KR20100042446A - A fixing structure of pillar and construction method thereof - Google Patents

A fixing structure of pillar and construction method thereof Download PDF

Info

Publication number
KR20100042446A
KR20100042446A KR1020080101598A KR20080101598A KR20100042446A KR 20100042446 A KR20100042446 A KR 20100042446A KR 1020080101598 A KR1020080101598 A KR 1020080101598A KR 20080101598 A KR20080101598 A KR 20080101598A KR 20100042446 A KR20100042446 A KR 20100042446A
Authority
KR
South Korea
Prior art keywords
tubular support
pillar
column
concrete foundation
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
KR1020080101598A
Other languages
Korean (ko)
Inventor
유조웅
Original Assignee
대실종합건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대실종합건설 주식회사 filed Critical 대실종합건설 주식회사
Priority to KR1020080101598A priority Critical patent/KR20100042446A/en
Publication of KR20100042446A publication Critical patent/KR20100042446A/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/165Shapes polygonal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Signs Or Road Markings (AREA)
  • Foundations (AREA)

Abstract

본 발명은 시설물의 기둥을 설치하는 기둥 정착구조 및 그 시공방법에 관한 것으로서, 콘크리트 기초 구조물(11)의 중앙 중공부에 매립되어 고정된 관형 지지체(10)와, 상기 관형 지지체(10)에 삽입되어 고정되는 기둥(20)과, 상기 관형 지지체(10)에 기둥(20)을 체결 고정하는 체결수단(30)과; 걸림홈(15)에 걸리는 기둥의 걸이구(40) 및; 상기 관형 지지체(10)와 기둥(20)의 지상 체결 고정부위에 씌워지는 캡(50)으로 이루어져 프리캐스트 콘크리트(PC)로 제작되는 콘크리트 기초 구조물에 매립된 관형 지지체에 기둥의 하부를 삽입하여 고정함으로써 시공이 용이하여 시공에 소요되는 시간과 인력의 감소로 시공비용을 현저하게 절감되어 경제성이 탁월하고, 기둥을 설치할 때에 지상에 다수의 앵커 볼트와 앵커 너트를 사용하지 않으므로 앵커 볼트나 너트의 부식으로 인한 수명단축 없이 장기간 사용할 수 있어 수명이 길뿐만 아니라 분리가 용이하여 보수작업을 적은 비용으로 단시간에 간단히 할 수 있고, 가로등 등의 기둥이 인도로 많이 들어가지 않고 차도에 매우 가깝게 설치되어 보도를 걷는 보행자의 불편을 줄일 수 있으면서도 외관이 미려하며, 기둥의 신호등, 도로표지판 등을 인도로 돌려서 작업하므로서 차량의 통행을 차단함이 없이 시공할 수 있는 각별한 장점이 있는 유용한 발명이다.The present invention relates to a column fixing structure for installing a pillar of a facility and a construction method thereof, the tubular support (10) embedded in a central hollow portion of a concrete foundation structure (11) and inserted into the tubular support (10) And fixed to the pillar 20 and fastening means 30 for fastening and fixing the pillar 20 to the tubular support 10; Hanging hole 40 of the pillar to be caught in the locking groove 15; The cap 50 is formed on the ground fastening fixing part of the tubular support 10 and the pillar 20 to be fixed by inserting a lower portion of the column into a tubular support embedded in a concrete foundation structure made of precast concrete (PC). As construction is easy, the cost of construction is remarkably reduced due to the reduction of time and manpower required for construction, and it is excellent in economic efficiency. Corrosion of anchor bolt or nut is not necessary because many anchor bolts and anchor nuts are not used on the ground when installing pillars. It can be used for a long time without shortening its lifespan, so it is not only long, but also easy to remove, so that maintenance work can be simplified in a short time with low cost, and pillars such as street lamps are installed very close to the roadway without entering much sidewalks. It can reduce the inconvenience of walking pedestrians, but it is also beautiful in appearance. In turn is a useful invention that has particular advantage to the construction without blocking the passage of working hameuroseo vehicle.

Description

기둥 정착구조 및 그 시공방법{A fixing structure of pillar and construction method thereof}A fixing structure of pillar and construction method

본 발명은 도로의 교통 신호등, 가로등, 도로표지판, 씨씨티비(CCTV), 강관전주 등 시설물의 기둥을 설치하는 기둥 정착구조에 관한 것으로서, 더욱 상세하게는 프리캐스트 콘크리트(PC)로 제작되는 지하 콘크리트 기초 구조물에 매립된 관형 지지체가 기둥의 하부에 삽입되어 고정됨으로써 시공이 용이하여 공기의 단축과 시공비용을 현저하게 절감할 수 있는 기둥 정착구조 및 그 시공방법에 관한 것이다. The present invention relates to a column fixing structure for installing pillars of facilities such as traffic lights, street lamps, road signs, CTVs, steel pipe poles, etc., and more specifically, underground concrete made of precast concrete (PC). The tubular support embedded in the base structure is inserted and fixed to the lower portion of the column to facilitate the construction of the pillar fixing structure that can significantly reduce the shortening of the air and the construction cost and its construction method.

일반적으로 도로의 교통 신호등, 가로등, 도로표지판, 씨씨티비(CCTV), 강관전주 등 시설물의 설치에 있어서는 지반에 콘크리트 기초를 매설하고 이에 돌출된 앵커 볼트에 너트로서 지주의 하단의 플랜지를 조립하는 구성으로 설치하는 것이 대부분인바, 이러한 설치방법은 지주 하단의 플랜지에 형성된 볼트 삽입공의 위치와 기초콘크리트의 앵커볼트의 돌출위치를 일치시켜야만 그 기립설치가 가능하였는데, 콘크리트 기초 제작시 앵커 볼트의 위치가 조금씩 변경되는 문제점이 있어 기초콘크리트 상에 지주를 기립설치하는데 많은 어려움이 야기된다고 하는 결점이 있다.In general, in the installation of facilities such as traffic lights, street lights, road signs, CTVs, steel pipe poles, etc., a concrete foundation is embedded in the ground, and the flange of the bottom of the prop is assembled to the anchor bolt protruding therefrom. Most of the installation method is installed in such a way that the mounting position of the bolt insertion hole formed in the flange of the bottom of the support concrete and the anchoring position of the anchor bolt of the foundation concrete was able to be installed. There is a problem that there is a problem that is changed little by little, causing a lot of difficulty in standing upright installation on the foundation concrete.

특히 가로등은 거리의 조명이나 교통의 안전, 또는 미관(美觀) 따위를 위하여 길가를 따라 설치해 놓은 조명시설로서, 고속도로, 시가지의 주요도로, 상업지구 도로, 주택지구 도로 등 설치장소에 따라 그에 알맞은 종류가 사용되는 것으로서, 가로등의 가로등주의 형식에는 여러 가지가 있는데, 하단부가 일직선형의 원통형으로 제작된 가로등주가 본 발명의 적용 대상이 된다.In particular, street lamps are lighting facilities installed along the roadside for the purpose of street lighting, traffic safety, or aesthetics.The street lamp is a kind suitable for installation places such as highways, main roads in the city, commercial roads, and residential district roads. As is used, there are a number of types of street lamps of street lamps, street lamps made of a cylindrical shape of the lower end is a target of the present invention.

