기 선단부 회전 및 전도 방지용 날개는 3~4개 정도 구비되는 것이 바람직하고, 항타시 기초 파일(10)의 지반 매립에 지장이 없도록 하부쪽이 상부쪽보다 돌출 폭이 좁도록 구비되는 것이 바람직하다. 8A and 8B, in the present invention, the pile tip portion embedded in the undisturbed ground G1 of the foundation pile 10 has three or more wings 15 for preventing rotation and fall of the tip portion. A plurality of symmetrically coupled, the front end rotation and fall prevention wings are preferably provided with about 3 to 4, the lower side is projecting width narrower than the upper side so that there is no obstacle in the ground filling of the foundation pile (10) during driving It is preferable to be provided so that.
본 발명에서 상기 선단부 회전 및 전도 방지용 날개는 미교란 지반에 매립된 기초 파일의 회전과 전도를 방지하기 위하여 필요하나, 지지력이 강한 지반인 경우에는 상기 선단부의 회전 및 전도 방지용 날개는 경우에 따라서 부착하지 않을 수도 있으며 이 또한 본 발명의 범위에 속하는 것으로 해석되어야 한다.
In the present invention, the tip rotation and fall prevention wings are necessary to prevent rotation and fall of the foundation pile embedded in the undisturbed ground, but in the case of strong bearing ground, the vane rotation and fall prevention wings are attached as the case may be. It should not be construed as being within the scope of the present invention.
도 9는 본 발명의 일 실시예에 따른 지주 정착 구조물의 기초 파일부를 도 6의 A-A 방향에서 바라본 것을 나타낸다. FIG. 9 illustrates the foundation pile of the support fixing structure according to the embodiment of the present invention as viewed from the A-A direction of FIG. 6.
도 9에 도시된 바와 같이, 본 발명에 따른 지주 정착 구조물에 사용되는 기초 파일(10)은 그 외주면에 ELP 전선관(11) 삽입을 위한 전선관 연결관(16)이 구비되어 있어 ELP 전선관의 결합을 원스텝(one-step)으로 진행할 수 있도록 하고 결합 후에는 ELP 전선관(11)의 자체 탄력에 의해 단단히 고정되므로 분리되는 문제가 발생하지 않는다. 또한, 기초 파일(10)의 교란 지반(G2) 부분에 속하는 지점에는 두부 회전 및 전도 방지용 날개(18)를 복수개 구비하고 있고 그 하부 끝단에 날개 바닥판(19)을 추가로 구비함으로써 하중에 대한 수직 저항력을 증가시키고 이에 따라 풍압력에 저항할 수 있는 수평 저항력도 함께 증대되는 특징을 갖는다.
As shown in FIG. 9, the foundation pile 10 used in the strut fixing structure according to the present invention is provided with a conduit connector 16 for inserting the ELP conduit 11 on the outer circumferential surface thereof so as to couple the ELP conduit. It is possible to proceed in a one-step and after the combination is firmly fixed by the self-elasticity of the ELP conduit 11 does not cause a problem of separation. In addition, at the point belonging to the disturbing ground G2 portion of the foundation pile 10, a plurality of blades 18 for head rotation and fall prevention are provided, and a wing bottom plate 19 is further provided at the lower end thereof so that The vertical resistance is increased and thus the horizontal resistance that can withstand wind pressure is also increased.
본 발명에 따른 상기 기둥 정착 구조물에 사용되는 지주 구조체(20)는 1등 가로등, 2등 가로등과 같은 가로등 종류의 지주, 도로 교통 신호등 지주, 도로 표지판 지주, 씨씨티비(CCTV) 지주 등에 사용될 수 있다. 상기 지주 구조체(20)는 중량이 과도하게 크지 않으므로 과 중량의 콘크리트 기초 없이 금속관으로 이루어진 기초 파일을 사용하는 것만으로 충분히 전단 응력을 견딜 수 있으므로 본 발명은 이러한 저중량(통상 100kg 이하) 또는 중중량(통상 100 ~ 300 kg)의 지주 정착 구조물을 시공함에 있어 시공 비용을 절감하고 시공 기간을 단축할 수 있다.
