KR20080100002A - Construction apparatus and installation method using it - Google Patents

Construction apparatus and installation method using it Download PDF

Info

Publication number
KR20080100002A
KR20080100002A KR1020070046006A KR20070046006A KR20080100002A KR 20080100002 A KR20080100002 A KR 20080100002A KR 1020070046006 A KR1020070046006 A KR 1020070046006A KR 20070046006 A KR20070046006 A KR 20070046006A KR 20080100002 A KR20080100002 A KR 20080100002A
Authority
KR
South Korea
Prior art keywords
building
hoist
moving unit
frame structure
steel
Prior art date
Application number
KR1020070046006A
Other languages
Korean (ko)
Inventor
김지욱
Original Assignee
김지욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김지욱 filed Critical 김지욱
Priority to KR1020070046006A priority Critical patent/KR20080100002A/en
Publication of KR20080100002A publication Critical patent/KR20080100002A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D2700/00Capstans, winches or hoists
    • B66D2700/02Hoists or accessories for hoists
    • B66D2700/023Hoists
    • B66D2700/025Hoists motor operated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Apparatus and method for construction are provided to have the economical effect including manpower, cost and time saving etc. and to be used for the fabricated building and symmetric concrete structure. An apparatus for construction comprises an iron frame(100) structure in which lower-part is opened in order to pass through the building(500), a hoist(200) conveying material, the panel etc. to the horizontal direction about the iron frame structure, a vertical transfer part(300) lifting up and down, and fixing the iron frame structure to the building, a horizontal moving part moving horizontally and fixing the iron structure to the building.

Description

건축 장치 및 방법{CONSTRUCTION APPARATUS AND INSTALLATION METHOD USING IT}Construction device and method {CONSTRUCTION APPARATUS AND INSTALLATION METHOD USING IT}

도 1는 본 발명의 바람직한 실시례에 따른 건축 장치를 도시한 사시도. 1 is a perspective view showing a building device according to a preferred embodiment of the present invention.

도 2는 다른 실시례에 따른 건축 장치를 도시한 사시도. 2 is a perspective view showing a building device according to another embodiment.

도 3는 도 1의 건축 장치를 각 방향에서 본 평면도, 사시도, 정면도, 측면도. 3 is a plan view, a perspective view, a front view, and a side view of the building apparatus of FIG. 1 as viewed from each direction.

도 4은 도 1의 A부분을 확대 도시한 사시도. 4 is an enlarged perspective view of portion A of FIG. 1;

도 5는 도 1의 고정부를 확대 도시한 사시도. 5 is an enlarged perspective view of the fixing part of FIG. 1;

도 6는 도 5에 도시한 고정부의 다른 실시례를 도시한 단면도. 6 is a cross-sectional view showing another embodiment of the fixing part shown in FIG.

도 7는 도 1의 건축 장치의 실행부의 일실시례를 도시한 사시도. 7 is a perspective view showing an embodiment of the execution unit of the building device of FIG.

도 8의 a,b는 도 1의 시공에 이용되는 거푸집의 실시례를 각각 도시한 평면도 및 사시도. 8 a and b are a plan view and a perspective view respectively showing an embodiment of the formwork used in the construction of FIG.

도 9의 a,b,c는 도 1의 이용하여 시공된 콘크리트 구조물의 측벽에 설치되는 상면 패널 지지부의 일실시례를 각각 도시한 사시도 및 측면도. 9 is a perspective view and a side view respectively showing an embodiment of the upper panel support portion installed on the side wall of the concrete structure constructed using FIG.

도 10 내지 도 18은 도 1의 건축 장치를 이용하여 콘크리트 구조물이 시공되는 과정을 도시한 사시도. 10 to 18 is a perspective view showing a process in which a concrete structure is constructed using the building device of FIG.

도 19는 호이스트의 실시례를 도시한 사시도. 19 is a perspective view showing an embodiment of the hoist.

도 20은 결합부의 실시례를 도시한 사시도. 20 is a perspective view showing an embodiment of the coupling portion.

도 21은 수평이동부의 실시례를 도시한 사시도. 21 is a perspective view showing an embodiment of a horizontal moving unit.

종래 건축에 있어 많은 인력, 비용, 시간 등이 소비되었다. In the conventional construction, a lot of manpower, cost, time, etc. were consumed.

본 발명은 상기 문제를 해결하기 위한 것으로; 시공에 있어 인력, 비용, 시간 등을 절감 경제적 효과를 기대할 수 있는 것을 특징으로 한다. 본 발명은 특히 조립식 건물 및 좌, 우 대칭인 콘크리트 구조물 시공 등에 있어 효율적으로 사용될 수 있다. The present invention is to solve the above problems; In the construction, it can be expected to reduce the labor, cost, time, etc. economic effect. The present invention can be effectively used in the construction of prefabricated buildings and concrete structures that are symmetrical left and right.

본 발명은 건축물을 관통할 수 있도록 하면이 개방된 철골구조(100); 철골구조(100)의 상단에 설치되어, 자재 등을 철골구조(100)에 대해 수평 방향으로 운반시키는 호이스트(200); 철골구조(100)에 설치되고, 건축물에 고정될 수 있는 고정부가 마련되어, 철골구조(100)를 콘크리트 구조물에 대해 상승, 하강, 고정시키는 수직이동부(300); 철골구조(100)에 설치되어, 건축물에 설치된 레일을 따라 철골구조(100)를 콘크리트 구조물에 대해 수평 방향으로 이동 시키는 수평이동부(400)를 가진다. The present invention is the steel frame structure 100 is open to the bottom to penetrate the building; A hoist 200 installed at an upper end of the steel frame structure 100 to convey materials and the like in a horizontal direction with respect to the steel frame structure 100; Installed in the steel frame structure 100, is provided with a fixed portion that can be fixed to the building, vertical movement unit 300 for raising, lowering, fixing the steel structure 100 to the concrete structure; Installed in the steel frame structure 100, has a horizontal moving unit 400 for moving the steel frame structure 100 in the horizontal direction with respect to the concrete structure along the rail installed in the building.

