CN109706842A - A kind of urban viaduct Single column pier capping beam construction device - Google Patents
A kind of urban viaduct Single column pier capping beam construction device Download PDFInfo
- Publication number
- CN109706842A CN109706842A CN201910064864.2A CN201910064864A CN109706842A CN 109706842 A CN109706842 A CN 109706842A CN 201910064864 A CN201910064864 A CN 201910064864A CN 109706842 A CN109706842 A CN 109706842A
- Authority
- CN
- China
- Prior art keywords
- bridge pier
- support post
- pier
- capping beam
- single column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000000725 suspension Substances 0.000 claims abstract description 12
- 230000036316 preload Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 description 4
- 238000009432 framing Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 238000009304 pastoral farming Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
The invention discloses a kind of urban viaduct Single column pier capping beam construction devices, it is characterized in that including the support post for being fixed on bridge pier two sides, passing through the stress truss that suspension cable is supported by bridge pier and support post and the capping beam template being laid in stress truss positioned at bridge pier two sides.The present invention can effectively solve the problems, such as that existing overhead road of city bridge construction causes traffic passage space insufficient, have the advantages that safer, convenient and efficient, save the cost of constructing.
Description
Technical field
The invention belongs to overpass constructing devices, and in particular to a kind of urban viaduct Single column pier capping beam construction device.
Background technique
Currently, urban viaduct Single column pier bent cap generally uses construction area integrally to enclose shelves, Full space support construction lid is set up
Beam.The limitation of existing construction technology:
1, the traffic capacity is greatly reduced: vehicle will be caused impassable after setting up full framing, even if setting up door opening reserves lane,
The traffic capacity will also be greatly reduced;
2, increase traffic navigation pressure: when using raft support method construction Single column pier bent cap, will directly occupy former vehicle and pedestrian
Passage space is bound to cause the increase of other road traffic leading pressure;
3, basement process needs prudent treatment: before setting up full framing, need to conscientiously carry out stiffening basic ground and carry out draining and arrange
Applying, which prevents rainwater from impregnating ground, causes accident resulting from poor quality of projects;
4, safety management difficulty is big: due to being that road occupying is constructed in original path, former multilane sports bicycle road, sends out in the location
Raw vehicle mutually knocks into the back, the probability of grazing will increase or even vehicle crash anti-collision wall causes stent migration to collapse to be likely to.
Summary of the invention
The purpose of the present invention is causing traffic passage space insufficient for existing overhead road of city bridge construction, one kind is provided and is more pacified
Entirely, the urban viaduct Single column pier capping beam construction device of convenient and quick construction, save the cost.
Realize the object of the invention the technical solution adopted is as follows:
Urban viaduct Single column pier capping beam construction device provided by the invention, support post, position including being fixed on bridge pier two sides
Pass through the stress truss that suspension cable is supported by bridge pier and support post and the capping beam template being laid in stress truss in bridge pier two sides.
The bottom end of the support post is mounted on the pre- bracket for being embedded in bridge pier and fixes with the bridge pier, the support post
Top is provided with tensioning and pre-tightens platform, and the pier stud end of the stress truss is mounted on the pre- bracket for being embedded in bridge pier by the bridge pier
Support, the cantilever end of stress truss pre-tighten platform with tensioning by anchorage beam and are connected with suspension cable by the support post branch
Support.
Beneficial effect
Support post, capping beam template, stress truss, pre-buried bracket, tensioning in the present invention pre-tighten platform, anchorage beam and oblique pull
Rope is the common used material of project construction, strong applicability;Without carrying out basement process, save the cost;Original road is not changed
Space can maintain original traffic navigation scheme, not will cause " bottleneck " phenomenon, and safety is secure;Support post, bent cap bed die,
Stress truss, pre-buried bracket, tensioning preload platform, anchorage beam and suspension cable can be made into sub-assembly, and installing and dismounting is easy to operate
And it is reusable, accelerate construction speed;Top tensioning pre-tightens platform can adjust stress at any time, accomplish that stress can
Control, quality are secure;Full framing is substituted with support post and suspension cable, reduces construction investment.
Technical solution of the present invention is further illustrated with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is sectional view along AA in Fig. 1.
Specific embodiment
As shown in Figure 1, 2, urban viaduct Single column pier capping beam construction device provided by the invention, including it is fixed on bridge pier two
The support post 3 of side, the stress truss 5 supported by support post 3 positioned at bridge pier two sides by suspension cable 2 and in stress truss 5
The capping beam template 4 of laying;The bottom end of the support post 3 is mounted on the pre- bracket 7 for being embedded in bridge pier and fixes with the bridge pier, institute
It states 3 top of support post and is provided with tensioning preload platform 1, the pier stud end of the stress truss 5 is mounted on the pre- ox for being embedded in bridge pier
It is supported on leg 7 by the bridge pier, the cantilever end of stress truss 5 pre-tightens the suspension cable 2 of platform 1 by anchorage beam 6 and tensioning and connects
It connects and is supported by the support post 3.
When Coping Construction, using Inclined cable-stayed construction with brackets, support post 3 is mounted on pre-buried bracket 7 with crane,
Crane lifts by crane stress truss 5, and 5 pier stud end of stress truss is mounted on pre-buried bracket 7, the suspension cable 2 that cantilever end will anchor
Button hangs over tensioning and pre-tightens on platform 1, removes crane, and presetting 2 length of suspension cable makes stress truss 5 be substantially at bent cap bottom plate flat
Surface state is laid with bent cap bed die, adjusts suspension cable 2, rotary ligating cover beam steel, installation side form forms capping beam template 4, in capping beam template
Bent cap concrete is poured in 4 forms bent cap.
Claims (2)
1. a kind of urban viaduct Single column pier capping beam construction device, it is characterized in that include the support post for being fixed on bridge pier two sides,
The stress truss supported by suspension cable by bridge pier and support post positioned at bridge pier two sides and the bent cap mould being laid in stress truss
Plate.
2. urban viaduct Single column pier capping beam construction device according to claim 1, it is characterized in that the support post
Bottom end is mounted on the pre- bracket for being embedded in bridge pier and fixes with the bridge pier, and it is flat that the support post top is provided with tensioning preload
Platform, the pier stud end of the stress truss are mounted on the pre- bracket for being embedded in bridge pier and are supported by the bridge pier, the cantilever of stress truss
End is connected with suspension cable with tensioning preload platform by anchorage beam and is supported by the support post.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910064864.2A CN109706842A (en) | 2019-01-23 | 2019-01-23 | A kind of urban viaduct Single column pier capping beam construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910064864.2A CN109706842A (en) | 2019-01-23 | 2019-01-23 | A kind of urban viaduct Single column pier capping beam construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109706842A true CN109706842A (en) | 2019-05-03 |
Family
ID=66262781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910064864.2A Pending CN109706842A (en) | 2019-01-23 | 2019-01-23 | A kind of urban viaduct Single column pier capping beam construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109706842A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112593485A (en) * | 2020-12-11 | 2021-04-02 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN112681136A (en) * | 2020-12-15 | 2021-04-20 | 中国建筑第八工程局有限公司 | Support structure of hollow pier top template and construction method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200322141Y1 (en) * | 2003-04-28 | 2003-08-06 | 주식회사 대한콘설탄트 | Temporary apparatus support structure for pier of bridge |
CN101440604A (en) * | 2008-12-29 | 2009-05-27 | 中铁大桥局股份有限公司 | Cable opposite pulling type pier-side bracket |
CN201377077Y (en) * | 2009-03-25 | 2010-01-06 | 中铁二十一局集团第三工程有限公司 | Double-hoop bracket for single-column bent cap in bridge construction |
CN201762662U (en) * | 2010-08-11 | 2011-03-16 | 中铁三局集团有限公司 | Independent bridge pier capping beam formwork support |
CN203923914U (en) * | 2014-05-20 | 2014-11-05 | 中交四公局第三工程有限公司 | Solely stub bent cap support |
CN104746435A (en) * | 2015-04-03 | 2015-07-01 | 中国建筑第六工程局有限公司 | Wide-angle Y-shaped pier column construction method |
CN204589822U (en) * | 2015-04-30 | 2015-08-26 | 南京铁道职业技术学院 | The two cantilever bent cap anchor ear Construction Support system of a kind of solely post |
CN107100076A (en) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | A kind of Cast-in-place Bent Cap construction method |
CN210086061U (en) * | 2019-01-23 | 2020-02-18 | 湖南路桥建设集团有限责任公司 | City viaduct single-column pier bent cap construction equipment |
-
2019
- 2019-01-23 CN CN201910064864.2A patent/CN109706842A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200322141Y1 (en) * | 2003-04-28 | 2003-08-06 | 주식회사 대한콘설탄트 | Temporary apparatus support structure for pier of bridge |
CN101440604A (en) * | 2008-12-29 | 2009-05-27 | 中铁大桥局股份有限公司 | Cable opposite pulling type pier-side bracket |
CN201377077Y (en) * | 2009-03-25 | 2010-01-06 | 中铁二十一局集团第三工程有限公司 | Double-hoop bracket for single-column bent cap in bridge construction |
CN201762662U (en) * | 2010-08-11 | 2011-03-16 | 中铁三局集团有限公司 | Independent bridge pier capping beam formwork support |
CN203923914U (en) * | 2014-05-20 | 2014-11-05 | 中交四公局第三工程有限公司 | Solely stub bent cap support |
CN104746435A (en) * | 2015-04-03 | 2015-07-01 | 中国建筑第六工程局有限公司 | Wide-angle Y-shaped pier column construction method |
CN204589822U (en) * | 2015-04-30 | 2015-08-26 | 南京铁道职业技术学院 | The two cantilever bent cap anchor ear Construction Support system of a kind of solely post |
CN107100076A (en) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | A kind of Cast-in-place Bent Cap construction method |
CN210086061U (en) * | 2019-01-23 | 2020-02-18 | 湖南路桥建设集团有限责任公司 | City viaduct single-column pier bent cap construction equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112593485A (en) * | 2020-12-11 | 2021-04-02 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN112593485B (en) * | 2020-12-11 | 2021-07-23 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN112681136A (en) * | 2020-12-15 | 2021-04-20 | 中国建筑第八工程局有限公司 | Support structure of hollow pier top template and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106436583B (en) | A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method | |
CN105839536B (en) | A kind of construction method of Cable-stayed Bridge Pylon | |
CN204662279U (en) | Tumbling-type concrete box girder bridge rotator construction with protection system closes up hanger device | |
CN106087777B (en) | The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system | |
CN109972517A (en) | A kind of construction method of steel reinforced concrete bondbeam cable-stayed bridge main-beam | |
CN107905114B (en) | A kind of construction method of large span Successive interference cancellation | |
CN102418315A (en) | Construction method for concrete-filled steel tube arched bridge with large low-buckle tower erection bridge width | |
CN108842597A (en) | A kind of municipal construction temporary concrete steel structure bridge and its installation method | |
CN101158146A (en) | Cable-stayed bridge main-beam sliding form frame system and construction method | |
CN109706842A (en) | A kind of urban viaduct Single column pier capping beam construction device | |
CN106988229A (en) | A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method | |
CN102268858B (en) | Cradle for suspension pouring of arch-type bridge | |
CN108221694B (en) | The method for installing long-span arch bridge tie-rod | |
CN102277836B (en) | Construction method of tilting concrete tower base | |
CN106012851A (en) | Synchronous construction method of steel box girder and concrete pier studs | |
CN209907210U (en) | Integral pouring template system for T-shaped beam sidewalk board and sound barrier base | |
CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
CN105484163A (en) | Girder-pier sequential construction method of pier top segment of auxiliary pier of cable stayed bridge | |
CN210086061U (en) | City viaduct single-column pier bent cap construction equipment | |
CN208328660U (en) | The U-shaped girder construction of the Two bors d's oeuveres of combined bridge | |
CN106351128B (en) | The construction method of cable-stayed bridge end bay girder | |
CN107151981B (en) | The construction method of bridge floor constructing device | |
CN104963292A (en) | Construction method of reinforced concrete multi-span arch bridge or continuous box structure bridge | |
CN211689932U (en) | Cast-in-place beam suspends support in midair | |
CN208981019U (en) | Ladder type prefabricated plate with auxiliary block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |