KR100588445B1 - Method for installation of environment friendly electric utility pole - Google Patents
Method for installation of environment friendly electric utility pole Download PDFInfo
- Publication number
- KR100588445B1 KR100588445B1 KR1020050087826A KR20050087826A KR100588445B1 KR 100588445 B1 KR100588445 B1 KR 100588445B1 KR 1020050087826 A KR1020050087826 A KR 1020050087826A KR 20050087826 A KR20050087826 A KR 20050087826A KR 100588445 B1 KR100588445 B1 KR 100588445B1
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- concrete structure
- space
- ground
- foundation
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
본 발명은 환경친화적 전주 설치 공법에 관한 것으로서, 특히 저면 테두리에 원형의 플랜지를 구비하고, 상기 주 콘크리트 구조물을 형성하기 위해 콘크리트의 타설시 내부로 콘크리트가 유입되도록 하단부 측면에 콘크리트 유입홀을 구비하며, 콘크리트주, 강관주, FRP주중 선택된 어느 하나이며, 일체형으로 형성되거나 또는 다단으로 분리되는 분리형으로 형성되는 전주 및 콘크리트 구조물을 지중에 매설하며, 전주의 설치 공법에 있어서; 지중에 수직으로 터파기를 하여 공간부를 형성하고, 상기 공간부에서 콘크리트를 타설시 서로 동일한 형태의 상, 하부 플레이트에 수직으로 복수의 니은자형태의 앵커 볼트가 결합되고 상기 기초 콘크리트 구조물에 삽입시 상기 하부 플레이트가 상기 기초 콘크리트 구조물 내부에 위치하고 상기 상부 플레이트의 저면이 상기 기초 콘크리트 구조물의 상면과 면접 또는 이격되는 형성되는 체결 부재를 삽입하여 기초 콘크리트 구조물을 형성한 다음, 상기 전주의 저면을 상기 체결 부재에서 수평이 유지되도록 체결한 후 상기 공간부에서 콘크리트를 타설하여 상기 기초 콘크리트 구조물 상단에 주 콘크리트 구조물을 형성하는 것을 특징으로 한다.The present invention relates to an environmentally friendly electric pole installation method, in particular, having a circular flange on the bottom edge, and has a concrete inlet hole on the side of the lower end so that the concrete flows into the interior when the concrete is poured to form the main concrete structure , Concrete column, steel pipe column, FRP column, any one selected from the integral or formed into a separate type divided into multi-stage embedded poles and concrete structures in the ground, the installation method of the pole; To form a space by vertically dig in the ground, when placing concrete in the space, a plurality of needle-shaped anchor bolts are vertically coupled to the upper and lower plates of the same shape and inserted into the base concrete structure A bottom plate is placed inside the foundation concrete structure and a foundation member is formed by inserting a fastening member that is formed in which a bottom surface of the top plate is interviewed or spaced from an upper surface of the foundation concrete structure. After fastening so that the horizontal is maintained in the space portion, the concrete is characterized in that to form the main concrete structure on top of the base concrete structure.
상기와 같은 본 발명에 따르면 지면에서 수직으로 터파기를 한 후, 터파기된 공간에서 기초 콘크리트 구조물과 체결 부재를 함께 양생한 다음 체결 부재에 기둥을 고정시켜 수평을 맞추고, 수평이 이루어지면 다시 터파기된 공간에서 기둥의 저부 및 내부에 콘크리트를 타설하여 주 콘트리트 구조물을 양생시킨 후 터파기된 공간에 흙을 채워 콘크리트 구조물 및 기둥 하부가 지중으로 매설되도록 함으로써 친환경적으로 전주를 설치할 수 있다.According to the present invention as described above, after digging vertically from the ground, curing the foundation concrete structure and the fastening member together in the exploded space and then fixed the column to the fastening member to level the horizontal, if the horizontal is made again After placing concrete in the bottom and inside of the pillar in the space, the main concrete structure is cured and filled with soil in the burrowed space so that the concrete structure and the bottom of the pillar are buried under the ground.
전주, 환경, 친화, 수평, 체결 부재, 콘크리트, 유입홀 Electric pole, environment, friendly, horizontal, fastening member, concrete, inflow hole
Description
도 1은 종래의 전주 설치의 구성을 나타낸 단면도,1 is a cross-sectional view showing the configuration of a conventional pole installation;
도 2는 종래의 환경친화적 조립식전주의 구성을 나타낸 사시도,Figure 2 is a perspective view showing the configuration of a conventional environmentally friendly prefabricated pole,
도 3은 종래의 전주의 설치공법 및 그 지지구의 구성을 나타낸 단면도,3 is a cross-sectional view showing the configuration of a conventional pole pole installation method and its support,
도 4는 본 발명의 환경친화적 전주 설치 공법에 따른 전주의 구성을 나타낸 사시도,Figure 4 is a perspective view showing the configuration of the pole pole according to the environmentally friendly pole installation method of the present invention,
도 5는 본 발명의 환경친화적 전주 설치 공법에 따른 체결 부재의 구성을 나타낸 사시도,Figure 5 is a perspective view showing the configuration of the fastening member according to the environmentally friendly pole installation method of the present invention,
도 6a~도 6e는 본 발명에 따른 환경친화적 전주 설치 공법의 과정을 나타낸 단면도.6a to 6e is a cross-sectional view showing a process of environmentally friendly pole installation method according to the present invention.
<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>
101 : 공간부 110 : 전주101: space section 110: Jeonju
113 : 콘크리트 유입홀 120 : 체결 부재113: concrete inlet hole 120: fastening member
121, 123 : 상, 하부 플레이트 130 : 기초 콘크리트 구조물121, 123: upper, lower plate 130: foundation concrete structure
140 : 주 콘크리트 구조물140: main concrete structure
본 발명은 환경친화적 전주 설치 공법에 관한 것으로서, 상세하게는 전주의 설치 과정에서 수평을 유지하도록 하고, 콘크리트 구조물 및 기둥 하부가 지중으로 매설되도록 하는 환경친화적 전주 설치 공법에 관한 것이다.The present invention relates to an environmentally friendly pole installation method, and more particularly to an environmentally friendly pole installation method to maintain the level in the installation process of the pole and to be buried under the concrete structure and the pillar.
일반적으로 전주라 함은 배전선이나 통신용 중계기 등의 통신장비가 설치되어 하부가 지하에 매립되어 고정되는 기둥을 말한다.In general, a pole is a column in which communication equipment such as distribution lines or communication repeaters is installed and the lower part is buried and fixed in the basement.
이러한 전주는 도 1에 도시된 바와 같이 지중에 앵커볼트(1)가 형성된 콘크리트 기초 구조물(3)이 지상으로 돌출되도록 형성한 후, 기둥(5) 하단에 형성된 플랜지(7)를 앵커볼트(1)에 삽입하여 기둥을 고정하는 방식으로 형성된다.This pole is formed as shown in Figure 1 to form a concrete foundation structure (3) formed with an anchor bolt (1) in the ground to protrude to the ground, the anchor bolt (1) formed at the bottom of the column (5) anchor bolt (1) It is formed in such a way that the pillar is fixed by insertion.
그러나, 이러한 전주는 기초 구조물과 기둥 하단의 플랜지가 지상으로 노출되는 형태이기 때문에 미관을 저해하는 요소로 작용하는 문제점이 있다.However, this pole has a problem that acts as a factor that inhibits aesthetics because the base structure and the flange of the bottom of the pillar is exposed to the ground.