본 발명의 구조는 필요에 따라 설치되는 위치 및 크기, 형태, 개수, 구조, 소재 등을 변경할 수 있으며, 일부 구조가 생략, 적용될 수 있음은 물론이다. The structure of the present invention can change the position and size, shape, number, structure, material, etc., which are installed as necessary, and some of the structures may be omitted or applied.

철골구조(100)는 다수의 철근(110)이 용접 또는 볼트(111), 너트(112); 결합(150)부 등 체결수단에 의해 조립될 수 있으며(도 4); 바람직하게는 건축물을 관통할 수 있도록 하면이 개방된 구조이다. Steel structure 100 is a plurality of reinforcement 110 is welded or bolts 111, nuts 112; Combination 150 can be assembled by a fastening means, such as (Fig. 4); Preferably, the lower surface is an open structure to penetrate the building.

철골구조(100)는 필요에 따른 크기를 가질 수 있는 것으로 건축물에 대응한 크기를 가질 수 있다. Steel frame structure 100 may have a size according to the need to have a size corresponding to the building.

결합부(150)는 철골구조(100)에 설치된 레일을 따라 이동하는 바퀴; 바퀴를 동작하게 하는 모터 등으로 구성될 수 있다. Coupling unit 150 is a wheel moving along the rail installed in the steel frame structure (100); It may be composed of a motor or the like for operating the wheel.

철골구조(100)의 견인, 하강 등의 동작에 있어; 상기 동작은 철골구조(100)를 형성하는 일부 구조 또는 전체에서 수행될 수 있다. 상기 동작이 일부 구조에서 수행될 경우; 동작이 해당 구조에서 순차적으로 수행되도록 할 수 있다. 이에 있어 상기 결합부(150)를 따라 해당 구조가 이동되도록 할 수 있다. In the operation of pulling, lowering, etc. of the steel frame structure 100; The operation may be performed in some or all of the structures forming the steel frame structure (100). When the operation is performed in some structure; The operations can be performed sequentially in the structure. In this case, the corresponding structure may be moved along the coupling part 150.

철골구조(100)에는 작업 공간 확보, 건축물에 대한 안정된 고정을 목적으로 볼트, 너트, 브라켓(bracket), 비계(scaffolding system), 클램프(clamp), 철골(안전)작업대, 안전발판(safety temporary equipment), 안정망 등의 구조가 결합될 수 있다. The steel frame structure 100 has bolts, nuts, brackets, scaffolding systems, clamps, steel working tables, and safety temporary equipment for the purpose of securing a working space and stable fixing to buildings. ), A structure such as a stability net may be combined.

호이스트(200)는, 철골구조(100, 건축물이 해당될 수 있다)에 설치된 레일; 레일을 따라 이동하는 한쌍의 바퀴; 한쌍의 바퀴와 연결되어 바퀴의 이동에 따라 함께 이동하는 윈치;로 구성될 수 있다. Hoist 200, the rail is installed on the steel structure (100, the building may correspond); A pair of wheels moving along the rail; It is connected to a pair of wheels winch to move together in accordance with the movement of the wheel; may be composed of.

호이스트(200)는 철골구조(100)에 설치되어 자재 등을 철골구조(100)에 대해 수평 방향으로 운반시키는 역할을 한다. 철골구조(100)에는 레일이 설치되어 있으며, 레일(210)을 따라 이동하는 한쌍의 바퀴(220a)는 연결봉(230a)에 의해 연결된다. 연결봉(230a)에는 다수개의 윈치(240)가 구비될 수 있다. 윈치(240)는; 모터 등의 작동에 의해 연결봉(230a)을 따라 이동, 회전이 가능한 구조를 가지며, 필요에 따라 크레인과 같은 윈치의 응용된 구조가 적용될 수 있으며; 도르레 등의 구조가 결합될 수 있다. The hoist 200 is installed in the steel frame structure 100 and serves to transport materials and the like in the horizontal direction with respect to the steel frame structure 100. The steel frame structure 100 is provided with a rail, a pair of wheels (220a) moving along the rail 210 is connected by a connecting rod (230a). The connecting bar 230a may be provided with a plurality of winches 240. Winch 240; It has a structure that can move, rotate along the connecting rod (230a) by the operation of the motor, etc., the applied structure of the winch, such as a crane can be applied as necessary; Pulleys and the like structure can be combined.

상기에 있어 호이스트(200)는 공지된 기술에 기초한 다양한 형태의 것이 적용될 수 있는 것으로 필요에 따라 철골구조(100) 또는 건축물에 설치된 레일; 레일을 따라 이동하는 바퀴, 모터 등의 동작에 의해 철골구조(100) 또는 건축물 상에서 상, 하 이동이 가능할 수 있도록 하는 해당 구조를 가질 수 있다. In the above hoist 200 is to be applied to a variety of forms based on known techniques, if necessary, steel frame structure 100 or a rail installed in the building; It may have a corresponding structure to be able to move up and down on the steel frame structure 100 or the building by the operation of the wheel, motor, and the like moving along the rail.

상기 윈치(240)가 구비된 연결봉(230a,230c)은 필요에 따른 개수로 구성될 수 있으며; 상기 윈치(240) 및 연결봉(230a,230c)은 전체 또는 일부가 연동되도록 할 수 있으며; 각기 동작되도록 할 수 있다. The connecting rods 230a and 230c provided with the winch 240 may be configured as many as necessary; The winch 240 and the connecting rods 230a and 230c may be interlocked in whole or in part; Can be operated individually.

윈치(240)에는 와이어(241)가 권취되어 있으며, 와이어(241)의 끝단에는 자재 등을 용이하게 고정시킬 수 있도록 하는 걸고리(243), 집게 등의 구조가 구비된다. The winch 240 is wound around the wire 241, and the ends of the wire 241 are provided with structures such as hooks 243 and tongs for easily fixing materials and the like.

수직이동부(300)는 바람직하게는 윈치(310)이며; 윈치(310)에 권치된 와이어(311)의 끝단에는 고정부(330)가 구비된다. 고정부는, 필요에 따른 위치에 설치되어 건축물에 철골구조(100)가 고정될 수 있도록 하는 구조로; 건축물에 부착되며, 삽입공이 형성되어 있는 브라켓(331); 삽입공에 체결되어, 브라켓이 건축물에 고정되도록 하는 체결부재(333); 브라켓에 구비되어, 윈치의 와이어가 고정되는 걸림고리(336,336a);로 구성될 수 있다. The vertical moving part 300 is preferably a winch 310; The fixing part 330 is provided at the end of the wire 311 wound around the winch 310. Fixing portion is installed in a position as needed to the structure to be fixed to the steel frame structure 100 to the building; A bracket 331 attached to the building and having an insertion hole formed therein; A fastening member 333 fastened to the insertion hole to fix the bracket to the building; It is provided on the bracket, the hook 336, 336a to which the wire of the winch is fixed; may be configured.

이외, 수직이동부(300)은 철골구조(100)에 고정되어, 건축물에 설치된 레일;을 따라 이동하는 바퀴; 바퀴를 동작하게 하는 모터; 등으로 구성될 수 있으며; 필요에 따라 이동 및 회전이 가능하도록 하는 해당 구조를 가질 수 있다. In addition, the vertical movement unit 300 is fixed to the steel frame structure 100, the rail installed in the building; wheels to move along; A motor for operating the wheel; And the like; If necessary, it may have a corresponding structure to allow movement and rotation.

수평이동부(400)는 철골구조(100)에 고정되어, 건축물에 설치된 레일(550);을 따라 이동하는 바퀴(401); 바퀴를 동작하게 하는 모터; 등으로 구성될 수 있다. Horizontal moving unit 400 is fixed to the steel frame structure 100, the rail 550 installed in the building; wheels 401 to move along; A motor for operating the wheel; And the like.

수직이동부(300), 수평이동부(400)는 다수개로 구성될 수 있으며, 전체 또는 일부가 연동 또는 각기 동작될 수 있다. The vertical moving part 300 and the horizontal moving part 400 may be configured in plural, and all or part of the vertical moving part 300 and the horizontal moving part 400 may be operated.

상기 브라켓(331)은 'ㄷ', 'ㄱ', 'ㄴ'형 등 실시례에 따라 다양한 형태로 제작; 건축물(500)의 천정면(510), 바닥면, 측벽에 부착될 수 있는 것으로; 삽입공(332)을 가질 수 있다(도 5). 삽입공(332)에는 볼트(334), 너트 등 체결부재(333)가 체결된다. 이에 있어 볼트(334)가 콘크리트 구조물(500)의 천정면(510) 또는 바닥면을 관통하도록 하고, 볼트(334)의 일단에는 너트(355)가 결합, 고정되도록 함으로써, 브라켓(331a)이 콘크리트 구조물(500)에 고정되도록 할 수 있으며; 브라켓(331a)의 삽입공(332a)에 한쌍의 볼트(333a)를 체결하고, 한쌍의 볼트(333a) 하면이 천정면(510)의 상, 하면에 각각 접촉되도록 고정시킴으로써, 브라켓(331a)이 콘크리트 구조물(500)에 고정되도록 할 수 있다(도 6). The bracket 331 is produced in various forms according to the embodiment, such as 'c', 'a', 'b' type; It can be attached to the ceiling surface 510, the bottom surface, side walls of the building 500; It may have an insertion hole 332 (Fig. 5). A fastening member 333 such as a bolt 334 and a nut is fastened to the insertion hole 332. In this case, the bolt 334 penetrates the ceiling surface 510 or the bottom surface of the concrete structure 500, and the nut 355 is coupled and fixed to one end of the bolt 334 so that the bracket 331a is concrete. Can be secured to the structure 500; The pair of bolts 333a are fastened to the insertion hole 332a of the bracket 331a, and the brackets 331a are fixed by fixing the pair of bolts 333a so that the lower surfaces of the brackets 331a contact the upper and lower surfaces of the ceiling surface 510, respectively. It can be fixed to the concrete structure 500 (Fig. 6).

본 발명의 동작에 있어; 호이스트(200) 및 수직이동부(300), 수평이동부(400)의 동작을 유, 무선을 통해 제어하는 실행부(조정부, 컨트롤장치, 단말장치)가 구비될 수 있다. 실행부는 필요에 따른 상기 해당 구조에 내, 외장된 형태를 가질 수 있다. In the operation of the present invention; An execution unit (adjustment unit, control unit, terminal device) for controlling the operation of the hoist 200, the vertical moving unit 300, the horizontal moving unit 400 via wired or wireless may be provided. The execution unit may have an internal and external form in the corresponding structure as required.

조정부(종래, 타워 크레인의 조정실과 유사할 수 있다)는 호이스트(200) 및 수직이동부(300), 수평이동부(400)의 제어가 가능한 장치로서; 내부에 작업자가 탑승할 수 있는 공간 및 상기 제어에 필요한 해당 구조를 가질 수 있으며; 철골구조(100)상에서 이동 및 회전이 가능하도록 하는 해당 구조를 가질 수 있다. The adjusting unit (conventionally, may be similar to the adjusting room of the tower crane) is a device capable of controlling the hoist 200, the vertical moving unit 300, and the horizontal moving unit 400; It can have a space for the operator to ride inside and the corresponding structure required for the control; It may have a corresponding structure to enable movement and rotation on the steel frame structure (100).

