CN106436583B - A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method - Google Patents

A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method Download PDF

Info

Publication number
CN106436583B
CN106436583B CN201610900956.6A CN201610900956A CN106436583B CN 106436583 B CN106436583 B CN 106436583B CN 201610900956 A CN201610900956 A CN 201610900956A CN 106436583 B CN106436583 B CN 106436583B
Authority
CN
China
Prior art keywords
steel pipe
cap
cushion cap
round steel
screw thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610900956.6A
Other languages
Chinese (zh)
Other versions
CN106436583A (en
Inventor
王鹏
王星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Hanjiang Heavy Industry Co., Ltd
China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201610900956.6A priority Critical patent/CN106436583B/en
Publication of CN106436583A publication Critical patent/CN106436583A/en
Application granted granted Critical
Publication of CN106436583B publication Critical patent/CN106436583B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of interim stretch-draw anchor suspension device of great cantilever bent cap, including the pre-buried round steel pipe of bent cap being set on large span bent cap, the pre-buried round steel pipe of cushion cap on cushion cap, and the multiple standard knot fining twisted steels connected by rebar sleeve, the pre-buried round steel pipe of bent cap is correspondingly arranged with the pre-buried round steel pipe upper and lower position of cushion cap, multiple standard knot fining twisted steels are in turn connected to form screw thread steel column, the upper end of screw thread steel column passes through the pre-buried round steel pipe of bent cap, end successively uses screw thread billet, screw thread steel washer, screw-thread steel nut is fixed, the lower end of screw thread steel column screws in the pre-buried round steel pipe of cushion cap and fixes.The present invention also provides a kind of construction methods of the interim stretch-draw anchor suspension device of great cantilever bent cap.Construction process of the invention is few, and method is simple.It need to only be carried out when pouring bent cap and cushion cap pre-buried, when Bridge Erector will be in place using a small amount of manually installed fining twisted steel, a large amount of personnel and equipment investment can be saved compared to other construction methods, it is applied widely.

Description

A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method
Technical field
The present invention relates to Summarized Account of Bridge Erection Construction technical field, specifically the interim stretch-draw anchor suspension device of great cantilever bent cap and its apply Work method.
Background technique
In the erecting beam construction of city, in order to adapt to the road network of city complexity, the setting of pier stud can not be often evenly distributed. In crossing region in order not to isolate existing highway, the bridge of setting large span is generally required, and due to the design of bridge structure The length needs of limitation, box beam are consistent, therefore produce the bent cap structure of large span.
When setting up the box beam of these large spans, supporting leg can stand in large span bent cap Bridge Erector for standard across erection Cantilever segment can cause huge moment of flexure to bent cap and pier stud and be more than its structural strength.Current general solution is in frame Temporary rest pier is arranged in the underface of the main supporting leg of bridge machine.Load when using the program by girder erection by bridging machine passes through temporary rest pier It is directly delivered to ground, moment of flexure will not be generated to pier stud, while bent cap is subjected only to normal pressure, preferably resolve Bridge Erector progress At large span bent cap the problem of Precast Concrete Segmental Bridges box beam erection.
However both need to process or lease temporary rest pier using above-mentioned temporary rest pier scheme, it is also desirable to temporary rest pier into Row is set up, dismantles, and will be a bigger cost payout herein, while also tending to become a control in work of setting a roof beam in place Property engineering.
Summary of the invention
In view of the above shortcomings of the prior art, the present invention provides a kind of interim stretch-draw anchor supporting dress of great cantilever bent cap It sets and its construction method, replaces the biggish temporary support of the scale of construction using fining twisted steel, construction process is few, and method is simple.
A kind of interim stretch-draw anchor suspension device of great cantilever bent cap, including the pre-buried round steel of bent cap being set on large span bent cap Pipe, the pre-buried round steel pipe of the cushion cap on cushion cap and the multiple standard knot fining twisted steels connected by rebar sleeve, lid The pre-buried round steel pipe of beam is correspondingly arranged with the pre-buried round steel pipe upper and lower position of cushion cap, and multiple standard knot fining twisted steels are in turn connected to form Screw thread steel column, the upper end of screw thread steel column pass through the pre-buried round steel pipe of bent cap, end successively use screw thread billet, screw thread steel washer, Screw-thread steel nut is fixed, and the lower end of screw thread steel column screws in the pre-buried round steel pipe of cushion cap and fixes.
Further, the lower loop of the pre-buried round steel pipe of cushion cap is arranged with spiral busting reinforcement, the bottom of spiral busting reinforcement Equipped with cushion cap Pressure-bearing pads, spiral busting reinforcement and cushion cap Pressure-bearing pads are for preventing concrete from rupturing during stress.
Further, fastening nut is welded on cushion cap Pressure-bearing pads, the lower end of screw thread steel column passes through the pre-buried round steel of cushion cap Fastening nut is screwed in after pipe.
Further, cushion cap Pressure-bearing pads are also welded with the fastening nut protection cap protected to fastening nut, fastening Nut protection cap is located at fastening nut lower part.
A kind of construction method of the interim stretch-draw anchor suspension device of great cantilever bent cap, includes the following steps:
Step 1: forming the pre-buried round steel pipe of bent cap in the pre-buried round steel pipe of design position when large span bent cap is poured, holding The pre-buried pre-buried round steel pipe in round steel pipe position of bent cap, Pressure-bearing pads are corresponded to when platform pours, screw-thread steel nut forms the pre-buried round steel of cushion cap Pipe;
Step 2: multiple standard knot fining twisted steels are in turn connected to form screw thread steel column, the upper end of screw thread steel column passes through lid The pre-buried round steel pipe of beam, end are successively fixed using screw thread billet, screw thread steel washer, screw-thread steel nut, the lower end of screw thread steel column The pre-buried round steel pipe of cushion cap is screwed in fix.
Further, fastening nut is welded on cushion cap Pressure-bearing pads, the lower end of screw thread steel column passes through the pre-buried circle of cushion cap Fastening nut is screwed in after steel pipe.
The present invention is few using the mode construction process that interim screw-thread steel pulling bent cap mode replaces temporary rest pier to prop up bent cap, Installation is simple, and material therefor is few, it is only necessary to carried out when pouring bent cap and cushion cap it is pre-buried, when Bridge Erector will be in place using a small amount of Manually installed fining twisted steel can save a large amount of personnel and equipment investment compared to other construction methods, not only effect Height, and cost is low compared with temporary rest pier is used, and especially under the operating condition of high pier stud, advantage is particularly evident.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the interim stretch-draw anchor suspension device of great cantilever bent cap of the present invention;
Fig. 2 is the pre-buried and reserved schematic diagram on bent cap of the present invention;
Fig. 3 is the pre-buried and reserved schematic diagram on cushion cap of the present invention;
Fig. 4 is the structural schematic diagram of fining twisted steel of the present invention;
Fig. 5 is the construction schematic diagram that the prior art uses temporary rest pier.
In figure: 1-has set a roof beam in place piece, 2-bridge formation owner's supporting legs, 3-large span bent caps, 4-pier studs, 5-great cantilever bent caps Interim stretch-draw anchor suspension device, 6-cushion caps, the pre-buried round steel pipe of 7-bent caps, the pre-buried round steel pipe of 8-cushion caps, 9-rubber stoppers, 10-spiral busting reinforcements, 11-cushion cap Pressure-bearing pads, 12-fastening nuts, 13-fastening nut protection caps, 14-screw-thread steels Backing plate, 15-screw thread steel washers, 16-adjust section fining twisted steel, 17-screw-thread steel nuts, 18-rebar sleeves, 19-marks Quasi- section fining twisted steel, 20-temporary rest piers.
Specific embodiment
Below in conjunction with the attached drawing in the present invention, the technical solution in the present invention is clearly and completely described.
Fig. 1 is the box beam erection using the interim stretch-draw anchor suspension device 5 of great cantilever bent cap of the present invention to large span bent cap 3 The arrangement schematic diagram of gib is carried out, it can be seen from the figure that the interim stretch-draw anchor suspension device 5 of the great cantilever bent cap Setting is not full symmetric with 2 positions of bridge formation owner supporting leg, and the purpose being arranged in this way is to mutually fit with the position of lower part cushion cap 6 Bridge formation owner supporting leg 2 should be combined and set a roof beam in place piece 1 give large span bent cap 3 apply load condition.Great cantilever bent cap is interim The setting position of stretch-draw anchor suspension device 5 should be determined by calculation according to the difference of project.
Fig. 2 shows the pre-buried and reserved arrangement on large span bent cap 3.Anchor great cantilever bent cap is determined according to above-mentioned calculating After the diameter of the screw-thread steel of interim stretch-draw anchor suspension device 5 and position, when large span bent cap 3 is constructed, corresponding position is buried If the diameter of the pre-buried round steel pipe 7 of bent cap, the pre-buried round steel pipe 7 of bent cap is 10mm bigger than fining twisted steel diameter, so as to fining twisted steel Installation.
Fig. 3 shows the pre-buried and reserved arrangement on cushion cap 6.The interim tensioning of great cantilever bent cap is determined according to above-mentioned calculating After the diameter of the screw-thread steel of anchoring support device 5 and position, when cushion cap 6 is constructed, corresponding position and respective depth, which are buried, is held The pre-buried round steel pipe 8 of platform, rubber stopper 9, spiral busting reinforcement 10, cushion cap Pressure-bearing pads 11, fastening nut 12, fastening nut protection cap 13.The pre-buried round steel pipe 8 of cushion cap is similar with the pre-buried round steel pipe 7 of bent cap, and diameter is 10mm bigger than fining twisted steel diameter.Rubber stopper 9 The pre-buried round steel pipe of cushion cap 8 is protected after being completed for the construction of cushion cap 6, prevents sundries from entering.10 He of spiral busting reinforcement The effect of cushion cap Pressure-bearing pads 11 is that concrete ruptures during stress in order to prevent.Fastening nut 12 is welded on cushion cap and holds On pressure pad plate 11, fining twisted steel is screwed in into 12 suitable length of fastening nut when needing to install fining twisted steel.Fastening Nut protection cap 13 is also welded on cushion cap Pressure-bearing pads 11, is protected to fastening nut 12, is prevented in 6 casting process of cushion cap Concrete enters destruction screw thread.
Fig. 4 shows the connection between fining twisted steel, and screw-thread steel is arranged using modularization, passes through adjustment criteria section finish rolling The combination of 19 different length of screw-thread steel can satisfy the bent cap demand of different height.The fining twisted steel at 3 end of large span bent cap makes 3 top of large span bent cap is fixed on screw thread billet 14, screw thread steel washer 15, screw-thread steel nut 17.Standard knot finish rolling screw thread It is attached between steel 19 by rebar sleeve 18.To the fining twisted steel installed using hydraulic jack tensioning to setting Evaluation makes screw-thread steel and the preparatory stress of dependent Concrete structure.
