Prior art keywords
pier
nut
bridge
inspection facility
fixing
Prior art date
Application number
KR1020040064781A
Other languages
Korean (ko)
Inventor
배석동
전종환
Original Assignee
(주) 선암기술연구소
전종환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 선암기술연구소, 전종환 filed Critical (주) 선암기술연구소
Priority to KR1020040064781A priority Critical patent/KR20060016371A/en
Publication of KR20060016371A publication Critical patent/KR20060016371A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량의 하부 구조물과 콘트리트 타설되어 일체화된 매설용 너트를 이용하여 점검시설을 고정할 수 있도록 한 교량 점검시설을 고정하기 위한 매설형 너트에 관한 것이다.The present invention relates to a buried nut for fixing a bridge inspection facility so that the inspection facility can be fixed by using concrete buried nuts integrated with the lower structure of the bridge.

본 발명에 따른 교량 점검시설을 고정하기 위한 매설형 너트는, 교각을 점검하기 위하여 난간과 발판 및 고정대를 구비하며 교각에 점검시설을 고정설치하기 위한 공지의 것에 있어서, 교각 상부의 내부 둘레에 설치되며 상기 점검시설의 고정대가 고정되는 다수개의 너트부와, 상기 너트부로부터 교각의 내부로 연장되는 연장부로 이루어져, 상기 교각과 일체로 콘크리트 타설되는 것을 특징으로 한다. The buried nut for fixing the bridge inspection facility according to the present invention is provided with a railing, scaffolding and a fixed stage for inspecting the pier, and is known in the art for fixing and installing the inspection facility in the pier. And a plurality of nut parts to which the fixing stand of the inspection facility is fixed, and an extension part extending from the nut part to the inside of the pier, wherein the pour is integrally formed with the pier.

따라서, 본 발명에 따른 교량 점검시설을 고정하기 위한 매설형 너트는, 교각에 미리 설치된 매설형 너트에 점검시설을 조립함으로써 별도의 부대공정이 필요없이 설치 및 해체가 용이하여 작업능률을 향상시킬 수 있으며, 교각의 형상에 무관하게 설치가 가능하여 적응성이 우수하고, 콘크리트 탈락 및 철근부식 등이 전혀 없어 교각의 내구성을 증진시킬 수 있는 효과가 있다. 또한, 교량 상부 가설시 필요시에 임시작업대 설치를 위하여 작업대 이용이 가능하며, 교량확장시에 유리하고, 교량받침 교체시에 지장이 없이 교체할 수 있는 장점이 있다. Therefore, the buried nut for fixing the bridge inspection facility according to the present invention, by assembling the inspection facility to the buried nut pre-installed in the pier can be easily installed and dismantled without the need for an additional process to improve the work efficiency It can be installed irrespective of the shape of the pier, and has excellent adaptability, and there is no concrete dropout or reinforcing corrosion of the pier, thereby improving the durability of the pier. In addition, it is possible to use the workbench for temporary workbench installation when the upper part of the bridge is required, it is advantageous when the bridge is extended, there is an advantage that can be replaced without trouble when replacing the bridge support.

교량, 교각, 조립식, 점검시설, 매설형, 너트Bridge, Pier, Prefab, Inspection Facility, Buried, Nut

Description

교량 점검시설을 고정하기 위한 매설형 너트{Bridge Inspection Equipment Fixed by Laid Nut}Bridge Inspection Equipment Fixed by Laid Nut}

도 1a와 도 1b는 종래에 사용된 교량 점검시설의 일예로 앵커볼트를 이용한 교량 점검대를 나타낸 측단면도와 평면도.Figure 1a and Figure 1b is a side cross-sectional view showing a bridge inspection platform using an anchor bolt as an example of a conventional bridge inspection facility.

도 2a와 도 2b는 종래에 사용된 교량 점검시설의 다른예로 걸이식 점검시설의 측단면도와 평면도. 2A and 2B are side cross-sectional views and plan views of a hook type inspection facility as another example of a bridge inspection facility used in the related art.

도 3은 본 발명에 의한 교량 점검시설을 고정하기 위한 매설형 너트의 개략도를 나타낸 단면도.3 is a cross-sectional view showing a schematic view of a buried nut for fixing the bridge inspection facility according to the present invention.

도 4는 본 발명에 의한 매설형 너트의 배치를 나타낸 사시도.Figure 4 is a perspective view showing the arrangement of the buried nut according to the present invention.