컨트롤 장치(도 7, 700)는 호이스트(200) 및 수직이동부(300), 수평이동부(400)의 제어가 가능한 장치이다. The control device (FIGS. 7 and 700) is a device capable of controlling the hoist 200, the vertical moving part 300, and the horizontal moving part 400.

단말장치는 호이스트(200) 및 수직이동부(300), 수평이동부(400)의 수동 및 자동 제어가 가능한 장치로서; 노트북, PDA, 휴대폰 및 상기 동작을 목적으로 제작된 단말기기 등이 사용될 수 있다. The terminal device is a device capable of manual and automatic control of the hoist 200, the vertical moving part 300, and the horizontal moving part 400; Notebooks, PDAs, mobile phones, and terminal devices designed for the above operation may be used.

단말장치는, 운영체계; 유, 무선 통신을 가능하게 하는 모뎀, 네트워크 어댑터; 하기 센서 및 영상장치로부터 감지된 데이터(이하 '좌표데이터'라 지칭한다)를 영상데이터로 변환, 출력하는 액정화면, 모니터 등 출력장치; 좌표데이터를 분석, 처리하여 해당 구조 및 자재의 x, y, z축 상의 좌표값을 분석, 처리하여 제어프로그램으로 출력하는 좌표처리장치; 좌표처리장치로부터 입력받은 데이터 및 제어데이터를 참조, 상기 본 발명의 구조 동작을 제어하는 제어프로그램; 유, 무선을 통해 제어 내용을 해당 장치로 출력하는 출력부; 제어프로그램, 제어데이터의 제작, 편집, 수정, 삭제 등을 목적으로 프로그래밍된 제어프로그램 관리부; 마우스, 키보드, 조이스틱 등 입력장치; HDD, CD-ROM 등 저장장치; 데이터베이스; 등으로 구성되며; 철골구조(100), 호이스트(200), 수직이동부(300), 수평이동부(400), 해당 자재 등에 설치되어 상기 구조의 위치, 상태를 감지하는 센서 및 촬영하는 카메라 등 영상장치와 연동될 수 있다. 단말장치에 의해 제어될 경우 상기 센서 및 영상장치 는; 설치된 해당 구조의 좌표값을 실시간 좌표처리장치로 출력한다. The terminal device includes an operating system; Modems and network adapters for wired and wireless communications; An output device such as a liquid crystal display and a monitor for converting and outputting data (hereinafter referred to as 'coordinate data') detected by the sensor and the image device into image data; A coordinate processing apparatus for analyzing and processing coordinate data to analyze and process coordinate values on x, y, and z axes of a corresponding structure and material and to output them to a control program; A control program for controlling the structure operation of the present invention with reference to data and control data received from a coordinate processing apparatus; An output unit for outputting control contents to the corresponding device via wired or wireless; A control program manager programmed for the purpose of producing, editing, modifying, deleting a control program and control data; Input devices such as a mouse, a keyboard and a joystick; Storage devices such as HDDs, CD-ROMs, etc .; Database; And the like; Installed in steel structure 100, hoist 200, vertical moving unit 300, horizontal moving unit 400, the material and the like to be connected to the image device, such as a sensor for detecting the position and status of the structure and the camera to shoot Can be. When controlled by the terminal device, the sensor and the image device; Output the coordinates of the installed structure to the real-time coordinate processing device.

출력장치는 호이스트(200), 수직이동부(300), 수평이동부(400)의 정밀한 작업을 가능하게 한다. 일례로 호이스트(200)를 통해 해당 자재를 이동시킬 경우; 해당 자재의 현 위치, 설치될 위치 등을 영상데이터로 출력; 작업에 있어 필요한 내용을 확인, 비교, 분석할 수 있도록 한다. The output device enables precise operation of the hoist 200, the vertical moving part 300, and the horizontal moving part 400. For example, when moving the material through the hoist 200; Outputting the current position of the material and the position to be installed as image data; It allows you to identify, compare and analyze what you need to do.

제어데이터는 호이스트(200) 및 수직이동부(300), 수평이동부(400)의 제어 내용; 해당 자재가 설치될 위치, 이동 방법 등 시공 절차, 방법 에 관한 데이터를 가진다. The control data includes the control contents of the hoist 200, the vertical moving part 300, and the horizontal moving part 400; It has data on the construction procedure and method such as the location of the material and the method of movement.

제어프로그램, 제어데이터, 제어프로그램 관리부는 CD-ROM 등 저장장치, 인터넷 등을 통해 입력될 수 있다. The control program, the control data, and the control program manager may be input through a storage device such as a CD-ROM or the Internet.

상기 본 발명의 구조는 단말장치를 통해 수동으로 제어될 수 있으며, 제어프로그램에 의해 자동으로 제어될 수 있다. 이에 있어 상기 구조는 해당 명령을 유, 무선으로 입력받을 수 있는 수신부 및 해당 장치를 가진다. The structure of the present invention can be controlled manually through the terminal device, it can be automatically controlled by the control program. In this regard, the structure has a receiver and a device capable of receiving a corresponding command wired or wirelessly.

상기 자동으로 제어될 경우 실시례는 다음과 같다. 호이스트의 동작에 있어; 좌표처리장치는 실시간 해당 구조의 좌표데이터를 분석, 처리하여 제어프로그램으로 출 력한다. 제어프로그램은 상기 입력받은 데이터 및 제어데이터를 참조하여 호이스트을 이동, 자재를 해당 위치로 이동한다. 작업자는 이동된 자재를 용접, 체결부재 등을 이용, 고정시킨다. The embodiment is as follows when automatically controlled. In the operation of the hoist; The coordinate processing device analyzes and processes the coordinate data of the corresponding structure in real time and outputs it to the control program. The control program moves the hoist by referring to the input data and the control data, and moves the material to the corresponding position. The worker fixes the moved material using welding or fastening members.

상기에 있어 단말장치는 필요에 따라 호이스트, 수평이동부, 수직이동부에 내, 외장될 수 있으며 다수개로 구성될 수 있다. 다수개로 구성될 경우 각기 동작 또는 데이터를 유, 무선으로 교류, 공유하며 연동될 수 있다. In the above, the terminal device may be internally and externally included in the hoist, the horizontal moving part and the vertical moving part as necessary, and may be configured in plural. When composed of a plurality of operations or data can be exchanged, wired and wireless, and interlocked.

본 발명의 실시례에 있어; 아파트 등과 같은 건물에서 측벽(530)의 외측면에 대응하는 거푸집을 외측 패널(630), 측벽(530)의 내측면에 대응하는 거푸집을 내측 패널(610), 천정면(510)에 대응하는 거푸집을 상면 패널(650)이라 정의한다. 상기 패널은 목재, 철재 등 다양한 소재로 제작될 수 있으며; 다수 패널이 결합되어 하나의 패널을 구성할 경우 결합되는 이음부(620)를 힌지축 회전되게 하여 패널을 접을 수 있으며(도 8; a,b); 호이스트(200)의 걸고리(243), 와이어(241)가 연결될 수 있도록 걸림수단이 구비된다. In an embodiment of the invention; Formwork corresponding to the outer surface of the side wall 530, the formwork corresponding to the inner surface of the side panel 530, the formwork corresponding to the inner panel 610, the ceiling surface 510 in a building such as an apartment Is defined as a top panel 650. The panel may be made of various materials such as wood and steel; When a plurality of panels are combined to form one panel, the panels may be folded by hinge-rotating the joint 620 to be coupled (FIG. 8; a, b); Hook 243 of the hoist 200, the locking means is provided so that the wire 241 can be connected.

시공된 측벽(530)에는 상면 패널(650)을 지지하기 위한 상면 패널 지지부(670; 도 9; a,b,c; 측벽에 볼트: 672, 너트: 673에 의해 고정되는 브라켓: 671과, 이에 안착되어 상면 패널의 하면을 지지하는 지지부재: 675로 구성된다)가 설치된다. The constructed side wall 530 includes a top panel support 670 for supporting the top panel 650 (FIG. 9; a, b, c; a bracket 671 fixed to the side wall by a bolt 672 and a nut 673), and And a supporting member (composed of 675) which is seated and supports the lower surface of the top panel.

상면 패널 지지부(670)는 다양한 방법을 통해 측벽(530)에 고정될 수 있다. 이에 있어 측벽(530)에 관통된 구멍이 필요할 경우, 패널 상에 해당 구멍이 형성될 수 있도록 하는 구조를 가질 수 있다. Top panel support 670 may be secured to sidewall 530 through a variety of methods. In this case, when a hole through the side wall 530 is required, it may have a structure that allows the hole to be formed on the panel.

한쌍의 브라켓(671)은 양측벽에 대응되게 설치되고, 이에 지지부재(675)의 양단이 각각 안착된다. 브라켓(671)은 'ㄷ', 'ㄱ', 'ㄴ'형 등 실시례에 따라 다양한 형태로 제작될 수 있다. The pair of brackets 671 are installed to correspond to both side walls, and both ends of the support member 675 are respectively seated. The bracket 671 may be manufactured in various forms depending on the embodiment such as 'c', 'a', 'b' type.

지지부재(675)는 목재, 철재 등이 될 수 있으며, 하면에 서포트(support) 등의 구조가 지지될 수 있다. The support member 675 may be made of wood, steel, or the like, and a structure such as a support may be supported on the bottom surface.

본 발명의 실시례는 다음과 같다. 일반적으로 아파트 등의 고층 건물의 경우 좌, 우 대칭인 경향이 있다(이하 좌측에 해당되는 공간을 '공간A'라 하고; 우측에 해당되는 공간을 '공간B'라 지칭한다). 이에 있어 공간A, B를 동시 또는 각각 시공할 수 있다. Embodiments of the present invention are as follows. In general, high-rise buildings such as apartments tend to be left-right symmetrical (hereinafter, the space corresponding to the left side is referred to as 'space A'; the space corresponding to the right side is referred to as 'space B'). In this case, spaces A and B can be constructed simultaneously or separately.

공간A, B를 각기 시공할 경우의 실시례는 다음과 같다. An example in the case of constructing the spaces A and B, respectively, is as follows.

1단계; 철골구조(100)를 준비하여(도 10). 지상에 고정시킨다. 기초 공사 등 구조물이 있을 경우; 해당 구조에 고정부(330)를 고정시킨다. Stage 1; To prepare a steel structure 100 (Fig. 10). Secure it to the ground. If there is a structure such as foundation work; The fixing part 330 is fixed to the structure.

2단계; 호이스트(200)를 이용; 공간A에 철근(540) 등 자재와 내, 외측 패널을 이 동, 설치한다(도 12). Step 2; Using hoist 200; In the space A, materials such as rebar 540 and inner and outer panels are moved and installed (FIG. 12).

3단계; 상기 설치된 패널에 콘크리트를 타설한다. Step 3; Concrete is poured into the installed panels.

4단계; 콘크리트가 굳으면; 내, 외측 패널을 분리; 호이스트(200)를 이용, 공간B로 이동, 상기 2단계와 동일, 유사한 절차, 방법을 따라 철근(540) 등 자재와 내, 외측 패널을 설치한다(도 13). 불필요한 패널이 있을 경우, 패널을 접은 다음(도 8), 적절한 위치에 보관; 필요한 패널이 있을 경우, 공급받아 사용할 수 있다. Step 4; When concrete hardens; Separating inner and outer panels; The hoist 200 is used to move to the space B, and the same materials as the above two steps, and the inner and outer panels, such as the reinforcing bar 540, are installed in accordance with similar procedures and methods (FIG. 13). If there are unnecessary panels, fold the panels (Figure 8) and store them in the proper place; If a panel is required, it can be supplied.