이와 같은 구조의 교통신호등, 가로등, 도로표지판 등 시설물의 기둥 설치는 장소에 따라 그 길이가 달라지게 제작하고 기둥의 하부에는 앵커 볼트를 삽입 체결할 수 있도록 볼트공이 형성된 판형상의 플랜지를 일체로 용접하여 기초바닥에 설치되는 콘크리트 기초 구조물에 앵커 볼트를 직립으로 설치하여 너트로 체결하는 것이다.The installation of the pillars of facilities such as traffic lights, street lamps, road signs, etc. has the same length depending on the location. The anchor bolt is installed upright on the concrete foundation structure installed on the foundation floor and fastened with nuts.

즉, 상기 가로등이나 도로표지판 등 시설물의 기둥 설치공법은 기둥 설치시 기둥의 기초 콘크리트 구조물을 타설하기 위하여 터파기를 시행하고, 터파기를 한 후에 거푸집 설치하고, 거푸집의 양측에서 상면으로 돌출되게 전선관을 끼우고, 바닥면에서 사방으로 돌출되게 앵커 볼트를 설치한 후 기초 구조물을 설치하기 위해 콘크리트를 타설하고, 그 기초 구조물을 양생하는 것이다.In other words, the pillar installation method of the facilities such as street lamps and road signs are carried out in order to pour the foundation concrete structure of the pillar when installing the pillar, install the formwork after the excavation, and pinch the conduit to protrude from the sides of the formwork to the upper surface. After installing anchor bolts to protrude in all directions from the bottom surface, the concrete is poured to install the foundation structure, and the foundation structure is cured.

이러한 종래의 기둥 설치방법을 채용한 가로등 설치예는 도 1 및 도 2a, 도 2b에 도시한 바와 같이 콘크리트에 의해 양생된 콘크리트 기초 구조물(7)의 상단에는 다수개의 앵커 볼트(6)가 상방으로 돌출되고, 측면과 상단 중심부가 서로 연결되는 전선관(9)이 구성된 것으로, 상단이 노출하도록 콘크리트 기초 구조물(7)을 지면까지 매립하고, 가로등주(2)의 플랜지(5)에 형성된 볼트공(5a)으로 앵커 볼 트(6)를 삽입 시킨후 너트(3)로 체결하여 가로등주(2)를 세우고, 지면에 매설된 전력선을 전선관(9) 내로 관통하여 가로등(1)과 연결하여 가로등(1)을 사용할 수 있도록 하는 것이다.Street lamp installation example employing such a conventional pillar mounting method is shown in Figure 1 and 2a, 2b is a plurality of anchor bolts (6) upward on the top of the concrete foundation structure (7) cured by concrete The conduit 9 is formed to protrude, and the side and the upper center are connected to each other. The concrete foundation structure 7 is embedded to the ground so as to expose the upper end, and the bolt hole 5a formed in the flange 5 of the street lamp column 2. Insert the anchor bolt (6) and tighten it with the nut (3) to erect the street lamp pole (2), and the power line embedded in the ground penetrates into the conduit (9) and connects with the street lamp (1) to the street lamp (1). To make it available.

상기와 같이 가로등주(2)와 콘크리트 기초(7) 구조물을 앵커 볼트(6)와 너트(3)에 의해 조립할 수 있도록 하는 것은 가로등주(2) 내부에 전선교체나 기타의 부수작업을 할 수 있도록 하기 위함이다.The assembly of the street lamp column (2) and the concrete foundation (7) structure by the anchor bolts (6) and the nut (3) as described above to allow the replacement of the wire or other side work inside the street lamp column (2) For sake.

또한, 일부에서는 가로등주(2)와 콘크리트 기초(7)가 결합한 앵커 볼트(6)와 너트(6)를 보호하기 위하여 베이스 커버(4)로 감싸기도 한다.In addition, in some cases it is wrapped with a base cover (4) to protect the anchor bolt (6) and the nut (6) to which the street lamp pole (2) and the concrete foundation (7) are coupled.

도 2a는 종래방식으로 기초 구조물에 가로등주의 설치상태를 확대 도시해 보인 분리 사시도로, 콘크리트 기초 구조물(7) 위에 사방으로 돌출된 앵커 볼트(6)와 측면에서 삽입되어 중앙으로 돌출된 복수의 전선관(9)이 돌출되고, 콘크리트 기초(7)의 상면 보다 조금 작은 면적을 가지는 플랜지(5)의 볼트공(5a)에 앵커볼트를 끼우고 너트로 결합하여 가로등주(2)를 설치하는 것이다.Figure 2a is an exploded perspective view showing an enlarged state of the installation of the street lamp in the conventional structure in a conventional manner, the anchor bolts 6 protruding in all directions on the concrete foundation structure (7) and a plurality of conduits protruding from the side to the center (9) is protruding, the anchor bolt is inserted into the bolt hole (5a) of the flange (5) having a slightly smaller area than the upper surface of the concrete foundation (7) to install the street lamp (2) by coupling with a nut.

한편, 상기와 같이 가로등주(2)를 설치할 때는 하중이 무거운 가로등주(2)의 상부를 크레인으로 들어올린 후 기초 구조물(7)에서 돌출된 앵커 볼트(6)에 가로등주(2)의 플랜지(5)에 형성된 볼트공(5a)을 삽입하여 조립하고 있으나 하중이 무겁고, 크레인에 매달려 있기 때문에 작업자가 앵커 볼트(6)와 너트(3)의 중심을 서로 맞추기에 어려움이 수반되고, 다수의 앵커 볼트(6)와 너트(3)의 체결 등으로 시공에 시간과 인력이 많이 소요되어 시공에 소요되는 경비가 증가하게 되는 결점이 있다.On the other hand, when installing the street lamps (2) as described above, the lifting of the heavy load of the street lamps (2) with a crane and then the flange (5) of the street lamps (2) to the anchor bolt (6) protruding from the base structure (7) It is assembled by inserting the bolt hole (5a) formed in the but the load is heavy, it is difficult to align the center of the anchor bolt (6) and the nut (3) because the worker is hanging on the crane, a number of anchor bolts ( 6) and the nut (3), such as the construction takes a lot of time and manpower, there is a drawback to increase the cost required for construction.

또한, 상기 가로등주(2) 내부에 전선교체나 기타의 보수 작업을 할 경우에는 크레인으로 가로등주(2)의 상부를 고정한 후 앵커 볼트(6)에서 너트(3)를 일일이 풀어서 들어올린 후 전선교체나 보수 작업을 마친 후 다시 가로등주(2)를 콘크리트 기초 구조물(7)에 조립을 하여야 하기 때문에 처음 가로등(1)을 시공할 때와 마찬가지로 조립이 번거로운 문제점이 있다.In addition, in the case of wire replacement or other repair work inside the street lamp (2), after fixing the upper portion of the street lamp (2) with a crane, lifting the nut (3) from the anchor bolt (6) one by one after lifting the wire replacement or After completing the repair work, the lamppost 2 needs to be assembled again to the concrete foundation structure 7, and thus, the assembly is cumbersome as in the first construction of the lamppost 1.

