CN203160765U - Steel-clad anti-theft machine room integrating three towers and machine room body - Google Patents
Steel-clad anti-theft machine room integrating three towers and machine room body Download PDFInfo
- Publication number
- CN203160765U CN203160765U CN 201320149518 CN201320149518U CN203160765U CN 203160765 U CN203160765 U CN 203160765U CN 201320149518 CN201320149518 CN 201320149518 CN 201320149518 U CN201320149518 U CN 201320149518U CN 203160765 U CN203160765 U CN 203160765U
- Authority
- CN
- China
- Prior art keywords
- machine room
- iron tower
- tower
- iron
- hypomere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a steel-clad anti-theft machine room integrating three towers and a machine room body. The steel-clad anti-theft machine room comprises the machine room body and the three iron towers. The lower section of the first iron tower and the lower section of the second iron tower are welded to the inner sides of two vertical columns on one side of the machine room body respectively, the lower section of the third iron tower is arranged in the front wall or the back wall of the machine room body, the upper portion, the middle portion and the lower portion of the lower section of the third iron tower are fixedly connected with a beam, a wallboard and a ground trough of the machine room body respectively, and pull rods are arranged among the first iron tower, the second iron tower and the third iron tower. According to the steel-clad anti-theft machine room, the machine room body and the iron towers are organically combined, the design is ingenious, the structure is reasonable, the appearance is attractive, the machine room body is stable, windproof, dustproof, waterproof and anti-theft, the iron towers are strong in windproof performance, anti-seismic performance and anti-impact performance, all components are designed in a standard mode, materials are convenient to transport, carry and repeatedly use, on-site assembly and disassembly are convenient, time, work and labor are saved, construction land is little, the building cycle is short, and the machine room has high cost performance and is the best choice of base station building outdoors and in mountainous areas.
Description
Technical field
The utility model relates to a kind of machine room, relates in particular to a kind of three iron tower machine rooms that are mainly used in communication system.
Background technology
Along with constantly increasing progressively of mobile communication market user, the mobile base station construction also must increase fast, could satisfy user's demand.At present, can meet the need of market substantially in the base station, cities and towns, but the base station in field and mountain area is required with regard to not satisfying market far away, and therefore, present base station construction emphasis mainly concentrates on field and mountain area.Because the particularity in base station construction geographical position, and machine room and iron tower be to the requirement of technology such as antidetonation, wind resistance, shock resistance, and existing base station is that machine room separates construction with iron tower mostly, construction period is long, investment is big, and often also there are problems such as stolen, difficult in maintenance in this class base station.
The utility model content
Technical problem to be solved in the utility model is, overcomes the above defective, provides a kind of reasonable in design, and convenient transportation is installed, antidetonation, wind resistance, the antitheft machine room of the integrated armor in three shaft tower rooms that anti-impact force is strong.
In order to solve the above technical problem, the antitheft machine room of a kind of integrated armor in three shaft tower rooms of the utility model, comprise machine room and three iron towers, the hypomere of the hypomere of first iron tower, second iron tower is welded on respectively in two columns of machine room one side, the hypomere of the 3rd iron tower is arranged in the front or rear wall of machine room, and the upper, middle and lower of the hypomere of described the 3rd iron tower are connected and fixed with machine room crossbeam, wallboard, geosyncline respectively; Between described first iron tower, second iron tower and the 3rd iron tower, be provided with pull bar.
As improvement, the suspension column of two columns of the hypomere of the utility model and described first iron tower, second iron tower welding is welded with the suspension column steel plate, and suspension column steel plate and machine room ground concrete basis are connected and fixed; The bottom of the hypomere junction of described geosyncline and the 3rd iron tower is welded with the geosyncline steel plate, and geosyncline steel plate and machine room ground concrete basis are connected and fixed.
Further, under watt plate on machine room described in the utility model roof, between crossbeam 12 and the crossbeam gusset plate 13 is set.
As preferably, the tower bar of first iron tower described in the utility model, second iron tower and the 3rd iron tower is the multistage modular design, and adjacent two sections tower bars are connected and fixed with flange; Be provided with cat ladder 9 between first iron tower described in the utility model and second iron tower.
The antitheft machine room of the integrated armor in three shaft tower rooms described in the utility model, the hypomere of first iron tower, second iron tower is welded in the column of machine room one side, the hypomere of the 3rd iron tower is arranged in the front or rear wall of machine room, and the upper, middle and lower of the hypomere of described the 3rd iron tower are connected and fixed with machine room crossbeam, wallboard, geosyncline respectively; Between described first iron tower, second iron tower and the 3rd iron tower, pull bar is set, this multiple spot is multidirectional tiltedly to be drawn, the horizontal supported design of drawing, globality and the tower bar support force of body of the tower have been guaranteed, tower bar flexural capacity is strengthened simultaneously, and satisfies the globality load counterweight on basis and wind resistance, antidetonation, the shock proof requirement of iron tower; The suspension column described and column that the first iron tower hypomere, the second iron tower hypomere weld welds the suspension column steel plate, at the bottom of described geosyncline and the 3rd iron tower hypomere junction welding geosyncline steel plate, suspension column steel plate, geosyncline steel plate and machine room ground concrete basis are connected and fixed, under watt plate on machine room roof, between crossbeam and the crossbeam gusset plate is set, roofing is reinforced, make that the steadiness of iron tower and machine room is greatly strengthened, satisfy the iron tower machine room to antidetonation, wind resistance, shock proof requirement.The parts that the utility model is identical all are made into standard component, the tower bar of described iron tower is the multistage modular design, convenient transportation, carrying, installation and dismounting can on-the-spot be assembled, and just can finish All Jobs without any need for lifting appliance, construction land is few, save time, laborsaving, the saving of labor, reduce cost, save the soil.
The beneficial effects of the utility model: owing to used the above structure, the utility model has been realized the organic unity of machine room and iron tower, design ingenious, rational in infrastructure, good looking appearance; Machine room is firm, and is windproof, dustproof, and waterproof is antitheft; Iron tower wind resistance, antidetonation, anti-impact force are strong, each part standard design, make things convenient for transportation, carrying and the repeated use of material, on-the-spot assembling, convenient disassembly, save time, saving of labor, laborsaving, construction land is few, and the construction period is short, has very high cost performance, be the preferably selection of field and mountain area base station construction, have good social benefit and economic benefit.
Description of drawings
Fig. 1 is one of the utility model structural representation;
Fig. 2 is two of the utility model structural representation;
Fig. 3 is the utility model column and tower bar hypomere connection diagram;
Fig. 4 is the utility model suspension column steel plate and concrete foundation connection diagram;
Fig. 5 is the utility model geosyncline steel plate and concrete foundation connection diagram;
Fig. 6 reinforces schematic diagram for the utility model roofing.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
The antitheft machine room of a kind of integrated armor in three shaft tower rooms of the utility model, comprise machine room and three iron towers, the hypomere of the hypomere of first iron tower 1, second iron tower 8 is welded on respectively in two columns 2 of machine room one side, the hypomere of the 3rd iron tower 5 is arranged in the front or rear wall of machine room, and the upper, middle and lower of the hypomere of described the 3rd iron tower 5 are connected and fixed with machine room crossbeam 3, wallboard 6, geosyncline 4 respectively; Between described first iron tower, second iron tower and the 3rd iron tower, be provided with pull bar 7.
As improvement, the suspension column of two columns 2 of the hypomere of the utility model and described first iron tower 1, second iron tower 8 welding is welded with suspension column steel plate 10, and suspension column steel plate 10 is connected and fixed with machine room ground concrete basis; The bottom of the hypomere junction of described geosyncline 4 and the 3rd iron tower 5 is welded with geosyncline steel plate 11, and geosyncline steel plate 11 is connected and fixed with machine room ground concrete basis.
Further, under watt plate on machine room described in the utility model roof, between crossbeam 12 and the crossbeam gusset plate 13 is set.
As preferably, the tower bar of iron tower described in the utility model is the multistage modular design, and adjacent two sections tower bars are connected and fixed with flange; Be provided with cat ladder 9 between first iron tower 1 described in the utility model and second iron tower 8.
Embodiment: each same parts of machine room described in the utility model all is made into standard component, and the connecting portion welding steel is as junction plate, and beats connecting hole at junction plate as required, and each parts connects with metal bolts by connecting hole.In two columns 2 in machine room left side, respectively the hypomere of first iron tower 1, second iron tower 8 and suspension column and the column cap of column 2 are welded, the suspension column welding suspension column steel plate 10 of column is connected and fixed suspension column steel plate 10 and machine room ground concrete basis 14 with bolt; In the back wall of machine room, with the steel square tube of the 80x80x4mm hypomere as the 3rd iron tower 5, the upper, middle and lower of the hypomere of the 3rd iron tower 5 are connected with machine room crossbeam 3, steel wallboard 6, machine room geosyncline 4 respectively, the bottom welding geosyncline steel plate 11 of geosyncline 4 is connected and fixed geosyncline steel plate 11 and machine room ground concrete basis 14 with metal bolts; Pull bar 7 between first iron tower 1 and second iron tower 8, between second iron tower 8 and the 3rd iron tower 5 adopts arranged in a crossed manner, separate with the cross-tie segmentation, span between first iron tower 1 and the 3rd iron tower 5 is bigger, a pull bar vertically is set between the two, separate with the cross-tie segmentation again, every intersegmental oblique drawbar arranged in a crossed manner, namely pull bar is mounted to M shape, can guarantee that like this iron tower has enough support forces, metope is not attractive in appearance in not influencing again; Below described machine room roof tiles plate, crossbeam 12 both sides and crossbeam 3 inboards are welded to connect steel plate respectively, stamp connecting hole, with metal bolts two channel-section steels are connected and fixed as gusset plate 13, and the steadiness of machine room iron tower is further strengthened; The tower bar height of three iron towers of the utility model is set to 24m, is the multistage modular design, and adjacent two sections tower bars are connected and fixed with flange, and the top of tower bar is loaded onto lightning rod; Welding steel on the cross-tie between first iron tower 1 and second iron tower 8 is stamped connecting hole, by being bolted on the steel plate, dismantles all very convenient cat ladder 9.Machine room described in the utility model is divided into inside and outside double-layer structure, internal layer is adopted the steel sandwich composite board by 75mm and is constituted, outer armor layer is combined by 2-2.5mm steel plate bending part, inside and outside two-layer combination effectively solves problems such as antitheft, the waterproof and dustproof, wind resistance of machine room, and makes it to become a firm integral body.
It below only is a kind of embodiment of the present utility model; those skilled in the art are after reading above description; can learn to have multiple mode can realize the technical solution of the utility model; the iron tower height is between 20-24m; the utility model will be optimal selection; as long as used above technical scheme, all should fall into protection domain of the present utility model.
Claims (5)
1. antitheft machine room of the integrated armor in shaft tower room, comprise machine room and three iron towers, it is characterized in that, the hypomere of the hypomere of first iron tower (1), second iron tower (8) is welded on respectively in two columns (2) of machine room one side, the hypomere of the 3rd iron tower (5) is arranged in the front or rear wall of machine room, and the upper, middle and lower of the hypomere of described the 3rd iron tower (5) are connected and fixed with machine room crossbeam (3), wallboard (6), geosyncline (4) respectively; Between described first iron tower, second iron tower and the 3rd iron tower, be provided with pull bar (7).
2. according to the antitheft machine room of the described a kind of integrated armor in three shaft tower rooms of claim 1, it is characterized in that, be welded with suspension column steel plate (10) with the suspension column of two columns (2) of the hypomere of described first iron tower (1), second iron tower (8) welding, suspension column steel plate (10) is connected and fixed with machine room ground concrete basis; Described geosyncline (4) is welded with geosyncline steel plate (11) with the bottom of the hypomere junction of the 3rd iron tower (5), and geosyncline steel plate (11) is connected and fixed with machine room ground concrete basis.
3. according to the antitheft machine room of the described a kind of integrated armor in three shaft tower rooms of claim 1, it is characterized in that, under watt plate on described machine room roof, be provided with gusset plate (13) between crossbeam (12) and the crossbeam (3).
4. according to the antitheft machine room of the described a kind of integrated armor in three shaft tower rooms of claim 1, it is characterized in that the tower bar of described first iron tower, second iron tower and the 3rd iron tower is the multistage modular design, adjacent two sections tower bars are connected and fixed with flange.
5. according to the antitheft machine room of the described a kind of integrated armor in three shaft tower rooms of claim 1, it is characterized in that, be provided with cat ladder (9) between described first iron tower (1) and second iron tower (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320149518 CN203160765U (en) | 2013-03-29 | 2013-03-29 | Steel-clad anti-theft machine room integrating three towers and machine room body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320149518 CN203160765U (en) | 2013-03-29 | 2013-03-29 | Steel-clad anti-theft machine room integrating three towers and machine room body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203160765U true CN203160765U (en) | 2013-08-28 |
Family
ID=49021960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320149518 Expired - Fee Related CN203160765U (en) | 2013-03-29 | 2013-03-29 | Steel-clad anti-theft machine room integrating three towers and machine room body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203160765U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355125A (en) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | A kind of integrated environment-friendly fast-assembling base station |
-
2013
- 2013-03-29 CN CN 201320149518 patent/CN203160765U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107355125A (en) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | A kind of integrated environment-friendly fast-assembling base station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201850795U (en) | Hinge center support frame steel structure | |
CN203080965U (en) | Intelligent steel structure anti-seismic villa | |
CN107165274A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems | |
CN204876695U (en) | Light section structure indirect air cooling tower of triangle -shaped unit check | |
CN203160765U (en) | Steel-clad anti-theft machine room integrating three towers and machine room body | |
CN206396915U (en) | A kind of connecting node of assembled steel tubing string and steel I-beam | |
CN203160763U (en) | Steel-clad anti-theft machine room integrating two towers and machine room body | |
CN202466616U (en) | Prefabricated-assembled-embedded type weight system | |
CN202324198U (en) | Anti-pulling embedded fixed column base for portal-rigid frame | |
CN203160764U (en) | One-pole tower-room integrated armor anti-theft machine room | |
CN214942942U (en) | Novel steel skeleton-bamboo board combined wall | |
CN201598727U (en) | Load-bearing structure of vertical lifting type high-rise three-dimensional garage in steel structure | |
CN204311791U (en) | Seashore flexible direct current converter station valve Room associating architectural structure system | |
CN205444455U (en) | Adopt environment -friendly type wall body's building window subassembly structure | |
CN110714529A (en) | Integral prefabricated balcony | |
CN203247703U (en) | Steel structural plant frame | |
CN208267162U (en) | Assembled sash type light steel frame-steel mesh-foamed concrete faced wall | |
CN203347009U (en) | Large-span high-performance steel structure | |
CN2235504Y (en) | Composite material ladder-shaped chock for mining use | |
CN201605864U (en) | Narrow base tower for power transmission line | |
CN211922954U (en) | Integral prefabricated balcony | |
CN211524274U (en) | Communication tower adds synthetic bill-board reinforced structure of stand newly | |
CN211524273U (en) | Additional steel truss of communication tower synthesizes bill-board structure | |
CN202826071U (en) | Combined supporting structure of concrete mixing plant and floor powder storage bin | |
CN203867063U (en) | Assembled-type room beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |