CN105350458B - Construction method of composite structure platform for construction of Y-shaped pier of bridge - Google Patents

Construction method of composite structure platform for construction of Y-shaped pier of bridge Download PDF

Info

Publication number
CN105350458B
CN105350458B CN201510785177.1A CN201510785177A CN105350458B CN 105350458 B CN105350458 B CN 105350458B CN 201510785177 A CN201510785177 A CN 201510785177A CN 105350458 B CN105350458 B CN 105350458B
Authority
CN
China
Prior art keywords
type
poured
column
cushion cap
piers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510785177.1A
Other languages
Chinese (zh)
Other versions
CN105350458A (en
Inventor
周俊龙
高璞
余流
王安鑫
刘跃武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201510785177.1A priority Critical patent/CN105350458B/en
Publication of CN105350458A publication Critical patent/CN105350458A/en
Application granted granted Critical
Publication of CN105350458B publication Critical patent/CN105350458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a mounting method of a composite structure platform for construction of a Y-shaped pier of a bridge. The method comprises the following steps that (1) a plurality of vertical pre-embedded steel plates are arranged on the left side and the right side of a bearing platform formwork at intervals respectively, and a plurality of horizontal pre-embedded steel plates are arranged on the top faces of the positions, on the left side and the right side of a stand column of the Y-shaped pier to be poured, of the bearing platform formwork at intervals respectively; (2) a bearing platform is poured; (3) a plurality of section steel beams are erected on the two sides of the stand column of the Y-shaped pier to be poured respectively; (4) the stand column of the Y-shaped pier is poured; (5) the bottom ends of a plurality of concrete-filled steel tube inclined struts are welded and connected to the vertical pre-embedded steel plates and the horizontal pre-embedded steel plates respectively, and the other ends of the concrete-filled steel tube inclined struts are welded to the correspondingly-arranged section steel beams respectively; (6) bailey beams and distribution beams are sequentially laid on the section steel beams on the same side; and (7) Y-shaped pier formwork supporting frames are distributed on the distribution beams on the left side and the right side respectively. According to the method, the shear strength of concrete is greatly improved.