도 5는 본 발명에 의한 너트가 매설된 교각의 평단면도. Figure 5 is a plan sectional view of the piers embedded with a nut according to the present invention.

도 6a 내지 도 6f는 본 발명에 의한 교량 점검시설을 고정하기 위한 매설형 너트의 시공 공정을 도시한 설명도.6A to 6F are explanatory views showing the construction process of the buried nut for fixing the bridge inspection facility according to the present invention.

**도면의 주요부분에 대한 부호의 설명**** Description of the symbols for the main parts of the drawings **

1: 난간 1a: 핸들1: handrail 1a: handle

1b: 난간고정대 2: 발판1b: Railing Fixture 2: Scaffold

3: 고정대 4: 발판고정대3: holder 4: footrest

10: 점검시설 20: 교각10: Inspection facility 20: Pier

21: 교각 상부 30: 매설형 너트21: pier top 30: buried nut

31: 너트부 31a: 마개31: nut 31a: plug

32: 연장부 33: 연결부32: extension part 33: connection part

34: 보강부 35: 볼트34: reinforcement part 35: bolt

40: 횡철근 50: 종철근40: horizontal rebar 50: longitudinal rebar

60: 거푸집60: formwork

본 발명은 교량 점검시설을 고정하기 위한 매설형 너트에 관한 것으로, 보다 상세하게는, 교량의 하부 구조물과 콘트리트 타설되어 일체화된 매설용 너트를 이용하여 점검시설을 고정할 수 있도록 한 교량 점검시설을 고정하기 위한 매설형 너트에 관한 것이다.The present invention relates to a buried nut for fixing a bridge inspection facility, and more particularly, to a bridge inspection facility for fixing the inspection facility by using concrete embedded with the lower structure of the bridge. A buried nut for fixing.

주지하는 바와 같이, 교량을 점검하기 위하여 교각에 점검시설을 고정설치하고 점검하게 된다. As is well known, inspection facilities are fixedly installed and inspected in bridge piers to inspect bridges.

종래에 사용된 교량 점검시설의 일례로, 한국등록실용신안공보 제208101호(고안의 명칭: 교량 점검대)에 게재된 교량 점검대의 측단면도와 평면도를 도 1a와 도 1b에 도시하였다. As an example of a bridge inspection facility used in the related art, side cross-sectional views and plan views of the bridge inspection platform published in Korean Registered Utility Model Publication No. 208101 (designation name: Bridge inspection platform) are shown in FIGS. 1A and 1B.

도시된 바와 같이, 점검대(100) 고정을 위하여 교각(101)의 측면에 천공기계로 구멍을 뚫고 앵커볼트(102)를 설치한 후에 상기 앵커볼트(102)에 점검대(100)를 고정하였다. As shown, after fixing the anchor bolt 102 by drilling a hole in the side of the piers 101 to install the anchor bolt 102 for fixing the check table 100 was fixed to the check table 100 to the anchor bolt 102 .

이러한 경우에는 앵커볼트(102)를 설치하기 위하여 교각(101)에 천공하고 앵커볼트(102)를 삽입하여 고정한 후 점검대(100)를 현장에서 제작 설치하기 때문에 작업시간이 많이 소요될 뿐만 아니라, 교각(101)을 천공하게 됨으로써 콘크리트의 탈락, 균열, 박리, 중성화 등 열화에 따른 부식의 가속화 현상을 발생시켜 교각을 손상시키며, 앵커볼트(102) 설치에 따른 결합상태 확인 등이 어려운 문제점이 있었다. 또한, 점검 후에는 앵커볼트(102)가 외부로 노출됨으로써 부식이 발생되어 재사용이 어려워 향후 유지관리가 어려운 문제점이 있었다. 또한, 교각(101)의 형상에 따라 점검대(100)를 설치하는데 많은 제약이 따르게 되어 별도의 부대공정이 필요한 문제점이 있었다. In this case, not only time-consuming work, but also piercing the pier 101 in order to install the anchor bolt 102 and inserting the anchor bolt 102 to fix and then check the production stand 100 in the field By puncturing 101, damage of the piers may occur due to acceleration of corrosion due to deterioration such as dropping, cracking, peeling, and neutralization of concrete, damaging the piers, and it is difficult to check the coupling state according to the installation of the anchor bolts 102. In addition, after the inspection, the anchor bolt 102 is exposed to the outside, so that corrosion occurs and reuse is difficult, so that there is a problem that future maintenance is difficult. In addition, according to the shape of the pier 101 has a lot of restrictions to install the check table 100 has a problem that requires a separate additional process.