또한, 상기 가로등주(2)의 하부에 형성된 베이스(5)의 볼트공(5a)에 기초 구조물(7)의 앵커 볼트(6)를 삽입한 후 너트(3)로 체결하나, 시간이 경과 하면 눈, 비 또는 먼지 등이 앵커 볼트(6)와 너트(3)의 체결부위에 인입되어 부식이 쉽게 되기 때문에 보수 작업시 분리하는 데 많은 어려움이 있다.In addition, the anchor bolt 6 of the foundation structure 7 is inserted into the bolt hole 5a of the base 5 formed in the lower part of the street lamp 2, and then tightened with a nut 3, but when time passes, , Rain or dust is introduced into the fastening portion of the anchor bolt (6) and the nut (3) is easy to corrode, there is a lot of difficulty in separating during repair work.

또한, 가로등주(2)와 콘크리트 기초 구조물(7)에 앵커 볼트(6)를 삽입하여 너트(3)로 체결하면 베이스(5)의 상부로 앵커 볼트(6)가 돌출되어 야간에는 보행자가 발에 걸려 넘어져 다치는 안전사고가 발생하였으며, 콘크리트 기초 구조물(7)이 상부가 좁고 하부가 넓은 사각뿔형으로 되어 가로등주가 인도로 많이 들어가서 설치됨으로써 보행자의 통로가 좁아져 보행에 지장을 주는 문제점이 있다.In addition, when the anchor bolt 6 is inserted into the street lamp column 2 and the concrete foundation structure 7 and fastened with the nut 3, the anchor bolt 6 protrudes from the upper part of the base 5 so that the pedestrian can rest on the foot at night. Safety accidents caused by falling over were injured, and the concrete foundation structure 7 has a narrow pyramid shape with a narrow upper portion and a lower lower portion thereof.

또한, 상기 가로등주(2)의 설치시공에는 가로등주(2) 상부에 설치되는 수평방향 지지대가 차량이 통행하는 차도측에 위치한 상태로 작업을 하게 되어 작업시에 차량의 통행을 차단여야 하는 문제점이 있다. In addition, the installation of the street lamp (2) has a problem that the horizontal support installed on the street lamp (2) to work in the state located on the side of the roadway through which the vehicle passes to block the passage of the vehicle at the time of work. .

본 발명은 상기한 실정을 감안하여 종래 가로등이나 도로표지판 등 시설물의 기둥 설치시에 야기 되는 여러 가지 결점 및 문제점 들을 해결하고자 발명한 것으로서, 그 목적은 프리캐스트 콘크리트(PC)로 제작되는 지하 콘크리트 기초 구조물에 매립된 관형 지지체에 단순히 기둥의 하부를 삽입하여 고정함으로써 시공이 용이하여 시간과 인력의 감소로 시공비용이 현저하게 절감되어 경제성이 탁월한 기둥 정착구조 및 그 시공방법을 제공하는 데 있다.The present invention has been invented to solve various defects and problems caused by the installation of pillars of a conventional street light or road sign in view of the above situation, the purpose of which is the basement concrete base material made of precast concrete (PC) By simply inserting and fixing the lower part of the column to the tubular support embedded in the structure, the construction is easy and the construction cost is remarkably reduced due to the reduction of time and manpower, thereby providing an excellent column fixing structure and a construction method thereof.

본 발명의 다른 목적은 지상에 위치하는 기둥을 설치할 때에 지상에 위치하는 다수의 앵커 볼트와 너트를 사용하지 않으므로 앵커 볼트나 너트의 부식으로 인한 수명단축의 염려 없이 장기간 안정되게 사용할 수 있어 수명이 길면서도 분리가 용이하여 보수작업을 적은 비용으로 단시간에 간단히 할 수 있는 기둥 정착구조 및 그 시공방법을 제공하는 데 있다.Another object of the present invention is not to use a plurality of anchor bolts and nuts located on the ground when installing the ground poles can be used stably for a long time without fear of shortening the life due to corrosion of the anchor bolts or nuts long life In addition, it is easy to separate and provide a pillar fixing structure and a construction method that can simplify the repair work in a short time at a low cost.

본 발명의 또 다른 목적은 콘크리트 기초 구조물로 상부가 좁고 하부가 넓은 사각뿔형 프리캐스트 콘크리트(PC)를 사용하지 않고, 일자형 사각통형, 일자형 다각통형 프리캐스트 콘크리트(PC)를 사용함으로써 가로등 등의 기둥이 인도로 많이 들어가지 않고 차도에 매우 가깝게 설치할 수 있어 보도를 걷는 보행자의 불편을 줄일 수 있으면서 외관이 미려한 기둥 정착구조 및 그 시공방법을 제공하는 데 있다.Still another object of the present invention is to use a square pyramid-shaped, straight polycylindrical precast concrete (PC) without using a pyramid-shaped precast concrete (PC) with a narrow upper and wide lower portion as a concrete foundation structure. In order to reduce the inconvenience of pedestrians walking on the sidewalks, it is possible to install very close to the roadway without entering much of the sidewalks, and to provide a pillar fixing structure with a beautiful appearance and a construction method thereof.

본 발명의 또 다른 목적은 시공시에 기둥의 상부에 설치되는 수평방향 지지대를 차량이 통행하는 차도측에 위치 하지 않은 상태(인도측)에서 설치한 후 차도측으로 회전시켜 고정함으로써 차량의 통행을 차단함이 없이 시공할 수 있는 기둥 정착구조 및 그 시공방법을 제공하는 데 있다. Still another object of the present invention is to block the traffic of the vehicle by installing the horizontal support installed on the upper part of the column at the time of construction in a state in which the vehicle is not located on the side of the roadway where the vehicle passes (India side), and then rotating and fixing the roadway side to the side of the roadway. It is to provide a column fixing structure and a method of construction thereof that can be installed without a box.

본 발명 기둥 정착구조는 지하 콘크리트 기초 구조물의 중앙 중공부에 매립되어 고정된 관형 지지체와, 상기 관형 지지체에 삽입되어 고정되는 기둥과, 상기 관형 지지체에 기둥이 끼워진 채로 관형 지지체와 기둥을 체결 고정하는 체결수단과; 상기 관형 지지체의 상부 걸이구구홈에 걸리는 기둥의 걸이구구 및; 상기 관형 지지체와 기둥의 지상 체결 고정부위에 씌워지는 캡으로 이루어지는 것을 특징으로 한다.The column anchoring structure of the present invention includes a tubular support embedded in a central hollow portion of an underground concrete foundation structure, a pillar inserted and fixed to the tubular support, and fastening and fixing the tubular support and the pillar while the pillar is inserted into the tubular support. Fastening means; Hanging sphere of the column to be caught in the upper hanger groove of the tubular support; It characterized in that the cap consisting of a cap on the ground fastening fixed portion of the tubular support and the pillar.

본 발명은 프리캐스트 콘크리트(PC)로 제작되는 콘크리트 기초 구조물에 매립된 관형 지지체에 기둥의 하부를 삽입하여 고정함으로써 시공이 용이하여 시공에 소요되는 시간과 인력의 감소로 시공비용이 현저하게 절감되어 경제성이 탁월하고, 지상에 위치하는 기둥을 설치할 때에 지상에 위치하는 다수의 앵커 볼트와 너트를 사용하지 않으므로 앵커 볼트나 너트의 부식으로 인한 수명 단축의 염려 없이 장기간 안정되게 사용할 수 있어 수명이 길뿐만 아니라 분리가 용이하여 보수작업을 적은 비용으로 단시간에 간단히 할 수 있고, 가로등 등의 기둥이 인도로 많이 들어가지 않고 차도에 매우 가깝게 설치할 수 있어 보도를 걷는 보행자의 불편을 줄일 수 있으며, 신호등 등의 기둥을 인도로 돌려 작업하므로서 차량의 통행을 차단함이 없이 시공할 수 있는 각별한 장점이 있다.The present invention is easy to install by inserting the lower part of the column to the tubular support embedded in the concrete foundation structure made of precast concrete (PC), the construction cost is significantly reduced by reducing the time and manpower required for construction Excellent economic feasibility, and do not use a lot of anchor bolts and nuts on the ground when installing the pillars on the ground can be used stably for a long time without fear of shortening the life due to corrosion of anchor bolts and nuts. In addition, it is easy to separate, so that maintenance work can be simplified in a short time at low cost, and the pillars such as street lamps can be installed very close to the roadway without entering many sidewalks, thereby reducing the inconvenience of pedestrians walking on the sidewalk. By turning the column to sidewalk, it can be installed without blocking traffic. There is a particular advantage.

이하, 첨부된 도면 및 바람직한 실시예로서 본 발명 기둥 정착구조 및 그 시 공방법을 상세하게 설명한다.Hereinafter, the pillar fixing structure and the construction method of the present invention will be described in detail with the accompanying drawings and preferred embodiments.

도 3은 본 발명 기둥 정착구조의 사시도, 도 4는 본 발명 기둥 정착구조의 분해 사시도, 도 5는 본 발명 기둥 정착구조의 사용상태 단면도, 도 6a는 도 5의 A-A'선 단면도, 도 6b는 캡을 제외한 본 발명 기둥 정착구조의 평면도로서, 본 발명 기둥 정착구조는 콘크리트 기초 구조물(11)의 중앙 중공부에 매립되어 고정된 관형 지지체(10)와, 상기 관형 지지체(10)에 삽입되어 고정되는 기둥(20)과, 상기 관형 지지체(10)에 기둥(20)이 끼워진 채로 관형 지지체(10)와 기둥(20)을 체결 고정하는 체결수단(30)과; 상기 관형 지지체(10)의 상부 걸이구구홈에 걸리는 기둥의 걸이구구(40) 및; 상기 관형 지지체(10)와 기둥(20)의 지상 체결 고정부위에 씌워지는 캡(50)으로 이루어져 있다.Figure 3 is a perspective view of the column fixing structure of the present invention, Figure 4 is an exploded perspective view of the column fixing structure of the present invention, Figure 5 is a cross-sectional view of the state of use of the column fixing structure of the present invention, Figure 6a is a cross-sectional view taken along line A-A 'of FIG. 6b is a plan view of the pillar fixing structure of the present invention excluding a cap, and the pillar fixing structure of the present invention is inserted into the tubular support 10 and the tubular support 10 embedded and fixed in the central hollow portion of the concrete foundation structure 11. And a column 20 to be fixed and fastening means 30 for fastening and fixing the tubular support 10 and the column 20 while the column 20 is fitted to the tubular support 10; Hanging sphere (40) of the pillar that is caught in the upper hanger groove of the tubular support (10); It consists of a cap 50 that is covered on the ground fastening fixed portion of the tubular support 10 and the pillar 20.

상기 관형 지지체(10)는 내후성 강관으로서, 상부에 체결수단(30)을 체결하기 위한 체결공(12)이 다수 형성되고, 삽입부의 외주연에 선단이 용접된 다수의 결착볼트(13)가 상기 콘크리트 기초 구조물(11)에 매립되어 일체로 되며, 상기 결착볼트(13)의 상부 관형 지지체(10)에 상기 콘크리트 기초 구조물(11)의 다수 전선공(14)과 맞닿는 부위에 전선공(16)이 다수 형성되고, 상부 선단에는 아래로 향하여 다수의 걸림홈(15)이 형성된 상태로 상기 콘크리트 기초 구조물(11)에 매립 고정되어 있다.The tubular support 10 is a weather-resistant steel pipe, a plurality of fastening holes 12 for fastening the fastening means 30 is formed on the upper portion, and a plurality of fastening bolts 13 whose ends are welded to the outer periphery of the insert are It is embedded in the concrete foundation structure (11) to be integrated, the wire hole 16 in the contact portion of the upper tubular support 10 of the binding bolt 13 and the plurality of wire holes 14 of the concrete foundation structure (11) A plurality of these are formed, and the upper end is fixed to the concrete foundation structure 11 in a state in which a plurality of locking grooves 15 are formed downward.

여기서 상기 콘크리트 기초 구조물(11)은 중앙부가 상하로 관통된 관형으로 지하에 매설시 회전하지 않고 고정 강도를 높일 수 있도록 4 ∼ 12각 기둥 중 어느 하나의 다각 기둥인 것이 바람직하다.Here, the concrete foundation structure 11 is preferably a polygonal pillar of any one of 4 to 12 square pillars so as to increase the fixed strength without rotating when buried in the basement with a tubular penetrating up and down.

또한, 상기 기둥(20)은 하부에 상기 관형 지지체(10)의 상부가 삽입되도록 형성된 원통관(21)과, 상기 관형 지지체(10)의 상단부 걸림홈(15)에 삽입되어 걸리도록 상기 원통관(21)의 내면에 용접으로 고정된 다수의 걸이구(40) 및; 상기 관형 지지체(10)의 체결공(12)과 맞닿는 부위에 형성된 관통공(22)으로 형성되어 있다.In addition, the pillar 20 is a cylindrical tube 21 formed so that the upper portion of the tubular support 10 is inserted into the lower portion, and the cylindrical tube so as to be inserted into the upper end engaging groove 15 of the tubular support 10. A plurality of hooks 40 fixed by welding to the inner surface of 21; It is formed of a through hole 22 formed in a portion in contact with the fastening hole 12 of the tubular support (10).

여기서 관형 지지체(10)는 상기 콘크리트 기초 구조물(11)에 관형 지지체(10)가 매립되도록 공장에서 프리캐스트 콘크리트로 제작되어 지하에 매립되는 것으로서, 상기 콘크리트 기초 구조물(11)의 관형 지지체(10)가 삽입되는 기둥(20)은 관형 지지체(10)가 삽입되는 하측부 부분만 원통관의 형상을 이루면 되므로 이 부분을 제외한 기둥(20)의 상부 부분은 특별한 형상 및 구조로 제한되지 않는다.Here, the tubular support 10 is made of precast concrete at the factory so that the tubular support 10 is embedded in the concrete foundation structure 11 and is buried underground, and the tubular support 10 of the concrete foundation structure 11 is Since the pillar 20 is inserted into the tubular support 10 is inserted only the lower portion of the cylindrical tube to form the shape of the upper portion of the pillar 20 except this portion is not limited to a special shape and structure.

예를 들면, 관형 지지체(10)가 삽입되는 부분을 제외한 기둥(20) 상부 부분은 원통상의 기둥이거나, 6각기둥, 8각기둥 등 다각 기둥이어도 된다.For example, the upper part of the pillar 20 except the part into which the tubular support 10 is inserted may be a cylindrical pillar or a polygonal pillar such as a hexagonal pillar or an octagonal pillar.