Fig. 5 is the schematic diagram that the prior art carries out same operating condition construction using temporary rest pier 20.It can be seen from the figure that making Need to set up the huge temporary rest pier of the scale of construction with temporary rest pier, it is time-consuming and laborious.And use the interim stretch-draw anchor of this great cantilever bent cap Suspension device 5 only needs the simple pre-buried and screw-thread steel installation of progress that can achieve the goal, and saves a large amount of manpower and material resources and duration.
Suitable position of the present invention in bridge formation owner's supporting leg supporting point pier stud opposite side holds bent cap, keeps large span bent cap symmetrical Stress guarantees structure stress safety to eliminate the moment of flexure to pier stud.It is only needed on bent cap and cushion cap using fining twisted steel It is appropriate reserved and pre-buried to carry out, and reaches that need the long bent cap constructed be installation fining twisted steel in Bridge Erector, according to design value into Row tensioning, specific as follows:
1, screw-thread steel designs
Use diameter for the screw-thread steel (UTS=1030Mpa) of 32mm totally 16 pulling bent caps, elasticity modulus 170* 103N/mm2, screw-thread steel overall length are 25m, and every screw-thread steel force value of pre- tensioning is 210kN.
1.1 calculate screw thread hardness of steel
In erection process, since bent cap is by eccentric load, increase pulling force suffered by interim screw-thread steel, in peak load feelings Under condition, screw-thread steel Strength co-mputation process is as follows in erection process:
Screw-thread steel prestressing force
F1=210*0.9=189kN (loss of tension for considering 10%)
Since bent cap offset causes screw-thread steel to extend 29mm, increased pulling force are as follows:
Screw-thread steel institute stress are as follows:
F=F1+F2=347kN < 0.75UTS=620kN
Therefore intensity is met the requirements.
1.2 cushion cap shear calculations
Pre-buried back plate sizes are 180mm*180mm*40mm, bury and are upgraded to 750mm, then screw-thread steel shear stress suffered by cushion cap are as follows:
Therefore cushion cap shearing resistance is met the requirements.
It is analyzed by above-mentioned calculating, the mode that bent cap mode replaces temporary rest pier to prop up bent cap is held using interim screw-thread steel Feasible, installation is simple, and material therefor is few, only need on bent cap and cushion cap preformed hole and nut, then pass through spiral shell Line steel anchors bent cap and cushion cap, and not only effect is high, but also cost is low compared with temporary rest pier is used, the operating condition especially in high pier stud Under, advantage is particularly evident.This method is applicable not only to overhang bent cap herein, is having eccentric load to need to prop up using buttress In the case of, the mode of " changing support to draw " is used, plays unexpected effect sometimes.
The present invention also provides a kind of construction methods of the interim stretch-draw anchor suspension device of great cantilever bent cap, including walk as follows It is rapid:
Step 1: the pre-buried round steel pipe 7 of bent cap is formed in the pre-buried round steel pipe of design position when large span bent cap 3 is poured, Cushion cap 6 corresponds to the bent cap pre-buried pre-buried round steel pipe in 7 position of round steel pipe when pouring, Pressure-bearing pads, it is pre-buried that screw-thread steel nut forms cushion cap Round steel pipe 8;
Step 2: multiple standard knot fining twisted steels 19 are in turn connected to form screw thread steel column, the upper end of screw thread steel column is passed through The pre-buried round steel pipe 7 of bent cap, end successively use screw thread billet 14, screw thread steel washer 15, screw-thread steel nut 17 fixed, screw-thread steel It is fixed that the lower end of column screws in the pre-buried round steel pipe 8 of cushion cap.
Wherein, fastening nut 12 is welded on cushion cap Pressure-bearing pads 11, the lower end of screw thread steel column passes through the pre-buried circle of cushion cap Fastening nut 12 is screwed in after steel pipe 8.
The demounting procedure of above-mentioned apparatus are as follows: the screw-thread steel spiral shell after Bridge Erector is constructed, first on disassembly large span bent cap 3 Then mother 17 successively dismantles standard knot fining twisted steel 19 from top to down, and screws out the screw-thread steel on cushion cap 6, finally use nothing The hole of shrinkage grouting filler closure cushion cap 6 and large span bent cap 3.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Belong to those skilled in the art in the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of, all answers It is included within the scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.

Claims (3)

1. a kind of interim stretch-draw anchor suspension device of great cantilever bent cap, it is characterised in that: including being set on large span bent cap (3) The pre-buried round steel pipe of bent cap (7), be set to cushion cap (6) on the pre-buried round steel pipe of cushion cap (8) and by rebar sleeve (18) connect Multiple standard knot fining twisted steels (19), the pre-buried round steel pipe of bent cap (7) is corresponding with cushion cap pre-buried round steel pipe (8) upper and lower position to be set It sets, multiple standard knot fining twisted steels (19) are in turn connected to form screw thread steel column, and the upper end of screw thread steel column passes through the pre-buried circle of bent cap Steel pipe (7), end successively use screw thread billet (14), screw thread steel washer (15), screw-thread steel nut (17) fixed, screw thread steel column To screw in the pre-buried round steel pipe of cushion cap (8) fixed for lower end;The lower loop of the pre-buried round steel pipe of cushion cap (8) is arranged with spiral busting reinforcement (10), the bottom of spiral busting reinforcement (10) is equipped with cushion cap Pressure-bearing pads (11), spiral busting reinforcement (10) and cushion cap pressure-bearing pad Plate (11) is for preventing concrete from rupturing during stress;Fastening nut (12) are welded on cushion cap Pressure-bearing pads (11), The lower end of screw thread steel column passes through the pre-buried round steel pipe of cushion cap (8) and screws in fastening nut (12) afterwards.
2. the interim stretch-draw anchor suspension device of great cantilever bent cap as described in claim 1, it is characterised in that: cushion cap Pressure-bearing pads (11) it is also welded with the fastening nut protection cap (13) protected to fastening nut (12), fastening nut protection cap (13) is located at Fastening nut (12) lower part.
3. a kind of construction method of the interim stretch-draw anchor suspension device of great cantilever bent cap, it is characterised in that include the following steps:
Step 1: the pre-buried round steel pipe of bent cap (7) are formed in the pre-buried round steel pipe of design position when large span bent cap (3) is poured, Cushion cap (6) corresponds to the pre-buried round steel pipe in the pre-buried round steel pipe of bent cap (7) position, Pressure-bearing pads when pouring, screw-thread steel nut forms cushion cap Pre-buried round steel pipe (8), the lower loop of the pre-buried round steel pipe of cushion cap (8) are arranged with spiral busting reinforcement (10), spiral busting reinforcement (10) bottom is equipped with cushion cap Pressure-bearing pads (11);
Step 2: multiple standard knot fining twisted steels (19) are in turn connected to form screw thread steel column, the upper end of screw thread steel column passes through lid The pre-buried round steel pipe of beam (7), end successively use screw thread billet (14), screw thread steel washer (15), screw-thread steel nut (17) fixed, It is fixed that the lower end of screw thread steel column screws in the pre-buried round steel pipe of cushion cap (8);
It is welded on cushion cap Pressure-bearing pads (11) fastening nut (12), the lower end of screw thread steel column passes through the pre-buried round steel pipe of cushion cap (8) fastening nut (12) are screwed in afterwards.
CN201610900956.6A 2016-10-14 2016-10-14 A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method Active CN106436583B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610900956.6A CN106436583B (en) 2016-10-14 2016-10-14 A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610900956.6A CN106436583B (en) 2016-10-14 2016-10-14 A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method

Publications (2)

Publication Number Publication Date
CN106436583A CN106436583A (en) 2017-02-22
CN106436583B true CN106436583B (en) 2019-02-19

Family

ID=58174186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610900956.6A Active CN106436583B (en) 2016-10-14 2016-10-14 A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method

Country Status (1)

Country Link
CN (1) CN106436583B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109468946B (en) * 2018-04-12 2024-04-12 上海公路投资建设发展有限公司 Steel structure temporary fixing device and process for large-scale bent cap cantilever assembly
CN110541364A (en) * 2019-09-04 2019-12-06 上海城建市政工程(集团)有限公司 Bridge bent cap segmented prefabrication, assembly and fixation method
CN110685222A (en) * 2019-09-04 2020-01-14 上海城建市政工程(集团)有限公司 Balance construction method for prefabricated bent cap support-free pull rod
CN111042006B (en) * 2020-01-16 2022-04-15 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof
CN111501527A (en) * 2020-03-31 2020-08-07 上海城建市政工程(集团)有限公司 Temporary fixing method for prestressed concrete bent cap with small column spacing and large cantilever
CN111809505A (en) * 2020-06-19 2020-10-23 中铁大桥局上海工程有限公司 Anchor pulling component and eccentric beam
CN112627060A (en) * 2020-12-30 2021-04-09 中国建筑土木建设有限公司 Side-span cast-in-place section cantilever bearing system and construction method thereof
CN113652966B (en) * 2021-07-13 2022-11-25 宁波市政工程建设集团股份有限公司 Construction method of full-prefabricated assembly type concrete beam type bridge structure system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260651A (en) * 2008-04-25 2008-09-10 中交第二航务工程局有限公司 Method and device for accomplishing self-balancing load and anchoring temporarily between main beam and platform
CN101736686A (en) * 2009-11-27 2010-06-16 大连理工大学 Self-anchored hybrid beam cable-stayed suspension cooperative system bridge
CN103061249A (en) * 2012-12-29 2013-04-24 青岛海德路桥工程股份有限公司 Quick positioning construction device and construction method for steel-pipe column of bridge
CN206090327U (en) * 2016-10-14 2017-04-12 中铁十一局集团有限公司 Big interim tensioning anchorage supporting device of cantilever bent cap

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100814387B1 (en) * 2007-12-03 2008-03-18 노윤근 Prestressed concrete girder manufacture method equipped with end anchorage for economical upkeeping

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260651A (en) * 2008-04-25 2008-09-10 中交第二航务工程局有限公司 Method and device for accomplishing self-balancing load and anchoring temporarily between main beam and platform
CN101736686A (en) * 2009-11-27 2010-06-16 大连理工大学 Self-anchored hybrid beam cable-stayed suspension cooperative system bridge
CN103061249A (en) * 2012-12-29 2013-04-24 青岛海德路桥工程股份有限公司 Quick positioning construction device and construction method for steel-pipe column of bridge
CN206090327U (en) * 2016-10-14 2017-04-12 中铁十一局集团有限公司 Big interim tensioning anchorage supporting device of cantilever bent cap

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"高速干线跨河大桥主桥墩临时固结施工技术";何月方;《建筑施工》;20150125;第37卷(第1期);第104页第3节

Also Published As

Publication number Publication date
CN106436583A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106436583B (en) A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method
CN213267529U (en) Assembled bridge concatenation bent cap installation bearing structure
CN106702910A (en) Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes
CN105350458B (en) Construction method of composite structure platform for construction of Y-shaped pier of bridge
CN104005338B (en) A kind of long-span cablestayed bridges tower beam three-dimensional temporary consolidation structure
CN105178200B (en) The oblique pull sectional shelf-unit construction method of number segmental construction of suspension pouring arch-type bridge
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN108978471A (en) A kind of support device and its installation method increasing cable-stayed bridge abnormity Sarasota rigidity
CN204589822U (en) The two cantilever bent cap anchor ear Construction Support system of a kind of solely post
KR101198812B1 (en) composite rahmen bridge using a preflex girder
CN103774541B (en) A kind of multiple-piece composite beam bridge top and the bottom monolithic construction and construction method thereof
CN106087777B (en) The construction method of high pier long cantilever Cast-in-place Bent Cap combined type formwork system
CN104452597A (en) Supporting system for construction of super-long water pier prestressed cap beam
CN110184948A (en) A kind of Bridge beam construction method
KR101527782B1 (en) Management and reverse displacement of composite bridge composite inclined support installation method
CN102277836B (en) Construction method of tilting concrete tower base
CN104929047B (en) A kind of V-type pier outer support construction method
CN106894345A (en) Continuous beam end bay closing device and method
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN206607506U (en) A kind of through type adds the capping construction support of passive stress trapezoid block
CN206090327U (en) Big interim tensioning anchorage supporting device of cantilever bent cap
CN106939557A (en) A kind of pin-connected panel bracket casting platform of brace support
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
CN109706842A (en) A kind of urban viaduct Single column pier capping beam construction device
CN110792042A (en) Anti-overturning reinforcing method for rectangular single-column pier bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220124

Address after: 430061 No.277 Zhongshan Road, Wuchang District, Wuhan City, Hubei Province

Patentee after: CHINA RAILWAY 11 BUREAU GROUP Co.,Ltd.

Patentee after: China Railway 11th Bureau Group Hanjiang Heavy Industry Co., Ltd

Address before: 430071 No. 347, Wuchang, Wuhan District, Hubei, Zhongshan Road

Patentee before: CHINA RAILWAY 11 BUREAU GROUP Co.,Ltd.

TR01 Transfer of patent right