KR100719950B1 - Prefabricated base plate for prop installation and construction method - Google Patents

Prefabricated base plate for prop installation and construction method Download PDF

Info

Publication number
KR100719950B1
KR100719950B1 KR1020050036910A KR20050036910A KR100719950B1 KR 100719950 B1 KR100719950 B1 KR 100719950B1 KR 1020050036910 A KR1020050036910 A KR 1020050036910A KR 20050036910 A KR20050036910 A KR 20050036910A KR 100719950 B1 KR100719950 B1 KR 100719950B1
Authority
KR
South Korea
Prior art keywords
foundation
base plate
installation
support
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020050036910A
Other languages
Korean (ko)
Other versions
KR20060114790A (en
Inventor
공현덕
Original Assignee
공현덕
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 공현덕 filed Critical 공현덕
Priority to KR1020050036910A priority Critical patent/KR100719950B1/en
Publication of KR20060114790A publication Critical patent/KR20060114790A/en
Application granted granted Critical
Publication of KR100719950B1 publication Critical patent/KR100719950B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

본 발명은 지주 설치용 기초를 형성시킴에 있어서, 지주가 설치되는 현장에서 직접 조립시켜 기초를 형성시킬 수 있게 하고, 기초를 형성시키는 공기를 단축시켜 공사비용을 절감시킴은 물론 보행자의 통행에 불편을 주는 것을 최소화시킬 수 킬 수 있게 하는 지주 설치용 조립식 기초판에 관한 것이다.The present invention is to form the foundation for the installation of the support, can be directly assembled at the site where the support is installed to form the foundation, shorten the air to form the foundation to reduce the construction cost as well as inconvenience in the pedestrian traffic It is directed to a prefabricated base plate for installation of struts, which can minimize giving.

종래의 기초 형성방법은 별도의 거푸집을 필요로 하고, 타설된 콘크리트가 양생되는 동안 기초의 주변에 파헤쳐진 구덩이를 그대로 유지하다가 콘크리트의 양생이 완료되면 거푸집을 제거하고 구덩이를 다시 매꾸어야 되어 상당한 공사기간이 소요됨은 물론 공사 현장을 운행하는 차량과 보행장의 통행에 많은 불편함을 전가시키는 문제점이 있었던 바, 본 발명은 지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시켜 구성함으로써, 지주가 설치되는 작업현장에서 기초를 형성시키는 기초판을 조립시키고, 조립인 완료된 기초판의 내부에 지주와 연결되는 앵커와 함께 콘크리트를 타설시킨 후 곧바로 구덩이를 메꿀 수 있어 기초를 형성하는 공사기간을 대폭적으로 단축시킬 수 있는 것이다. 이는 공사비용은 절감시킴은 물론이고 공사로 인하여 차량과 보행자의 통행을 방해하는 것을 최소화시킬 수 있는 효과가 있다. 또한 지중에 매립 설치되는 기초가 지중내에 보다 확고하게 설치될 수 있어 기초에 설치되는 지주를 보다 견고하게 지지할 수 있는 효과가 있다.The conventional method of foundation formation requires a separate formwork, while maintaining the pit dug around the foundation while the poured concrete is being cured, and removing the formwork and refilling the pit when curing of the concrete is completed. It takes a long time, of course, there was a problem of passing a lot of inconvenience to the traffic of vehicles and pedestrians running on the construction site, the present invention in forming the foundation for the installation of the pillar, another base plate on the periphery of the base plate (1) By forming and configuring the connecting device (2) connected to (1), the foundation plate to form the foundation at the work site where the post is installed, and the concrete together with the anchor connected to the support in the interior of the completed base plate It is possible to shorten the pit immediately after pouring, greatly reducing the construction period for the foundation. This not only reduces the construction cost but also has the effect of minimizing the obstruction of traffic of vehicles and pedestrians due to construction. In addition, the foundation to be buried in the ground can be installed more firmly in the ground has the effect that can support more firmly installed on the foundation.

Description

지주 설치용 조립식 기초판 및 그 시공방법{Fabricated baseplate for post}Prefabricated base plate for prop installation and its construction method {Fabricated baseplate for post}

도 1a,1b는 본 발명에 따른 기초판의 사시 및 분리사시도.Figure 1a, 1b is a perspective view and a separated perspective view of the base plate according to the invention.

