KR200322141Y1 - Temporary apparatus support structure for pier of bridge - Google Patents
Temporary apparatus support structure for pier of bridge Download PDFInfo
- Publication number
- KR200322141Y1 KR200322141Y1 KR20-2003-0013088U KR20030013088U KR200322141Y1 KR 200322141 Y1 KR200322141 Y1 KR 200322141Y1 KR 20030013088 U KR20030013088 U KR 20030013088U KR 200322141 Y1 KR200322141 Y1 KR 200322141Y1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- coping
- fixed
- pier
- truss
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
본 고안은 교각 코핑 시공을 위한 가시설 하부 받침틀에 관한 것으로서, 더욱 상세하게는 교각에 강봉 설치홀을 형성하고 그 강봉 설치홀을 이용하여 가시설물로 하부 받침틀을 연결하여 코핑의 시공을 원활하게 할 수 있고, 공사기간의 단축 및 시공성의 향상을 도모하고자하는 교각 코핑 시공을 위한 가시설 하부 받침틀 구조에 관한 것이다.The present invention relates to a temporary lower support frame for pier coping construction, and more specifically, to form a steel rod installation hole in the pier and to connect the lower support frame to the fixture using the steel rod installation hole to facilitate the construction of the coping. In addition, the present invention relates to a temporary support frame structure for a temporary pier coping construction to shorten the construction period and improve construction performance.
본 고안은, 교각의 코핑을 지지하는 받침틀 구조에 있어서, 상기 교각(100)에는 다수개가 형성된 강봉 설치홀(110)에 다단으로 고정 강봉(200)이 삽입되고, 상기 상단에 설치된 고정 강봉(200)에 트러스 받침대(300)가 연결 고정틀(500)로 고정되며, 상기 하단에 설치된 고정 강봉(200)에 체결된 지지 연결대(400)가 트러스 받침대(300)와 고정 강봉(200)에 체결됨과 아울러, 작업자들이 하부 받침틀(900)의 상부에서 코핑 철근(800)을 배근하여 코핑을 배근할 수 있도록 지지 구조가 구성됨을 특징으로 하는 교각 코핑 시공을 위한 가시설 하부 받침틀 구조를 제공한다.The present invention, in the supporting frame structure for supporting the coping of the pier, the pier 100 is inserted into the steel rod installation hole 110 formed in a plurality of fixed steel bar 200 is inserted into a plurality of stages, the fixed steel bar 200 is installed on the top The truss support 300 is fixed to the connection fixing frame 500, and the support connecting rod 400 fastened to the fixed steel rod 200 installed at the lower end is fastened to the truss support 300 and the fixed steel rod 200. To provide a temporary support base structure for the bridge pier coping construction, characterized in that the support structure is configured to allow workers to reinforce the coping reinforcement 800 in the upper portion of the lower support frame 900.
Description
본 고안은 교각 코핑 시공을 위한 가시설 하부 받침틀에 관한 것으로서, 더욱 상세하게는 교각에 강봉 설치홀을 형성하고 그 강봉 설치홀을 이용하여 가시설물로 하부 받침틀을 연결하여 코핑의 시공을 원활하게 할 수 있고, 공사기간의 단축 및 시공성의 향상을 도모하고자하는 교각 코핑 시공을 위한 가시설 하부 받침틀 구조에 관한 것이다.The present invention relates to a temporary lower support frame for pier coping construction, and more specifically, to form a steel rod installation hole in the pier and to connect the lower support frame to the fixture using the steel rod installation hole to facilitate the construction of the coping. In addition, the present invention relates to a temporary support frame structure for a temporary pier coping construction to shorten the construction period and improve construction performance.
일반적으로 교량을 시공하는 경우, 교각이 시공된 후에 교각 코핑이 시공되는데, 상기 교각 코핑은 대부분 현장 시공으로 제작하게 된다.In general, in the case of constructing a bridge, a pier coping is constructed after the pier is constructed, and the pier coping is mostly manufactured by field construction.
상기 교각 코핑은 교량의 상부 구조를 지지하는 받침부라 할 수 있는데, 상기 교각 코핑의 시공은 가시설을 이용하여 시공하는게 대부분이다.The pier coping may be referred to as a support for supporting the upper structure of the bridge, the construction of the pier coping is mostly constructed by using a temporary facility.
상기 교각 코핑을 시공하는 경우 사용되는 다양한 종류의 가시설이 있지만, 이러한 시설물은 대부분 비계를 설치하여 상부에 작업 공간을 만들어 코핑을 시공하는 등 복잡한 구조로 설치되는 관계로 작업의 효율성이 저해되는 단점을 안고 있다.Although there are various kinds of temporary equipment used when constructing the bridge coping, these facilities are installed in a complicated structure such as constructing a coping by constructing a work space on the upper part of the scaffolding, and thus the efficiency of work is impaired. Holding it.
또한, 현장 사정에 따라 시공이 용이하지 않은 장소인 경우에는, 시공 기간이 많이 소요되는 등 작업에 많은 차질이 발생하는 등의 단점을 안고 있고, 과도한 투자비가 소요되는 단점을 안고 있다.In addition, when the construction site is not easy due to the situation on the site, the construction has a disadvantage, such as a lot of construction time, such as a long time, and has a disadvantage of excessive investment costs.
본 고안은 상술한 문제점을 감안하여 안출한 것으로서, 본 고안은, 가시설물로 하부 받침틀을 사용함과 아울러 교각에 미리 형성한 강봉 설치홀을 통해 하부 받침틀을 설치할 수 있어 시공성을 향상시킴과 아울러 시공비를 경감시킬 수 있는 한편, 현장 사정에 전혀 영향없이 교각만 시공되면 코핑 시공 작업이 곧바로 이루어질 수 있는 교각 코핑 시공을 위한 가시설 하부 받침틀 구조를 제공함을 그 목적으로 한다.The present invention has been devised in view of the above-described problems, and the present invention can use the lower support frame as a temporary fixture and install the lower support frame through a steel rod installation hole formed in the pier in advance, thereby improving construction performance and improving construction costs. On the other hand, the purpose of the present invention is to provide a temporary lower frame structure for the construction of bridge coping, in which the coping construction work can be performed immediately if only the pier is constructed without any influence on the site.
도 1은 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀이 설치된 측면 상태를 나타내는 도면.1 is a view showing a side state installed the temporary support frame for the bridge piercing construction of the present invention.
도 2는 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀의 분해된 상태를 나타내는 도면.Figure 2 is a view showing an exploded state of the temporary support frame for the pier coping construction of the present invention.
도 3은 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀의 시공 순서도.Figure 3 is a construction flowchart of the lower support frame for the pier coping construction of the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
100: 교각 110: 강봉 설치홀100: pier 110: steel rod mounting hole
200: 고정 강봉 300: 트러스 받침대200: fixed steel bar 300: truss support
310: 고정틀 연결부 312,322,332: 볼트홀310: fixing frame connection part 312,322,332: bolt hole
400: 지지 연결대 410,410': 연결링400: support connecting rod 410,410 ': connecting ring
500: 연결 고정틀 502,602: 볼트부500: connection fixing frame 502,602: bolt portion
600: 체결 볼트 650: 너트600: fastening bolt 650: nut
800: 코핑 철근 900: 하부 받침틀800: coping rebar 900: lower support frame
본 고안은 상술한 목적을 달성하기 위하여, 본 고안은, 교각의 코핑을 지지하는 받침틀 구조에 있어서, 상기 교각에는 다수개가 형성된 강봉 설치홀에 다단으로 고정 강봉이 삽입되고, 상기 상단에 설치된 고정 강봉에 트러스 받침대가 연결 고정틀로 고정되며, 상기 하단에 설치된 고정 강봉에 체결된 지지 연결대가 트러스 받침대와 고정 강봉에 체결됨과 아울러, 작업자들이 하부 받침틀의 상부에서 코핑 철근을 배근하여 코핑을 배근할 수 있도록 지지 구조가 구성됨을 특징으로 하는 교각 코핑 시공을 위한 가시설 하부 받침틀 구조를 제공한다.The present invention, in order to achieve the above object, the present invention, in the supporting frame structure for supporting the coping of the piers, a fixed steel rod is inserted into the steel rod installation hole formed in a plurality of stages in the piers, fixed steel rods installed on the top The truss pedestal is fixed to the connection fixing frame, and the support connecting rod fastened to the fixed steel rod installed at the lower end is fastened to the truss pedestal and the fixed steel bar, and the workers can reinforce the coping by reinforcing coping reinforcement from the upper part of the lower support frame. Provided is a temporary lower frame structure for pier coping construction, characterized in that the support structure is configured.
이하, 첨부 도면을 참조하여 본 고안의 구성을 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration of the present invention.
도 1은 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀이 설치된 측면 상태를 나타내는 도면이고, 도 2는 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀의 분해된 상태를 나타내는 도면이다.1 is a view showing a side state of the provisional lower support frame is installed for the pier coping construction of the present invention, Figure 2 is a view showing an exploded state of the provisional lower support frame for the pier coping construction of the present invention.
도 1에서 알 수 있듯이, 교각(100)에는 다수개의 강봉 설치홀이 형성되고, 그 강봉 설치홀에 고정 강봉(200)이 삽입되며, 그 고정 강봉(200)에 다수개의 지지 연결대(400)의 일측이 체결되고, 그 지지 연결대(400)의 타측이 트러스받침대(300)에 체결되며, 한편 상기 트러스 받침대(300)는 고정 강봉(200)에 연결 고정틀(500)이 체결되어 지지된다.As can be seen in Figure 1, the pier 100 is formed with a plurality of steel rod installation holes, the fixed steel rod 200 is inserted into the steel rod installation hole, the fixed steel bar 200 of the plurality of support connecting rod 400 One side is fastened, and the other side of the support connecting portion 400 is fastened to the truss support 300, while the truss support 300 is supported by a fixed fixing frame 500 is fastened to the fixed steel bar (200).
상기 트러스 받침대(300)가 설치되면 하부 받침틀(900)의 시공이 완료되고, 작업자들은 가시설 구조물인 하부 받침틀(900)의 상부에서 코핑 철근(800)을 배근하여 코핑을 시공하기 위한 사전 작업을 실시하게 된다.When the truss pedestal 300 is installed, the construction of the lower support frame 900 is completed, and workers perform a preliminary work for constructing the coping by placing the coping reinforcement 800 on the upper portion of the lower support frame 900 that is a temporary structure. Done.
도 2에서 알 수 있듯이, 상기 하부 받침틀(900)은, 다수개의 고정 강봉(200), ㄷ자 형태로 제작된 2개의 트러스 받침대(300), 다수개의 지지 연결대(400), 다수개의 연결 고정틀(500), 및 다수개의 체결 볼트(600)로 구성된다.As can be seen in Figure 2, the lower support frame 900, a plurality of fixed steel rods 200, two truss pedestal 300 made in the U-shape, a plurality of support connecting rods 400, a plurality of connection fixing frame 500 ), And a plurality of fastening bolts 600.
상기 고정 강봉(200)은, 내측이 관통된 파이프 형태로 강봉 체결홀에 삽입되며, 상부에 설치되는 트러스 받침대(300)와 지지 연결대(400)를 지지하게 된다.The fixed steel bar 200 is inserted into the steel bar fastening hole in the form of a pipe through the inside, and supports the truss pedestal 300 and the support connecting portion 400 is installed on the top.
상기 트러스 받침대(300)는, ㄷ자형 형태의 트러스 구조물로, 하측에 고정틀 연결부(310)가 형성되고, 그 고정틀 연결부(310)에 수평한 볼트홀(312)이 형성되며, 또한 그 고정틀 연결부(310)가 형성된 받침부에는 다수개의 수직한 볼트홀(322)이 형성되고, ㄷ자형으로 절곡된 측면에도 다수개의 볼트홀(332)이 형성된다.The truss pedestal 300 is a t-shaped truss structure, a fixing frame connecting portion 310 is formed on the lower side, a horizontal bolt hole 312 is formed in the fixing frame connecting portion 310, and the fixing frame connecting portion ( A plurality of vertical bolt holes 322 are formed in the supporting portion on which the 310 is formed, and a plurality of bolt holes 332 are formed on the side bent in a U-shape.
상기 지지 연결대(400)는, 중앙은 평바 형태로 형성되고, 길이방향의 양측에 각각 크기가 다른 연결링(410)(410')이 형성되며, 일측이 고정 강봉(200)에 고정되고, 타측이 체결 볼트(600)에 체결된다.The support connecting portion 400, the center is formed in the form of a flat bar, the connecting ring 410, 410 'of different sizes are formed on both sides of the longitudinal direction, one side is fixed to the fixed steel bar 200, the other side The fastening bolt 600 is fastened.
상기 체결 볼트(600)는, 길이방향 양측에 각각 볼트부(602)가 형성되고, 너트(650)에 의하여 2개의 트러스 받침대(300)의 고정틀 연결부(310)를 관통함과 아울러 지지 연결대(400)의 연결링(410')을 관통하여 너트(650)로 고정된다.The fastening bolt 600 is formed with bolts 602 on both sides in the longitudinal direction, respectively, and penetrates through the fixing frame connecting portions 310 of the two truss pedestals 300 by a nut 650 and a support connecting rod 400. It is fixed to the nut 650 through the connection ring 410 'of.
상기 체결 볼트(600)는, 길이가 긴 것과 짧은 것이 함께 사용된다.The fastening bolt 600 is used together with the long and short.
상기 연결 고정틀(500)은 U자형 형태로, 끝에 볼트부(502)가 형성되어, 트러스 받침대(300)의 수직한 볼트홀(322)에 연결 고정틀(500)이 고정되어 고정 강봉(200)에 트러스 받침대(300)가 지지되도록 설치된다.The connecting fixing frame 500 has a U-shape, a bolt portion 502 is formed at the end thereof, and the connecting fixing frame 500 is fixed to the vertical bolt hole 322 of the truss support 300 to the fixed steel bar 200. The truss pedestal 300 is installed to be supported.
도 3은 본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀의 시공 순서도이다.3 is a construction flowchart of the lower support frame for the pier coping construction of the present invention.
제 1 단계는, 교각(100)에 강봉 설치홀(110)을 형성하는 단계이다.The first step is to form a steel rod installation hole 110 in the piers (100).
즉, 교각(100)을 시공시 파이프 등을 매설한 후 콘크리트를 타설하면 강봉 설치홀(110)이 형성된다.That is, the steel rod installation hole 110 is formed when the concrete is poured after embedding the pipe when the bridge 100 is constructed.
제 2 단계는, 상단 교각 설치홀(110)에 고정 강봉(200)을 삽입한 후 트러스 받침대(300)를 연결 고정틀(500)로 고정하는 단계이다.The second step is a step of fixing the truss pedestal 300 with the connection fixing frame 500 after inserting the fixed steel bar 200 into the upper pier installation hole 110.
제 3 단계는, 하단 교각 설치홀(110)에 고정 강봉(200)을 삽입한 후 트러스 받침대(300)와 하단 고정 강봉(200)에 지지 연결대(400)를 연결하는 단계이다.The third step is to insert the fixed steel bar 200 into the lower piers installation hole 110 and then connect the support connecting portion 400 to the truss base 300 and the lower fixed steel bar (200).
제 4 단계는, 교각(100)에 설치된 하부 받침틀(900) 상부에서 작업자에 의한 코핑 철근(800)을 배근하고 콘크리트를 타설하여 코핑을 형성하는 단계이다.The fourth step is to reinforce the coping reinforcement 800 by the worker in the upper portion of the lower support frame 900 installed in the pier 100 and to cast the concrete to form a coping.
상술한 본 고안의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.
본 고안의 교각 코핑 시공을 위한 가시설 하부 받침틀은, 그 구조상, 교각미리 강봉 설치홀이 형성되고, 그 강봉 설치홀에 고정 강봉을 삽입한 후 트러스 받침대, 지지 연결대를 고정하는 작업순으로 이루어지는 관계로, 작업의 효율화를 도모할 수 있고, 제작된 하부 받침틀은 다른 교각 시공시에도 이용이 가능한 관계로 시공 기간 및 시공비를 절감할 수 있는 효과를 갖는다.The lower support frame of the temporary structure for pier coping construction of the present invention has a structure in which the pier pre-bar rod installation hole is formed, and after the fixed steel rod is inserted into the rod installation hole, the truss support and the support connecting rod are fixed. As a result, the lower support frame manufactured can be used in other pier constructions, and thus the construction period and construction cost can be reduced.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2003-0013088U KR200322141Y1 (en) | 2003-04-28 | 2003-04-28 | Temporary apparatus support structure for pier of bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2003-0013088U KR200322141Y1 (en) | 2003-04-28 | 2003-04-28 | Temporary apparatus support structure for pier of bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200322141Y1 true KR200322141Y1 (en) | 2003-08-06 |
Family
ID=49412219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2003-0013088U KR200322141Y1 (en) | 2003-04-28 | 2003-04-28 | Temporary apparatus support structure for pier of bridge |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200322141Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706842A (en) * | 2019-01-23 | 2019-05-03 | 湖南路桥建设集团有限责任公司 | A kind of urban viaduct Single column pier capping beam construction device |
CN112176877A (en) * | 2020-09-29 | 2021-01-05 | 上海城建市政工程(集团)有限公司 | Truss fixing mechanism on pier stand column |
-
2003
- 2003-04-28 KR KR20-2003-0013088U patent/KR200322141Y1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706842A (en) * | 2019-01-23 | 2019-05-03 | 湖南路桥建设集团有限责任公司 | A kind of urban viaduct Single column pier capping beam construction device |
CN112176877A (en) * | 2020-09-29 | 2021-01-05 | 上海城建市政工程(集团)有限公司 | Truss fixing mechanism on pier stand column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20110010248A (en) | Multi u-head bracket apparatus for bridge construction | |
KR200322141Y1 (en) | Temporary apparatus support structure for pier of bridge | |
EP1561874A1 (en) | Connecting device and node for buildings with prefabricated elements | |
KR200426056Y1 (en) | Concrete slab railing prop for joining it to bare reinforcing rod directly | |
KR20190118274A (en) | Assembly of bridge steel wire and method of bridge construction using it | |
KR102444870B1 (en) | Mounting apparatus for wall form supporter | |
KR100469638B1 (en) | Support construction for slab of prestressed concrete beam of bridge | |
JP2007205142A (en) | Built-up fence conduit equipped with single plate sidewall panel | |
KR200323015Y1 (en) | Ceiling construction device that performs ceiling panel hanger and slab rebar construction at the same time | |
KR200437077Y1 (en) | A charnel house | |
KR20060016371A (en) | Bridge inspection equipment fixed by laid nut | |
KR20210078117A (en) | Clamp for scaffold pipes | |
JP2003056186A5 (en) | ||
KR200362177Y1 (en) | Reinforcement structure for H-beam column | |
KR200298061Y1 (en) | divided supporter structure for supporting a mould for forming a concrete united wall | |
KR100829062B1 (en) | Concrete pumping pipe supporting bracket and pylon construction method using the same | |
KR200392074Y1 (en) | Trussed supporting post for easily constructing concrete structures | |
KR102361789B1 (en) | Supporter for installating horizontal member of supporting system | |
CN220815186U (en) | Sleeve type strong connection railway safety protection fence | |
JPH06272378A (en) | Supporting structure for precast concrete form | |
KR20000040928A (en) | Structure for mounting mold of steel-reinforced concrete to reduced height of floor | |
CN210217165U (en) | Novel concrete conveying accessory | |
JPH0270822A (en) | Temporary post erection method and device | |
JP2006057315A (en) | Construction method for columnar structure | |
JP3453487B2 (en) | Anchor bolt mounting device for steel reinforced concrete structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20120724 Year of fee payment: 10 |
|
EXPY | Expiration of term |