5단계; 공간A 측벽(530a)에 상면 패널 지지부(670)를 설치; 이의 상면에 상면 패널(650) 및 철근(540)을 배치시킨다(도 14). Step 5; An upper panel support 670 is provided on the space A side wall 530a; The upper panel 650 and the reinforcing bar 540 are disposed on the upper surface thereof (FIG. 14).

6단계; 공간A의 상면 패널(650)과, 공간B의 내, 외측 패널에 콘크리트를 타설한다(도 15). Step 6; Concrete is poured into the upper panel 650 of the space A and the inner and outer panels of the space B (FIG. 15).

7단계; 콘크리트가 굳으면, 공간B의 내, 외측 패널을 분리; 호이스트(200)를 이용; 한층 위 공간A에 2단계와 동일, 유사한 절차, 방법을 따라 해당 자재 및 내, 외측 패널을 설치; 공간B에 5단계와 동일, 유사한 절차, 방법을 따라 상면 패널 지지부(670), 상면 패널(650), 철근(540)을 설치한다. Step 7; When the concrete is hardened, the inner and outer panels of the space B are separated; Using hoist 200; Install the material and the inner and outer panels according to the same procedures and methods as in step 2 in space A above; In the space B, the top panel support part 670, the top panel 650, and the reinforcing bar 540 are installed in the same manner as in step 5, in a similar procedure and method.

8단계; 7단계에서 설치된 공간A의 내, 외측 패널과, 공간B의 상면 패널(650)에 콘크리트를 타설한다. Step 8; Concrete is poured into the inner and outer panels of the space A and the upper panel 650 of the space B installed in step 7.

9단계; 콘크리트가 굳으면, 철골구조(100)를 상층으로 견인한다. Step 9; When the concrete hardens, the steel structure 100 is towed to the upper layer.

10단계; 4단계 이하를 반복한다. Step 10; Repeat step 4 and below.

11단계; 최상층까지 시공이 완료되면; 철골구조(100)를 한층 아래로 이동; 미장, 도장 등 외벽 작업을 수행한다. 이때, 타워 크레인, 화물 엘리베이터 등을 이용, 호이스트(200) 등 일부 구조를 분리, 제거할 수 있다. Step 11; When construction is completed to the top floor; Moving the steel structure 100 down; Perform exterior wall work such as plastering and painting. In this case, some structures such as the hoist 200 may be separated and removed using a tower crane, a cargo elevator, or the like.

12단계; 11단계 이하를 반복한다. 12 steps; Repeat step 11 or below.

13단계; 철골구조(100)가 최하층까지 이동, 외벽 작업이 완료되면, 철골구조(100)를 제거한다. Step 13; Steel structure 100 is moved to the lowest floor, when the outer wall work is completed, remove the steel structure (100).

상기에 수직이동부(300)의 동작에 있어; 고정부(330)의 위치는 필요에 따라 변경될 수 있다. In the operation of the vertical movement unit 300; The position of the fixing part 330 may be changed as necessary.

공간A, B를 동시 시공할 경우의 실시례는 다음과 같다. The example at the time of constructing space A and B simultaneously is as follows.

1단계; 철골구조(100)를 준비하여(도 10). 지상에 고정시킨다. 기초 공사 등 구조물이 있을 경우; 해당 구조에 고정부(330)를 고정시킨다. Stage 1; To prepare a steel structure 100 (Fig. 10). Secure it to the ground. If there is a structure such as foundation work; The fixing part 330 is fixed to the structure.

2단계; 호이스트(200)를 이용; 공간A,B에 두개 층에 대응하는 높이를 가지는 외측 패널, 철근(540)과 한개층에 대응하는 높이를 가지는 내측 패널(610)을 설치한다(도 16). Step 2; Using hoist 200; In the spaces A and B, an outer panel having a height corresponding to two layers, a reinforcing bar 540 and an inner panel 610 having a height corresponding to one layer are provided (FIG. 16).

3단계; 설치된 내, 외측 패널(630)에 콘크리트를 타설한다. Step 3; Concrete is poured into the installed inner and outer panels 630.

4단계; 콘크리트가 굳으면; 내측 패널(610)을 분리한 후 호이스트(200)를 이용, 한층 위의 높이에 대응하도록 견인, 외측 패널(630)에 고정한다. Step 4; When concrete hardens; After the inner panel 610 is removed, the hoist 200 is fixed to the outer panel 630 to be pulled to correspond to the height above.

5단계; 3단계에서 생성된 측벽(530)에 상면 패널 지지부(670), 상면 패널(650), 철근(540)을 배치시킨다(도 17). Step 5; The top panel support 670, the top panel 650, and the rebar 540 are disposed on the side wall 530 generated in step 3 (FIG. 17).

6단계; 4단계에서 설치된 내, 외측 패널과, 5단계에서 설치된 상면 패널(650)에 콘크리트를 타설한다(도 18). 이때 천정면, 측벽에 대응하는 패널에 콘크리트를 따 로 타설할 수 있다. Step 6; Concrete is poured into the inner and outer panels installed in step 4 and the top panel 650 installed in step 5 (FIG. 18). At this time, the concrete can be poured separately on the panel corresponding to the ceiling surface and the side wall.

7단계; 콘크리트가 굳으면, 철골구조(100)를 상층으로 견인한다. Step 7; When the concrete hardens, the steel structure 100 is towed to the upper layer.