The strut structure 20 used in the pillar fixing structure according to the present invention may be used for a street lamp type such as a 1-light street lamp and a 2-light street lamp, a road traffic light prop, a road sign prop, a CTV prop. . Since the strut structure 20 is not excessively large in weight, the present invention is capable of withstanding shear stress by simply using a foundation pile made of a metal tube without an overweight concrete foundation. In general, the construction cost of 100 ~ 300 kg) can reduce the construction cost and shorten the construction period.
이하에서는 본 발명에 따른 상기 지주 정착 구조물의 시공 방법에 관하여 설명한다. 본 발명에 따른 상기 지주 정착 구조물의 시공 방법은 하기의 순서로 진행된다. 즉, Hereinafter will be described with respect to the construction method of the strut fixing structure according to the present invention. The construction method of the post anchoring structure according to the present invention proceeds in the following order. In other words,
(a) 기주 정착 구조물을 시공할 위치의 지면을 터파기하되 기초 파일에 구비된 파상형 경질 폴리에틸렌(ELP) 전선관 삽입을 위한 전선관 연결관이 노출될 정도로 터파기하고, 터파기한 지점에 기초 파일을 항타하여 매립하되 상기 기초 파일의 최상부는 지면과 수평을 유지토록 하고 상기 기초 파일에 구비된 상기 전선관 연결관 상위 부분은 노출시켜 매립하는 단계;(a) Destroy the ground at the location where the host anchoring structure is to be constructed, and sever enough to expose the conduit connector for insertion of the corrugated hard polyethylene (ELP) conduit provided in the foundation pile, and at the point where Burying and filling the foundation pile so that the top of the foundation pile is flush with the ground and exposes the upper portion of the conduit connector pipe provided in the foundation pile;
(b) 상기 매립된 기초 파일의 측면에 수평으로 형성된 전선관 연결관에 파상형 경질 폴리에틸렌(ELP) 전선관을 삽입 고정하고 전선을 기초 파일 내부를 통해 상부로 인출시키는 단계;(b) inserting and fixing a wave-shaped hard polyethylene (ELP) conduit in a conduit conduit formed horizontally on the side of the embedded foundation pile and drawing the electrical wire upward through the interior of the foundation pile;
(c) 상기 기초 파일의 베이스 플레이트 상부에 지주 구조체의 지주 플랜지를 밀착시켜 지주 구조체를 적재하고 상기 베이스 플레이트 및 지주 플랜지의 볼트홀을 통해 볼트를 삽입하고 너트 고정하여 지주 구조체를 베이스 플레이트 상에 정착시키는 단계; 및(c) Loading the strut structure by closely contacting the strut flange of the strut structure on the base plate of the foundation pile, inserting the bolt through the bolt hole of the base plate and the strut flange, and fixing the strut structure on the base plate. Making a step; And
(d) 상기 (a)에서 터파기한 흙을 되메우고 평탄화하는 단계(d) backfilling and leveling the soil excavated in (a)
를 포함하여 구성된다..
이 때, 상기 기초 파일(10)은 미교란 지반(G1) 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개(15)가 3개 이상 복수개 대칭적으로 결합되고, 교란 지반(G2)에 속하는 부분에는 파상형 경질 폴리에틸렌(ELP) 전선관 삽입 고정을 위한 전선관 연결관(16)이 수평 방향으로 강관 형태로 부착되며, 상부에는 지주 구조체(20)가 정착되는 베이스 플레이트(17)가 부착되고, 상기 베이스 플레이트(17) 하부와 기초 파일(10) 외주면에는 파일 두부 회전 및 전도 방지용 날개(18)가 하방으로 복수개 연결되며, 상기 두부 회전 및 전도 방지용 날개의 하단에는 수평 방향으로 날개 바닥판(19)이 구비되고, 상기 베이스 플레이트(17)에는 상부 지주 구조체(20)를 결합하기 위한 볼트홀(21)이 각 코너에 대칭적으로 구비되되 상기 볼트홀(21)은 연결 볼트(22)가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되어 있는 기초 파일인 것을 특징으로 한다.