도 2는 본 발명 기초판 연결장치 다른 실시예도.Figure 2 is another embodiment of the present invention base plate connecting device.

도 3은 본 발명에 따른 기초판의 또 다른 실시예도.Figure 3 is another embodiment of the base plate according to the present invention.

도 4는 본 발명 기초판 연결장치의 연장블록 실시예도.Figure 4 is an embodiment of an extension block of the base plate connecting device of the present invention.

도 5a,5b,5c는 본 발명 기초판의 시공도.Figure 5a, 5b, 5c is a construction of the base plate of the present invention.

***도면의 주요 부분에 대한 부호의 설명****** Description of the symbols for the main parts of the drawings ***

1 - 기초판 2 - 연결장치1-base plate 2-connector

3 - 통공 5 - 기초3-Through Hole 5-Foundation

6 - 앵커 7 - 배관6-anchor 7-piping

21 - 브라켓 22 - 홈21-Bracket 22-Home

23 - 밴드부재 24 - 요철23-band member 24-unevenness

10 - 연결블록10-connecting block

본 발명은 지주 설치용 조립식 기초판에 관한 것으로, 더욱 상세하게는 지주 설치를 위한 거푸집을 규격의 콘크리트판으로 구성하여 이를 지주가 설치되는 현장에서 직접 조립한 후 매립하고 콘크리트를 타설하여(콘크리트를 타설한 후 곧바로 매립할 수도 있음) 기초를 형성 함으로써 기초를 시공 공기 및 공사비용을 절감시킴은 물론 보행자의 통행에 불편을 주는 것을 최소화시킬 수 킬 수 있게 하는 지주 설치용 조립식 기초판에 관한 것이다.The present invention relates to a prefabricated base plate for installation of struts, and more specifically, to form the formwork for the strut installation of concrete plate of the standard directly assembled in the site where the struts are installed and then reclaimed and poured concrete (pouring concrete The present invention relates to a prefabricated base plate for installation of struts, which can reduce the construction air and construction costs as well as minimize the inconvenience of pedestrian traffic.

일반적으로 전봇대, 신호등, 가로등, 현수막 등을 설치시키기 위하여는 지중에 지주를 매립시켜야 한다.Generally, in order to install power poles, traffic lights, street lamps, banners, etc., landowners should be buried underground.

이러한 지주가 견고하고 확고하게 시설물을 지탱하기 위하여는 지주가 지중에 견고하게 매립 설치되어야 함은 물론이다.Of course, in order for these landlords to firmly and firmly support their facilities, landlords must be installed in the ground.

종래 상기와 같은 지주를 설치함에 있어서는 지주가 설치된 곳을 구덩이를 파고, 그 구덩이의 내부에 거푸집을 설치하고, 상기 거푸집의 내부에 콘크리트를 타설하여 기초를 형성시키며, 기초의 상부에 지주와 연결되는 앵커를 매립시켜 기초를 형성시켜 왔다.In the conventional installation of such a support, digging a pit where the support is installed, installing a formwork in the interior of the pit, pouring concrete into the form of the formwork to form a foundation, connected to the support in the upper portion of the foundation Anchors have been embedded to form the foundation.

그러나 이와 같은 종래의 기초 형성방법은 별도의 거푸집을 필요로 하고, 타설된 콘크리트가 양생되는 동안 기초의 주변에 파헤쳐진 구덩이를 그대로 유지하다가 콘크리트의 양생이 완료되면 거푸집을 제거하고 구덩이를 다시 메꾸어야 되는 등 상당한 공사기간이 소요됨은 물론 기초공사 기간 내내 공사 현장을 운행하는 차량과 보행장의 통행에 많은 불편함을 전가시키거나 작업장 주변환경 미관을 해치는 문제점이 있었다.However, this conventional method of forming the foundation requires a separate formwork, while maintaining the pit dug around the foundation while the poured concrete is being cured, and removing the formwork and refilling the pit when curing of the concrete is completed. There is a problem that it takes a considerable period of construction, such as a lot of discomfort in the passage of vehicles and pedestrians running the construction site throughout the foundation period, or hurt the aesthetics of the surrounding environment.

이러한 종래의 문제점을 해결하기 위한 종래의 또 다른 방법으로 콘크리트 제조 공장에서 다량의 기초를 제작하고, 완성된 기초를 지주가 설치되는 현장으로 이송한 후에 기초를 지중에 매립시키는 방법이 시도되었다.As another conventional method for solving such a conventional problem, a method of manufacturing a large amount of foundation in a concrete manufacturing plant, transferring the completed foundation to the site where the post is installed, and then embedding the foundation in the ground was attempted.

그러나 이와 같은 기초 설치방법은 현장에서의 공사기간을 단축시킬 수 있으나, 중량체인 기초를 작업현장으로 이송시키는데 많은 운송비용이 소요되고, 작업현장에서는 중량체인 기초를 이동 설치시킬 수 있는 크레인과 같은 중장비를 필요로 하여 기초설치작업에 많은 제한이 있는 것이다.However, this basic installation method can shorten the construction period in the field, but it takes a lot of transportation cost to transfer the heavy chain foundation to the work site, and heavy equipment such as a crane that can move and install the heavy chain foundation at the work site. There are many limitations to the basic installation work.

또한 이미 완성된 기초를 사용함에 따라 현장의 설치 조건에 따라 기초의 크기 및 형상 등을 적절하게 변경시킬 수 없는 단점도 있는 것이다.In addition, there is a disadvantage that can not properly change the size and shape of the foundation according to the installation conditions of the site, as the already used foundation.

본 발명은 전술한 문제점을 해결하기 위해 안출된 것으로서, 본 발명은 지주가 설치되는 작업현장에서 기초를 형성시키는 기초판을 조립시키고, 곧바로 매립한 후 앵커와 콘크리트를 타설하거나 또는 조립인 완료된 기초판의 내부에 지주와 연결되는 앵커와 함께 콘크리트를 타설시킨 후 곧바로 구덩이를 메꿀 수 있게 하여 기초형성작업을 신속하고 편리하게 할 수 있게 하는 지주 설치용 조립식 기초판을 제공함에 그 목적이 있다.The present invention has been made to solve the above-described problems, the present invention is to assemble the base plate to form the foundation at the site where the strut is installed, and immediately after filling the anchor and concrete, or assembled base plate completed It is an object of the present invention to provide a prefabricated base plate for installation of a strut so that the foundation can be quickly and conveniently formed by pouring concrete after anchoring concrete together with anchors connected to the strut.

본 발명의 또 다른 목적은 지중에 매립 설치되는 기초가 지중내에 보다 확고하게 설치될 수 있게 하여 기초에 설치되는 지주를 견고하게 지지할 수 있게 하는 지주 설치용 조립식 기초판을 제공함에 있다. It is still another object of the present invention to provide a prefabricated base plate for installation of struts, which enables the foundation to be buried in the ground to be more firmly installed in the ground so as to firmly support the struts installed on the foundation.

본 발명은 상기와 같은 목적을 달성하기 위해서 다음과 같이 구성된다. 즉, 본 발명은 지주 설치용 조립식 기초판을 구성함에 있어서, 기초판의 주연에 또 다 른 기초판과 연결되는 브라켓을 형성시켜 구성되는 것에 특징을 둔 것이다.The present invention is configured as follows to achieve the above object. That is, the present invention is characterized in that it is configured by forming a bracket connected to another base plate on the periphery of the base plate in the construction of the prefabricated base plate for installation of the strut.

이하에서는 첨부 도면을 참조하여 본 발명의 바람직한 실시 예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1a,1b는 본 발명에 따른 기초판의 사시 및 분리사시도이고, 도 2는 본 발명 기초판 연결장치 다른 실시예도이고, 도 3은 본 발명에 따른 기초판의 또 다른 실시예도이고, 도 4는 본 발명 기초판 연결장치의 연장블록 실시예도이며, 도 5a,5b,5c는 본 발명 기초판의 시공도이다.Figure 1a, 1b is a perspective view and a separate perspective view of the base plate according to the invention, Figure 2 is another embodiment of the base plate connecting device of the present invention, Figure 3 is another embodiment of the base plate according to the invention, Figure 4 Is an embodiment of an extension block of the base plate connecting device of the present invention, Figures 5a, 5b, 5c is a construction of the base plate of the present invention.

도 1a,1b에 도시된 바와 같이, 본 발명은 지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시켜 구성되는 것으로, 상기 연결장치(2)는 기초판(1)의 단부에 일단이 매립되는 브라켓(21)으로 구성하여 이에 이웃하는 기초판과 볼트(너트) 체결로 조립 할 수 있고, 또 도 2와 같이 각 기초판(1) 외측면에 서로 연결되는 다수의 홈(22)을 구비하여 조립후 상기 홈으로 밴드부재(반생)(23)를 감아 조립할 수도 있으며, 또 도 3과 같이 기초판(1)의 주연에 다수의 서로 물리어(교합되게 엇물림) 결합되는 요철부(24)를 형성시켜 이들을 교합시켜 조립하는 등 다양한 방법을 채택할 수 있다.As shown in Figs. 1A and 1B, the present invention is configured by forming a connecting device 2 connected to another base plate 1 at the periphery of the base plate 1 in forming a support mounting base. In addition, the connecting device 2 is composed of a bracket 21 having one end embedded in the end of the base plate 1 and can be assembled by fastening the bolts (nuts) and the base plate neighboring thereto, as shown in FIG. The base plate 1 may include a plurality of grooves 22 connected to each other on the outer side of the base plate 1 and then be assembled by winding a band member (half) 23 into the grooves, and as shown in FIG. 3. Various methods can be adopted, such as forming a concave-convex portion 24 that is coupled to each other by bite (or bite interlocking) at the periphery and assemble them by assembling them.

또한 상기 기초판(1)은 콘크리트로 구성되는 것이 바람직하나 이에 국한되지 않고 합성수지, 금속 등 다양한 재질의 것으로도 가능하다.In addition, the base plate 1 is preferably composed of concrete, but is not limited thereto, and may be made of various materials such as synthetic resin and metal.

그리고 상기 기초판(1)의 형상은 도면에 도시되는 바와 같이, 사다리꼴을 형상으로 형성시킬 수도 있으며, 삼각형, 원호형, 사각형 등과 같은 다양한 형상으로 현장에 맞게 형성시킬 수 있다. And the shape of the base plate 1 may be formed in a trapezoidal shape, as shown in the figure, it can be formed in various shapes, such as triangles, arcs, squares, etc. to suit the site.

그리고 상기 기초판(1)에는 도 5a,5b,5c와 같이 다수의 통공(3)을 형성시켜 조립이 완료된 기초판(1)의 내부에 콘크리트를 타설할 때 타설되는 콘트리트가 상기 통공(3)을 통하여 기초판(1)의 외부로 노출될 수 있게 하여 형성되는 기초(5)가 지중에 보다 견고하게 설치될 수 있게 구성하였다.In the base plate 1, a plurality of through holes 3 are formed as shown in FIGS. 5A, 5B and 5C, and concrete poured when concrete is poured into the inside of the assembled base plate 1 is completed. Through the base plate (5) formed to be exposed to the outside of the base plate (1) was configured to be installed more firmly in the ground.

설치되는 지주의 크기에 따라 기초의 크기도 늘려야 할 경우에는 도 4와 같이 상기 기초의 하부에 연결되는 연장블록을 별도로 구성하여 이를 활용 할 수가 있다. 이때 상기 연장블록은 상기 조립된 기초판(1)의 하부와 연결시켜 일체화 되도록 하는데, 이는 상기 기초판(1)을 연결하기 위해 설치되는 브라켓(21)을 상기 각 기초판(1)의 하부와 상기 연장블록(10)의 상부에 매립설치하여 볼트와 너트의 체결로 일체화 시키도록 구성한다. 이때 연장블록(10)은 상기 기초판(1)의 두께보다 조금 넓게 구성하여 기초판(1)이 보다 안정되게 안착되도록 하는 것이 바람직하다.When it is necessary to increase the size of the foundation in accordance with the size of the post to be installed can be utilized by separately configuring an extension block connected to the lower portion of the foundation as shown in FIG. In this case, the extension block is integrated with the lower part of the assembled base plate 1, which is connected to the lower part of each base plate 1 by a bracket 21 installed to connect the base plate 1. It is installed to be embedded in the upper portion of the extension block 10 to be integrated by fastening the bolt and nut. At this time, the extension block 10 is preferably configured to be slightly wider than the thickness of the base plate 1 so that the base plate 1 is more stable seated.

이와 같이 구성되는 본 발명은 도 5a,5b,5c와 같이 지주(8)를 설치될 곳에 터파기를 파고, 그 구덩이 내부에 소정의 형상을 이루도록 전술한 연결장치로 기초판(1)을 조립시킨다. 즉, 기초판(1)의 주변에 형성되는 브라켓(2)을 인접하는 또 다른 기초판(1)의 브라켓(2)에 밀착시키고 반생 또는 볼트/너트를 이용하여 각각의 기초판(1)을 연결시키거나, 둘레에 형성된 홈(22)에 밴드부재(23)를 감거나, 또는 요철(24)을 교합시켜 조립한다.5A, 5B, and 5C, the present invention constructed as described above digs a trench where the support 8 is to be installed, and assembles the base plate 1 with the above-described connecting device to form a predetermined shape inside the pit. That is, the bracket 2 formed around the base plate 1 is brought into close contact with the bracket 2 of another adjacent base plate 1, and each base plate 1 is attached to each other using a half-life or bolts / nuts. The band member 23 is wound around the groove 22 formed around the periphery, or the concave-convex 24 is assembled.

이와 같은 본 발명의 기초판(1) 조립은 좌/우로는 물론이고, 상/하 방향으로 도 조립시킬 수 있어 현장의 조건에 따라 형성되는 기초(5)의 형상을 다양하게 변경시킬 수 있고, 그 크기와 높이 또한 자유자재로 조정할 수 있는 것이다.Such assembling the base plate 1 of the present invention can be assembled not only in the left and right, but also in the up / down direction, so that the shape of the base 5 formed according to the site conditions can be variously changed. Its size and height can also be adjusted freely.

기초판(1)의 조립이 완료되면 상기 기초판(1)의 개구부만 노출되도록 하여 매립한 후 앵커(6)를 설치하고 상기 개구부를 통해 기초판(1) 내부에 콘크리트를 타설한다. When the assembly of the base plate (1) is completed, only the opening of the base plate (1) is exposed to embed and then anchor (6) is installed and concrete is poured into the base plate (1) through the opening.

또 다른 방법으로, 조립이 완료된 기초판(1)의 내부에 배선용 배관(7)과 앵커(6)를 설치시키고, 콘크리트를 타설시킨다. 콘크리트의 타설작업이 완료되면 타설된 콘크리트가 양생되기를 기다리지 않고 곧 바로 구덩이를 메꾼다.As another method, the wiring piping 7 and the anchor 6 are installed in the inside of the base plate 1 with which assembly is completed, and the concrete is poured. When the concrete is finished, the pit is filled immediately without waiting for the poured concrete to cure.

상기 콘크리트 타설 후 여타의 기초공사와 같이 거푸집을 제거하듯이 상기 기초판(1)을 제거하지 않는다. 이는 타설된 콘크리트와 일체가 되어 하나의 몸체를 이루기 때문이다.After the concrete is poured, the foundation plate 1 is not removed as the formwork is removed like other foundation works. This is because it is integrated with the poured concrete to form a body.

이어 타설된 콘크리트의 양생이 완료되면 기초(5)의 상부로 노출된 앵커(6)에 지주(8)를 연결시키는 것으로 지주의 설치작업이 완료된다.Then, when curing of the poured concrete is completed, the installation work of the support is completed by connecting the support 8 to the anchor 6 exposed to the upper part of the foundation 5.

본 발명은 전술한 실시 예에 국한되지 않고 본 발명의 기술사상이 허용하는 범위 내에서 다양하게 변형하여 실시할 수가 있다.The present invention is not limited to the above embodiments, and various modifications can be made within the scope of the technical idea of the present invention.

이상에서와 같이 본 발명에 따르면 지주가 설치되는 작업현장에서 기초를 형성시키는 기초판을 조립시키고, 조립인 완료된 기초판의 내부에 지주와 연결되는 앵커와 함께 콘크리트를 타설시킨 후 곧바로 구덩이를 메꿀 수 있어 기초를 형성하는 공사기간을 대폭적으로 단축시킬 수 있는 것이다. 이는 공사비용은 절감시킴은 물론이고 공사로 인하여 차량과 보행자의 통행을 방해하는 것을 최소화시킬 수 있는 효과가 있다. 또한 지중에 매립 설치되는 기초가 지중내에 보다 확고하게 설치될 수 있어 기초에 설치되는 지주를 보다 견고하게 지지할 수 있는 효과가 있다.As described above, according to the present invention, assembling the base plate to form the foundation in the work site where the post is installed, and after pouring concrete with anchors connected to the support in the interior of the completed base plate that is assembled can fill the pit immediately Therefore, the construction period to form the foundation can be greatly shortened. This not only reduces the construction cost but also has the effect of minimizing the obstruction of traffic of vehicles and pedestrians due to construction. In addition, the foundation to be buried in the ground can be installed more firmly in the ground has the effect that can support more firmly installed on the foundation.

Claims (8)

지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시키되,In forming the foundation for holding the strut, at the periphery of the foundation plate 1 is formed a connecting device 2 connected with another foundation plate 1, 상기 기초판(1)의 하부에 연결되는 연장블록(10)을 더 구성하여 된 것을 특징으로 하는 지주 설치용 조립식 기초판.Prefabricated base plate for holding installation, characterized in that it further comprises an extension block 10 connected to the lower portion of the base plate (1). 지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시키되,In forming the foundation for holding the strut, at the periphery of the foundation plate 1 is formed a connecting device 2 connected with another foundation plate 1, 상기 연결장치(2)는 기초판(1)의 단부에 일단이 매립되는 브라켓(21)을 구성하고, The connecting device 2 constitutes a bracket 21 having one end embedded in an end of the base plate 1, 상기 기초판(1)의 하부에 연결되는 연장블록(10)을 더 구성하여 된 것을 특징으로 하는 지주 설치용 조립식 기초판.Prefabricated base plate for holding installation, characterized in that further comprises an extension block 10 connected to the lower portion of the base plate (1). 지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시키되,In forming the foundation for holding the strut, at the periphery of the foundation plate 1 is formed a connecting device 2 connected with another foundation plate 1, 상기 연결장치(2)는 기초판(1) 외측면에 다수의 홈(22)과, 조립후 상기 홈에 감겨지는 밴드부재(23)로 이루어지며,The connecting device 2 consists of a plurality of grooves 22 on the outer surface of the base plate 1, and a band member 23 wound around the grooves after assembly, 상기 기초판(1)의 하부에 연결되는 연장블록(10)을 더 구성하여 된 것을 특징으로 하는 지주 설치용 조립식 기초판.Prefabricated base plate for holding installation, characterized in that it further comprises an extension block 10 connected to the lower portion of the base plate (1). 지주 설치용 기초를 형성함에 있어서, 기초판(1)의 주연에 또 다른 기초판(1)과 연결되는 연결장치(2)를 형성시키되,In forming the foundation for holding the strut, at the periphery of the foundation plate 1 is formed a connecting device 2 connected with another foundation plate 1, 상기 연결장치(2)는 기초판(1) 양측부에 연결되는 다른 기초판(1)과 교합되는 요철부(24)를 형성하고,The connecting device 2 forms an uneven portion 24 engaged with other base plates 1 connected to both sides of the base plate 1, 상기 기초판(1)의 하부에 연결되는 연장블록(10)을 더 구성하여 된 것을 특징으로 하는 지주 설치용 조립식 기초판.Prefabricated base plate for holding installation, characterized in that it further comprises an extension block 10 connected to the lower portion of the base plate (1). 삭제delete 삭제delete 삭제delete 삭제delete
KR1020050036910A 2005-05-03 2005-05-03 Prefabricated base plate for prop installation and construction method Expired - Fee Related KR100719950B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050036910A KR100719950B1 (en) 2005-05-03 2005-05-03 Prefabricated base plate for prop installation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050036910A KR100719950B1 (en) 2005-05-03 2005-05-03 Prefabricated base plate for prop installation and construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0012437U Division KR200391038Y1 (en) 2005-05-03 2005-05-03 Fabricated baseplate for post

Publications (2)

Publication Number Publication Date
KR20060114790A KR20060114790A (en) 2006-11-08
KR100719950B1 true KR100719950B1 (en) 2007-06-07

Family

ID=37652362

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050036910A Expired - Fee Related KR100719950B1 (en) 2005-05-03 2005-05-03 Prefabricated base plate for prop installation and construction method

Country Status (1)

Country Link
KR (1) KR100719950B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101178092B1 (en) * 2010-08-25 2012-08-30 주식회사 현암 Multi-purpose light pole cover with road guide function
KR101351462B1 (en) 2013-10-07 2014-01-14 주식회사 지에스웹 Construction method for supporting post of viewing facility for natural scene

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100828657B1 (en) * 2007-01-29 2008-05-09 임화목 Formwork structure to provide the foundation structure for easy installation of street light
KR100859660B1 (en) * 2007-03-22 2008-09-23 김진호 Strut fixing base of road facility
CN108005099B (en) * 2017-11-24 2023-08-15 国网江苏省电力公司南京供电公司 Prefabricated assembled concrete stepped foundation for pole tower and assembling method thereof
KR200494594Y1 (en) * 2017-11-29 2021-11-11 제진수 Structures for support

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001082819A (en) * 1999-09-14 2001-03-30 Hitachi Plant Eng & Constr Co Ltd Air conditioning equipment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001082819A (en) * 1999-09-14 2001-03-30 Hitachi Plant Eng & Constr Co Ltd Air conditioning equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
등록실용신안공보 제20-0182819호

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101178092B1 (en) * 2010-08-25 2012-08-30 주식회사 현암 Multi-purpose light pole cover with road guide function
KR101351462B1 (en) 2013-10-07 2014-01-14 주식회사 지에스웹 Construction method for supporting post of viewing facility for natural scene

Also Published As

Publication number Publication date
KR20060114790A (en) 2006-11-08

Similar Documents

Publication Publication Date Title
KR100885131B1 (en) Column fixing structure and construction method
KR100991886B1 (en) Pillar fixing structure
KR100775816B1 (en) Street lamps that can be easily separated from the foundation structure
KR100947852B1 (en) Combination structure of street lamp lantern and base
KR101837951B1 (en) Pile for securing the post of the road facility
KR100719950B1 (en) Prefabricated base plate for prop installation and construction method
KR100828657B1 (en) Formwork structure to provide the foundation structure for easy installation of street light
KR20100055031A (en) The foundation a streetlight for nstallation
KR20110137644A (en) Column fixing structure and construction method
KR200391038Y1 (en) Fabricated baseplate for post
KR100905889B1 (en) Structural Structure for Lantern Installation
KR20190010947A (en) Base plate upside buried integral concrete foundation block
KR101193312B1 (en) Three-segment assembly retaining wall
KR101668056B1 (en) Base block for installing the street light posts
KR20100033750A (en) A fixing structure of electric and construction method thereof
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR20060114604A (en) Prefabricated base plate for prop installation and construction method
US7721490B1 (en) System and method for installing a base for a roadside utility pole
KR100824740B1 (en) Boundary stone for pedestrian safety and its construction method
KR100920127B1 (en) Structural Structure and Construction Method for Road Traffic Facilities
JP2004084184A (en) Precast continuous foundation for guard fence
KR20090083978A (en) Construction method of prefabricated foundation for body installation of wind power generator
KR100374487B1 (en) The prop for barricade and the construction method of it
KR20110017141A (en) Landfill type foundation structure and installation method of lamppost
KR200348534Y1 (en) Wing type of footpath block

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

P15-X000 Request for amendment of ip right document rejected

St.27 status event code: A-5-5-P10-P15-nap-X000

P15-X000 Request for amendment of ip right document rejected

St.27 status event code: A-5-5-P10-P15-nap-X000

FPAY Annual fee payment

Payment date: 20100514

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20110515

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20110515

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000