8단계; 2단계와 동일, 유사한 절차, 방법을 따라 내, 외측 패널, 해당 자재를 설치하고, 6단계에서 생성된 측벽에 대응하도록, 5단계와 동일, 유사한 절차, 방법을 따라 상부패널 지지부(670), 상면 패널(650), 철근(540)을 배치하고 콘크리트를 타설한다. Step 8; Same as step 2, following the same procedure and method, the inner and outer panels, the upper panel support 670, according to the same procedure, method and the same as step 5, to install the corresponding material, and to correspond to the side wall created in step 6, The upper panel 650 and the rebar 540 are disposed and concrete is poured.

9단계; 콘크리트가 굳으면, 철골구조(100)를 상층으로 견인한다. Step 9; When the concrete hardens, the steel structure 100 is towed to the upper layer.

10단계; 2단계 이하를 반복한다. Step 10; Repeat step 2 and below.

11단계; 최상층까지 시공이 완료되면; 철골구조(100)를 한층 아래로 이동; 미장, 도장 등 외벽 작업을 수행한다. 이때, 타워 크레인, 화물 엘리베이터 등을 이용; 호이스트(200) 등 일부 구조를 분리, 제거할 수 있다. Step 11; When construction is completed to the top floor; Moving the steel structure 100 down; Perform exterior wall work such as plastering and painting. At this time, using a tower crane, cargo elevator, etc .; Some structures such as the hoist 200 can be separated and removed.

12단계; 11단계 이하를 반복한다. 12 steps; Repeat step 11 or below.

13단계, 철골구조(100)가 최하층까지 이동, 외벽 작업이 완료되면, 철골구조(100)를 제거한다. Step 13, the steel structure 100 is moved to the lowest floor, when the outer wall work is completed, remove the steel structure 100.

상기에 수직이동부(300)의 동작에 있어; 고정부(330)의 위치는 필요에 따라 변경될 수 있다. In the operation of the vertical movement unit 300; The position of the fixing part 330 may be changed as necessary.

본 발명의 실시에 있어; 필요한 자재는 타워 크레인, 화물 엘리베이트 등을 통해 공급받을 수 있다. 이에 있어 지상에서 필요한 형태로 가공한 후 공급받을 수 있다. In the practice of the present invention; The necessary materials can be supplied by tower cranes, freight elevators, etc. In this case, it can be supplied after being processed to the required shape on the ground.

상기 실시례에 있어 필요에 따라 수평이동부(400)의 동작에 의해 건축물(500)에 대한 철골구조(100)의 수평 이동이 포함될 수 있다. In the above embodiment, the horizontal movement of the steel structure 100 with respect to the building 500 may be included by the operation of the horizontal moving unit 400 as necessary.

본 발명의 실시는; 천정면, 측벽을 따로 시공하는 것이 바람직하다. 이에 있어 시공 절차 및 방법은 당업자에 있어 다양하게 응용, 실시될 수 있다. 이에 있어 조립식 구조물의 시공 등에 있어서도 하기 특허청구범위에 기재된 본 발명의 기술 사상 및 영역으로부터 벗어나지 않는 범위 내에서 다양하게 수정, 변형하여 실시할 수 있다. The practice of the present invention; It is preferable to construct a ceiling surface and a side wall separately. In this regard, the construction procedure and method may be variously applied and implemented by those skilled in the art. In this regard, even in the construction of the prefabricated structure, it can be carried out in a variety of modifications and variations within the scope not departing from the spirit and scope of the present invention described in the claims.

건축물의 시공에 있어 인력, 비용, 시간 절감 및 공급, 수요 창출 등에 있어 경제적 효과를 기대할 수 있다. In the construction of buildings, economic effects can be expected in manpower, cost, time saving and supply, and demand generation.

Claims (9)

건축물을 시공하기 위한 건축 장치에 있어서, 건축물을 관통할 수 있도록 하면이 개방된 철골구조; 철골구조에 설치되어, 자재, 패널 등을 철골구조에 대해 수평 방향으로 운반시키는 호이스트; 철골구조에 설치되어, 철골구조를 건축물에 대해 상승, 하강, 고정시키는 수직이동부; 철골구조에 설치되어, 철골구조를 건축물에 대 해 수평 이동, 고정시키는 수평이동부;를 포함하여 이루어지는 건축 장치. A building device for constructing a building, comprising: a steel frame structure having an open lower surface to penetrate a building; A hoist installed in the steel frame structure to convey materials, panels, etc. in a horizontal direction with respect to the steel frame structure; Installed in the steel structure, the vertical moving portion for raising, lowering, fixing the steel structure relative to the building; And a horizontal moving unit installed in the steel structure and horizontally moving and fixing the steel structure to the building. 제 1항에 있어서, 호이스트는, 철골구조에 설치된 레일; 레일을 따라 이동하는 한쌍의 바퀴; 한쌍의 바퀴와 연결봉에 의해 연결되어 바퀴의 이동에 따라 이동 및 연결봉 상에서 이동, 회전이 가능한 윈치;로 구성된 것을 특징으로 하는 건축 장치. The hoist according to claim 1, further comprising: a rail provided in a steel frame structure; A pair of wheels moving along the rail; A winch that is connected by a pair of wheels and connecting rods to move and rotate on the connecting rods in accordance with the movement of the wheels; 제 1항에 있어서, 수직이동부는 윈치인 것을 특징으로 하는 건축 장치. The building device according to claim 1, wherein the vertical moving part is a winch. 제 3항에 있어서, 건축물에 고정될 수 있는 고정부가 마련되어, 삽입공을 가진 브라켓; 삽입공에 체결되어, 상기 브라켓이 상기 콘크리트 구조물에 고정되도록 하는 체결부재; 브라켓에 구비되어, 상기 윈치의 와이어가 고정되는 걸림고리;로 구성된 것을 특징으로 하는 건축 장치. According to claim 3, The fixing part which can be fixed to the building is provided, the bracket having an insertion hole; A fastening member fastened to an insertion hole to fix the bracket to the concrete structure; It is provided on the bracket, the hook hook is fixed to the wire of the winch; Building device, characterized in that consisting of. 제 1항에 있어서, 수직이동부는 건축물에 설치되는 레일을 따라 이동하는 바퀴; 바퀴를 동작하게 하는 모터;로 구성될 수 있는 것을 특징으로 하는 건축 장치. According to claim 1, wherein the vertical moving unit wheel for moving along the rail installed in the building; A motor for operating a wheel; building device, characterized in that consisting of. 제 1항에 있어서, 수평이동부는 건축물에 설치된 레일을 따라 이동하는 바퀴; 바퀴를 동작하게 하는 모터;로 구성될 수 있는 것을 특징으로 하는 건축 장치. According to claim 1, wherein the horizontal moving unit wheel for moving along the rail installed in the building; A motor for operating a wheel; building device, characterized in that consisting of. 제 1항에 있어서, 호이스트, 수직이동부, 수평이동부는 단말장치와 유, 무선으로 연결되어 자동으로 제어될 수 있는 것을 특징으로 하는 건축 장치. The building apparatus of claim 1, wherein the hoist, the vertical moving unit, and the horizontal moving unit are automatically connected to the terminal apparatus by wire or wirelessly. 제 7항에 있어서, 단말장치는 The terminal apparatus of claim 7, wherein the terminal apparatus 각 장치를 동작하게 하는 운영체계; An operating system for operating each device; 유, 무선 통신을 가능하게 하는 모뎀, 네트워크 어댑터; Modems and network adapters for wired and wireless communications; 센서로부터 감지된 데이터를 좌표데이터로 처리하여 제어프로그램으로 출력하는 좌표처리장치;A coordinate processing apparatus for processing the data sensed by the sensor as coordinate data and outputting the coordinate data to a control program; 좌표데이터 및 제어데이터에 기초해 호이스트, 수직이동부, 수평이동부의 동작을 제어하는 제어프로그램; A control program for controlling the operation of the hoist, the vertical moving unit, and the horizontal moving unit based on the coordinate data and the control data; 제어 내용을 각 장치로 출력하는 출력부; An output unit for outputting control contents to each device; 좌표데이터를 영상데이터로 출력하는 출력장치; An output device for outputting coordinate data as image data; 제어프로그램 및 제어데이터의 가공을 목적으로 프로그래밍된 제어프로그램 관리부; A control program manager programmed for processing the control program and the control data; 마우스, 키보드 등 입력장치; Input devices such as a mouse and a keyboard; HDD, CD-ROM 등 저장장치; Storage devices such as HDDs, CD-ROMs, etc .; 데이터베이스;로 Database; as 구성된 것을 특징으로 하는 건축 장치. Construction device, characterized in that configured. 제 1항 내지 제 8항 중 어느 항의 건축 장치를 이용하여 천정면과 측벽을 따로 시공하는 것을 특징으로 하는 건축물 시공 방법. A building construction method comprising using a building device according to any one of claims 1 to 8 to separate the ceiling surface and the side wall.
KR1020070046006A 2007-05-11 2007-05-11 Construction apparatus and installation method using it KR20080100002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070046006A KR20080100002A (en) 2007-05-11 2007-05-11 Construction apparatus and installation method using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070046006A KR20080100002A (en) 2007-05-11 2007-05-11 Construction apparatus and installation method using it

Publications (1)

Publication Number Publication Date
KR20080100002A true KR20080100002A (en) 2008-11-14

Family

ID=40286816

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070046006A KR20080100002A (en) 2007-05-11 2007-05-11 Construction apparatus and installation method using it

Country Status (1)

Country Link
KR (1) KR20080100002A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733590A (en) * 2012-06-26 2012-10-17 杨政 Lifting mechanism for inserted lift scaffold
CN110700550A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Lower hanger for lifting scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733590A (en) * 2012-06-26 2012-10-17 杨政 Lifting mechanism for inserted lift scaffold
CN110700550A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Lower hanger for lifting scaffold

Similar Documents

Publication Publication Date Title
RU2616306C1 (en) Method for construction of multistore buildings of three-dimensional blocks
CN106241618A (en) A kind of curtain wall profiles boom hoisting
CN211923466U (en) Elevator shaft regularization operation platform
KR20080100002A (en) Construction apparatus and installation method using it
KR20080104429A (en) Construction apparatus and installation method using it
KR20080099685A (en) Construction apparatus and installation method using it
JP2000145129A (en) Staging provided with load lifter
JPH0754491A (en) Erecting device for exterior curtain wall of building
JP6646220B2 (en) Construction method of suspended steel frame for suspended ceiling
KR20090102047A (en) Construction apparatus and installation method using it
JP2017031676A (en) Earthquake resistant reinforcement method and reinforcement device of existing building
CN206051364U (en) A kind of curtain wall profiles boom hoisting
KR20080099758A (en) Construction apparatus and installation method using it
KR200387937Y1 (en) Construction apparatus and installation method using it
KR20070032601A (en) Construction apparatus and installation method using it
CN107792802A (en) A kind of small members movement and mounting system and method
KR20050058314A (en) Construction apparatus and installation method using it
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
KR20210068283A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
JP3220397B2 (en) Elevating scaffold
JPH10292619A (en) Self-climbing hanging scaffold unit for use in hanging scaffold constructing system corresponding to large space
KR20210141194A (en) Construction Method and Device of Wall and Floor Structure in Elevator's Machine Room in Apartment Building and Office Using Hanging Structural Method by Steel and Deck Plate in Top-down Structure
JP5166055B2 (en) Construction method of multistory parking lot
KR20060136019A (en) Construction apparatus and installation method using it
KR20070000049A (en) Construction apparatus and installation method using it

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination