CN104929047B - A kind of V-type pier outer support construction method - Google Patents

A kind of V-type pier outer support construction method Download PDF

Info

Publication number
CN104929047B
CN104929047B CN201510311057.8A CN201510311057A CN104929047B CN 104929047 B CN104929047 B CN 104929047B CN 201510311057 A CN201510311057 A CN 201510311057A CN 104929047 B CN104929047 B CN 104929047B
Authority
CN
China
Prior art keywords
truss
right angle
construction
type pier
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510311057.8A
Other languages
Chinese (zh)
Other versions
CN104929047A (en
Inventor
高辉
郝凤波
刘志斌
韩金昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Municipal Group Co Ltd
Original Assignee
Shenyang Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Municipal Group Co Ltd filed Critical Shenyang Municipal Group Co Ltd
Priority to CN201510311057.8A priority Critical patent/CN104929047B/en
Publication of CN104929047A publication Critical patent/CN104929047A/en
Application granted granted Critical
Publication of CN104929047B publication Critical patent/CN104929047B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of V-type pier outer support construction method, including preparative work before construction, foundation ditch backfill and process, grade beam truss foundation construction, right angle truss installa-tion, pier reinforcing bar, model sheetinstallat, essence pricks the operations such as coarse thread steel bar installation, V-type pier concreting, V-type pier template, right angle truss dismounting.The present invention uses right angle truss and the finish rolling deformed bar integrated application to drawing two kinds of construction technologies, individual event construction technology is simple, easily operated, compared with conventional construction method, ensure that V-type pier keeps globality not produce extra moment of flexure without bigger turnover component through battered leg self and bottom, more will not produce crack;Less input for circulation material.Ensure construction safety simultaneously, improved construction speed, reduce construction cost.

Description

A kind of V-type pier outer support construction method
Technical field
The present invention relates to bridge construction construction technique field, specifically ephemeral stream and overbridge Beam V-type pier right angle truss outer support construction method.
Background technology
Along with economic great development, the traffic base such as highway, town road builds Fast Construction. Road construction by river, gully, Lu Yulu intersect etc. be both needed to build bridge, especially municipal administration bridge Beam is built not only to meet and is used function, considers city look of the city simultaneously.Numerous bridge pier columns are tied In configuration formula, V-type pier is novel in design light and handy, but during construction, owing to V-type pier root is relatively thin, During battered leg construction, it is had a negative impact;And when pouring with V-type pier battered leg intersection girder, V-type pier battered leg root can be produced secondary effect again.This construction method uses purlin, V-type pier right angle Frame outer support coordinates finish rolling coarse thread steel bar symmetry drawknot right angle truss mode, effectively solves V-type pier root stress problem, to ensureing construction safety, accelerating construction progress, reduction is constructed into Originally have great significance.
Summary of the invention
The purpose of the present invention, is to provide a kind of safe and reliable, and speed of application is fast, saves resource V-type pier stud construction method.
The technical scheme is that
A kind of V-type pier outer support construction method, comprises the steps:
1, foundation ditch backfill and process
In cushion cap foundation ditch, graded gravel is backfilled, by foundation ditch before backfill after bearing platform construction Eliminating impurities is clean.Back-filling in layers, every layer thickness is not more than 20cm, and compaction in layers rolls, Compactness reaches more than 98% can fill last layer.It is backfilling into design grade beam (truss basis) end Surfacing is carried out after absolute altitude.
2, grade beam (truss basis) construction
Grade beam cross dimensions is 750 × 750mm.Cushion cap foundation ditch backfilled after by survey crew Provide grade beam design and construction position (truss is in place), need before concreting again to survey and set grade beam After construction location, sandbox reserved location, truss back position are errorless, carry out casting concrete. Correct embedment truss before concrete initial set, fixing bar built-in fitting.
3, right angle truss installa-tion
After design size segmentation blanking, square steel be connected by welding, weldquality press three grades Above standard controls.
Right angle truss installa-tion pre-test personnel provide the exact position of truss again, and place sandbox (regulation height, it is simple to dismounting), sandbox first presses closely through reaction frame before using.By multiple Right angle truss is respectively placed in the setting position on sandbox.The every side of right angle truss installa-tion order in place by Outer to interior or from the inside to the outside, first install in place after, uses four points of steel wire ropes connection purlins, right angle Frame fixes right angle truss with the pre-buried anchor ring on grade beam;After second right angle truss installa-tion is in place, Installing the connecting rod between two right angle in place truss, connecting rod connects right angle truss and uses bolt, Fixing right angle Truss Steel cord does not releases;3rd right angle truss, the 4th right angle truss are installed, Between third and fourth truss, connecting rod is installed and is fully completed, centre once will connect to both sides The fastening of bar bolt puts in place, then releases steel wire rope.Again check truss installa-tion position, right angle, close With on space between C20 concreting truss and rear backrest welded truss and grade beam after lattice Embedded ribs.
4, V-type pier reinforcing bar, model sheetinstallat
Lay horizontal stupefied inside right angle truss, use 16# channel-section steel, carry out subsequently steel form install and Reinforcing bar binding works, and essence is pricked after completing spiral fastening, carries out concrete after being fully completed Pour work.
During the construction of V-type pier, in the range of V-type pier, outer erection construction scaffold and up-downgoing construction walk Road, construction scaffolding uses fastener type steel pipe scaffold, uses platform springboard completely to spread.
V-type pier template uses set shaped steel formwork 1.5 meters × 1.0 meters, and between template, connected mode is adopted It is connected with, between inner and outer template, uses M14 split bolt to be attached.
Pier foundation and variable cross-section use prefabricated abnormal formwork;Other position uses set shaped steel formwork 1.5 meters × 1.0 meters.
Model sheetinstallat order is: 1, pier foundation model sheetinstallat;2, after right angle truss installa-tion is in place, Truss is pressed design attitude back cord is installed, then V-type pier battered leg exterior sheathing is installed;3、V After type pier battered leg reinforcement installation completes, variable-cross-section special shaped template is installed;4, install in V-type pier Template, template back arris in installing, split bolt M14 fastens.
5, essence pricks coarse thread steel bar installation
Essence is pricked coarse thread steel bar and is used φ 32 essence to prick spiral, and grade is PSB830.
After model sheetinstallat completes in V-type pier, φ 32 essence is pricked coarse thread steel bar in place also by design The order applying the bundle coarse thread steel bar installation of pretension essence is carried out from the bottom to top along V-type pier height, altogether Five roads are installed.Direction across bridge every pair right angle truss is respectively mounted essence and pricks coarse thread steel bar.
6, V-type pier concreting
Concrete one-time-concreting to 15cm under pier and beam junction, two battered legs placement layer by layer simultaneously, Use internal vibration rod to be aided with attached vibrator to vibrate.
7, V-type pier template, right angle truss are removed
Treat that the girder pre-stressed slip casting of upper tank completes to reach 100% purlin, dismountable V-type pier right angle, rear Frame.First removal finish rolling coarse thread steel bar, abolishes the concrete between truss and rear backrest, then Removal sandbox, right angle truss and V-type pier battered leg spacing reach to remove exterior sheathing, back cord, Finally remove right angle truss.
Advantages of the present invention
The present invention is by using V-type pier right angle truss outer support to coordinate finish rolling coarse thread steel bar Symmetrical drawknot right angle truss mode, effectively solves V-type pier root stress problem, and guarantee is executed The safety of work, shortens the construction period, has saved construction cost.
Accompanying drawing illustrates:
Fig. 1 is construction technology process schematic diagram.
Detailed description of the invention
A kind of V-type pier outer support construction method, specifically includes the following step:
1, foundation ditch backfill and process
Before backfill, the foreign material (soil block, woven bag, benzene plate etc.) in foundation ditch are removed clean. Back-filling in layers graded gravel, every layer of backfill thickness≤20cm, compaction in layers rolls, and compactness reaches More than 98% can fill last layer.Note after being backfilling into design grade beam (truss basis) end absolute altitude Meaning surfacing.
2, grade beam (truss basis) construction
Cushion cap foundation ditch backfilled after by survey crew be given grade beam (cross dimensions is 750 × 750mm) design and construction position (truss is in place), reinforcing bar, template and concrete construction perform bridge Beam foundation construction code requirement.Need before concreting again to survey and set grade beam construction location, sandbox Can casting concrete after reserved location, truss back position are errorless.Before concrete initial set accurately Bar built-in fitting fixed by pre-buried truss.
3, right angle truss installa-tion
Right angle truss is entrusted has the unit of Construction of Steel Structure qualification to process.For ease of transport, on-the-spot With good conditionsi can produce at the scene.After design size segmentation blanking, square steel be connected by weldering Connecing, weldquality is controlled by standard above grade 3.In construction and transportation, it is to avoid collide with straight Angle truss is in order to avoid causing the damage of load-bearing rod member or causing carrying disadvantageous deformation etc..
Right angle truss installa-tion pre-test personnel again provide the exact position of truss and place sandbox (regulation height, it is simple to dismounting), sandbox first presses closely through reaction frame before using.Use 25T Autocrane makes truss be located on sandbox and and uses hydraulic jack fine setting to design Position.The every side of right angle truss installa-tion order in place from outside to inside or from the inside to the outside, first installation After in place, four points of steel wire rope truss frame for connectings are used to fix truss with the pre-buried anchor ring on grade beam;The After two truss installa-tion are in place, installing the connecting rod between two right angle in place truss, connecting rod is even Connecing truss uses bolt, fixing Truss Steel cord not to release;Install the 3rd right angle truss, Four right angle truss, between third and fourth truss connecting rod install be fully completed, by centre to It (is only bolt to screw half i.e. in installation process that connecting-rod bolt fastening is once put in place by both sides Can), then release steel wire rope.Again check truss installa-tion position, right angle, qualified after use C20 Space welded truss and the embedded ribs on grade beam between concreting truss and rear backrest.
4, pier reinforcing bar, model sheetinstallat
Lay horizontal stupefied (16# channel-section steel) inside right angle truss, carry out steel form installation and reinforcing bar subsequently Colligation works, and essence is pricked spiral (to drawing reinforcing bar) in place and fasten after completing, the completeest Concreting work is carried out after one-tenth.
During the construction of V-type pier, in the range of V-type pier, outer erection construction scaffold and up-downgoing construction walk Road, construction scaffolding uses fastener type steel pipe scaffold, uses platform springboard completely to spread.
V-type pier pier foundation and variable cross-section use the abnormal formwork of customization;Other position uses customization Set shaped steel formwork 1.5 meters × 1.0 meters, between template, connected mode is with bolts, inside and outside M14 split bolt is used to be attached between template.
Model sheetinstallat order is: 1, pier foundation model sheetinstallat;2, after right angle truss installa-tion is in place, Truss is pressed design attitude back cord is installed, then V-type pier battered leg exterior sheathing is installed;3、V After type pier battered leg reinforcement installation completes, variable-cross-section special shaped template is installed;4, install in V-type pier Template, template back arris in installing, split bolt M14 fastens.
Pier model sheetinstallat abnormal formwork is installed by hand fit's crane, and typified form is with manually installed It is main.
5, essence pricks coarse thread steel bar installation
Essence is pricked coarse thread steel bar and is used φ 32 essence to prick spiral, and grade is PSB830.
After model sheetinstallat completes in V-type pier, φ 32 essence is pricked coarse thread steel bar in place also by design Applying pretension, after prestretching, the position of truss, the position of V-type pier template all set at design drawing In meter site error allowed band.
Essence is pricked the order of coarse thread steel bar installation and is carried out from the bottom to top along V-type pier height, installs five altogether Road.Direction across bridge every pair right angle truss is respectively mounted essence and pricks coarse thread steel bar.
6, V-type pier concreting
Concrete uses concrete mixer one-time-concreting to pier and 15cm under beam junction, and two is oblique Leg placement layer by layer simultaneously, uses internal vibration rod to be aided with attached vibrator and vibrates.
7, V-type pier template, right angle truss are removed
Treat that the girder pre-stressed slip casting of upper tank completes to reach 100% purlin, dismountable V-type pier right angle, rear Frame.First removal finish rolling coarse thread steel bar, abolishes the concrete between truss and rear backrest, then Removal sandbox, right angle truss and V-type pier battered leg spacing reach to remove exterior sheathing, back cord, Finally remove right angle truss.

Claims (1)

1. a V-type pier outer support construction method, it is characterised in that comprise the steps:
(1) foundation ditch backfill and process
In cushion cap foundation ditch, graded gravel is backfilled, by foundation ditch before backfill after bearing platform construction Eliminating impurities is clean;Back-filling in layers, every layer thickness is not more than 20cm, and compaction in layers rolls, Compactness reaches more than 98% can fill last layer;Table is carried out after being backfilling into design ground bottom elevation Face is smooth;
(2) grade beam construction
Grade beam cross dimensions is 750 × 750mm;Cushion cap foundation ditch backfilled after by survey crew Provide grade beam design and construction position, need before concreting again to survey and set grade beam construction location, sand After case reserved location, truss back position are errorless, carry out casting concrete;Before concrete initial set Correct embedment truss, fixing bar built-in fitting;
(3) right angle truss installa-tion
After design size segmentation blanking, square steel be connected by welding, weldquality press three grades Above standard controls;
Right angle truss installa-tion pre-test personnel provide the exact position of truss again, and place sand Case, sandbox first presses closely through reaction frame before using;Multiple right angles truss is respectively placed in sandbox On setting position;The every side of right angle truss installa-tion order in place from outside to inside or from the inside to the outside, After one installation is in place, four points of steel wire ropes are used to connect right angle truss and the pre-buried anchor ring on grade beam Fixing right angle truss;After second right angle truss installa-tion is in place, two right angle in place truss are installed Between connecting rod, connecting rod connects right angle truss and uses bolt, and fixing right angle Truss Steel cord is not Release;3rd right angle truss, the 4th right angle truss are installed, between third and fourth truss Connecting rod is installed and is fully completed, centre once connecting-rod bolt fastening put in place, so to both sides Rear releasing steel wire rope;Again check truss installa-tion position, right angle, qualified after water with C20 concrete Build space between truss and rear backrest welded truss and the embedded ribs on grade beam;
(4) V-type pier reinforcing bar, model sheetinstallat
Lay horizontal stupefied inside right angle truss, use 16# channel-section steel, carry out subsequently steel form install and Reinforcing bar binding works, and essence is pricked after completing spiral fastening, carries out concrete after being fully completed Pour work;
During the construction of V-type pier, in the range of V-type pier, outer erection construction scaffold and up-downgoing construction walk Road, construction scaffolding uses fastener type steel pipe scaffold, uses platform springboard completely to spread;
V-type pier template uses set shaped steel formwork 1.5 meters × 1.0 meters, and between template, connected mode is adopted It is connected with, between inner and outer template, uses M14 split bolt to be attached;
Pier foundation and variable cross-section use prefabricated abnormal formwork;Other position uses set shaped steel formwork 1.5 meters × 1.0 meters;
Model sheetinstallat order is: 1, pier foundation model sheetinstallat;2, after right angle truss installa-tion is in place, Truss is pressed design attitude back cord is installed, then V-type pier battered leg exterior sheathing is installed;3、V After type pier battered leg reinforcement installation completes, variable-cross-section special shaped template is installed;4, install in V-type pier Template, template back arris in installing, split bolt M14 fastens;
(5) essence pricks coarse thread steel bar installation
Essence is pricked coarse thread steel bar and is used φ 32 essence to prick spiral, and grade is PSB830;
After model sheetinstallat completes in V-type pier, φ 32 essence is pricked coarse thread steel bar in place also by design The order applying the bundle coarse thread steel bar installation of pretension essence is carried out from the bottom to top along V-type pier height, altogether Five roads are installed;Direction across bridge every pair right angle truss is respectively mounted essence and pricks coarse thread steel bar;
(6) V-type pier concreting
Concrete one-time-concreting to 15cm under pier and beam junction, two battered legs placement layer by layer simultaneously, Use internal vibration rod to be aided with attached vibrator to vibrate;
(7) V-type pier template, right angle truss are removed
Treat that the girder pre-stressed slip casting of upper tank completes to reach 100% purlin, dismountable V-type pier right angle, rear Frame;First removal finish rolling coarse thread steel bar, abolishes the concrete between truss and rear backrest, then Removal sandbox, right angle truss and V-type pier battered leg spacing reach to remove exterior sheathing, back cord, Finally remove right angle truss.
CN201510311057.8A 2015-06-09 2015-06-09 A kind of V-type pier outer support construction method Expired - Fee Related CN104929047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510311057.8A CN104929047B (en) 2015-06-09 2015-06-09 A kind of V-type pier outer support construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510311057.8A CN104929047B (en) 2015-06-09 2015-06-09 A kind of V-type pier outer support construction method

Publications (2)

Publication Number Publication Date
CN104929047A CN104929047A (en) 2015-09-23
CN104929047B true CN104929047B (en) 2016-08-24

Family

ID=54116456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510311057.8A Expired - Fee Related CN104929047B (en) 2015-06-09 2015-06-09 A kind of V-type pier outer support construction method

Country Status (1)

Country Link
CN (1) CN104929047B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437746A (en) * 2016-10-10 2017-02-22 中国水利水电第十四工程局有限公司 Construction method and construction device of underground cavity high-side wall facing concrete
CN106677069B (en) * 2016-12-28 2018-04-06 杭州江润科技有限公司 A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN107938516B (en) * 2017-11-16 2019-08-23 华蓝设计(集团)有限公司 Shaped pier structure battered leg temporary support installation security method for dismounting
CN109024286B (en) * 2018-07-10 2020-09-01 中铁大桥局集团第一工程有限公司 Construction method for cast-in-situ V-shaped pier of concrete support wall
CN110029559A (en) * 2019-05-24 2019-07-19 中国十七冶集团有限公司 A kind of gutter slding form operation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070679A (en) * 2004-09-01 2006-03-16 Yoshisuke Kamiya Continuous girder bridge in which triangle structures having damping/supporting devices at lower ends are connected by girder
RU2291242C1 (en) * 2005-08-15 2007-01-10 Юрий Иванович Файко Bridge structure
CN202323772U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Upside-down hanging construction device for steel stranded wires of bridge V-shaped support
CN202954299U (en) * 2012-10-16 2013-05-29 上海城建市政工程(集团)有限公司 Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN104120649B (en) * 2014-08-13 2015-12-16 江苏中设集团股份有限公司 Have the anti-thrust force protection wall of end of the bridge without end carriage V-type rigid frame bridge

Also Published As

Publication number Publication date
CN104929047A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN104929047B (en) A kind of V-type pier outer support construction method
CN103741604B (en) Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof
CN106120568B (en) The construction method of cross a river Main Bridge bridge pier secondary locking temporary consolidation structure
CN107119574A (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN106930194B (en) Inter-tie and pier stud global formation construction method and template used holder
CN105040970A (en) High formwork system of comprehensive gymnasium and construction method thereof
CN105421245B (en) Bent cap is without support steel hoop method construction technology
CN103774854A (en) Construction method for hoisting heavy type ultrahigh steel member
CN112982181A (en) Construction method for steel-concrete combined section of through-type steel box continuous arch bridge
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN108842624A (en) High pier Cast-in-place Bent Cap combined type overhanging formwork system and construction method
CN110387822A (en) Cast-in-place Bent Cap assembled steel pipe holder and its construction method
CN106869548A (en) A kind of newel framework assembled underground parking structural system and construction method
CN101575858A (en) Construction method of steel cofferdam used for reinforcing underwater pier
CN110184948A (en) A kind of Bridge beam construction method
CN107100083A (en) A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure and construction method
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
CN110409624A (en) A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method
CN101806040B (en) Underpinning device and method for bridge and building
CN106480826A (en) The cast-in-place traversing construction engineering method of single line box beam pier top

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824