따라서 본 발명의 기둥(20)은 가로등, 도로의 교통 신호등, 도로표지판 등 시설물의 기둥과 같이 어느 특정 기둥에 한정되지 않고, 관형 지지체(10)가 삽입되는 기둥(20)의 하부를 관형 지지체(10)가 삽입되어 고정될 수 있도록 구성하면, 그 외는 기둥의 형상이나 구조 및 용도에 관계없이 채용하여 사용할 수 있다.Therefore, the pillar 20 of the present invention is not limited to any particular pillar, such as a pillar of a facility such as a street lamp, a traffic light of a road, a road sign, and the lower portion of the pillar 20 into which the tubular support 10 is inserted. If it is configured so that 10) can be inserted and fixed, it can be adopted and used regardless of the shape, structure, and use of the column.

그리고 상기 체결수단(30)은 락볼트(31)와 너트(32)로 이루어져 관형 지지체(10)의 상부가 기둥(20)에 삽입되어 관형 지지체(10)의 체결공(12)과 기둥(20)의 관통공(22)이 일치한 상태에서 락볼트(31)가 상기 체결공(12)과 관통공(22)을 통해 기둥(20)을 관통한 상태에서 락볼트(31)의 양단에 너트(32)가 체결되어 관형 지지체(10)에 기둥(20)이 고정되도록 되어 있다.And the fastening means 30 is composed of a lock bolt 31 and the nut 32, the upper portion of the tubular support 10 is inserted into the pillar 20, the fastening hole 12 and the pillar 20 of the tubular support 10 Nut in both ends of the lock bolt 31 in the state in which the lock bolt 31 penetrates the column 20 through the fastening hole 12 and the through hole 22 in a state where the through holes 22 of the The 32 is fastened so that the pillar 20 may be fixed to the tubular support 10.

상기 캡(50)은 상기 관형 지지체(10)와 기둥(20)의 지상 연결부위에 씌워지는 것으로서, 캡(50)과 콘크리트 기초 구조물(11)의 연결부와 캡(50)과 기둥(20)의 연결부는 실리콘 접착제로 접합되어 있다.The cap 50 is covered on the ground connection portion of the tubular support 10 and the pillar 20, the connection portion of the cap 50 and the concrete foundation structure 11 and the cap 50 and the pillar 20 The connection is joined with a silicone adhesive.

한편, 본 발명 기둥 정착구조의 시공방법은 프리캐스트 콘크리트(PC)로 제작되는 콘크리트 기초 구조물(11)에 매립되도록 관형 지지체(10)를 제작하는 관형지지체 제작공정(S1단계)과; 상기 관형 지지체(10)가 삽입된 콘크리트 기초 구조물(11) 제작공정(S2단계)과; 상기 관형 지지체(10)가 삽입되어 고정될 수 있는 기둥(20)을 제작하는 기둥 제작공정(S3단계)과; 상기 기둥(10)을 설치할 곳의 지면을 굴착기로 굴착하는 굴착공정(S4단계)과; 상기 굴착공정에서 굴착된 곳에 관형 지지체(10)를 구비하는 콘크리트 기초 구조물(11)의 상부면이 지면과 일치하도록 콘크리트 기초 구조물(11)을 매립하는 구조물 매립공정(S5단계)과; 상기 콘크리트 기초 구조물(11)의 하부 중공부에 굴착시의 토사(60)를 채우고 상기 토사(60)의 상부에 방수 몰탈(70)을 채우는 방수공정(S6단계)과; 상기 관형 지지체(10)의 상부에 기둥(20)의 하부를 삽입하여 고정하는 기둥설치공정(S7단계) 및; 상기 관형 지지체(10)와 기둥(20)의 지상 연결부위에 캡(50)을 씌워 고정하는 캡설치공정(S8단계)로 이루어지는 것을 특징으로 한다.On the other hand, the construction method of the column fixing structure of the present invention is a tubular support manufacturing process (S1 step) for manufacturing the tubular support 10 to be embedded in the concrete foundation structure 11 is made of precast concrete (PC); A concrete foundation structure 11 into which the tubular support 10 is inserted (S2) manufacturing process; A column manufacturing process (step S3) of manufacturing the column 20 into which the tubular support 10 can be inserted and fixed; An excavation process (step S4) of digging the ground of the place where the pillar 10 is to be installed with an excavator; A structure embedding process (step S5) of embedding the concrete foundation structure 11 so that the upper surface of the concrete foundation structure 11 having the tubular support 10 coincides with the ground in the excavation process; A waterproofing process (step S6) of filling the earth and sand 60 during excavation in the lower hollow portion of the concrete foundation structure 11 and filling the waterproof mortar 70 in the upper portion of the earth and sand 60; A pillar installation step (step S7) of inserting and fixing a lower portion of the pillar 20 on the upper portion of the tubular support 10; It is characterized by consisting of a cap installation step (S8 step) to cover the cap 50 on the ground connection portion of the tubular support 10 and the pillar 20.

상기 관형지지체 제작공정(S1단계)에는 결착볼트(13)의 설치단계와, 전선공(16) 형성단계, 체결공(12) 형성단계 및, 걸림홈(15) 형성단계가 포함되고, 상기 기둥 제작공정(S2)에는 걸이구(40) 형성단계와, 관통공(22) 형성단계로 이루어져 있다.The tubular support manufacturing process (step S1) includes the installation step of the binding bolt 13, the wire hole 16 forming step, the fastening hole 12 forming step, and the engaging groove 15 forming step, the pillar The manufacturing process (S2) consists of a hook hole 40 forming step and a through hole 22 forming step.

다음에는 상기한 바와 같이 구성된 본 발명 기둥 정착구조를 이용하여 기둥을 설치하는 시공에 대하여 설명한다.Next, a description will be given of the installation of the column using the present invention column fixing structure configured as described above.

본 발명에서 관형 지지체(10)는 관형 지지체(10)가 매립되어 프리캐스트 콘크리트(PC)로 제작한 콘크리트 기초 구조물(11)을 지하에 매립하여 사용하는 것으로서, 도 5에 도시한 바와 같이 기둥(10)을 설치할 곳의 지면을 스크류 오거 등의 굴착기로 굴착하여(S4단계) S2단계의 관형 지지체(10)가 삽입된 콘크리트 기초 구조물(11) 제작공정에서 제작한 콘크리트 기초 구조물(11)의 상부면이 지면과 일치하도록 콘크리트 기초 구조물(11)를 매립한다(S5단계).In the present invention, the tubular support 10 is used by embedding the concrete foundation structure 11 made of precast concrete (PC) embedded in the tubular support 10 in the basement, as shown in FIG. 10) Excavate the ground of the installation site with an excavator such as a screw auger (step S4) and the upper part of the concrete foundation structure 11 manufactured in the manufacturing process of the concrete foundation structure 11 into which the tubular support 10 of step S2 is inserted. Landfill the concrete foundation structure 11 so that the surface coincides with the ground (S5 step).

다음, 콘크리트 기초 구조물(11)의 하부 중공부에 굴착시의 토사(60)를 채우고, 상기 토사(60)의 상부에 방수 몰탈(70)을 채우는데, 상기 방수 몰탈(70)은 무수축 시멘트 방수 몰탈이나 수지 몰탈을 사용하고, 그 높이는 관형 지지체(10)의 하단부로 한다(S6단계).Next, the bottom hollow of the concrete foundation structure 11 is filled with the soil sand during the excavation, and the waterproof mortar 70 is filled in the upper portion of the soil sand 60, the waterproof mortar 70 is a non-condensing cement Waterproof mortar or resin mortar is used, and the height thereof is the lower end of the tubular support 10 (step S6).

상기에서 토사(60)와 방수 몰탈(70)을 채우는 것은 콘크리트 기초 구조물(11)의 기둥(20) 내에 물이 침투하여 전선 연결 부위에서의 합선이나 누전을 방지하기 위함이다.Filling the soil 60 and the waterproof mortar 70 is to prevent the short circuit or short-circuit at the wire connection by the water penetrates into the pillar 20 of the concrete foundation structure (11).

다음에는 콘크리트 기초 구조물(11)의 전선공(14) 및 관형 지지체(10)의 전선공(16)을 통해 관형 지지체(10) 내부로 인출되어 있는 전선을 S3단계의 기둥 제작공정에서 제작한 기둥(20)의 내부로 인출되는 전선과 연결한 다음 관형 지지체(10)의 상부에 기둥(20)을 삽입하되 관형 지지체(10)의 걸림홈(15)에 기둥(20)의 걸이구(40)가 걸리도록 삽입한다.Next, the wire drawn out through the wire hole 14 of the concrete foundation structure 11 and the wire hole 16 of the tubular support 10 to the inside of the tubular support 10 is a column manufactured in the pillar manufacturing process of step S3. The hook 20 of the pillar 20 is connected to the wire drawn out to the inside of the tubular body 20, and then the pillar 20 is inserted into the upper portion of the tubular support 10. Insert it so that

이와 같이하여 관형 지지체(10)의 걸림홈(15)에 기둥(20)의 걸이구(40)가 삽입되어 걸이구(40)가 걸린 상태로 고정된다.In this way, the hook hole 40 of the column 20 is inserted into the locking groove 15 of the tubular support 10 and fixed in a state where the hook hole 40 is locked.

이 상태에서는 관형 지지체(10)의 체결공(12)과 기둥(20)의 관통공(22)이 일치된 상태가 되므로 락볼트(31)로 상기 체결공(12)과 관통공(22)을 관통시켜 락볼트(31)에 너트(32)를 체결하여 관형 지지체(10)에 기둥(20)을 고정시킨다.In this state, the fastening hole 12 of the tubular support 10 and the through hole 22 of the pillar 20 are in a state of coincidence, so that the fastening hole 12 and the through hole 22 are locked with the lock bolt 31. The nut 32 is fastened to the lock bolt 31 to fix the pillar 20 to the tubular support 10.

이와 같은 작업은 기둥(20)이 가로등, 교통표지판 기둥과 같이 고 중량물인 경우에는 크레인 등을 사용하여 시공하게 되며, 그 다음에 마지막으로 상기 관형 지지체(10)와 기둥(20)의 지상 체결부위에 캡(50)을 씌우고, 캡(50)과 콘크리트 기초 구조물(11)의 연결부와 캡(50)과 기둥(20)의 연결부를 실리콘 접착제로 접합시킴으로써 기둥의 시공이 완료된다.In this case, when the pillar 20 is a heavy object such as a street lamp or a traffic sign pillar, the construction is performed using a crane or the like, and finally, the ground fastening portion of the tubular support 10 and the pillar 20. Covering the cap 50, the construction of the column is completed by bonding the connection portion of the cap 50 and the concrete foundation structure 11 and the connection portion of the cap 50 and the pillar 20 with a silicone adhesive.

일반적으로 기둥(20)이 설치되는 종래의 콘크리트 기초 구조물은 상부가 좁고 하부가 넓은 사각뿔형 프리캐스트 콘크리트(PC)가 사용됨으로 인하여 가로등 등의 기둥이 인도로 많이 들어가 보도가 좁아져 보도를 걷는 보행자를 불편하게 하므로 본 발명은 일자형 다각통형의 기초 구조물(11)을 사용하므로 상기 기둥을 인도상에서 차도에 매우 가깝게 설치할 수 있다.In general, the concrete foundation structure in which the pillars 20 are installed is a pedestrian walking on the sidewalk due to the narrow sidewalks as the pillars such as street lamps enter the sidewalk due to the use of a square pyramid-shaped precast concrete (PC) having a narrow upper portion and a wider lower portion. Since the present invention uses the base structure 11 of the linear polygonal cylindrical shape so that the pillar can be installed very close to the roadway in India.

그리고, 본 발명의 기둥(20)은 금속제 이외에 합성수지로도 제작할 수 있으며, 상기 기둥(20)은 광고물을 부착할 수 없도록 기둥(20) 외측에 하단부로 부터 일정 높이까지 요철부를 형성할 수도 있다.In addition, the pillar 20 of the present invention may be made of synthetic resin in addition to the metal, and the pillar 20 may form an uneven portion from the lower end to a predetermined height on the outside of the pillar 20 so as not to attach an advertisement. .

지금까지 본 발명을 바람직한 실시예로서 설명하였으나, 본 발명은 이에 한정되지 않고 발명의 요지를 이탈하지 않는 범위 내에서 다양하게 변형하여 실시할 수 있음은 물론이다.While the present invention has been described as a preferred embodiment, the present invention is not limited thereto, and various modifications can be made without departing from the gist of the invention.

도 1은 종래 기초구조물에 설치된 가로등 기둥의 사용상태 예시도,1 is a view illustrating a state of use of a lamppost installed in a conventional foundation structure;

도 2a는 종래방식으로 기초구조물에 가로등 기둥의 설치상태를 나타낸 분해사시도,Figure 2a is an exploded perspective view showing the installation state of the lamppost on the foundation structure in a conventional manner,

도 2b는 종래방식으로 기초구조물에 가로등 기둥의 설치상태를 나타낸 사시도,Figure 2b is a perspective view showing the installation state of the lamppost to the foundation structure in a conventional manner,

도 3은 본 발명 기둥 정착구조의 사시도,3 is a perspective view of the pillar fixing structure of the present invention;

도 4는 본 발명 기둥 정착구조의 분해 사시도,4 is an exploded perspective view of the column fixing structure of the present invention;

도 5는 본 발명 기둥 정착구조의 사용상태 단면도,5 is a cross-sectional view of the state of use of the column fixing structure of the present invention;

도 6a는 도 5의 A-A'선 단면도,6A is a cross-sectional view taken along the line AA ′ of FIG. 5;

도 6b는 캡을 제외한 본 발명 기둥 정착구조의 평면도이다.Figure 6b is a plan view of the column fixing structure of the present invention without the cap.

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10 : 관형 지지체 11 : 콘크리트 기초 구조물10 tubular support 11 concrete foundation structure

12 : 체결공 13 : 결착볼트12: fastening hole 13: fastening bolt

14, 16 : 전선공 15 : 걸림홈14, 16: electrician 15: hanging groove

20 : 기둥 21 : 원통관20: pillar 21: cylinder tube

22 : 관통공 30 : 체결수단22: through hole 30: fastening means

31 : 락볼트 32 : 너트31: Rock Bolt 32: Nut

40 : 걸이구 50 : 캡 40: hook 50: cap

Claims (9)

콘크리트 기초 구조물(11)의 중앙 중공부에 매립되어 고정된 관형 지지체(10)와, 상기 관형 지지체(10)에 삽입되어 고정되는 기둥(20)과, 상기 관형 지지체(10)에 기둥(20)이 끼워진 채로 관형 지지체(10)와 기둥(20)을 체결 고정하는 체결수단(30)과; 상기 관형 지지체(10)의 상부 걸림홈(15)에 걸리는 기둥의 걸이구(40) 및; 상기 관형 지지체(10)와 기둥(20)의 지상 체결 고정부위에 씌워지는 캡(50)으로 이루어진 것을 특징으로 하는 기둥 정착구조.A tubular support 10 embedded in the central hollow portion of the concrete foundation structure 11 and fixed, a column 20 inserted into and fixed to the tubular support 10, and a column 20 on the tubular support 10. Fastening means 30 for fastening and fixing the tubular support 10 and the pillar 20 while being inserted; Hanging hole 40 of the pillar to be caught in the upper locking groove 15 of the tubular support (10); Column fixing structure, characterized in that consisting of the cap 50 is covered on the ground fastening fixed portion of the tubular support (10) and the column (20). 제 1항에 있어서, 상기 관형 지지체(10)는 내후성 강관으로서, 상부에 체결수단(30)을 체결하기 위한 체결공(12)이 다수 형성되고, 삽입부의 외주연에 선단이 용접된 다수의 결착볼트(13)가 상기 콘크리트 기초 구조물(11)에 매립되어 일체로 되며, 상기 결착볼트(13)의 상부 관형 지지체(10)에 상기 콘크리트 기초 구조물(11)의 다수 전선공(14)과 맞닿는 부위에 전선공(16)이 다수 형성되고, 상부 선단에는 아래로 향하여 다수의 걸림홈(15)이 형성된 상태로 상기 콘크리트 기초 구조물(11)에 매립 고정되는 것을 특징으로 하는 기둥 정착구조.According to claim 1, The tubular support 10 is a weather-resistant steel pipe, a plurality of fastening holes 12 for fastening the fastening means 30 is formed on the upper part, a plurality of fasteners welded to the outer periphery of the insert portion A portion of the bolt 13 embedded in the concrete foundation structure 11 is integrally formed, and the upper tubular support 10 of the binding bolt 13 is in contact with a plurality of wire holes 14 of the concrete foundation structure 11. A plurality of wire holes 16 are formed in the column fixing structure, characterized in that the upper end is fixed to the concrete foundation structure (11) buried in a state in which a plurality of engaging grooves 15 are formed downward. 제 1항 또는 제 2항에 있어서, 상기 콘크리트 기초 구조물(11)은 중앙부가 상하로 관통된 관형으로 지하에 매설시 회전하지 않고 고정 강도를 높일 수 있도록 4 ∼ 12각 기둥 중 어느 하나의 다각 기둥인 것을 특징으로 하는 기둥 정착구조.According to claim 1 or 2, wherein the concrete foundation structure 11 is a tubular shape of the central portion penetrates up and down so that the multi-column of any one of 4 to 12 square pillars so as to increase the fixed strength without rotating when buried underground The pillar fixing structure characterized in that the. 제 1항에 있어서, 상기 기둥(20)은 하부에 상기 관형 지지체(10)의 상부가 삽입되도록 형성된 원통관(21)과, 상기 관형 지지체(10)의 상단부 걸림홈(15)에 삽입되어 걸리도록 상기 원통관(21)의 내면에 용접으로 고정된 다수의 걸이구(40) 및; 상기 관형 지지체(10)의 체결공(12)과 맞닿는 부위에 형성된 관통공(22)으로 형성되어 있는 것을 특징으로 하는 기둥 정착구조.According to claim 1, wherein the pillar 20 is inserted into the cylindrical tube 21 formed so that the upper portion of the tubular support 10 is inserted into the upper end of the tubular support 10, the hook groove 15 A plurality of hooks 40 fixed to the inner surface of the cylindrical tube 21 by welding; Column fixing structure, characterized in that formed by the through-holes 22 formed in the portion in contact with the fastening hole 12 of the tubular support (10). 제 1항에 있어서, 상기 체결수단(30)은 락볼트(31)와 너트(32)로 이루어져 관형 지지체(10)의 상부가 기둥(20)에 삽입되어 관형 지지체(10)의 체결공(12)과 기둥(20)의 관통공(22)이 일치한 상태에서 락볼트(31)가 상기 체결공(12)과 관통공(22)을 통해 기둥(20)을 관통한 상태에서 락볼트(31)의 양단에 너트(32)가 체결되어 관형 지지체(10)에 기둥(20)이 고정되도록 되어 있는 것을 특징으로 하는 기둥 정착구조.According to claim 1, The fastening means 30 is composed of a lock bolt 31 and the nut 32, the upper portion of the tubular support 10 is inserted into the column 20, the fastening hole 12 of the tubular support 10 ) And the lock bolt 31 in the state where the through-hole 22 of the pillar 20 coincides with the through-hole 22 through the fastening hole 12 and the through-hole 22. A pillar fixing structure, characterized in that the nut (32) is fastened to both ends of the) so that the column (20) is fixed to the tubular support (10). 제 1항에 있어서, 상기 캡(50)은 상기 관형 지지체(10)와 기둥(20)의 지상 연결부위에 씌워지는 것으로서, 캡(50)과 콘크리트 기초 구조물(11)의 연결부와 캡(50)과 기둥(20)의 연결부가 실리콘 접착제로 접합되어 설치되는 것을 특징으로 하는 기둥 정착구조.According to claim 1, wherein the cap 50 is to cover the ground connection of the tubular support 10 and the pillar 20, the connection portion 50 and the cap 50 of the cap 50 and the concrete foundation structure 11 The pillar fixing structure, characterized in that the connection portion of the pillar 20 and the adhesive is installed by bonding. 프리캐스트 콘크리트(PC)로 제작되는 콘크리트 기초 구조물(11)에 매립되도 록 관형 지지체(10)를 제작하는 관형지지체 제작공정(S1단계)과; 상기 관형 지지체(10)가 삽입된 콘크리트 기초 구조물(11) 제작공정(S2단계)과; 상기 관형 지지체(10)가 삽입되어 고정될 수 있는 기둥(20)을 제작하는 기둥 제작공정(S3단계)과; 상기 기둥(10)을 설치할 곳의 지면을 굴착기로 굴착하는 굴착공정(S4단계)과; 상기 굴착공정에서 굴착된 곳에 관형 지지체(10)를 구비하는 콘크리트 기초 구조물(11)의 상부면이 지면과 일치하도록 콘크리트 기초 구조물(11)을 매립하는 구조물 매립공정(S5단계)과; 상기 콘크리트 기초 구조물(11)의 하부 중공부에 굴착시의 토사(60)를 채우고 상기 토사(60)의 상부에 방수 몰탈(70)을 채우는 방수공정(S6단계)과; 상기 관형 지지체(10)의 상부에 기둥(20)의 하부를 삽입하여 고정하는 기둥설치공정(S7단계) 및; 상기 관형 지지체(10)와 기둥(20)의 지상 연결부위에 캡(50)을 씌워 고정하는 캡 설치공정(S8단계)으로 이루어지는 것을 특징으로 하는 기둥 정착구조의 시공방법.A tubular support manufacturing process (step S1) of manufacturing the tubular support 10 to be embedded in the concrete foundation structure 11 made of precast concrete (PC); A concrete foundation structure 11 into which the tubular support 10 is inserted (S2) manufacturing process; A column manufacturing process (step S3) of manufacturing the column 20 into which the tubular support 10 can be inserted and fixed; An excavation process (step S4) of digging the ground of the place where the pillar 10 is to be installed with an excavator; A structure embedding process (step S5) of embedding the concrete foundation structure 11 so that the upper surface of the concrete foundation structure 11 having the tubular support 10 coincides with the ground in the excavation process; A waterproofing process (step S6) of filling the earth and sand 60 during excavation in the lower hollow portion of the concrete foundation structure 11 and filling the waterproof mortar 70 in the upper portion of the earth and sand 60; A pillar installation step (step S7) of inserting and fixing a lower portion of the pillar 20 on the upper portion of the tubular support 10; Construction method of the column fixing structure comprising a cap installation step (S8 step) to cover and fix the cap 50 to the ground connection portion of the tubular support (10) and the column (20). 제 7항에 있어서, 상기 관형 지지체(10)는 내후성 강관으로서, 상부에 체결수단(30)을 체결하기 위한 체결공(12)이 다수 형성되고, 삽입부의 외주연에 선단이 용접된 다수의 결착볼트(13)가 상기 콘크리트 기초 구조물(11)에 매립되어 일체로 되며, 상기 결착볼트(13)의 상부 관형 지지체(10)에 상기 콘크리트 기초 구조물(11)의 다수의 전선공(14)과 맞닿는 부위에 전선공(16)이 다수 형성되고, 상부 선단에는 아래로 향하여 다수의 걸림홈(15)이 형성된 상태로 상기 콘크리트 기초 구조물(11)에 매립 고정되는 것을 특징으로 하는 기둥 정착구조의 시공방법.According to claim 7, The tubular support 10 is a weather-resistant steel pipe, a plurality of fastening holes 12 for fastening the fastening means 30 is formed on the upper portion, a plurality of fasteners are welded to the outer periphery of the insert portion The bolt 13 is embedded in the concrete foundation structure 11 and is integrally formed, and the upper tubular support 10 of the binding bolt 13 is in contact with a plurality of wire holes 14 of the concrete foundation structure 11. A plurality of wire holes 16 are formed in the site, and the upper end of the construction method of the column fixing structure, characterized in that fixed to the concrete foundation structure 11 in a state in which a plurality of locking grooves 15 are formed downwardly . 제 7항에 있어서, 상기 기둥(20)은 하부에 상기 관형 지지체(10)의 상부가 삽입되도록 형성된 원통관(21)과, 상기 관형 지지체(10)의 상단부 걸림홈(15)에 삽입되어 걸리도록 상기 원통관(21)의 내면에 용접으로 고정된 다수의 걸이구(40) 및; 상기 관형 지지체(10)의 체결공(12)과 맞닿는 부위에 형성된 관통공(22)으로 형성되어 있는 것을 특징으로 하는 기둥 정착구조의 시공방법.The method of claim 7, wherein the pillar 20 is inserted into the cylindrical tube 21 formed so that the upper portion of the tubular support 10 is inserted into the lower end, and the locking groove 15 of the upper end of the tubular support 10 is caught. A plurality of hooks 40 fixed to the inner surface of the cylindrical tube 21 by welding; Construction method of the column anchoring structure, characterized in that formed in the through hole 22 formed in the portion in contact with the fastening hole 12 of the tubular support (10).
KR1020080101598A 2008-10-16 2008-10-16 A fixing structure of pillar and construction method thereof Ceased KR20100042446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080101598A KR20100042446A (en) 2008-10-16 2008-10-16 A fixing structure of pillar and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080101598A KR20100042446A (en) 2008-10-16 2008-10-16 A fixing structure of pillar and construction method thereof

