CN201377077Y - Double-hoop bracket for single-column bent cap in bridge construction - Google Patents

Double-hoop bracket for single-column bent cap in bridge construction Download PDF

Info

Publication number
CN201377077Y
CN201377077Y CN200920032334U CN200920032334U CN201377077Y CN 201377077 Y CN201377077 Y CN 201377077Y CN 200920032334 U CN200920032334 U CN 200920032334U CN 200920032334 U CN200920032334 U CN 200920032334U CN 201377077 Y CN201377077 Y CN 201377077Y
Authority
CN
China
Prior art keywords
construction
hoop
column
anchor ear
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920032334U
Other languages
Chinese (zh)
Inventor
王亮
池平平
张超民
赵春锋
苏红岭
陈向军
马建会
田占良
帖少伟
张沱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN200920032334U priority Critical patent/CN201377077Y/en
Application granted granted Critical
Publication of CN201377077Y publication Critical patent/CN201377077Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A double-hoop bracket for single-column bent caps in bridge construction relates to a bracket provided for single-column bent caps in bridge construction. In order to overcome the defect that the prior full framing construction single-column bent cap is restricted by terrain and environment, the utility model provides the double-hoop bracket for single-column bent caps, which is particularly suitable for the construction of higher pier single-column bent caps. The utility model adopts the technical scheme that an upper hoop and a lower hoop are respectively fixed with a pier column; bottom mould bases are respectively connected to the left and the right side of the upper hoop through a connecting plate; each of the two corners at the lower part of the bottom mould base is connected with an upper pin boss; a lower pin boss is fixedly connected to the upper part of the lower hoop; and a sway rod and a sway adjusting rod are hinged between the corresponding upper pin boss and the lower pin boss. Restrictions from construction environment and conditions on the double-hoop bracket is small, the application scope is wide, the efficiency is high, and pier bent caps with identical diameters can be turned over for use, thereby greatly reducing construction cost; the bracket has the advantages of simple manufacture, light weight and convenient use; and the round single-column construction bent cap does not require embedded parts.

Description

The only post bent cap of bridge construction double embrace hoop support
Technical field
The utility model relates to a kind of road and bridge construction equipment, specifically is a kind of only post bent cap double embrace hoop support, belongs to bridge mechanical execution field.
Background technology
Solely post bent cap double embrace hoop support is a kind of bracing frame that provides for the only post bent cap of bridge construction.At present, the construction of the only post bent cap of bridge engineering is basic adopts the construction of the full hall of conventional steel pipe frame, because of most bridge pier column height higher, so the steel pipe input amount is very big; Time and effort consuming is set up and removed to steel pipe frame, influences construction period; Because of bridge construction environment ground mostly is broken stone greatly, geological conditions is poor again, the basic utmost point built on the sand, steel pipe frame construction also needs anticipate the basis; If it is precipitous to meet the pier stud physical features, left and right sides panel height difference is big, and the next-door neighbour stream, and the construction plant is narrow and small, thereby can't satisfy steel pipe frame and set up that shared space is big, the specific (special) requirements of the broad construction gauge of needs; If meet pier stud near pioneer road, again with dealing driving, pedestrian mutual interference mutually, the influence construction.
The utility model content
Be subjected to the defective of landform and environmental limitations in order to overcome full hall frame only post bent cap of constructing, the utility model provides a kind of only post bent cap double embrace hoop support, and this support is particularly suitable for the construction of the only post bent cap of higher pier stud, and the restriction that is not subjected to terrain environment with influence.
The technical scheme that the utility model adopted is:
Last anchor ear and pier stud top are fixed, and following anchor ear and pier stud bottom are fixed; Each side connect a bed die frame by junction plate at last anchor ear, respectively establish an operating desk before and after the bed die frame, two jiaos of key seats on that respectively are connected in bed die frame end head bottom; Key seat under anchor ear top is connected down; Between key seat on the correspondence and following key seat, be hinged with hound and diagonal brace adjusting rod, all be connected between two hounds of the left and right sides by the strut connecting rod.
The utility model is subjected to the construction environment condition restriction little, applied widely, short construction period, efficient height, pier stud bent cap with diameter can have enough to meet the need use, greatly reduces engineering cost, and support processing is simple, in light weight, easy to operate, and circular solely post high pier construction bent cap does not stay built-in fitting.
Description of drawings
Accompanying drawing 1 is the main TV structure schematic diagram of the utility model embodiment.
Accompanying drawing 2 is the left TV structure schematic diagram of the utility model embodiment.
Accompanying drawing 3 is the plan structure schematic diagram of the utility model embodiment.
Description of reference numerals is as follows: go up anchor ear 1, following anchor ear 2, bed die frame 3, operating desk 4, pier stud 5, following key seat 6, cross-beam connecting plate 7, hound 8, diagonal brace adjusting rod 9, go up key seat 10, rubber pad 11, strut connecting rod 12.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done and to be described in further detail:
Accompany one deck rubber pad (11) between last anchor ear (1) and the pier stud (5) and fix, accompany one deck rubber pad (11) between following anchor ear (2) and the pier stud (5) and fix with pier stud (5) bottom with pier stud (5) top; Each side connect a bed die frame (3) by junction plate (7) at last anchor ear (1), respectively establish an operating desk (4) before and after the bed die frame (3), two jiaos of upward key seats (10) that respectively are connected in bed die frame (3) bottom, termination; Key seat (6) under anchor ear (2) top is connected down; Between key seat on the correspondence (10) and following key seat (6), be hinged with hound (8) and diagonal brace adjusting rod (9), all be connected between two hounds (8) of the left and right sides by strut connecting rod (12).
The utility model is at first regulated the strut adjusting rod of both sides before construction, make the levelness of bed die frame reach the technical requirements of construction bent cap template, lays the bent cap bed die then on the bed die frame, carries out the follow-up construction that bent cap is built again.

Claims (2)

1. the only post bent cap of bridge construction double embrace hoop support is characterized in that fixing on last anchor ear (1) and pier stud (5) top, and following anchor ear (2) is fixed with pier stud (5) bottom; Each side connect a bed die frame (3) by junction plate (7) at last anchor ear (1), respectively establish an operating desk (4) before and after the bed die frame (3), two jiaos of upward key seats (10) that respectively are connected in bed die frame (3) bottom, termination; Key seat (6) under anchor ear (2) top is connected down; Between key seat on the correspondence (10) and following key seat (6), be hinged with hound (8) and diagonal brace adjusting rod (9), all be connected between two hounds (8) of the left and right sides by strut connecting rod (12).
2. the only post bent cap of bridge construction according to claim 1 double embrace hoop support is characterized in that accompanying one deck rubber pad (11) between last anchor ear (1) and pier stud (5), accompanies one deck rubber pad (11) between following anchor ear (2) and the pier stud (5).
CN200920032334U 2009-03-25 2009-03-25 Double-hoop bracket for single-column bent cap in bridge construction Expired - Fee Related CN201377077Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920032334U CN201377077Y (en) 2009-03-25 2009-03-25 Double-hoop bracket for single-column bent cap in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920032334U CN201377077Y (en) 2009-03-25 2009-03-25 Double-hoop bracket for single-column bent cap in bridge construction

Publications (1)

Publication Number Publication Date
CN201377077Y true CN201377077Y (en) 2010-01-06

Family

ID=41517182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920032334U Expired - Fee Related CN201377077Y (en) 2009-03-25 2009-03-25 Double-hoop bracket for single-column bent cap in bridge construction

Country Status (1)

Country Link
CN (1) CN201377077Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN101922143A (en) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 Construction method of bent cap
CN101935982A (en) * 2010-08-11 2011-01-05 中铁三局集团有限公司 Method for setting up bent cap form bracket of isolated pier
CN102277835A (en) * 2011-05-10 2011-12-14 中铁九局集团有限公司 Method for constructing single-column bent cap by adopting hoop and A-frame composite system
CN107419664A (en) * 2017-05-30 2017-12-01 林再颐 A kind of Support bracket structure of bridge construction
CN109518942A (en) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 A kind of tool strutting system and its application method controlling two-dimensional elements precision
CN109706842A (en) * 2019-01-23 2019-05-03 湖南路桥建设集团有限责任公司 A kind of urban viaduct Single column pier capping beam construction device
CN112813806A (en) * 2021-01-07 2021-05-18 安徽仁成建设工程有限公司 Bridge pier column capping beam formwork system and construction method
CN113309077A (en) * 2021-07-05 2021-08-27 扬州工业职业技术学院 A connection structure for precast concrete stake

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761034B (en) * 2010-03-25 2013-05-08 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN101922143B (en) * 2010-07-02 2012-02-01 上海市第二市政工程有限公司 Construction method of bent cap
CN101922143A (en) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 Construction method of bent cap
CN101935982B (en) * 2010-08-11 2011-11-16 中铁三局集团有限公司 Method for setting up bent cap form bracket of isolated pier
CN101935982A (en) * 2010-08-11 2011-01-05 中铁三局集团有限公司 Method for setting up bent cap form bracket of isolated pier
CN102277835A (en) * 2011-05-10 2011-12-14 中铁九局集团有限公司 Method for constructing single-column bent cap by adopting hoop and A-frame composite system
CN107419664A (en) * 2017-05-30 2017-12-01 林再颐 A kind of Support bracket structure of bridge construction
CN107419664B (en) * 2017-05-30 2019-06-28 倡创(上海)咨询管理事务所 A kind of Support bracket structure of bridge construction
CN109518942A (en) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 A kind of tool strutting system and its application method controlling two-dimensional elements precision
CN109518942B (en) * 2018-12-05 2024-01-02 上海建工二建集团有限公司 Tool-based bracket system for controlling precision of two-dimensional component and application method thereof
CN109706842A (en) * 2019-01-23 2019-05-03 湖南路桥建设集团有限责任公司 A kind of urban viaduct Single column pier capping beam construction device
CN112813806A (en) * 2021-01-07 2021-05-18 安徽仁成建设工程有限公司 Bridge pier column capping beam formwork system and construction method
CN113309077A (en) * 2021-07-05 2021-08-27 扬州工业职业技术学院 A connection structure for precast concrete stake

Similar Documents

Publication Publication Date Title
CN201377077Y (en) Double-hoop bracket for single-column bent cap in bridge construction
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN203639095U (en) Inner-side-column lifting device for reverse installation method
CN202081669U (en) Integrated flange coupling three-pipe tower communication base station
CN205811032U (en) A kind of roofing miniaturization ready-package communication antenna support bar
CN208415290U (en) Outdoor substation's Steel Structure foundation construction structure
CN203924868U (en) Movable communication tower
CN202850515U (en) Regulating-type temporary supporting rod for inclined steel column installation
CN202280270U (en) 220 KV (kilovolt) GIS (Geographic Information System) outgoing line framework
CN203160797U (en) Steel structure tower
CN205896392U (en) Petroleum tube supporting frame
CN202346553U (en) Counterweight framework of elevator
CN210153907U (en) Air energy heat pump heating buffer water tank
CN206599851U (en) Cross structure ball type network frame bridle iron
CN203347806U (en) Cable-stayed radial spar bearing platform
CN211524274U (en) Communication tower adds synthetic bill-board reinforced structure of stand newly
CN206888185U (en) A kind of antidetonation formed steel construction
CN201777805U (en) Support of load tower crane
CN204825952U (en) Tower machine steel platform basis fixed leg
CN203160765U (en) Steel-clad anti-theft machine room integrating three towers and machine room body
CN201756789U (en) Frame structure for cantilever and suspension operation bench
CN203271093U (en) Novel scaffold
CN202414521U (en) Circuit board loader
CN207360065U (en) Battery bracket assembly before electric automobile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100106

Termination date: 20140325