Description

A kind of construction method of bridge Y types pier construction with combinative structure platform
Technical field
The present invention relates to field of bridge construction, relate in particular to a kind of bridge Y types pier construction combinative structure platform and Its installation method.
Background technology
At present, known Y types bridge construction platform has various ways, but there is a problem that certain.For universal not And geological conditions compared with hard formation blocked up suitable for Muddy Bottoms coating, it is impossible to which the intensity of effectively utilizes pier shaft is transmitting vertical lotus Carry, supporting removal is difficult after the completion of construction, typically can only be cut off using the bottom, produce larger waste to material, and in navigation Under conditions of having high demands cannot the bottom cut off, universality is poor, it is impossible to greatest extent play steel platform load-carrying properties.
The construction method of the great-angle Y type pier stud announced by publication No. CN104746435A employs substantial amounts of steel-pipe pile knot Structure and slant-pull structure system, need to carry out substantial amounts of piling construction, and steel using amount are big.Y types pier construction terminate after steel-pipe pile not Easily pull out, waste of material can only be caused by the way of excision.
The concrete structure formwork bracing frame of the bridge V-type bridge pier announced by publication No. CN202390763U, its V for adopting Type bracing frame is the method for carrying out bent cap concrete structure construction after the construction of V limbs, it is impossible to which effectively application is constructed with V limbs.
A kind of wide-angle V-shaped pier that publication No. C102888815A and CN202954299U are announced and 0# block box beams are poured Building construction method needs to lay a large amount of supports, and material consumption is big, also needs to process ground.
A kind of Y types pier template and support system and publication No. CN101481902A that publication No. CN203007846U is announced The V type pier inclined leg combined type support for continuous rigid frame bridge announced and layered cast-in-situ construction method, its erection depend on enclosing for pontic Fender pile and the drilled pile for separately setting, and multiple tracks is laid to lacing wire, support connection complicated so that the program is fitted in implementation process Answering property is poor, and enforcement difficulty is big, does not apply to and is not provided with fender post and does not set the suspended deck structure of drilled pile.
The content of the invention
It is an object of the invention to overcome the shortcomings of prior art, there is provided a kind of installation effectiveness is high, inherent structure is affected It is little, strong applicability, construction method of the big bridge Y types pier construction of bearing capacity with combinative structure platform.
For reaching above-mentioned purpose, the present invention adopts following technical proposals:
A kind of installation method of the bridge Y types pier construction of the present invention with combinative structure platform, it comprises the following steps:
(1) the multiple vertical pre-embedded steel slabs of setting are longitudinally respectively separated and to be poured in the left and right sides of cushion cap template along cushion cap The multiple horizontal pre-buried steels of setting are respectively separated longitudinally along cushion cap on the top surface of the cushion cap template of the column left and right sides of the Y type piers built Plate;
(2) cushion cap is poured in cushion cap template;
(3) many root type girder steels of height such as install respectively in the horizontal direction in the column both sides of Y type piers to be poured and make It is located on the inside of described many root type girder steels in the column of Y type piers to be poured, then by the column of Y type piers to be poured Reinforcing bar makes the column of section steel beam and Y type piers through default reinforced hole on the inner side edge of a wing of the section steel beam being correspondingly arranged and web Reinforcing bar be connected;
(4) pour the column of Y type piers;
(5) when the concrete strength of the column of Y type piers reaches requirement, many concrete filled steel tube diagonal brace bottoms are welded respectively It is connected on vertical pre-embedded steel slab and horizontal pre-embedded steel slab in succession and the other end is respectively welded on the section steel beam being correspondingly arranged;
(6) Bailey beam is laid on many root type girder steels of the homonymy for having supported, and described Bailey beam is adopted with section steel beam Take spot welding and securing member is fixed;
(7) distribution beam is laid respectively in Bailey beam described in the left and right sides, described distribution beam and Bailey beam are using fastening Part and spot welding connection;
(8) the outer wall shape respectively according to Y type socle V-arrangements to be poured in the distribution beam of the left and right sides lays Y type piers Formwork-support.
Using the invention has the beneficial effects as follows:
(1) platform is supported on cushion cap eventually through concrete filled steel tube diagonal brace and is connected with pier stud by pre-buried mode, right Underlying geological condition does not require that assembling and disassembling is convenient, and steel using amount is few, easy construction;
(2) concrete filled steel tube has good mechanical property, has compared to traditional steel pipe support structure preferably anti- Pressure performance.
(3) the original reinforcing bar of pillarwork can be passed through from the reinforced hole of section steel beam, will not be because of the pre-buried connection of section steel beam Laying to the intrinsic reinforcing bar of structure is impacted;
(4) reinforcing bar penetrated in opening up the shaped steel flange of beam of reinforced hole, web improves the ductility of anchor structure, it is to avoid The brittle break of anchor system;
(5), in casting process, the concrete performance of tapping can be improved, and the shearing resistance for substantially increasing concrete is strong Degree;
(6) combined system is applicable to current known any pier shaft height, the battered leg of the Y type piers of battered leg angle and pours and apply Work platform, intensity are high, flexible arrangement.
Description of the drawings
Fig. 1 is the bridge Y types built using a kind of installation method of bridge Y types pier construction combinative structure platform of the invention The front view of pier structure;
Fig. 2 is that a kind of work progress of the installation method of bridge Y types pier construction combinative structure platform of the present invention is faced Figure;
Fig. 3 is the detail structure figure of the embedded region A of section steel beam shown in Fig. 2.
Specific embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
A kind of construction method of the bridge Y types pier construction of the present invention with combinative structure platform, it comprises the following steps:
(1) the multiple vertical pre-embedded steel slabs 8 of setting are longitudinally respectively separated in the left and right sides of cushion cap template along cushion cap and treating It is pre- the multiple levels of setting to be respectively separated longitudinally along cushion cap on the top surface of the cushion cap template of 2 left and right sides of column of the Y type piers for pouring Bury steel plate 9;
(2) cushion cap 1 is poured in cushion cap template;
(3) many root type girder steels 4 for the height such as installing respectively in the horizontal direction in 2 both sides of column of Y type piers to be poured are simultaneously The inner side of described many root type girder steels 4 is made to be located in the column 2 of Y type piers to be poured, then by the vertical of Y type piers to be poured The reinforcing bar 10 of post 2 through default reinforced hole 11 on the inner side edge of a wing of section steel beam 4 and web being correspondingly arranged make section steel beam 4 with The reinforcing bar 10 of the column 2 of Y type piers is connected;
(4) pour the column 2 of Y type piers;
(5) when the concrete strength of the column 2 of Y type piers reaches requirement, many 3 bottoms of concrete filled steel tube diagonal brace are distinguished It is welded to connect on vertical pre-embedded steel slab 8 and horizontal pre-embedded steel slab 9 and the other end is respectively welded at the section steel beam 4 being correspondingly arranged On;
(6) laying Bailey beam 5, described Bailey beam 5 and section steel beam on many root type girder steels 4 of the homonymy for having supported 4 take spot welding and securing member to be fixed;
(7) lay distribution beam 6 in Bailey beam described in the left and right sides 5 respectively, described distribution beam 6 is adopted with Bailey beam 4 Securing member and spot welding connection;
(8) the outer wall shape respectively according to Y type socle V-arrangements to be poured in left and right sides distribution beam 6 lays Y type piers Formwork-support 7.
The structure of the bridge Y type pier construction combinative structure platforms poured using the inventive method is included:On a left side for cushion cap 1 Right both sides are respectively provided with multiple vertical pre-embedded steel slabs 8 and the edge on the top surface of the cushion cap of 2 left and right sides of column of Y type piers Cushion cap is longitudinally respectively provided with multiple horizontal pre-embedded steel slabs 9, in 2 both sides of column of described Y type piers respectively along level side To many root type girder steels 4 for the height such as installing and the inner side of described many root type girder steels 4 is made to be located in the column 2 of Y type piers, it is described The reinforcing bar 10 of column 2 of Y type piers make through default reinforced hole 11 on the 4 inner side edge of a wing of section steel beam that is correspondingly arranged and web Section steel beam 4 is connected with the reinforcing bar 10 of the column 2 of Y type piers, and many 3 bottoms of concrete filled steel tube diagonal brace are respectively welded and are connected to vertically On pre-embedded steel slab 8 and horizontal pre-embedded steel slab 9 and the other end is respectively welded on the section steel beam 4 being correspondingly arranged, in many of homonymy Bailey beam 5 is fixed with root type girder steel 4, is respectively fixed with distribution beam 6, in the left and right sides in Bailey beam described in the left and right sides 5 Y type piers formwork-support 7 is laid with according to Y type socle V-arrangement outer wall shapes to be poured respectively in distribution beam 6.
Embodiment 1
(1) the multiple vertical pre-embedded steel slabs 8 of setting are longitudinally respectively separated in the left and right sides of cushion cap template along cushion cap and treating It is pre- the multiple levels of setting to be respectively separated longitudinally along cushion cap on the top surface of the cushion cap template of 2 left and right sides of column of the Y type piers for pouring Bury steel plate 9;
(2) cushion cap 1 is poured in cushion cap template;
(3) many root type girder steels 4 for the height such as installing respectively in the horizontal direction in 2 both sides of column of Y type piers to be poured are simultaneously The inner side of described many root type girder steels 4 is made to be located in the column 2 of Y type piers to be poured, then by the vertical of Y type piers to be poured The reinforcing bar 10 of post 2 through default reinforced hole 11 on the inner side edge of a wing of section steel beam 4 and web being correspondingly arranged make section steel beam 4 with The reinforcing bar 10 of the column 2 of Y type piers is connected;
(4) pour the column 2 of Y type piers;
(5) when the concrete strength of the column 2 of Y type piers reaches requirement, many 3 bottoms of concrete filled steel tube diagonal brace are distinguished It is welded to connect on vertical pre-embedded steel slab 8 and horizontal pre-embedded steel slab 9 and the other end is respectively welded at the section steel beam 4 being correspondingly arranged On;
(6) laying Bailey beam 5, described Bailey beam 5 and section steel beam on many root type girder steels 4 of the homonymy for having supported 4 take spot welding and securing member to be fixed;
(7) lay distribution beam 6 in Bailey beam described in the left and right sides 5 respectively, described distribution beam 6 is adopted with Bailey beam 4 Securing member and spot welding connection;
(8) the outer wall shape respectively according to Y type socle V-arrangements to be poured in left and right sides distribution beam 6 lays Y type piers Formwork-support 7.
With Y type piers formwork-support 7 as supporting the concrete for pouring Y type piers.Concrete filled steel tube has good after testing Mechanical property, has more preferable compressive property compared to traditional steel pipe support structure.

Claims (1)

1. a kind of bridge Y types pier is constructed and uses the installation method of combinative structure platform, it is characterised in that it comprises the following steps:
(1) the multiple vertical pre-embedded steel slabs of setting are longitudinally respectively separated and to be poured in the left and right sides of cushion cap template along cushion cap The multiple horizontal pre-embedded steel slabs of setting are respectively separated longitudinally along cushion cap on the top surface of the cushion cap template of the column left and right sides of Y type piers;
(2) cushion cap is poured in cushion cap template;
(3) many root type girder steels of height such as install respectively in the horizontal direction in the column both sides of Y type piers to be poured and make described Many root type girder steels on the inside of be located in the column of Y type piers to be poured, then by the reinforcing bar of the column of Y type piers to be poured Through on the inner side edge of a wing of the section steel beam being correspondingly arranged and web, default reinforced hole makes the steel of section steel beam and the column of Y type piers Muscle is connected;
(4) pour the column of Y type piers;
(5) when the concrete strength of the column of Y type piers reaches requirement, many concrete filled steel tube diagonal brace bottoms are respectively welded into company It is connected on vertical pre-embedded steel slab and horizontal pre-embedded steel slab and the other end is respectively welded on the section steel beam being correspondingly arranged;
(6) Bailey beam is laid on many root type girder steels of the homonymy for having supported, described Bailey beam and section steel beam are taken a little Weldering and securing member are fixed;
(7) lay distribution beam in Bailey beam described in the left and right sides respectively, described distribution beam and Bailey beam adopt securing member and Spot welding connects;
(8) the outer wall shape respectively according to Y type socle V-arrangements to be poured in the distribution beam of the left and right sides lays Y type pier templates Bracing frame.
CN201510785177.1A 2015-11-16 2015-11-16 Construction method of composite structure platform for construction of Y-shaped pier of bridge Active CN105350458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510785177.1A CN105350458B (en) 2015-11-16 2015-11-16 Construction method of composite structure platform for construction of Y-shaped pier of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510785177.1A CN105350458B (en) 2015-11-16 2015-11-16 Construction method of composite structure platform for construction of Y-shaped pier of bridge

Publications (2)

Publication Number Publication Date
CN105350458A CN105350458A (en) 2016-02-24
CN105350458B true CN105350458B (en) 2017-03-22

Family

ID=55326511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510785177.1A Active CN105350458B (en) 2015-11-16 2015-11-16 Construction method of composite structure platform for construction of Y-shaped pier of bridge

Country Status (1)

Country Link
CN (1) CN105350458B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821770B (en) * 2016-04-01 2017-05-24 上海城建市政工程(集团)有限公司 Connecting and locating method for multiple tower roots and large-size concrete bearing platform foundation of steel structure main tower
CN105951607A (en) * 2016-07-06 2016-09-21 苏文藏 Reinforced V-shaped bridge pier bracket
CN108661166A (en) * 2018-07-04 2018-10-16 西南交通大学 A kind of aluminium alloy truss node and concrete connecting structure and its installation method
CN110205945B (en) * 2019-07-03 2024-01-09 浙江中天恒筑钢构有限公司 Detachable and adjustable Y-shaped steel structure pier self-balancing device and construction method
CN111501531A (en) * 2020-03-31 2020-08-07 上海城建市政工程(集团)有限公司 Construction method of V-shaped thin-wall pier and 0# block main beam supporting system
CN111979918A (en) * 2020-07-08 2020-11-24 中交第二航务工程局有限公司 V-shaped pier combined construction method suitable for marine environment
CN112343171A (en) * 2020-11-02 2021-02-09 中国建筑第八工程局有限公司 Steel pipe column V-shaped steel support construction method
CN117230701B (en) * 2023-10-24 2024-05-28 中铁四局集团有限公司 Overweight load arc V pier bridge sector bracket and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000045229A (en) * 1998-07-28 2000-02-15 Nishimatsu Constr Co Ltd Constructing method of bridge
CN101200877A (en) * 2007-12-24 2008-06-18 贵州省桥梁工程总公司 Non-support construction process for triangle frame
CN202323772U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Upside-down hanging construction device for steel stranded wires of bridge V-shaped support
CN102888815B (en) * 2012-10-16 2015-08-26 上海城建市政工程(集团)有限公司 The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam
CN203007846U (en) * 2012-12-19 2013-06-19 中铁十局集团第三建设有限公司 Y-type block template and support system
CN104746435B (en) * 2015-04-03 2016-03-30 中国建筑第六工程局有限公司 A kind of construction method of great-angle Y type pier stud

Also Published As

Publication number Publication date
CN105350458A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105350458B (en) Construction method of composite structure platform for construction of Y-shaped pier of bridge
KR100958014B1 (en) Construction method of steel composite girder bridge
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN106869012B (en) Using the prefabricated thin-wall bent cap of prestressing with bond system
CN105951848A (en) Non-intermittent composite transfer structure for super-deep foundation pit support and construction method
CN106012872B (en) Continuous rigid frame bridge without dorsal funciculus oblique pull reinforcement system and construction method
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN109811633A (en) A kind of corrugated steel and Combined concrete double curvature arched bridge and preparation method thereof
CN105803924B (en) Mixed passenger and freight railway Simple T-Girders pavement combining structure and combined method
CN109235662A (en) A kind of column board connecting equipment comprising multiple shear connector
CN106436591A (en) Steel cantilever combined bridge deck slab widening and reconstruction structure and construction method thereof
CN103883052A (en) Upturned beam and cast-in-place slab overall pouring construction method
CN209907210U (en) Integral pouring template system for T-shaped beam sidewalk board and sound barrier base
CN106958319A (en) Precast concrete post component and connected node
CN205531016U (en) Precast concrete post component and connected node
CN102852281A (en) Prestressed precast main beam with laying gaps
CN206408639U (en) Assembled steel reinforced concrete composite bridge
CN110541429B (en) Energy-consuming bolt type connecting method for connecting concrete prefabricated column and foundation
CN205242263U (en) Integrated configuration platform is used in construction of bridge Y type mound
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN208502394U (en) A kind of antidetonation connection structure of steel construction pipe fitting and fabricated base
CN102852279A (en) Prestressed reinforced concrete superposed beam having convex-concave superposed surfaces
CN206554385U (en) Combining structure for assembled architecture
CN216109354U (en) Conversion layer steel column mounting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190314

Address after: 402260 Third Floor, No. 599 Qingqi Road, Binjiang New Town, Jiangjin District, Chongqing

Co-patentee after: China Construction Sixth Engineering Bureau Co., Ltd.

Patentee after: Zhongjian Bridge Co., Ltd.

Address before: 300451 No. 72 Hangzhou Road, Tanggu District, Tianjin

Patentee before: China Construction Sixth Engineering Bureau Co., Ltd.