At this time, the foundation pile 10 is the tip portion embedded in the undisturbed ground (G1) is a symmetrical coupling of three or more of the tip rotation and fall prevention wings (15) symmetrically, the portion belonging to the disturbing ground (G2) A conduit conduit tube 16 for fixing the corrugated hard polyethylene (ELP) conduit insert is attached in the form of a steel pipe in a horizontal direction, and a base plate 17 on which the strut structure 20 is fixed is attached, and the base plate (17) The lower portion and the outer circumferential surface of the base pile 10 are connected to the plurality of pile head rotation and fall prevention wings 18 downward, the lower end of the head rotation and fall prevention wings are provided with a wing bottom plate 19 in the horizontal direction The base plate 17 is provided with a bolt hole 21 symmetrically provided at each corner for coupling the upper strut structure 20, and the bolt hole 21 has a connecting bolt 22 formed inside or outside the room. It is characterized in that the base file is provided in the form of an ellipse in which the ratio of the length of the short portion and the long portion is 1: 2 to 1: 5 so as to be movably inserted in the direction.
본 발명에 따른 상기 지주 정착 구조물의 시공 방법에서 상기 기초 파일(10)은 강재나 주철로 이루어진 파일, 아연 도금된 강재 또는 아연 도금된 주철 파일 등과 같은 금속관을 사용하는 것이 바람직하나 반드시 이에 한정하는 것은 아니며, 상부 지주 구조체(20)의 전단 응력을 견딜 수 있는 재료로서 관형 구조물은 제한 없이 포함될 수 있다. 상기 기초 파일의 단면 형태는 반드시 원형일 필요는 없으나, 원형 단면의 경우 그 직경은 상부의 지주 구조체보다 작거나 클 수 있으며, 전단력을 유지하기 위해서는 상부 지주 구조체와 유사한 정도의 직경을 갖는 것을 사용하는 것이 좋다. 또한, 상기 기초 파일을 지중에 매립하는 깊이는 상부 지주 구조체의 중량, 바람의 세기 등에 따라 적절히 변경 가능하며, 통상적으로는 약 1 ~ 3m의 범위에서 조절될 수 있다.
In the method of constructing the support anchorage structure according to the present invention, the foundation pile 10 preferably uses a metal tube such as a pile made of steel or cast iron, a galvanized steel or a galvanized cast iron pile, but is not limited thereto. The tubular structure may be included without limitation as a material capable of withstanding the shear stress of the upper strut structure 20. The cross-sectional shape of the foundation pile does not necessarily need to be circular, but in the case of a circular cross section, its diameter may be smaller or larger than that of the upper strut structure, and in order to maintain shear force, a diameter having a diameter similar to that of the upper strut structure is used. It is good. In addition, the depth of embedding the foundation pile in the ground can be appropriately changed according to the weight of the upper strut structure, the wind strength, etc., can be usually adjusted in the range of about 1 to 3m.
본 발명에 따른 상기 지주 정착 구조물의 시공 방법에 사용되는 지주 구조체(20)는 1등 가로등, 2등 가로등과 같은 가로등 종류의 지주, 도로 교통 신호등 지주, 도로 표지판 지주, 씨씨티비(CCTV) 지주 등에 사용될 수 있다. 상기 지주 구조체(20)는 중량이 과도하게 크지 않으므로 과 중량의 콘크리트 기초 없이 금속관으로 이루어진 기초 파일을 사용하는 것만으로 충분히 전단 응력을 견딜 수 있으므로 본 발명은 이러한 저중량(통상 100kg 이하) 또는 중중량(통상 100 ~ 300 kg)의 지주 정착 구조물을 시공함에 있어 시공 비용을 절감하고 시공 기간을 단축할 수 있다.
The strut structure 20 used in the construction method of the strut fixing structure according to the present invention is a strut of a street lamp type such as a first street lamp, a second street lamp, a road traffic light strut, a road sign strut, a CTV strut and the like. Can be used. Since the strut structure 20 is not excessively large in weight, the present invention is capable of withstanding shear stress by simply using a foundation pile made of a metal tube without an overweight concrete foundation. In general, the construction cost of 100 ~ 300 kg) can reduce the construction cost and shorten the construction period.
