KR200375997Y1 - a precast structure for pillar - Google Patents
a precast structure for pillar Download PDFInfo
- Publication number
- KR200375997Y1 KR200375997Y1 KR20-2004-0031997U KR20040031997U KR200375997Y1 KR 200375997 Y1 KR200375997 Y1 KR 200375997Y1 KR 20040031997 U KR20040031997 U KR 20040031997U KR 200375997 Y1 KR200375997 Y1 KR 200375997Y1
- Authority
- KR
- South Korea
- Prior art keywords
- case
- pillar
- fixed
- concrete
- support
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2238—Sockets or holders for poles or posts to be placed on the ground
- E04H12/2246—Sockets or holders for poles or posts to be placed on the ground filled with water, sand or the like
Abstract
본 고안은 기둥부재 고정용 프리캐스트 구조물에 관한 것으로서, 더욱 상세하게는 앵커볼트가 돌출되도록 일체로 사출 성형된 케이스의 상부에 덮개와 기둥을 고정시킬 수 있는 받침대가 고정되어 케이스 내부에 콘크리트를 타설하여 양생시킨 후 현장으로 운반하거나 현장에서 케이스의 내부에 콘크리트나 중량체를 투입하여 지반에 매설하면 매우 간편하게 기둥을 설치할 수 있도록 한 고안에 관한 것이다.The present invention relates to a precast structure for fixing a pillar member, and more specifically, a pedestal for fixing a cover and a pillar is fixed to an upper portion of an integrally injection-molded case so that the anchor bolt protrudes, thereby placing concrete in the case. After curing and transporting to the site or on the site in the case of concrete or heavy materials put into the ground by embedding on the ground, it is related to the devised so that the pillar can be installed very easily.
전술한 본 고안은, 케이스(10)의 상부에는 앵커볼트(11)들이 고정되어 상부로 돌출되고, 개방된 케이스(10)의 상부에는 앵커볼트(11) 체결공(21)들이 뚫려진 덮개(20)가 결합되며, 덮개(20)에는 볼트 체결공(31)이 뚫려진 받침판(30)이 결합되어 앵커볼트(11)에 나사 결합되는 너트(51)로 고정되고, 받침판(30) 중앙에 형성된 지지관(32)에는 기둥(40)이 삽입 고정되며, 지반에 매설되는 케이스(10)의 내부에는 콘크리트(60)가 타설되거나 중량체(61)가 투입되도록 한 것을 특징으로 하는 기둥부재 고정용 프리캐스트 구조물에 의하여 달성될 수 있는 것이다.The present invention described above, the anchor bolt 11 is fixed to the upper portion of the case 10 is projected to the upper, the upper cover of the anchor bolt 11, the fastening hole 21 is a cover ( 20 is coupled, the support plate 30, the bolt fastening hole 31 is drilled to the cover 20 is fixed with a nut 51 screwed to the anchor bolt 11, in the center of the support plate 30 The pillar 40 is inserted into and fixed to the formed support tube 32, and the pillar member is fixed to the interior of the case 10 embedded in the ground, in which concrete 60 is poured or a weight body 61 is introduced. It can be achieved by the dragon precast structure.
Description
본 고안은 기둥부재 고정용 프리캐스트 구조물에 관한 것으로서, 더욱 상세하게는 앵커볼트가 돌출되도록 일체로 사출 성형된 케이스의 상부에 덮개와 기둥을 고정시킬 수 있는 받침대가 고정되어 케이스 내부에 콘크리트를 타설하여 양생시킨 후 현장으로 운반하거나 현장에서 케이스의 내부에 콘크리트나 중량체를 투입하여 지반에 매설하면 매우 간편하게 기둥을 설치할 수 있도록 한 고안에 관한 것이다.The present invention relates to a precast structure for fixing a pillar member, and more specifically, a pedestal for fixing a cover and a pillar is fixed to an upper portion of an integrally injection-molded case so that the anchor bolt protrudes, thereby placing concrete in the case. After curing and transporting to the site or on the site in the case of concrete or heavy materials put into the ground by embedding on the ground, it is related to the devised so that the pillar can be installed very easily.
일반적으로 전주, 가로등, 광고장치의 기둥과 같이 각종 기둥을 가로(街路)에 설치하는 경우에는 주로 사방에 앵커볼트가 용접된 철골 구조물을 지반에 매설한 후 콘크리트를 타설하여 기초를 고정시킨 후 돌출되는 앵커볼트에 기둥의 받침판을 결합하여 너트로 고정시키는 구성으로 되어 있다.In general, in case of installing various pillars such as poles, street lamps, and pillars of advertisement devices on the ground, steel structures with anchor bolts welded on all sides are embedded in the ground, and then concrete is laid to fix the foundation. Combining the support plate of the column to the anchor bolt to be fixed with a nut.
그러나, 전술한 바와 같이 현장에서 콘크리트를 타설하여 기초를 매설하는 경우에는 콘크리트 운송용 레미콘 차량 및 운송용 도로(道路)가 필요하였을 뿐 아니라 작업자들이 일일이 시멘트, 모래, 자갈을 물로 반죽하여 콘크리트를 타설하는 번거로운 작업과정을 거쳐야하는 것이므로 결국 작업자의 수가 증가되고, 콘크리트의 양생(養生)에 상당한 시간이 소요되어 작업의 효율을 높여줄 수 없었다.However, as described above, when laying the foundation by placing concrete on the site, not only the concrete ready-mixed concrete vehicle and the road for transport were needed, but also the workers had to knead cement, sand, and gravel with water to place concrete. Since the work process must go through, the number of workers eventually increased, and it took considerable time to cure concrete, which could not improve the work efficiency.
경우에 따라서는 공장에서 앵커볼트를 용접한 철골구조물을 거푸집에 넣고 콘크리트를 타설하여 양생시킨 프리캐스트 구조의 콘크리트 기초를 미리 제작하여 두었다가 필요시 현장으로 운송한 후 지반에 매설하여 기둥을 설치할 수도 있다.In some cases, precast concrete foundations made by placing steel structures welded with anchor bolts at the factory in the formwork and pouring concrete can be prepared in advance and transported to the site and installed in the ground after installation. .
그러나, 전술한 바와 같이 프리캐스트 구조의 콘크리트 기초를 사용하는 경우에는 양생된 콘크리트 덩어리의 중량이 무거워 운반작업이 어렵고 상당한 물류비가 지출되는 등의 폐단이 발생되었을 뿐 아니라 단순하게 콘크리트 덩어리를 지반에 매설하는 것이므로 기둥이 설치되는 작업장의 현장 조건에 따라 다양하게 대처할 수 없었다.However, when using the concrete foundation of the precast structure as described above, the cured concrete mass is heavy, which makes it difficult to transport and cost a considerable logistics cost. Because of this, it could not cope variously according to the site conditions of the workshop where the column is installed.
본 고안은 상기한 문제점을 감안하여 창안한 것으로서, 그 목적은 앵커볼트가 돌출되도록 일체로 사출 성형된 케이스의 상부에 덮개와 기둥을 고정시킬 수 있는 받침대가 고정되어 케이스 내부에 콘크리트를 타설하여 양생시킨 후 현장으로 운반하거나 현장에서 케이스의 내부에 콘크리트나 중량체를 투입하여 지반에 매설하면 매우 간편하게 기둥을 설치할 수 있는 기둥부재 고정용 프리캐스트 구조물을 제공함에 있는 것이다.The present invention was devised in view of the above-mentioned problems, and its purpose is to fix the cover and the pillar on the upper part of the integrally injection-molded case so that the anchor bolt is protruded to cure concrete by pouring concrete into the case. It is to provide a precast structure for fixing a pillar member that can be installed on the ground after transporting to the site or by placing concrete or heavy body in the case at the site and laying it on the ground.
상기한 목적을 달성하기 위한 본 고안의 특징은, 케이스(10)의 상부에는 앵커볼트(11)들이 고정되어 상부로 돌출되고, 개방된 케이스(10)의 상부에는 앵커볼트(11) 체결공(21)들이 뚫려진 덮개(20)가 결합되며, 덮개(20)에는 볼트 체결공(31)이 뚫려진 받침판(30)이 결합되어 앵커볼트(11)에 나사 결합되는 너트(51)로 고정되고, 받침판(30) 중앙에 형성된 지지관(32)에는 기둥(40)이 삽입 고정되며, 지반에 매설되는 케이스(10)의 내부에는 콘크리트(60)가 타설되거나 중량체(61)가 투입되도록 한 것을 특징으로 하는 기둥부재 고정용 프리캐스트 구조물에 의하여 달성될 수 있는 것이다. Features of the present invention for achieving the above object, the anchor bolts 11 are fixed to the upper portion of the case 10 protrudes to the top, the anchor bolt 11 fastening hole (on the top of the open case 10 ( 21 is coupled to the cover 20 is drilled, the support plate 30 is a bolt fastening hole 31 is coupled to the cover 20 is fixed by a nut 51 screwed to the anchor bolt 11 The pillar 40 is inserted into and fixed to the support tube 32 formed at the center of the support plate 30, and the concrete 60 is poured into the interior of the case 10 embedded in the ground or the weight 61 is introduced. It can be achieved by a precast structure for fixing the pillar member.
이하, 상기한 목적을 달성하기 위한 바람직한 실시예를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, described in detail by the accompanying drawings a preferred embodiment for achieving the above object is as follows.
도 1 내지는 도 6에서 도시한 바와 같이, 본 고안에 의한 프리캐스트 구조물은 상부가 개방된 케이스(10)로 구성되어 있고, 케이스(10)는 상부가 넓고 아래로 갈수록 폭이 좁아지는 역 사다리꼴 형상의 입방체로 구성되어 있다.As shown in Figure 1 to Figure 6, the precast structure according to the present invention is composed of a case 10 having an open top, the case 10 is a reverse trapezoidal shape that is wider at the top and narrower toward the bottom It consists of cubes.
그러나, 상기 케이스(10)는 원추형, 원통형 등으로 형성할 수 있는 것이므로 본 고안에서는 케이스(10)의 형상에 국한되는 것은 아니다.However, since the case 10 may be formed in a conical shape, a cylindrical shape, or the like, the present invention is not limited to the shape of the case 10.
상기 케이스(10)의 상부 사방에는 앵커볼트(11)들이 고정되어 상부로 돌출 형성되어 있고, 앵커볼트(11)들은 케이스를 사출 성형할 때 일체로 형성된다.Anchor bolts 11 are fixed to the upper sides of the case 10 to protrude upward, and the anchor bolts 11 are integrally formed when injection molding the case.
물론, 경우에 따라서는 상기 케이스(10)를 금속으로 제작하여 앵커볼트(11)를 용접하여 고정시킬 수 있는 것이므로 본 고안은 케이스(10)의 제작방법에 국한되는 것은 아니다.Of course, in some cases, the case 10 is made of metal so that the anchor bolt 11 can be fixed by welding, the present invention is not limited to the case 10 manufacturing method.
상기 케이스(10)의 상부에는 덮개(20)가 결합되어 있고, 덮개(20)의 사방에 뚫려진 체결공(21)들이 앵커볼트(11)들에 관통 삽입되어 결합된다.The cover 20 is coupled to the upper portion of the case 10, and fastening holes 21 drilled in all directions of the cover 20 are inserted into and coupled to the anchor bolts 11.
상기 케이스(10)의 내부에는 보강용 심재(12)가 수직으로 세워져 있고, 케이스(10)의 외측면에는 복수의 지지편(13)들이 돌출 형성되어 있다.A reinforcing core 12 is erected vertically inside the case 10, and a plurality of support pieces 13 protrude from the outer surface of the case 10.
상기 보강용 심재(12)는 케이스(10) 내부에 콘크리트(60)가 타설되었을 때 콘크리트(60)를 케이스(10)의 결속력을 높여 주고 견고한 결합이 이루어 질 수 있도록 한다.The reinforcing core material 12 increases the binding force of the concrete 60 to the case 10 when the concrete 60 is poured into the case 10 and allows a firm coupling to be made.
상기 케이스(10)의 외부면으로 돌출된 지지편(13)들은 케이스(10)를 지반에 매설한 후 지반을 다졌을 때 케이스(10)의 균형을 유지하여 기둥(40)의 넘어짐을 방지하고, 지지편(13)의 걸림 작용에 의하여 지반에서 견고한 매설이 이루어질 수 있도록 하는 역할을 수행할 수 있도록 되어 있다.The support pieces 13 protruding to the outer surface of the case 10 after the case 10 is embedded in the ground to maintain the balance of the case 10 when the ground is compacted to prevent the fall of the column 40 , By the engaging action of the support piece 13 is to be able to play a role to make a solid buried in the ground.
상기 케이스(10)와 덮개(20)는 강화 플라스틱 등으로 이루어진 합성수지를 사출 성형하여 형성된다.The case 10 and the cover 20 are formed by injection molding a synthetic resin made of reinforced plastic or the like.
한편, 바람직하기로는 상기 앵커볼트(11)의 하부에 외측으로 굽힘된 절곡부(11a)가 형성되어 케이스(10)를 사출 성형할 때 절곡부(11a)가 지지편(13)의 내부에 삽입되도록 하면 앵커볼트(11)를 더욱 견고하게 고정시킬 수 있는 등의 이점이 있는 것이다.On the other hand, preferably, the bent portion 11a which is bent outwardly is formed at the bottom of the anchor bolt 11 so that the bent portion 11a is inserted into the support piece 13 when injection molding the case 10. If so, there is an advantage such that the anchor bolt 11 can be more firmly fixed.
상기 덮개(20)의 상부에는 받침판(30)이 결합되어 있고, 받침판(30)의 사방에 뚫려진 체결공(31)들이 앵커볼트(11)들에 관통 삽입된 후 나사 결합되어 조임되는 너트(51)들에 의하여 견고하게 고정된다.The support plate 30 is coupled to the upper portion of the cover 20, the fastening holes 31 bored on all sides of the support plate 30 are inserted through the anchor bolts 11 and then screwed to tighten the nut ( 51) are firmly fixed.
상기 받침판(30)의 상부 중앙에는 지지관(32)이 형성되어 있고, 지지관(32)에는 기둥(40)이 결합되어 견고하게 고정된다.The support tube 32 is formed in the upper center of the support plate 30, the pillar 40 is coupled to the support tube 32 is firmly fixed.
상기 지지관(32)의 외부면에는 받침판(30)과 연결되는 보강용 리브(32a)가 형성되어 지지관(32)의 구조를 견고하게 유지할 수 있도록 되어 있고, 지지관(32)의 내부에는 가이드관(33)이 수직으로 고정되어 지지관(32)에 결합된 기둥(40)의 내부를 견고하게 지지할 수 있도록 되어 있다.A reinforcing rib 32a is formed on the outer surface of the support tube 32 to be connected to the support plate 30 so that the structure of the support tube 32 can be maintained firmly. The guide tube 33 is vertically fixed to firmly support the inside of the column 40 coupled to the support tube 32.
상기 지지관(32), 가이드관(33), 기둥(40)에는 고정볼트(50)가 관통 결합되어 너트(51)로 조임되어 기둥을 견고하게 고정시킬 수 있도록 되어 있다.A fixing bolt 50 is coupled to the support tube 32, the guide tube 33, and the pillar 40 so as to be tightly fastened by a nut 51 to firmly fix the pillar.
상기 받침판(30)과 지지관(32)은 금속 재질로 형성되어 용접에 의하여 고정된다. 이와 같이 받침판(30)에 형성된 지지관(32)에 기둥(40)을 결합시키는 경우에는 기둥의 하부에 받침판이 일체로 형성되어 콘크리트 기초의 앵커볼트에 결합되도록 하는 종래의 작업방법 보다 기둥(40)의 설치가 매우 간편하게 이루어질 수 있는 등의 이점이 있는 것이다.The support plate 30 and the support tube 32 are formed of a metal material and are fixed by welding. When the column 40 is coupled to the support tube 32 formed on the support plate 30 as described above, the support plate 32 is integrally formed at the bottom of the column so that the column 40 is coupled to the anchor bolt of the concrete foundation. ) Has the advantage that it can be made very easy.
상기 케이스(10)는 지반에 매설되고, 케이스(10)의 내부에는 콘크리트가 타설되거나 자갈이나 흙과 같은 중량체(61)가 투입되어 세워진 기둥을 안정적으로 지지할 수 있도록 되어 있다.The case 10 is buried in the ground, and the inside of the case 10 is to be able to stably support the pillars are built by placing concrete, or weights 61, such as gravel or soil.
이상에서는 본 고안의 바람직한 실시예에 대하여 도시하고 또한 설명하였으나, 본 고안은 상기한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 고안의 요지를 벗어남이 없이 당해 본 고안이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.In the above described and illustrated with respect to the preferred embodiment of the present invention, the present invention is not limited to the above-described embodiment, it is common in the field to which the present invention belongs without departing from the spirit of the present invention claimed in the claims. Various modifications can be made by those skilled in the art, and such modifications are intended to fall within the scope of the appended claims.
이상에서 상술한 바와 같은 본 고안은, 케이스(10)의 내부에 콘크리트(60)를 주입하여 양생시킨 후 덮개(20)와 받침판(30)을 결합하여 너트(51)로 고정시킨 프리캐스트 구조물을 대량으로 준비하였다가 필요한 곳으로 기둥과 함께 운반하여 지반을 파서 케이스(10)를 매설하고 지지관(32)에 기둥(40)을 삽입하여 고정시키기만 하면 기둥(40)의 설치가 신속 간편하게 완료되는 것이므로 최소의 인원으로 신속하게 기둥을 설치하여 작업의 효율을 최대한 높여줄 수 있을 뿐 아니라 별도의 콘크리트 타설용 레미콘 차량을 준비하거나 현장에서 콘크리트를 타설하는 번거로운 작업과정이 필요가 없는 것이므로 종래의 제반 문제점들이 완벽하게 해소되어 기둥 설치작업의 대외 경쟁력을 최대한 높여줄 수 있는 등의 이점이 있는 것이다. The present invention as described above, the precast structure fixed by the nut 51 by combining the cover 20 and the support plate 30 after curing by injecting concrete 60 into the case 10. The mass is prepared and transported together with the column to the required place, and the ground is dug to bury the case 10 and insert the column 40 into the support tube 32 to fix the installation of the column 40 quickly and simply. Since it is possible to install the column quickly with the minimum number of people, the efficiency of the work can be increased as well as the need for preparing a separate concrete placing concrete vehicle or placing the concrete in the field is not necessary. Problems have been completely solved, such as to increase the external competitiveness of the pillar installation work as possible.
또한, 작업 조건에 따라서 차량의 진입이 어려워 작업자들이 프리캐스트 구조물을 직접 운반해야 하는 경우에는 콘크리트가 타설되지 않은 가벼운 중량의 케이스(10)와 기둥(40)을 목적지까지 운반한 후 현장에서 조달이 가능한 자갈이나 흙과 같은 중량체(61)들을 케이스(10)의 내부에 투입하여 무겁게 한 상태에서 케이스(10)를 지반에 매설한 후 지지관(32)에 기둥(40)을 결합시키기만 하면 매우 간편하게 기둥(40)의 설치가 완료되는 것이므로 작업의 조건에 따라서 케이스(10) 내부에 콘크리트(60)나 흙과 같은 중량체(61)들을 선택하여 투입시킬 수 있는 것으로서 사용의 범위를 넓혀서 보다 다양하게 활용할 수 있는 것이다.In addition, if the vehicle is difficult to enter according to the working conditions, and workers have to transport the precast structure directly, the case 10 and the pillar 40 of light weight, in which concrete is not poured, are transported to the destination and procured on site. Just put the weight (61), such as gravel or soil into the case (10) inside the case 10 in a heavy state to bury the case (10) on the ground and then simply combine the column 40 to the support tube (32) Since the installation of the column 40 is completed very easily, the weights 61 such as concrete 60 or soil can be selected and introduced into the case 10 according to the conditions of the work. It can be used in various ways.
도 1은 본 고안의 일실시예를 예시한 사시도,1 is a perspective view illustrating an embodiment of the present invention,
도 2는 본 고안의 일실시예를 예시한 분해사시도,Figure 2 is an exploded perspective view illustrating an embodiment of the present invention,
도 3은 본 고안의 일실시예를 예시한 단면도,3 is a cross-sectional view illustrating an embodiment of the present invention;
도 4는 본 고안이 지반에 매설된 상태를 예시한 단면도,4 is a cross-sectional view illustrating a state in which the present invention is embedded in the ground,
도 5는 본 고안이 지반에 매설된 상태의 다른 실시예를 예시한 단면도,Figure 5 is a cross-sectional view illustrating another embodiment of the present invention buried in the ground,
도 6은 본 고안의 사용상태를 예시한 사시도.6 is a perspective view illustrating a use state of the present invention.
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 케이스 11 : 앵커볼트10 case 11 anchor bolt
11a : 절곡부 12 : 심재11a bend 12 heartwood
13 : 지지편 20 : 덮개13: support piece 20: cover
21, 31 : 체결공 30 : 받침판21, 31: fastener 30: support plate
32 : 지지관 32a : 리브32: support tube 32a: rib
33 : 가이드관 40 : 기둥33: guide tube 40: pillar
50 : 고정볼트 51 : 너트50: fixing bolt 51: nut
60 : 콘크리트 61 : 중량체60 concrete 61 weight
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0031997U KR200375997Y1 (en) | 2004-11-12 | 2004-11-12 | a precast structure for pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0031997U KR200375997Y1 (en) | 2004-11-12 | 2004-11-12 | a precast structure for pillar |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040092260A Division KR100645024B1 (en) | 2004-11-12 | 2004-11-12 | a precast structure for pillar |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200375997Y1 true KR200375997Y1 (en) | 2005-03-11 |
Family
ID=43677793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0031997U KR200375997Y1 (en) | 2004-11-12 | 2004-11-12 | a precast structure for pillar |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200375997Y1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100762976B1 (en) | 2006-02-23 | 2007-10-02 | 정해상 | A blocks for traffic sign and a method for working thereof |
KR100976095B1 (en) * | 2010-01-19 | 2010-08-16 | 주식회사 신한빛 | Pole supporter of road lighter |
KR20170011280A (en) * | 2015-07-22 | 2017-02-02 | 박세현 | variable type fixing device of the pole for a street Lights |
KR101983239B1 (en) | 2019-01-11 | 2019-05-29 | (주)웅진엔지니어링 | Base assembly for steel pipe mast |
KR20190002728U (en) * | 2017-11-29 | 2019-10-31 | 제진수 | Structures for support |
-
2004
- 2004-11-12 KR KR20-2004-0031997U patent/KR200375997Y1/en not_active IP Right Cessation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100762976B1 (en) | 2006-02-23 | 2007-10-02 | 정해상 | A blocks for traffic sign and a method for working thereof |
KR100976095B1 (en) * | 2010-01-19 | 2010-08-16 | 주식회사 신한빛 | Pole supporter of road lighter |
KR20170011280A (en) * | 2015-07-22 | 2017-02-02 | 박세현 | variable type fixing device of the pole for a street Lights |
KR101707487B1 (en) * | 2015-07-22 | 2017-02-16 | 박세현 | variable type fixing device of the pole for a street Lights |
KR20190002728U (en) * | 2017-11-29 | 2019-10-31 | 제진수 | Structures for support |
KR200494594Y1 (en) * | 2017-11-29 | 2021-11-11 | 제진수 | Structures for support |
KR101983239B1 (en) | 2019-01-11 | 2019-05-29 | (주)웅진엔지니어링 | Base assembly for steel pipe mast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100588445B1 (en) | Method for installation of environment friendly electric utility pole | |
US9284710B2 (en) | Prefabricated concrete pole base and adjustable connector | |
US7191569B2 (en) | Telescoping pier foundation | |
US6176055B1 (en) | Modular foundation system | |
US20130036678A1 (en) | Prefabricated concrete pole base and adjustable connector | |
KR100645024B1 (en) | a precast structure for pillar | |
KR101837951B1 (en) | Pile for securing the post of the road facility | |
KR200375997Y1 (en) | a precast structure for pillar | |
US20070212172A1 (en) | Telescoping pier foundation | |
KR100799848B1 (en) | In place assembling top type block | |
KR100774885B1 (en) | The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method | |
KR100472106B1 (en) | A concrete absolutely-type merger septic tank structure and an assembly set and the construction way to establish the above-mentioned merger septic tank structure | |
KR101011372B1 (en) | The foundation a streetlight for nstallation | |
KR200257289Y1 (en) | The concrete form constructed basic concrete structure of pole in electric railroads | |
KR20110137644A (en) | A fixing structure of pillar and construction method thereof | |
KR102120849B1 (en) | Installation structure and method of precast concrete culvert | |
KR20160012670A (en) | Rebar connecting implement and concrete embeded construction method of the same | |
KR20180115098A (en) | Prefabricated culvert | |
KR101482585B1 (en) | Post foundation block structure | |
KR101799237B1 (en) | Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same | |
JPH11124865A (en) | Foundation of columnar structure | |
KR101980152B1 (en) | Composite foundation structure for post and construction method for post using the same | |
KR200205758Y1 (en) | The prop for barricade | |
KR101530601B1 (en) | Method for a patterned concrete pannel and method for manufacturing a retaining wall including the same, and patterned concrete pannel | |
KR101003855B1 (en) | Structure of road sign frame and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20051206 Year of fee payment: 3 |
|
EXTG | Extinguishment |