Publications (1)

Publication Number Publication Date
KR20100042446A true KR20100042446A (en) 2010-04-26

Family

ID=42217803

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080101598A Ceased KR20100042446A (en) 2008-10-16 2008-10-16 A fixing structure of pillar and construction method thereof

Country Status (1)

Country Link
KR (1) KR20100042446A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101295890B1 (en) * 2013-05-13 2013-08-13 강난주 Bburied support foundation of support facility including road and tele-communication facility
CN104006359A (en) * 2014-06-10 2014-08-27 国家电网公司 Street lamp erecting method
KR102063297B1 (en) * 2019-05-30 2020-01-07 대화전설(주) Embedding device of distribution pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101295890B1 (en) * 2013-05-13 2013-08-13 강난주 Bburied support foundation of support facility including road and tele-communication facility
CN104006359A (en) * 2014-06-10 2014-08-27 国家电网公司 Street lamp erecting method
KR102063297B1 (en) * 2019-05-30 2020-01-07 대화전설(주) Embedding device of distribution pole

Similar Documents

Publication Publication Date Title
KR100885131B1 (en) Column fixing structure and construction method
KR100991886B1 (en) Pillar fixing structure
KR100775816B1 (en) Street lamps that can be easily separated from the foundation structure
KR100947852B1 (en) Combination structure of street lamp lantern and base
KR100907078B1 (en) Combination structure of columnar for outdoor lighting
KR101011372B1 (en) Street light installation base
KR20110137644A (en) Column fixing structure and construction method
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR101066388B1 (en) Street light main buried mounting frame and easy installation method
KR200463353Y1 (en) Apparatus for fixing the bottom end of the CCTV post or street lamp post
KR200433150Y1 (en) Fixture for street lamp post
KR20090102355A (en) Lower part protection structure for roadlamp and others
KR101007729B1 (en) Multi Purpose Mount
KR100905889B1 (en) Structural Structure for Lantern Installation
KR20100033750A (en) A fixing structure of electric and construction method thereof
KR101095957B1 (en) Door type road sign structure and construction method
KR100719950B1 (en) Prefabricated base plate for prop installation and construction method
KR101148172B1 (en) Street Lighting Pole Laying Footing Structure and Electing Method of Street Lighting Pole using the same
KR100920127B1 (en) Structural Structure and Construction Method for Road Traffic Facilities
US1784568A (en) Anchorage for poles
KR100920128B1 (en) Strut structures for road traffic facilities
KR20120110851A (en) Base block for fixing street light pole
KR101085796B1 (en) Concrete foundation integrated column fixing structure
KR101003855B1 (en) Road sign structure and construction method
KR101441117B1 (en) Buried cement block for landlords such as the crossroads

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20081016

PA0201 Request for examination
PG1501 Laying open of application
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20101111

Patent event code: PE09021S01D

E601 Decision to refuse application
PE0601 Decision on rejection of patent

Patent event date: 20110209

Comment text: Decision to Refuse Application

Patent event code: PE06012S01D

Patent event date: 20101111

Comment text: Notification of reason for refusal

Patent event code: PE06011S01I