기타, 본 발명에 따른 지주 정착 구조물의 시공 방법에서 설명되지 않은 사항은 위 본 발명에 따른 지주 정착 구조물의 설명 부분과 같다.
In addition, the matters that are not described in the construction method of the post anchoring structure according to the present invention are the same as the description of the post anchoring structure according to the present invention.
이상 설명한 바와 같이, 본 발명에 따른 지주 정착 구조물은 가로등이나 도로 교통 신호등과 같이 과중한 중량이 나가지 않는 지상 시설물을 설치하는데 사용될 수 있다. 이와 같은 시설물에 본 발명에 따른 지주 정착 구조물을 사용하면 기존 방법에 비하여 자재 제작비 및 시공비를 절감할 수 있고, 폐기물 비용을 발생시키지 않으므로 별도의 폐기물 처리 비용 없이 시공이 가능하여 전체 비용을 절감할 수 있으며, 공사 기간도 본당 10 분 이하로 줄일 수 있는 경제적 효과가 우수하다. 또한, 본 발명에 따른 지주 정착 구조물에 사용되는 기초 파일은 ELP 전선관 삽입을 위한 전선관 연결관이 구비되어 있어 ELP 전선관 결합을 견고하고 빠르게 진행할 수 있으며, 기초 파일의 교란 지반 부분에 속하는 지점에 두부 회전 및 전도 방지용 날개를 복수개 구비하고 있고 그 하부 끝단에 날개 바닥판을 추가로 구비함으로써 하중에 대한 수직 저항력을 증가시키고 풍압력에 대한 수평 저항력도 현저하게 증대시킬 수 있다.
As described above, the strut fixing structure according to the present invention can be used to install a ground facility that does not have a heavy weight, such as street lights or road traffic signals. The use of the holding fixture according to the present invention in such a facility can reduce the material manufacturing cost and construction cost compared to the existing method, and because it does not incur waste costs, construction can be performed without a separate waste disposal cost, thereby reducing the overall cost. The construction period is also excellent economic effect that can be reduced to less than 10 minutes per head. In addition, the foundation pile used in the strut fixing structure according to the present invention is provided with a conduit connector for inserting the ELP conduit can be fast and robust to the ELP conduit coupling, the head rotation to the point belonging to the disturbed ground portion of the foundation pile And it is provided with a plurality of wings for preventing fall, and further provided with a wing bottom plate at the lower end thereof can increase the vertical resistance to the load and the horizontal resistance to the wind pressure can be significantly increased.
본 발명은 상술한 특정의 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
The present invention is not limited to the above-described specific embodiments, and various modifications can be made by those skilled in the art without departing from the gist of the invention as claimed in the claims. Such changes are intended to fall within the scope of the claims.
1: 가로등 2: 가로등 지주
3: 너트 4: 보호덮개
5: 플랜지 6: 앵커 볼트
7: 콘크리트 기초 9: 전선관
10: 기초 파일 11: ELP 전선관
12: 테이프 13: 끈
14: 전선 15: 선단부 회전 및 전도 방지용 날개
16: 전선관 연결관 17: 베이스 플레이트
18: 두부 회전 및 전도 방지용 날개
19: 날개 바닥판 20: 지주 구조체
21: 볼트홀 22: 연결볼트
23: 너트 24: 플랜지
25: 접지선 26: 접지용 볼트
27: 베이스 플레이트 홀
1: street lamp 2: street lamp
3: nut 4: protective cover
5: flange 6: anchor bolt
7: concrete foundation 9: conduit
10: Foundation File 11: ELP Conduit
12: tape 13: string
14: electric wire 15: tip rotation and fall prevention wings
16: conduit connector 17: base plate
18: Head rotation and fall prevention wings
19: wing bottom plate 20: strut structure
21: Bolt hole 22: Connecting bolt
23: nut 24: flange
25: ground wire 26: grounding bolt
27: base plate hole

Claims (8)

  1. 지반에 매립 설치되며 상부에는 지주 구조체가 정착되는 베이스 플레이트가 부착되어 있고 상기 베이스 플레이트 하부와 기초 파일 외주면에는 파일 두부 회전 및 전도 방지용 날개가 하방으로 복수개 연결되어 있으며 상기 베이스 플레이트에는 상부 지주 구조체를 결합하기 위한 볼트홀이 각 코너에 대칭적으로 형성되어 있는 기초 파일; 및 지주 플랜지를 하단에 구비하며 상기 기초 파일의 베이스 플레이트와 상기 지주 플랜지의 볼트/너트 결합에 의해 상기 베이스 플레이트의 상부에 체결 정착되는 지주 구조체;를 포함하여 구성되며,
    상기 기초 파일의 미교란 지반 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개가 3개 이상 복수개 대칭적으로 결합되어 있고, 교란 지반에 속하는 기초 파일의 외주면 양쪽에 폴리에틸렌(ELP) 전선관의 원스텝 삽입 고정을 위한 강관이 접합되어 형성된 전선관 연결관이 20~100 mm의 길이 및 10~40 mm의 직경으로 구비되고 있으며, 상기 파일 두부 회전 및 전도 방지용 날개에는 수평 방향으로 날개 바닥판이 각 날개의 하단에 구비되어 있고, 상기 베이스 플레이트에 형성되어 있는 상기 볼트홀은 연결 볼트가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되어 있는 것을 특징으로 하는 지주 정착 구조물.
    The base plate is buried in the ground and is fixed to the upper base plate is fixed to the base plate and the lower base plate and the outer circumference of the base pile is connected to the plurality of wings to prevent the pile head rotation and fall down, the base plate is coupled to the upper support structure A foundation pile having bolt holes for symmetrically formed at each corner; And a strut structure having a strut flange at the bottom thereof and fastened and fixed to an upper portion of the base plate by bolt / nut coupling of the base plate and the strut flange of the foundation pile.
    The tip portion embedded in the undisturbed ground of the foundation pile is symmetrically coupled to a plurality of tip rotation and fall prevention wings, and a one-step insertion fixing of polyethylene (ELP) conduit is formed on both outer peripheral surfaces of the foundation pile belonging to the disturbing ground. The conduit pipe formed by joining the steel pipe for 20 to 100 mm in length and 10 to 40 mm in diameter is provided, the pile head rotation and fall prevention wings are provided with a wing bottom plate in the horizontal direction at the bottom of each wing The bolt hole formed in the base plate has an ellipse shape in which the ratio of the length of the short portion and the long portion is 1: 2 to 1: 5 so that the connecting bolt can be inserted to be movable inward or outward. A strut fixing structure, which is provided.
  2. 삭제delete
  3. 청구항 1에 있어서, 상기 기초 파일은 강재 파일, 주철 파일, 아연 도금된 강재 파일 또는 아연 도금된 주철 파일인 것을 특징으로 하는 지주 정착 구조물.
    The prop anchor structure of claim 1 wherein the foundation pile is a steel pile, a cast iron pile, a galvanized steel pile, or a galvanized cast iron pile.
  4. 청구항 1에 있어서, 상기 기초 파일의 내주면에는 접지선 연결을 위한 접지용 볼트가 구비되어 있는 것을 특징으로 하는 지주 정착 구조물.
    The support anchoring structure of claim 1, wherein a grounding bolt for connecting a ground wire is provided on an inner circumferential surface of the foundation pile.
  5. 청구항 1에 있어서, 상기 지주 구조체는 가로등 지주, 도로 교통 신호등 지주, 도로 표지판 지주 또는 씨씨티비(CCTV) 지주인 것을 특징으로 하는 지주 정착 구조물.
    The strut fixing structure according to claim 1, wherein the strut structure is a street light strut, a road traffic light strut, a road sign strut or a CTV strut.
  6. (a) 기주 정착 구조물을 시공할 위치의 지면을 터파기하되 기초 파일에 구비된 파상형 경질 폴리에틸렌(ELP) 전선관 삽입을 위한 전선관 연결관이 노출될 정도로 터파기하고, 터파기한 지점에 기초 파일을 항타하여 매립하되 상기 기초 파일의 최상부는 지면과 수평을 유지토록 하고 상기 기초 파일에 구비된 상기 전선관 연결관 상위 부분은 노출시켜 매립하는 단계;
    (b) 상기 매립된 기초 파일의 측면에 수평으로 형성된 전선관 연결관에 파상형 경질 폴리에틸렌(ELP) 전선관을 삽입 고정하고 전선을 기초 파일 내부를 통해 상부로 인출시키는 단계;
    (c) 상기 기초 파일의 베이스 플레이트 상부에 지주 구조체의 지주 플랜지를 밀착시켜 지주 구조체를 적재하고 상기 베이스 플레이트 및 지주 플랜지의 볼트홀을 통해 볼트를 삽입하고 너트 고정하여 지주 구조체를 베이스 플레이트 상에 정착시키는 단계; 및
    (d) 상기 (a)에서 터파기한 흙을 되메우고 평탄화하는 단계
    를 포함하여 구성되며,
    상기 기초 파일은 미교란 지반 중에 매립되는 선단부에는 선단부 회전 및 전도 방지용 날개가 3개 이상 복수개 대칭적으로 결합되고, 교란 지반에 속하는 기초 파일의 외주면 양쪽에 폴리에틸렌(ELP) 전선관의 원스텝 삽입 고정을 위한 강관이 접합되어 형성된 전선관 연결관이 20~100 mm의 길이 및 10~40 mm의 직경으로 구비되고 있으며, 상부에는 지주 구조체가 정착되는 베이스 플레이트가 부착되고, 상기 베이스 플레이트 하부와 기초 파일 외주면에는 파일 두부 회전 및 전도 방지용 날개가 하방으로 복수개 연결되며, 상기 두부 회전 및 전도 방지용 날개의 하단에는 수평 방향으로 날개 바닥판이 구비되고, 상기 베이스 플레이트에는 상부 지주 구조체를 결합하기 위한 볼트홀이 각 코너에 대칭적으로 구비되되 상기 볼트홀은 연결 볼트가 내측 또는 외측 방향으로 이동 가능하게 삽입될 수 있도록 짧은 부분과 긴 부분의 길이의 비율이 1:2~1:5가 되는 타원 형태로 구비되어 있는 기초 파일인 것을 특징으로 하는 지주 정착 구조물의 시공 방법.
    (a) Destroy the ground at the location where the host anchoring structure is to be constructed, and sever enough to expose the conduit connector for insertion of the corrugated hard polyethylene (ELP) conduit provided in the foundation pile, and at the point where Burying and filling the foundation pile so that the top of the foundation pile is flush with the ground and exposes the upper portion of the conduit connector pipe provided in the foundation pile;
    (b) inserting and fixing a wave-shaped hard polyethylene (ELP) conduit in a conduit conduit formed horizontally on the side of the embedded foundation pile and drawing the electrical wire upward through the interior of the foundation pile;
    (c) Loading the strut structure by closely contacting the strut flange of the strut structure on the base plate of the foundation pile, inserting the bolt through the bolt hole of the base plate and the strut flange, and fixing the strut structure on the base plate. Making a step; And
    (d) backfilling and leveling the soil excavated in (a)
    And,
    The foundation pile is a symmetrical coupling of three or more tip rotation and fall prevention blades at the tip portion embedded in the undisturbed ground, and for one-step insertion fixing of polyethylene (ELP) conduits on both outer peripheral surfaces of the foundation pile belonging to the disturbing ground. The conduit connection pipe formed by joining the steel pipes is provided with a length of 20 to 100 mm and a diameter of 10 to 40 mm, and a base plate to which the strut structure is fixed is attached to the upper part, and a pile is provided on the lower part of the base plate and the outer circumferential surface of the foundation file. Head rotation and fall prevention wings are connected to the plurality of downwards, the bottom of the head rotation and fall prevention wings are provided with a wing bottom plate in the horizontal direction, the base plate bolt holes for coupling the upper strut structure is symmetrical in each corner The bolt hole is provided as an inner or outer connection bolt A short part and the long part of the length ratio of one to be inserted to be movable in the direction: 2 to 1: construction of holding the fixing structure characterized in that the base file that is provided in an oval shape which is 5.
  7. 청구항 6에 있어서, 상기 기초 파일은 강재 파일, 주철 파일, 아연 도금된 강재 파일 또는 아연 도금된 주철 파일인 것을 특징으로 하는 지주 정착 구조물의 시공 방법.
    The method of claim 6, wherein the foundation pile is a steel pile, cast iron pile, galvanized steel pile or galvanized cast iron pile.
  8. 청구항 6에 있어서, 상기 (b)에서 전선을 상부로 인출함에 있어, 기초 파일의 내주면에 구비된 접지용 볼트에 접지선을 연결하는 것을 더 포함하는 것을 특징으로 하는 지주 정착 구조물의 시공 방법.


    The method of claim 6, further comprising connecting the ground wire to the grounding bolt provided on the inner circumferential surface of the foundation pile in drawing out the electric wire to the upper portion (b).


KR1020130107053A 2013-09-06 2013-09-06 Pillar settling structure and construction method of the same with improved stability and workability KR101358985B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130107053A KR101358985B1 (en) 2013-09-06 2013-09-06 Pillar settling structure and construction method of the same with improved stability and workability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130107053A KR101358985B1 (en) 2013-09-06 2013-09-06 Pillar settling structure and construction method of the same with improved stability and workability

Publications (1)

Publication Number Publication Date
KR101358985B1 true KR101358985B1 (en) 2014-02-07

Family

ID=50269995

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130107053A KR101358985B1 (en) 2013-09-06 2013-09-06 Pillar settling structure and construction method of the same with improved stability and workability

Country Status (1)

Country Link
KR (1) KR101358985B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155570A (en) * 2015-08-14 2015-12-16 华信咨询设计研究院有限公司 Communication pole tower with steel tube pile as foundation
KR101601904B1 (en) * 2015-05-20 2016-03-09 조선대학교 산학협력단 Press-in base support and method for installation therewith
KR20160110055A (en) 2015-11-23 2016-09-21 주식회사 한빛에스엘엘 foundation pile for pillar, pile driving cap, and method of constructing the same
KR101784392B1 (en) * 2017-04-18 2017-10-11 이동호 Construction method for post using foundation structure for post
CN107859052A (en) * 2017-11-02 2018-03-30 重庆大学 The adjustable single pile foundation and its construction method of a kind of connecting bridge rear column
KR20180129409A (en) 2017-05-26 2018-12-05 이동호 Composite foundation structure for post and construction method for post using the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100934934B1 (en) * 2009-06-19 2010-01-06 서한전기공업(주) Foundation of lamppost with horizontality balancer
JP2010043421A (en) * 2008-08-11 2010-02-25 Iwaki Tekko:Kk Member for foundation framework of snow fence, foundation of snow fence using the member, and method for constructing the foundation
KR100996734B1 (en) 2009-05-27 2010-11-25 박지운 Foundation assembly for trafic signal support structure and foundation using the same
KR101285156B1 (en) * 2013-03-04 2013-07-11 (주)대맥건설산업 Centering apparatus of column pile installed in cast-in-place pile construction mold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010043421A (en) * 2008-08-11 2010-02-25 Iwaki Tekko:Kk Member for foundation framework of snow fence, foundation of snow fence using the member, and method for constructing the foundation
KR100996734B1 (en) 2009-05-27 2010-11-25 박지운 Foundation assembly for trafic signal support structure and foundation using the same
KR100934934B1 (en) * 2009-06-19 2010-01-06 서한전기공업(주) Foundation of lamppost with horizontality balancer
KR101285156B1 (en) * 2013-03-04 2013-07-11 (주)대맥건설산업 Centering apparatus of column pile installed in cast-in-place pile construction mold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101601904B1 (en) * 2015-05-20 2016-03-09 조선대학교 산학협력단 Press-in base support and method for installation therewith
CN105155570A (en) * 2015-08-14 2015-12-16 华信咨询设计研究院有限公司 Communication pole tower with steel tube pile as foundation
KR20160110055A (en) 2015-11-23 2016-09-21 주식회사 한빛에스엘엘 foundation pile for pillar, pile driving cap, and method of constructing the same
KR101784392B1 (en) * 2017-04-18 2017-10-11 이동호 Construction method for post using foundation structure for post
KR20180129409A (en) 2017-05-26 2018-12-05 이동호 Composite foundation structure for post and construction method for post using the same
CN107859052A (en) * 2017-11-02 2018-03-30 重庆大学 The adjustable single pile foundation and its construction method of a kind of connecting bridge rear column

Similar Documents

Publication Publication Date Title
US6722821B1 (en) Helice pier post and method of installation
CA2205502C (en) Tensionless pier foundation
US8161698B2 (en) Foundation for monopole wind turbine tower
CA2844373C (en) Perimeter pile anchor foundation
US5039256A (en) Pinned foundation system
KR100777688B1 (en) Method for contructing arc-type utility pole underbracing for overhead line using extendable excavating unit for auger crane
CA2424334C (en) Perimeter weighted foundation for wind turbines and the like
CN201125354Y (en) Steep hill road bed branch block reinforced structure
US8109057B2 (en) Tower foundation system
KR100799358B1 (en) Combined retaining wall and method for constructing thereof
CN101560770B (en) Novel deep building foundation pit supporting system
CA2950997A1 (en) Foundation system for towers and method for installing the foundation system for towers
JP4698491B2 (en) Temporary closing method and structure of underwater structure
KR101590032B1 (en) Column wall using pile and structure construction method therewith
JP4392453B2 (en) Method for suppressing levitation of underground buried object and buried structure
KR20100087858A (en) Retaining wall using anchor and concrete panel and its construction method
KR100917044B1 (en) Concrete retaining wall construction method with dual wall jointed by anchor
AU2010202904A1 (en) Modular surface foundation for wind turbine space frame towers
US10352018B2 (en) Guy anchor remediation apparatus
KR100869815B1 (en) Apparatus to upgrade end bearing capacity of pile and pile construction method
KR100853099B1 (en) Street light foundation
KR101242476B1 (en) Base construct method of building and base construct member of building
JP4079280B2 (en) Hollow foundation for street light
JP5785258B2 (en) Root reinforcement
JP3876278B2 (en) Easy-cut tunnel segment structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170117

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180129

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20181112

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200107

Year of fee payment: 7