종래에 사용된 교량 점검시설의 다른예로, 걸이식 점검시설의 측단면도와 평면도를 도 2a와 도 2b에 도시하였다. As another example of a bridge inspection facility conventionally used, side cross-sectional views and plan views of a hanging inspection facility are shown in FIGS. 2A and 2B.

도시된 바와 같이, 교각상단(코핑)(103)에 걸이식 지지대(104)를 격자로 연결하여 교각상단(103)에 걸어 점검대(100)를 설치한 것이다. As shown in the figure, the hook-type support 104 is connected to the upper end of the pier (coping) 103 by lattice, and the inspection stand 100 is installed on the pier upper end 103.

이러한 경우에는 교각상단(103)에 걸이식 지지대를 많이 설치함으로써 설치비용이 많이 소요되며, 교량받침 배치에 따라 설치위치 및 간격제한을 받고, 구조물 외관이 과다한 시설물 부착으로 미관을 해치게 되는 문제점이 있었다. 또한, 앵커볼트로 구조물을 고정하지 않을 경우에는 점검대(100)의 흔들림 현상으로 점검자 접근시에 불안감을 주는 등의 단점이 있어 추가로 앵커볼트로 고정하여야 하며, 점검대(100) 설치시에 교각의 모서리가 탈락될 우려가 많은 문제점이 있었다. 이또 한, 전술한 앵커볼트(102)를 이용한 점검대(100)와 마찬가지로 교각(101)의 형상에 따라 점검대(100)를 설치하는데 많은 제약이 따르게 되어 별도의 부대공정이 필요한 문제점이 있었다. In this case, the installation cost is increased by installing a large number of hook-type supports on the top of the pier 103, receiving the installation position and spacing limitation according to the bridge support arrangement, there was a problem that the appearance of the structure is damaged by attaching excessive facilities. . In addition, when the anchor bolt is not fixed to the structure, there is a disadvantage of giving anxiety when approaching the inspector due to the shaking phenomenon of the check table 100, and should be additionally fixed with the anchor bolt, when the check table 100 is installed. There was a lot of problems that the edge of the piers fall off. In addition, similar to the check table 100 using the above-mentioned anchor bolt 102, there are many problems in installing the check table 100 according to the shape of the pier 101 has a problem that requires a separate additional process.

따라서, 본 발명은 상기한 바와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 매설형 너트를 이용하여 교각의 손상을 방지하여 교각의 내구성을 증진시키며, 별도의 부대공정이 필요없이 점검시설의 설치가 용이하여 작업능률을 향상시키도록 하는 교량 점검시설을 고정하기 위한 매설형 너트를 제공하는 것이다.Therefore, the present invention has been made to solve the problems of the prior art as described above, the object of the present invention to prevent the damage of the piers by using the buried nut to improve the durability of the piers, a separate additional process It is to provide a buried nut for fixing the bridge inspection facility to facilitate the installation of inspection facilities without any need, thereby improving work efficiency.

상기한 바와 같은 목적을 달성하기 위한 본 발명의 특징에 따르면, 교각을 점검하기 위하여 난간과 발판 및 고정대를 구비하며 교각에 점검시설을 고정설치하기 위한 공지의 것에 있어서, 교각 상부의 내부 둘레에 설치되며 상기 점검시설의 고정대가 고정되는 다수개의 너트부와, 상기 너트부로부터 교각의 내부로 연장되는 연장부로 이루어져, 상기 교각과 일체로 콘크리트 타설되는 것을 특징으로 한다.According to a feature of the present invention for achieving the object as described above, in the well-known thing for fixing the inspection facilities on the pier having a railing, a scaffold and a fixed base for inspecting the pier, installed around the inner pier And a plurality of nut parts to which the fixing stand of the inspection facility is fixed, and an extension part extending from the nut part to the inside of the pier, wherein the pour is integrally formed with the pier.

이하, 상기한 바와 같은 구성을 가지는 본 발명에 의한 교량 점검시설을 고정하기 위한 매설형 너트의 실시예를 첨부된 도면을 참고하여 상세하게 설명한다. Hereinafter, with reference to the accompanying drawings an embodiment of the buried nut for fixing the bridge inspection facility according to the present invention having the configuration as described above will be described in detail.

도 3에는 본 발명에 의한 교량 점검시설을 고정하기 위한 매설형 너트의 개략도가 단면도로 도시되어 있고, 도 4에는 본 발명에 의한 매설형 너트의 배치도가 사시도로 도시되어 있으며, 도 5에는 본 발명에 의한 너트가 매설된 교각이 평단면 도가 도시되어 있다. 3 is a schematic view of a buried nut for fixing a bridge inspection facility according to the present invention in a cross-sectional view, FIG. 4 is a layout view of a buried nut according to the present invention, and FIG. 5 is a present invention. A cross sectional plan view of the pier where the nut is embedded is shown.

도시된 바와 같이, 본 발명에 의한 교량 점검시설(10)은 난간(1)과 발판(2) 및 고정대(3)를 구비하며, 매설형 너트(30)는 교각(20)에 상기 고정대(3)를 고정시키기 위한 너트부(31)와, 상기 너트부(31)로부터 연장되는 연장부(32)와, 상기 연장부(32)의 단부를 서로 연결하는 연결부(33)와, 상기 연장부(32)의 중간을 연결시켜 보강하는 보강부(34)로 구성된다. As shown, the bridge inspection facility 10 according to the present invention includes a railing 1, a footrest 2, and a fixing rod 3, and the buried nut 30 has the fixing rod 3 at the pier 20. ), A nut part 31 for fixing the nut, an extension part 32 extending from the nut part 31, a connection part 33 connecting the ends of the extension part 32 to each other, and the extension part ( It consists of a reinforcing portion 34 to connect the middle of the 32.

상기 점검시설(10)은 점검자의 추락을 방지하기 위한 난간(1)과, 망형태로 제작되어 점검자의 이동을 가능하게 하는 발판(2) 및 점검시설(10)을 교각(20)에 고정시키기 위한 고정대(3)로 구성되어 있다. 상기 고정대(3)의 하부에는 상기 발판(2)을 지지하는 발판고정대(4)가 결합되며, 상기 발판고정대(4)의 단부에는 봉형태로 된 핸들(1a)을 고정하기 위한 난간고정대(1b)가 결합되어 난간(1)을 형성하고 있다. The inspection facility 10 is a railing (1) for preventing the fall of the inspector, and the footrest (2) and the inspection facility (10) to be made in the form of a net to enable the movement of the inspector to be fixed to the piers (20) It is composed of a fixed stand (3). The footrest holder 4 for supporting the footrest 2 is coupled to the lower portion of the holder 3, and the handrail holder 1b for fixing the handle 1a in the form of a rod at the end of the footrest fixture 4. ) Are combined to form a railing 1.

상기 매설형 너트(30)는 교각(20)에 상기 점검시설(10)의 고정대(3)를 고정시키기 위한 너트부(31)와, 상기 너트부(31)로부터 연장되는 연장부(32)와, 상기 연장부(32)의 단부를 서로 연결하는 연결부(33)와, 상기 연장부(32)의 중간을 연결시켜 보강하는 보강부(34)로 구성된다. The buried nut 30 includes a nut part 31 for fixing the fixing stand 3 of the inspection facility 10 to the piers 20, an extension part 32 extending from the nut part 31, and The connection part 33 connects the ends of the extension part to each other, and the reinforcement part 34 connects and reinforces the middle of the extension part 32.

상기 너트부(31)는 교각 상부(21)의 내부 둘레에 다수개 매설되며, 상하로 설치되어 상기 점검시설(10)의 고정대(3)가 볼트(35)에 의해 견고하게 고정되게 된다. The nut part 31 is embedded in a plurality of the inner circumference of the pier upper portion 21, is installed up and down so that the fixing stand 3 of the inspection facility 10 is firmly fixed by the bolt (35).

상기 연장부(32)는 상기 너트부(31)로부터 교각(10)의 내부로 설치되어 교각 (10)과 일체로 형성되게 된다. 또한, 상기 연장부(32)는 상기 교각(10)의 내부에 배설된 횡방향으로 설치되는 횡철근(40)과 결합되게 된다. The extension part 32 is installed into the pier 10 from the nut part 31 to be integrally formed with the pier 10. In addition, the extension part 32 is coupled to the transverse rebar 40 installed in the transverse direction disposed inside the pier 10.

상기 연결부(33)는 상하에 설치된 상기 연장부(32)의 단부를 서로 연결하며, 콘크리트를 타설하여 교각(20) 형성시에 콘트리트의 타설 압력에 의해 상하에 설치된 너트부(31)가 상하로 일정한 간격을 유지하도록 하는 역할을 하게 된다. The connecting portion 33 is connected to the ends of the extension portion 32 is installed on top and bottom of each other, the nut portion 31 is installed up and down by the casting pressure of the concrete up and down when the bridge is formed by placing concrete It will play a role to maintain a constant interval.

상기 보강부(34)는 교각 상부(21)의 상하에 설치된 상기 연장부(32)의 중간을 서로 연결하며, 상기 연결부(33)와 함께 작용하여 콘크리트를 타설하여 교각(20) 형성시에 콘트리트의 타설 압력에 의해 상하에 설치된 너트부(31)가 상하로 일정한 간격을 유지하고, 수직도를 유지하도록 보강하는 역할을 하게 된다.The reinforcement part 34 connects the middle of the extension part 32 installed above and below the pier upper part 21 to each other, and works together with the connection part 33 to cast concrete to form concrete at the time of forming the pier 20. Due to the placing pressure of the nut portion 31 installed at the top and bottom to maintain a constant interval up and down, and serves to reinforce to maintain the vertical degree.

특히, 본 발명은 상기와 같은 구성으로 된 매설형 너트(30)를 교각 상부(21)에 콘크리트 타설하여 교각과 일체로 됨으로써 종래에서와 같이 교각(20)의 상부를 천공하여 앵커볼트를 설치하거나 교각의 상부에 점검대를 걸어 설치할 필요없이 볼트(35)에 의해 점검시설(10)을 설치함으로써 교각(20)을 손상시키지 않고 설치할 수 있음은 물론이고 견고하고 용이하게 설치하여 작업능률을 향상시킬 수 있는 장점이 있다. In particular, the present invention by placing the buried nut 30 having the configuration as described above in the pier upper portion 21 to be integral with the pier to install the anchor bolt by drilling the upper portion of the pier 20 as in the prior art By installing the inspection facility 10 by bolts 35 without the need to install the inspection stand on the upper part of the pier, it can be installed without damaging the pier 20, as well as providing a solid and easy installation to improve work efficiency. There are advantages to it.

도 6a 내지 도 6f는 본 발명에 의한 교량 점검시설을 고정하기 위한 매설형 너트의 시공 공정을 도시한 설명도이다.6A to 6F are explanatory views showing the construction process of the buried nut for fixing the bridge inspection facility according to the present invention.

상기와 같은 구성으로 된 본 발명에 의한 매설형 너트를 이용하여 다음과 같은 방법으로 시공하여 점검시설을 고정하여 교량을 점검하게 된다. By using the buried nut according to the present invention having the above configuration, the construction is performed in the following manner to fix the inspection facility to inspect the bridge.

먼저, 교각(20)의 단부(코핑)(11)에 종철근(50)을 배근한다(도 6a). 이어서, 배근된 종철근(50)에 횡철근(40)을 조립하고, 너트부(31)에 마개(31a)가 씌워진 매설용 너트(30)의 연장부(32)를 교각 상부(21)의 둘레로 다수개 조립된 횡철근(40)에 조립한다(도 6b). 이어서, 종철근(50), 횡철근(40) 및 매설용 너트(30)가 조립된 교각(10)의 단부 주위에 거푸집(60)을 설치하고 콘크리트를 타설한다(도 6c). 이어서, 콘크리트를 양생시킨 다음, 거푸집(60) 및 마개(31a)를 제거한다(도 6d). 이어서, 고정대(3)를 볼트(35)를 이용하여 매설용 너트(30)에 고정시키고 고정대(3)의 하부에 발판고정대(4)를 결합하고 발판(2)을 고정시킨다. 이어서, 난간고정대(1b)를 발판고정대(4)에 결합시키고 핸들(1a)을 설치하여 난간(1)을 설치하면 시공이 완료된다. First, the longitudinal reinforcing bars 50 are placed at the ends (copings) 11 of the piers 20 (FIG. 6A). Next, the transverse rebar 40 is assembled to the reinforced longitudinal bar 50, and the extension part 32 of the embedding nut 30, which is covered with a stopper 31a on the nut part 31, is placed on the upper part of the pier. Assembled in a plurality of assembled transverse reinforcing bar 40 around (Fig. 6b). Subsequently, formwork 60 is placed around the ends of the piers 10 in which the longitudinal reinforcing bar 50, the transverse rebar 40, and the embedding nut 30 are assembled, and the concrete is poured (FIG. 6C). Subsequently, the concrete is cured, and then the formwork 60 and the stopper 31a are removed (FIG. 6D). Subsequently, the fixing stand 3 is fixed to the embedding nut 30 using the bolt 35, and the footrest fixing unit 4 is coupled to the lower part of the fixing stand 3 to fix the footrest 2. Subsequently, when the handrail fixing stand 1b is coupled to the scaffolding fixing stand 4 and the handle 1a is installed to install the handrail 1, the construction is completed.