상기와 같은 문제점을 해결하기 위하여 본 출원인에 의해 선출원된 실용신안등록 제356616호 "환경친화적 조립식전주"에 의하면, 도 2에 도시된 바와 같이 하부기둥(10)의 하부 외주면에 다수 개의 파이프삽입홀(13)이 형성되어 있고, 파이프삽입홀(13)을 관통하는 다수 개의 파이프(60)와, 상기 파이프삽입홀(13)에 삽입되어 있는 파이프(60)를 하부기둥(10)에 고정시키는 파이프고정부재(70)를 구비하여 보다 견고하게 하부기둥(10)을 기초에 고정시킬 수 있다. 그런 다음 하부기둥(10)에 순차적으로 중간기둥(20)과 상부기둥(40)을 결합시킨다.According to Utility Model Registration No. 356616 "Environmentally Friendly Prefabricated Pole" filed by the applicant to solve the above problems, a plurality of pipe insertion holes are provided on the lower outer peripheral surface of the
위와 같은 방법은 기초 형성을 위해 콘크리트 타설시 콘크리트가 하부기둥 (10)을 관통하고 있는 파이프(60)에 채워져 하부기둥(10)이 보다 견고하게 기초(80)에 고정되게 하는 방법이다. 또한, 파이프고정부재(70)는 파이프삽입홀(13)을 관통하고 있는 파이프(60)가 콘크리트 타설시 밀려 이동하는 것을 방지하기 위한 것으로 다양한 형태로 형성할 수 있다.The above method is a method in which the concrete is filled in the
이외에도 국내 특허 0274747호 "전주의 설치공법 및 그 지지구"에 의하면, 도 3에 도시된 바와 같이 차도(11)와 인도(12)의 경계구역에 매설된 하수관(13)을 기준으로, 매립공간부(14)를 형성한 후, 그 공간부(14)의 하수관(13) 상부선까지 콘크리트(15)를 내입하여 타설한 후, 이에 전주(16) 지지용 파이프체(2)와 보강 받침판(3)을 갖는 지지구를 입설하고, 다시 공간부(14)의 상부가지 콘크리트(15)를 타설하여 지지구와 콘크리트(15)가 일체가 되도록 양생시킨 후 전기한 지지구의 파이프체(2)에 전주(16)를 삽입하여 고정함을 특징으로 하는 전주의 설치공법.차도(11)와 인도(12)의 경계구역에 매설된 하수관(13)을 기준으로, 매립공간부(14)를 형성한 후, 그 공간부(14)의 하수관(13) 상부선까지 콘크리트(15)를 내입하여 타설한 후, 이에 전주(16) 지지용 파이프체(2)와 보강 받침판(3)을 갖는 지지구를 입설하고, 다시 공간부(14)의 상부가지 콘크리트(15)를 타설하여 지지구와 콘크리트(15)가 일체가 되도록 양생시킨 후 전기한 지지구의 파이프체(2)에 전주(16)를 삽입하여 고정한다.In addition, according to Korean Patent No. 0274747 "Jeonju installation method and its support," as shown in Figure 3, the landfill space based on the
그러나, 상기와 같이 기둥 또는 지지구를 고정시 별도의 고정 수단없이 직접 콘크리트를 이용하여 고정시키기 때문에 수평을 정확히 맞추기가 어렵고, 콘크리트의 타설 또는 양생 과정에서 기둥이 기울어질 수도 있는 문제점이 있다.However, when fixing the column or the support as described above using a concrete directly without a separate fixing means it is difficult to accurately level, there is a problem that the column may be inclined during the casting or curing process of concrete.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 지면에서 수직으로 터파기를 한 후, 터파기된 공간에서 기초 콘크리트 구조물과 체결 부재를 함께 양생한 다음 체결 부재에 기둥을 고정시켜 수평을 맞추고, 수평이 이루어지면 다시 터파기된 공간에서 기둥의 저부 및 내부에 콘크리트를 타설하여 주 콘트리트 구조물을 양생시킨 후 터파기된 공간에 흙을 채워 콘크리트 구조물 및 기둥 하부가 지중으로 매설되도록 함으로써 친환경적으로 전주를 설치할 수 있도록 하는 환경친화적 전주 설치 공법을 제공하는데 그 목적이 있다.The present invention is to solve the problems as described above, and after digging vertically from the ground, curing the foundation concrete structure and the fastening member together in the exploded space and then leveling the horizontal by fixing the column to the fastening member, horizontal When this is done, concrete is laid in the bottom and inside of the pillar in the burrowed space to cure the main concrete structure, and the soil is embedded in the burrowed space so that the concrete structure and the bottom of the pillar are buried under the ground. The purpose is to provide an environmentally friendly installation method for the installation.
상기와 같은 목적을 달성하기 위한 본 발명의 특징은,Features of the present invention for achieving the above object,
저면 테두리에 원형의 플랜지를 구비하고, 상기 주 콘크리트 구조물을 형성하기 위해 콘크리트의 타설시 내부로 콘크리트가 유입되도록 하단부 측면에 콘크리트 유입홀을 구비하며, 콘크리트주, 강관주, FRP주중 선택된 어느 하나이며, 일체형으로 형성되거나 또는 다단으로 분리되는 분리형으로 형성되는 전주 및 콘크리트 구조물을 지중에 매설하며, 전주의 설치 공법에 있어서; 지중에 수직으로 터파기를 하여 공간부를 형성하고, 상기 공간부에서 콘크리트를 타설시 서로 동일한 형태의 상, 하부 플레이트에 수직으로 복수의 니은자형태의 앵커 볼트가 결합되고 상기 기초 콘크리트 구조물에 삽입시 상기 하부 플레이트가 상기 기초 콘크리트 구조물 내부에 위치하고 상기 상부 플레이트의 저면이 상기 기초 콘크리트 구조물의 상면과 면접 또는 이격되는 형성되는 체결 부재를 삽입하여 기초 콘크리트 구조물을 형성한 다음, 상기 전주의 저면을 상기 체결 부재에서 수평이 유지되도록 체결한 후 상기 공간부에서 콘크리트를 타설하여 상기 기초 콘크리트 구조물 상단에 주 콘크리트 구조물을 형성하는 것을 특징으로 한다.It is provided with a circular flange at the bottom edge, and has a concrete inlet hole at the side of the lower end so that concrete is introduced into the concrete when the concrete is poured to form the main concrete structure. In the ground, embedded poles and concrete structures formed integrally formed or separated into multiple stages are embedded in the ground, the installation method of the pole; To form a space by vertically dig in the ground, when placing concrete in the space, a plurality of needle-shaped anchor bolts are vertically coupled to the upper and lower plates of the same shape and inserted into the base concrete structure A bottom plate is placed inside the foundation concrete structure and a foundation member is formed by inserting a fastening member that is formed in which a bottom surface of the top plate is interviewed or spaced from an upper surface of the foundation concrete structure. After fastening so that the horizontal is maintained in the space portion, the concrete is characterized in that to form the main concrete structure on top of the base concrete structure.
삭제delete
삭제delete
삭제delete
여기에서 또, 상기 기초 콘크리트 구조물과 상기 주 콘크리트 구조물은 철(凸)자 형태로 형성된다.Here, the basic concrete structure and the main concrete structure is formed in the form of iron.
이하, 본 발명에 따른 환경친화적 전주 설치 공법의 설치 과정을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the installation process of the environmentally friendly electric pole installation method according to the present invention will be described in detail with reference to the accompanying drawings.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. Terms to be described later are terms defined in consideration of functions in the present invention, and may be changed according to intentions or customs of users or operators. Therefore, the definition should be made based on the contents throughout the specification.
도 4는 본 발명의 환경친화적 전주 설치 공법에 따른 전주의 구성을 나타낸 사시도이고, 도 5는 본 발명의 환경친화적 전주 설치 공법에 따른 체결 부재의 구성을 나타낸 사시도이며, 도 6a~도 6e는 본 발명에 따른 환경친화적 전주 설치 공법의 과정을 나타낸 단면도이다.Figure 4 is a perspective view showing the configuration of the pole pole according to the environmentally friendly pole installation method of the present invention, Figure 5 is a perspective view showing the configuration of the fastening member according to the environment-friendly pole pole installation method of the present invention, Figures 6a to 6e It is sectional drawing which shows the process of environmentally friendly pole installation method which concerns on this invention.
도 4 내지 도 6e를 참조하면, 본 발명에 따른 환경친화적 전주 설치 공법은 전주(110)와, 체결 부재(120)가 마련된다.4 to 6E, the environmentally friendly electric pole installation method according to the present invention is provided with the
먼저, 전주(110)는 도 4에 도시된 바와 같이 저면 테두리에 원형의 플랜지(111)를 구비하고, 주 콘크리트 구조물(140)을 형성하기 위해 콘크리트의 타설시 내부로 콘크리트가 유입되도록 하단부 측면에 콘크리트 유입홀(113)을 구비한다. 여기에서, 전주(110)는 콘크리트주, 강관주, FRP주중 선택된 어느 하나이며, 일체형으로 형성되거나 또는 다단으로 분리되는 분리형으로 형성된다. 또한, 전주(110)가 삽입되는 지지구 형태로 형성될 수도 있다.First, the
그리고, 체결 부재(120)는 도 5에 도시된 바와 같이 서로 동일한 형태의 상, 하부 플레이트(121, 123)에 수직으로 복수의 니은자형태의 앵커 볼트(125)가 결합되고, 기초 콘크리트 구조물(130)에 삽입시 하부 플레이트(123)가 기초 콘크리트 구조물(130) 내부에 위치하고, 상부 플레이트(121)의 저면이 기초 콘크리트 구조물(130)의 상면과 면접 또는 이격된다.In addition, the
이하, 본 발명에 따른 환경친화적 전주 설치 공법의 과정을 설명하면, 먼저, 지면에서 수직으로 터파기 작업을 통해 기초 콘크리트 구조물(130)과 주 콘크리트 구조물(140)이 형성될 수 있는 공간부(101)를 만든다.Hereinafter, the process of environmentally friendly electric pole installation method according to the present invention, first, the
그런 다음, 공간부(101)의 저면에 기초 콘크리트 구조물(130)과, 주 콘크리트 구조물(140)을 지지하는 철근을 함께 배근하고, 거푸집을 설치한 다음 체결 부재(120)를 중앙부에 위치시킨 후 콘크리트를 타설한다. 이때, 체결 부재(120)는 수평을 유지시킨 상태에서 철근에 고정시키는 것이 바람직하며, 콘크리트는 기초 콘 크리트 구조물(130)만을 형성하도록 타설한다.Then, the
그리고, 체결 부재(120)는 상기에서 설명한 바와 같이 하부 플레이트(123)가 기초 콘크리트 구조물(130)내로 삽입되고, 상부 플레이트(121)의 저면이 기초 콘크리트 구조물(130)의 상면과 면접 또는 이격되도록 설치된다.As described above, the
콘크리트가 타설되어 기초 콘크리트 구조물(130)의 양생이 완료되면, 체결 부재(120)의 앵커 볼트(125)에 전주의 하단에 형성된 플랜지(111)를 볼트에 의해 체결하되, 체결시 전주(110)가 수평을 유지하도록 한다.When the concrete is poured and the curing of the
전주(110)의 체결이 완료되면, 다시 콘크리트를 타설하여 기초 콘크리트 구조물(130) 상면에 주 콘크리트 구조물(140)이 형성되도록 한다.When the fastening of the
이때, 주 콘크리트 구조물(140)을 형성하기 위해 콘크리트를 타설하는 경우 전주(110)의 콘크리트 유입홀(113)로 콘크리트가 유입되기 때문에, 전주 내부가 콘크리트로 채워져 내부 공간이 없어 유동 및 변형이 방지된다.In this case, when concrete is poured to form the
주 콘크리트 구조물(140)의 양생이 완료되면 공간부(101)에 흙을 채워 지면을 다져 작업을 완료한다.When the curing of the
그러면, 전주가 수평을 유지한 상태에서 콘크리트 구조물에 의해 지지된 상태로 전주의 하단만이 지면으로 돌출되기 때문에 견고하면서도 수평을 유지하고, 미관이 수려하다.Then, since the lower end of the pole is protruded to the ground in a state in which the pole is supported by the concrete structure in the horizontal state, it is firm and horizontal and the beauty is beautiful.
상기와 같이 구성되는 본 발명인 환경친화적 전주 설치 공법에 따르면, 지면에서 수직으로 터파기를 한 후, 터파기된 공간에서 기초 콘크리트 구조물과 체결 부재를 함께 양생한 다음 체결 부재에 기둥을 고정시켜 수평을 맞추고, 수평이 이루어지면 다시 터파기된 공간에서 기둥의 저부 및 내부에 콘크리트를 타설하여 주 콘트리트 구조물을 양생시킨 후 터파기된 공간에 흙을 채워 콘크리트 구조물 및 기둥 하부가 지중으로 매설되도록 함으로써 친환경적으로 전주를 설치할 수 있다.According to the environmentally friendly electric pole installation method of the present invention constituted as described above, after the vertical excavation from the ground, curing the foundation concrete structure and the fastening member together in the exploded space and then leveling the column by fixing the column to the fastening member When leveling is achieved, the concrete is placed in the bottom and inside of the column in the burrowed space to cure the main concrete structure, and then the soil is filled in the burrowed space so that the concrete structure and the bottom of the column are buried underground. Can be installed.
본 발명은 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있으며 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다. 하지만 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.As those skilled in the art would realize, the described embodiments may be modified in various ways, all without departing from the spirit or scope of the present invention. It is to be understood, however, that the present invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. Should be.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050087826A KR100588445B1 (en) | 2005-09-21 | 2005-09-21 | Method for installation of environment friendly electric utility pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050087826A KR100588445B1 (en) | 2005-09-21 | 2005-09-21 | Method for installation of environment friendly electric utility pole |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100588445B1 true KR100588445B1 (en) | 2006-06-12 |
Family
ID=37182599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050087826A KR100588445B1 (en) | 2005-09-21 | 2005-09-21 | Method for installation of environment friendly electric utility pole |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100588445B1 (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100725844B1 (en) | 2006-04-10 | 2007-06-08 | (주)극동메탈휀스 | the fence-supporting anchor |
KR101062399B1 (en) * | 2011-03-03 | 2011-09-05 | 주식회사 태성 | Method of planting of road lamp pole for under the ground |
KR101111079B1 (en) * | 2009-11-12 | 2012-02-24 | 주식회사 스페이스테크놀로지 | Floating structure using steel pipe pile |
KR101131829B1 (en) | 2009-02-26 | 2012-03-30 | 엘아이지건설 주식회사 | base plate and RCreinforce concrete construction method |
KR101125748B1 (en) | 2009-08-03 | 2012-04-12 | 안병준 | Combination structure of prop and plate |
CN103437630A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Track door motor installation structure |
CN103437619A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Track door installation structure |
CN103437644A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Embedded part for side hung door installation |
CN104032767A (en) * | 2014-06-20 | 2014-09-10 | 天津二十冶建设有限公司 | Tower crane foundation in deep foundation pit and construction method of tower crane foundation |
CN107201755A (en) * | 2017-05-26 | 2017-09-26 | 中国电力科学研究院 | A kind of concurrent air spring pole design method for considering pile-soil interaction |
CN107476636A (en) * | 2017-09-30 | 2017-12-15 | 贵州大兴电力设备制造有限公司 | A kind of electric pole anti-climbing device |
CN108775193A (en) * | 2018-07-03 | 2018-11-09 | 镇江市高等专科学校 | A kind of line bar builds ground stabilizing base |
KR102112575B1 (en) * | 2019-11-15 | 2020-05-19 | 주식회사 가야산업 | Foundation for fence post and method of construction thereof |
KR102646052B1 (en) * | 2023-06-23 | 2024-03-08 | 손숙주 | Rigidity Reinforced Street Light |
-
2005
- 2005-09-21 KR KR1020050087826A patent/KR100588445B1/en not_active IP Right Cessation
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100725844B1 (en) | 2006-04-10 | 2007-06-08 | (주)극동메탈휀스 | the fence-supporting anchor |
KR101131829B1 (en) | 2009-02-26 | 2012-03-30 | 엘아이지건설 주식회사 | base plate and RCreinforce concrete construction method |
KR101125748B1 (en) | 2009-08-03 | 2012-04-12 | 안병준 | Combination structure of prop and plate |
KR101111079B1 (en) * | 2009-11-12 | 2012-02-24 | 주식회사 스페이스테크놀로지 | Floating structure using steel pipe pile |
KR101062399B1 (en) * | 2011-03-03 | 2011-09-05 | 주식회사 태성 | Method of planting of road lamp pole for under the ground |
CN103437619A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Track door installation structure |
CN103437630A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Track door motor installation structure |
CN103437644A (en) * | 2013-08-28 | 2013-12-11 | 张家港固耐特围栏系统有限公司 | Embedded part for side hung door installation |
CN104032767A (en) * | 2014-06-20 | 2014-09-10 | 天津二十冶建设有限公司 | Tower crane foundation in deep foundation pit and construction method of tower crane foundation |
CN107201755A (en) * | 2017-05-26 | 2017-09-26 | 中国电力科学研究院 | A kind of concurrent air spring pole design method for considering pile-soil interaction |
CN107476636A (en) * | 2017-09-30 | 2017-12-15 | 贵州大兴电力设备制造有限公司 | A kind of electric pole anti-climbing device |
CN108775193A (en) * | 2018-07-03 | 2018-11-09 | 镇江市高等专科学校 | A kind of line bar builds ground stabilizing base |
CN108775193B (en) * | 2018-07-03 | 2024-03-26 | 镇江市高等专科学校 | Ground stabilization base is built to line pole |
KR102112575B1 (en) * | 2019-11-15 | 2020-05-19 | 주식회사 가야산업 | Foundation for fence post and method of construction thereof |
KR102646052B1 (en) * | 2023-06-23 | 2024-03-08 | 손숙주 | Rigidity Reinforced Street Light |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100588445B1 (en) | Method for installation of environment friendly electric utility pole | |
KR101105092B1 (en) | A precast retaining panel and construction method of the same with half pc type backfill | |
KR100982819B1 (en) | A prefabricated drain-road | |
KR101176937B1 (en) | Underground reclamation type water storage tank having a assembling structure and its constructing method | |
KR100645024B1 (en) | a precast structure for pillar | |
KR20180115098A (en) | Prefabricated culvert | |
KR20080002652U (en) | Iron Pole Base | |
KR200375997Y1 (en) | a precast structure for pillar | |
KR20090084038A (en) | A fabric of pillar and method for executing thereof | |
KR101039341B1 (en) | Pile structure and construction method for foundation using the same | |
KR101799237B1 (en) | Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same | |
KR100823348B1 (en) | Installation method of a retaining wall | |
KR200275363Y1 (en) | The mold establishment necessit do not exist assembly road water pipe | |
KR200339018Y1 (en) | Manhole for underground electric power distribution manufactured from precast concrete | |
KR20130142443A (en) | Foundation construction of bus stop using concrete block and method for constructionn the same | |
KR100374487B1 (en) | The prop for barricade and the construction method of it | |
KR200241078Y1 (en) | A pillar for interception | |
KR100657887B1 (en) | Supporting structure for laying of field facilities | |
KR100274747B1 (en) | Method for installation of electric pole and supporting device of the same | |
KR20130002676U (en) | A concrete multibase of post | |
JP5000771B2 (en) | Septic tank installation structure | |
KR102026112B1 (en) | Pre-cast concrete segment blocks for vertical structures with various bracket connection means | |
KR20090083978A (en) | Method of constructing sectional base for body in wind turbine | |
KR101318301B1 (en) | Frame structure for underground structure and method of constructing underground structure using the same | |
KR102330106B1 (en) | Method of manufacturing structure of septic tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130510 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140509 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150511 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160510 Year of fee payment: 11 |
|
LAPS | Lapse due to unpaid annual fee |