이상에서와 같이 본 발명에 의하면, 교각에 미리 설치된 매설형 너트에 점검시설을 조립함으로써 별도의 부대공정이 필요없이 설치 및 해체가 용이하여 작업능률을 향상시킬 수 있으며, 교각의 형상에 무관하게 설치가 가능하여 적응성이 우수하고, 콘크리트 탈락 및 철근부식 등이 전혀 없어 교각의 내구성을 증진시킬 수 있는 효과가 있다. 또한, 교량 상부 가설시 필요시에 임시작업대 설치를 위하여 작업대 이용이 가능하며, 교량확장시에 유리하고, 교량받침 교체시에 지장이 없이 교체할 수 있는 장점이 있다.


As described above, according to the present invention, by assembling the inspection facility to the buried nut pre-installed in the piers can be easily installed and dismantled without the need for a separate additional process to improve the work efficiency, and install regardless of the shape of the piers It is possible to have excellent adaptability, there is no dropout of concrete and corrosion of reinforcing bars, so there is an effect of improving durability of the piers. In addition, it is possible to use the workbench for temporary workbench installation when the upper part of the bridge is required, it is advantageous when the bridge is extended, there is an advantage that can be replaced without trouble when replacing the bridge support.


Claims (3)

교각(20)을 점검하기 위하여 난간(1)과 발판(2) 및 고정대(3)를 구비하며 교각(20)에 점검시설(10)을 고정설치하기 위한 공지의 것에 있어서, In the well-known thing provided with the railing 1, the footrest 2, and the fixing stand 3 for checking the bridge 20, and fixing the installation 10 to the bridge 20, 교각 상부(21)의 내부 둘레에 설치되며 상기 점검시설(10)의 고정대(3)가 고정되는 다수개의 너트부(31)와, Installed on the inner circumference of the upper portion of the pier 21 and a plurality of nut parts 31 to which the fixing stand 3 of the inspection facility 10 is fixed; 상기 너트부(31)로부터 교각(20)의 내부로 연장되는 연장부(32)로 이루어져, 상기 교각(20)과 일체로 콘크리트 타설되는 것을 특징으로 하는 교량 점검시설을 고정하기 위한 매설형 너트.A buried nut for fixing a bridge inspection facility, comprising an extension part 32 extending from the nut part 31 to the inside of the pier 20, the concrete being poured integrally with the pier 20. 제 1 항에 있어서,The method of claim 1, 상기 연장부(32)는 상기 교각(20)의 내부에 배설된 철근(40,50)과 결합됨을 특징으로 하는 교량 점검시설을 고정하기 위한 매설형 너트.The extension part 32 is a buried nut for fixing the bridge inspection facility, characterized in that coupled with the reinforcing bar (40, 50) disposed inside the pier (20). 제 1 항에 있어서,The method of claim 1, 상기 너트부(31)는 교각(20)의 내부 둘레에 상하로 배치되며, The nut part 31 is disposed up and down around the inner circumference of the piers 20, 상기 너트부(31)로부터 연장되는 상기 연장부(32)의 단부를 상하로 연결되는 연결부(33)와, A connection part 33 connected to an end of the extension part 32 extending from the nut part 31 up and down; 상기 연장부(32)의 중간을 서로 연결하는 보강하는 보강부(34)를 더 포함하여 이루어지는 것을 특징으로 하는 교량 점검시설을 고정하기 위한 매설형 너트.A buried nut for fixing a bridge inspection facility, characterized in that it further comprises a reinforcing part 34 for reinforcing the middle of the extension part 32.
KR1020040064781A 2004-08-17 2004-08-17 Bridge inspection equipment fixed by laid nut KR20060016371A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040064781A KR20060016371A (en) 2004-08-17 2004-08-17 Bridge inspection equipment fixed by laid nut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040064781A KR20060016371A (en) 2004-08-17 2004-08-17 Bridge inspection equipment fixed by laid nut

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0023565U Division KR200366416Y1 (en) 2004-08-18 2004-08-18 Bridge Inspection Equipment Fixed by Laid Nut

Publications (1)

Publication Number Publication Date
KR20060016371A true KR20060016371A (en) 2006-02-22

Family

ID=37124675

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040064781A KR20060016371A (en) 2004-08-17 2004-08-17 Bridge inspection equipment fixed by laid nut

Country Status (1)

Country Link
KR (1) KR20060016371A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100859194B1 (en) * 2007-06-26 2008-09-18 주식회사 엠앤디 A safety net device for pier
KR100860592B1 (en) * 2007-06-20 2008-09-26 삼성물산 주식회사 Temporary system for vertical structure using precast concreat block
KR102017654B1 (en) * 2019-01-08 2019-09-04 평화기업주식회사 Bridge inspection road and construction method thereof
KR102166856B1 (en) 2020-04-13 2020-10-16 다산기업 주식회사 Pre installation type bridge stairway fixing unit and method for constructing bridge stairway using this same
KR102277193B1 (en) 2021-01-12 2021-07-14 (주)이알코리아 Formwork perforation type pre-embedded anchor device for installation of bridge inspection facilities
KR102413916B1 (en) 2021-01-12 2022-06-28 (주)이알코리아 Construction method of pre-buried anchor in formwork perforation type for installation of bridge inspection facility
KR20220112615A (en) * 2021-02-04 2022-08-11 (주)이알코리아 Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100860592B1 (en) * 2007-06-20 2008-09-26 삼성물산 주식회사 Temporary system for vertical structure using precast concreat block
KR100859194B1 (en) * 2007-06-26 2008-09-18 주식회사 엠앤디 A safety net device for pier
KR102017654B1 (en) * 2019-01-08 2019-09-04 평화기업주식회사 Bridge inspection road and construction method thereof
KR102166856B1 (en) 2020-04-13 2020-10-16 다산기업 주식회사 Pre installation type bridge stairway fixing unit and method for constructing bridge stairway using this same
KR102277193B1 (en) 2021-01-12 2021-07-14 (주)이알코리아 Formwork perforation type pre-embedded anchor device for installation of bridge inspection facilities
KR102413916B1 (en) 2021-01-12 2022-06-28 (주)이알코리아 Construction method of pre-buried anchor in formwork perforation type for installation of bridge inspection facility
KR20220112615A (en) * 2021-02-04 2022-08-11 (주)이알코리아 Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie

Similar Documents

Publication Publication Date Title
JP4850151B2 (en) Hybrid tower for wind power generation and its construction method
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
JP2008038463A (en) Bridge girder erection method
KR101297127B1 (en) Landing pier structure construction method
KR101129698B1 (en) Hanger type temporary resources for cantilever and method for construction of cantilever part of bridge using the temporary resources
CN105464216A (en) Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
KR20060016371A (en) Bridge inspection equipment fixed by laid nut
KR100944007B1 (en) The bridge adjustable bearing for change off PC-beam puilling up system and the method
KR200366416Y1 (en) Bridge Inspection Equipment Fixed by Laid Nut
CN209907420U (en) Wet joint structure among bridge pier, bearing platform and pile foundation
KR0141463B1 (en) Method of prefabricating stairway
KR100595019B1 (en) Fixing jacket for checking bridge
JP2913436B2 (en) Mobile formwork method and equipment used for the method
KR100377868B1 (en) pier construction method using Pier scaffolding
CN115042316A (en) Prefabricated construction method for assembled bridge pier column
CN110644510B (en) Construction method of pier steel cofferdam
CN211368398U (en) Frame climbing structure
JPH0657956A (en) Construction of concrete structure
CN110905220B (en) Reinforced concrete structure buckling-restrained energy-dissipation brace installation construction method
CN112095780A (en) Upper cover structure system applied to track operation line and implementation method thereof
KR100469638B1 (en) Support construction for slab of prestressed concrete beam of bridge
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN110847355A (en) Novel efficient mounting node assembly integral beam column and production design method thereof
KR20060008453A (en) Bridge construction work method
KR200322141Y1 (en) Temporary apparatus support structure for pier of bridge

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E601 Decision to refuse application