CN110714529A - Integral prefabricated balcony - Google Patents

Integral prefabricated balcony Download PDF

Info

Publication number
CN110714529A
CN110714529A CN201911049646.8A CN201911049646A CN110714529A CN 110714529 A CN110714529 A CN 110714529A CN 201911049646 A CN201911049646 A CN 201911049646A CN 110714529 A CN110714529 A CN 110714529A
Authority
CN
China
Prior art keywords
plate
balcony
bottom plate
prefabricated
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911049646.8A
Other languages
Chinese (zh)
Inventor
宋欣
赵志国
王培然
国爱文
陈喜
韩晗
金鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huifu Construction Group Construction Industry Co Ltd
Original Assignee
Shandong Huifu Construction Group Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huifu Construction Group Construction Industry Co Ltd filed Critical Shandong Huifu Construction Group Construction Industry Co Ltd
Priority to CN201911049646.8A priority Critical patent/CN110714529A/en
Publication of CN110714529A publication Critical patent/CN110714529A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

本发明公开了一种整体预制阳台,包括预埋钢筋和阳台本体;所述预埋钢筋其一端伸入至阳台本体内部,其另一端穿过阳台本体,并与建筑主体浇筑连接;所述阳台本体包括底板,及固定于底板两侧的侧板,及围设于底板和侧板外围的围墙,及设置于底板下方的多个加强座,及垂直设置于侧板后侧的连接柱;所述底板和侧板分别通过预埋钢筋与建筑主体连接;所述围墙一体浇筑于底板和侧板前侧;所述连接柱沿其高度间隔设置有多个凹槽;所述凹槽与建筑主体之间填充有混凝土浇筑层;发明的整体预制阳台,安装方便,且与建筑主体连接牢固,安全性好。

Figure 201911049646

The invention discloses an integral prefabricated balcony, comprising pre-embedded steel bars and a balcony body; one end of the pre-embedded steel bars extends into the balcony body, and the other end passes through the balcony body and is connected with the building body by pouring; the balcony The body includes a bottom plate, side plates fixed on both sides of the bottom plate, a wall surrounding the bottom plate and the periphery of the side plates, a plurality of reinforcing seats arranged under the bottom plate, and a connecting column vertically arranged on the rear side of the side plate; The bottom plate and the side plate are respectively connected with the main body of the building through embedded steel bars; the enclosure wall is integrally cast on the front side of the bottom plate and the side plate; the connecting column is provided with a plurality of grooves at intervals along its height; The space is filled with a concrete pouring layer; the invented integral prefabricated balcony is easy to install, and is firmly connected with the main body of the building and has good safety.

Figure 201911049646

Description

一种整体预制阳台An integral prefabricated balcony

技术领域technical field

本发明涉及一种阳台,具体涉及一种整体预制阳台,属于建筑预制件技术领域。The invention relates to a balcony, in particular to an integral prefabricated balcony, and belongs to the technical field of building prefabricated parts.

背景技术Background technique

随着我国住宅产业化的推进,住宅建设持续发展,越来越多的企业加入到住宅产业化的行列。阳台作为住宅产业化部品体系中的重要组成部分,一直是众多企业关注的焦点;同时,阳台作为建筑结构中特殊的组成部分,是建筑室内外过渡的桥梁,是人类亲近自然的平台,也对建筑外部造型也具有重要的作用。但是,传统建筑的阳台板大多采用现场浇注的施工方式,存在现场施工量大、工艺复杂、进度慢、效率低、周期长且施工人员安全度不高的问题,不利于发挥现代住宅产业化优势。目前的阳台仅采用底板与建筑主体连接,使得阳台与建筑主体之间的连接程度不高,稳定性较差,尤其对于突出于建筑主体的凸阳台,安全性有待提高。With the advancement of housing industrialization in my country and the continuous development of housing construction, more and more enterprises have joined the ranks of housing industrialization. As an important part of the housing industrialization parts system, the balcony has always been the focus of many enterprises; at the same time, as a special part of the building structure, the balcony is the bridge between the interior and exterior of the building, and the platform for human beings to get close to nature. The exterior shape of the building also plays an important role. However, most of the balcony slabs of traditional buildings adopt the construction method of on-site casting, which has the problems of large on-site construction volume, complex process, slow progress, low efficiency, long period and low safety of construction personnel, which is not conducive to giving full play to the advantages of modern housing industrialization. . The current balcony only uses the bottom plate to connect with the main body of the building, so that the degree of connection between the balcony and the main body of the building is not high, and the stability is poor. Especially for the convex balcony protruding from the main body of the building, the safety needs to be improved.

发明内容SUMMARY OF THE INVENTION

为解决上述问题,本发明提出了一种整体预制阳台,安装方便,且与建筑主体连接牢固,安全性好。In order to solve the above problems, the present invention proposes an integral prefabricated balcony, which is easy to install, firmly connected to the main body of the building, and has good safety.

本发明的整体预制阳台,包括预埋钢筋和阳台本体;所述预埋钢筋其一端伸入至阳台本体内部,其另一端穿过阳台本体,并与建筑主体浇筑连接;所述阳台本体包括底板,及固定于底板两侧的侧板,及围设于底板和侧板外围的围墙,及设置于底板下方的多个加强座,及垂直设置于侧板后侧的连接柱;所述底板和侧板分别通过预埋钢筋与建筑主体连接;所述围墙一体浇筑于底板和侧板前侧;所述连接柱沿其高度间隔设置有多个凹槽;所述凹槽与建筑主体之间填充有混凝土浇筑层,安装时,将吊装工具与阳台本体其底板上预留的吊装钢筋连接,并利用吊装工具将阳台本体吊装至预安装位;阳台本体就位后,将底板和侧板的预埋钢筋与建筑主体连接,并采用混凝土一体浇筑固定,此处的预埋钢筋与建筑主体浇筑固定方法为现有技术中的钢筋浇筑方法,在此不再详述其具体操作步骤;在底板两侧设置侧板,可增加阳台本体与建筑主体之间的固定面积,提高牢固性,且可将侧板作为用于固定空调外机的设备平台,减少设备平台的安装成本;在侧板后侧设置与建筑主体连接的连接柱,可提高阳台本体与建筑主体之间的连接强度,提高整体稳固性,尤其适用于突出于建筑主体外侧的凸阳台设计,增加阳台本体与建筑主体之间的固定连接面积;在连接柱上设置有多个凹槽,并将连接柱的凹槽与建筑主体之间用混凝土进行填充和密封,增强了连接柱与建筑主体之间的连接性,提高了阳台本体与建筑主体之间的的相互作用力,增强了阳台本体与建筑主体件的咬合能力,提高稳固程度和安全性。The integral prefabricated balcony of the present invention includes pre-embedded steel bars and a balcony body; one end of the pre-embedded steel bars extends into the balcony body, and the other end passes through the balcony body and is poured and connected to the building body; the balcony body includes a bottom plate , and the side plates fixed on both sides of the bottom plate, and the wall surrounding the bottom plate and the periphery of the side plate, and a plurality of reinforcing seats arranged under the bottom plate, and the connecting column vertically arranged on the back side of the side plate; the bottom plate and The side plates are respectively connected with the main body of the building through embedded steel bars; the enclosure walls are integrally cast on the bottom plate and the front side of the side plates; a plurality of grooves are arranged at intervals along the height of the connecting column; the grooves and the main body of the building are filled with grooves. For the concrete pouring layer, during installation, connect the hoisting tool to the hoisting steel bars reserved on the bottom plate of the balcony body, and use the hoisting tool to hoist the balcony body to the pre-installation position; after the balcony body is in place, pre-embed the bottom plate and side plate The steel bars are connected with the main body of the building, and are fixed by integral casting with concrete. The method of pouring and fixing the pre-embedded steel bars and the main body of the building is the method of pouring steel bars in the prior art, and the specific operation steps will not be described in detail here; The installation of side panels can increase the fixed area between the balcony body and the building body, improve firmness, and the side panels can be used as equipment platforms for fixing the external units of the air conditioners, reducing the installation cost of the equipment platforms; The connecting column connected with the main body of the building can improve the connection strength between the balcony body and the main body of the building, and improve the overall stability, especially suitable for the design of convex balconies protruding from the outside of the main body of the building, and increase the fixed connection between the balcony body and the main body of the building. There are multiple grooves on the connecting column, and the grooves of the connecting column and the main body of the building are filled and sealed with concrete, which enhances the connection between the connecting column and the main body of the building, and improves the relationship between the balcony body and the main body of the building. The interaction force between the main body of the building enhances the occlusal ability of the balcony body and the main body of the building, and improves the stability and safety.

作为优选的实施方案,每一所述加强座中沿其高度方向设置有盲孔;所述盲孔中贯穿安装有预制钢管;所述加强座沿其宽度方向设有用于与盲孔联通的连接孔;所述预制钢管上开设有与连接孔同轴心的通孔;所述预制钢管其上端伸入至加强座的盲孔中,且其与加强座通过紧固螺栓和紧固螺母固定连接;所述预制钢管其下端露出于加强座外侧,且与雨棚固定连接,在底板下方的加强座上之间安装用于与雨棚连接的预制钢管,可将雨棚直接与预制钢管连接,无需再在建筑主体的墙体表面开设安装孔,组装更加便捷,且整体建筑楼房的雨棚安装更加整齐,美化了建筑楼房的外观;具体地,将预制钢管上端插入至盲孔中,接着将紧固螺栓依次穿过加强座其盲孔上的连接孔和预制钢管上的通孔,并利用紧固螺母进行固定;之后,在加强座两侧面浇筑混凝土,使得混凝土层能够覆盖紧固螺栓和紧固螺母,即将紧固螺栓和紧固螺母埋入加强座的混凝土层中;可根据雨棚的支撑钢板结构,在露出于加强座外部的预制钢管上开设用于与雨棚的支撑钢板连接的螺纹孔,或者将预制钢管直接与支撑钢板焊接固定。As a preferred embodiment, a blind hole is provided in each of the reinforcing seats along its height direction; a prefabricated steel pipe is installed through the blind hole; the reinforcing seat is provided with a connection for communicating with the blind hole along its width direction The prefabricated steel pipe is provided with a through hole coaxial with the connecting hole; the upper end of the prefabricated steel pipe extends into the blind hole of the reinforcing seat, and is fixedly connected to the reinforcing seat by tightening bolts and tightening nuts The lower end of the prefabricated steel pipe is exposed on the outside of the reinforcing seat and is fixedly connected with the canopy. A prefabricated steel pipe for connecting with the canopy is installed between the reinforcing seats under the bottom plate, and the canopy can be directly connected with the prefabricated steel pipe. There is no need to open installation holes on the wall surface of the main body of the building, the assembly is more convenient, and the canopy of the whole building is installed more neatly, which beautifies the appearance of the building. Specifically, insert the upper end of the prefabricated steel pipe into the blind hole, and then insert the The fastening bolts pass through the connecting holes on the blind holes of the reinforcing seat and the through holes on the prefabricated steel pipes in turn, and are fixed with fastening nuts; after that, concrete is poured on both sides of the reinforcing seat, so that the concrete layer can cover the fastening bolts and the fastening bolts. Fastening the nut means burying the fastening bolt and the fastening nut in the concrete layer of the reinforcing seat; according to the supporting steel plate structure of the canopy, a prefabricated steel pipe exposed outside the reinforcing seat can be opened for connection with the supporting steel plate of the canopy threaded holes, or the prefabricated steel pipe is welded and fixed directly to the supporting steel plate.

进一步地,所述雨棚包括支撑钢板,及垂直固定于支撑钢板前侧的横梁,及分别与横梁和支撑钢板固定连接的板框架,及安装于板框架中的聚碳酸酯板;所述板框架由中框和前框组成;所述前框固定于横梁前端;所述中框其前侧与前框固定,其后侧与支撑钢板上端固定。Further, the canopy includes a support steel plate, a beam vertically fixed on the front side of the support steel plate, a plate frame fixedly connected with the beam and the support steel plate respectively, and a polycarbonate plate installed in the plate frame; the plate The frame is composed of a middle frame and a front frame; the front frame is fixed to the front end of the beam; the front side of the middle frame is fixed to the front frame, and the rear side of the middle frame is fixed to the upper end of the supporting steel plate.

再进一步地,所述预制钢管与支撑钢板焊接固定。Still further, the prefabricated steel pipe and the supporting steel plate are welded and fixed.

再进一步地,所述预制钢管与支撑钢板上分别开设有正对设置有螺纹孔;所述预制钢管与支撑钢板通过螺栓和螺母固定连接。Still further, the prefabricated steel pipe and the support steel plate are respectively provided with threaded holes facing each other; the prefabricated steel pipe and the support steel plate are fixedly connected by bolts and nuts.

进一步地,所述底板下方设置有两个加强座,且两加强座分别位于底板两侧。Further, two reinforcing seats are arranged under the bottom plate, and the two reinforcing seats are respectively located on both sides of the bottom plate.

作为优选的实施方案,所述底板下方沿其长度方向间隔设置有若干个加强座,且相邻加强座之间间距相同。As a preferred embodiment, a plurality of reinforcing seats are arranged at intervals along the longitudinal direction of the bottom plate, and the spacing between adjacent reinforcing seats is the same.

进一步地,所述围墙其高度不大于30cm,且围墙上开设有多个用于安装栏板的预留孔,若围墙高度较低时,在围墙上栏板的预留孔,便于在后期施工过程中安装栏板,减少施工工程量,提高施工效率。Further, the height of the fence is not more than 30cm, and a plurality of reserved holes for installing the fence are provided on the fence. If the height of the fence is low, the reserved holes for the fence on the fence are convenient for later construction. During the process, the fence is installed to reduce the amount of construction work and improve the construction efficiency.

进一步地,所述围墙其高度不小于120cm,且围墙上方一体浇筑有绿化台,若围墙高度较高时,可根据设计要求需要在围墙上增设用于种植或摆放绿植的绿化台,营造良好的生活环境,更好地满足客户需求。Further, the height of the enclosure wall is not less than 120cm, and the top of the enclosure wall is integrally poured with a green platform. If the height of the enclosure wall is higher, a green platform for planting or placing green plants can be added on the enclosure wall according to the design requirements. A good living environment to better meet customer needs.

再进一步地,所述绿化台其底部向内侧倾斜,且其倾斜低端开设有排水孔,有利于排水,避免绿化台内部积水。Still further, the bottom of the greening platform is inclined inward, and the lower end of the slope is provided with a drainage hole, which is conducive to drainage and avoids water accumulation inside the greening platform.

本发明与现有技术相比较,本发明的整体预制阳台,在底板两侧设置侧板,可增加阳台本体与建筑主体之间的固定面积,提高牢固性,且可将侧板作为用于固定空调外机的设备平台,减少设备平台的安装成本;在侧板后侧设置与建筑主体连接的连接柱,可提高阳台本体与建筑主体之间的连接强度,提高整体稳固性,尤其适用于突出于建筑主体外侧的凸阳台设计,增加阳台本体与建筑主体之间的固定连接面积;在连接柱上设置有多个凹槽,并将连接柱的凹槽与建筑主体之间用混凝土进行填充和密封,增强了连接柱与建筑主体之间的连接性,提高了阳台本体与建筑主体之间的的相互作用力,增强了阳台本体与建筑主体件的咬合能力,提高稳固程度和安全性;在底板下方的加强座上之间安装用于与雨棚连接的预制钢管,可将雨棚直接与预制钢管连接,无需再在建筑主体的墙体表面开设安装孔,组装更加便捷,且整体建筑楼房的雨棚安装更加整齐,美化了建筑楼房的外观。Compared with the prior art, the integrated prefabricated balcony of the present invention has side plates on both sides of the bottom plate, which can increase the fixed area between the balcony body and the building main body, improve the firmness, and can use the side plates as a fixing tool. The equipment platform of the outdoor unit of the air conditioner reduces the installation cost of the equipment platform; the connecting column connected to the main body of the building is arranged on the back side of the side plate, which can improve the connection strength between the balcony body and the main body of the building, and improve the overall stability, especially suitable for protruding The convex balcony design on the outside of the main body of the building increases the fixed connection area between the balcony body and the main body of the building; multiple grooves are arranged on the connecting columns, and the grooves of the connecting columns and the building body are filled with concrete. The sealing enhances the connection between the connecting column and the main body of the building, improves the interaction force between the balcony body and the main body of the building, enhances the occlusal ability of the balcony body and the main body of the building, and improves the stability and safety; Prefabricated steel pipes for connecting with the canopy are installed between the reinforcing seats under the bottom plate, so that the canopy can be directly connected to the prefabricated steel pipes, and there is no need to open installation holes on the wall surface of the main body of the building. The assembly is more convenient, and the overall building building The installation of the canopy is more neat and beautifies the appearance of the building.

附图说明Description of drawings

图1是本发明的实施例1的安装俯视结构示意图。FIG. 1 is a schematic view of the installation top view structure of Embodiment 1 of the present invention.

图2是本发明的实施例1的正视结构示意图。FIG. 2 is a schematic front view of the structure of Embodiment 1 of the present invention.

图3是本发明的实施例2的正视结构示意图。FIG. 3 is a schematic front view of the structure of Embodiment 2 of the present invention.

图4是本发明的实施例2的预制钢管与加强座安装结构示意图。FIG. 4 is a schematic diagram of the installation structure of the prefabricated steel pipe and the reinforcing seat according to the second embodiment of the present invention.

图5是本发明的实施例3正视结构示意图。FIG. 5 is a schematic front view of the structure of Embodiment 3 of the present invention.

图6是本发明的实施例4的正视结构示意图。FIG. 6 is a schematic front view of the structure of Embodiment 4 of the present invention.

图7是本发明的实施例5的俯视结构示意图。FIG. 7 is a schematic top view of the structure of Embodiment 5 of the present invention.

图8是本发明的实施例5的正视结构示意图。FIG. 8 is a schematic front view of the structure of Embodiment 5 of the present invention.

附图中各部件标注为:1-预埋钢筋,2-阳台本体,21-底板,22-侧板,23-围墙,24-加强座,25-连接柱,3-建筑主体,4-凹槽,5-混凝土浇筑层,6-预留孔,7-盲孔,8-预制钢管,9-连接孔,10-通孔,11-紧固螺栓,12-紧固螺母,13-雨棚,131-支撑钢板,132-横梁,133-聚碳酸酯板,134-中框,135-前框,14-螺栓,15-绿化台,16-排水孔,17-浇筑于加强座两侧的混凝土层。The components in the attached drawings are marked as: 1- embedded steel bar, 2- balcony body, 21- bottom plate, 22- side plate, 23- wall, 24- reinforcing seat, 25- connecting column, 3- building main body, 4- concave Slot, 5- Concrete pouring layer, 6- Reserved hole, 7- Blind hole, 8- Prefabricated steel pipe, 9- Connecting hole, 10- Through hole, 11- Fastening bolt, 12- Fastening nut, 13- Canopy , 131-supporting steel plate, 132-beam, 133-polycarbonate plate, 134-middle frame, 135-front frame, 14-bolt, 15-greening table, 16-drainage hole, 17-casting on both sides of reinforcement seat concrete layer.

具体实施方式Detailed ways

实施例1:Example 1:

如图1和图2所示的整体预制阳台,包括预埋钢筋1和阳台本体2;所述预埋钢筋1其一端伸入至阳台本体2内部,其另一端穿过阳台本体2,并与建筑主体3浇筑连接;所述阳台本体2包括底板21,及固定于底板21两侧的侧板22,及围设于底板21和侧板22外围的围墙23,及设置于底板21下方的多个加强座24,及垂直设置于侧板22后侧的连接柱25;所述底板21和侧板22分别通过预埋钢筋1与建筑主体3连接;所述围墙23一体浇筑于底板21和侧板22前侧;所述连接柱25沿其高度间隔设置有多个凹槽4;所述凹槽4与建筑主体3之间填充有混凝土浇筑层5。The integral prefabricated balcony as shown in Figures 1 and 2 includes embedded steel bars 1 and a balcony body 2; one end of the embedded steel bars 1 extends into the balcony body 2, and the other end passes through the balcony body 2, and is connected with the balcony body 2. The main body 3 of the building is connected by pouring; the balcony body 2 includes a bottom plate 21 , side plates 22 fixed on both sides of the bottom plate 21 , a wall 23 surrounding the bottom plate 21 and the side plates 22 , and a plurality of walls arranged below the bottom plate 21 A reinforcing seat 24, and a connecting column 25 vertically arranged on the rear side of the side plate 22; the bottom plate 21 and the side plate 22 are respectively connected with the main body 3 through the embedded steel bars 1; the enclosure wall 23 is integrally cast on the bottom plate 21 and the side plate The front side of the plate 22 ; the connecting column 25 is provided with a plurality of grooves 4 at intervals along its height; a concrete pouring layer 5 is filled between the grooves 4 and the building body 3 .

所述底板21下方设置有两个加强座24,且两加强座24分别位于底板21两侧。Two reinforcing seats 24 are disposed below the bottom plate 21 , and the two reinforcing seats 24 are respectively located on both sides of the bottom plate 21 .

所述围墙23其高度不大于30cm,且围墙23上开设有多个用于安装栏板的预留孔6。The height of the enclosure wall 23 is not greater than 30 cm, and a plurality of reserved holes 6 for installing the fence are opened on the enclosure wall 23 .

实施例2:Example 2:

如图3和图4所示的整体预制阳台,其结构与实施例1基本相同,其中,每一所述加强座24中沿其高度方向设置有盲孔7;所述盲孔7中贯穿安装有预制钢管8;所述加强座24沿其宽度方向设有用于与盲孔7联通的连接孔9;所述预制钢管8上开设有与连接孔9同轴心的通孔10;所述预制钢管8其上端伸入至加强座24的盲孔7中,且其与加强座24通过紧固螺栓11和紧固螺母12固定连接;所述预制钢管8其下端露出于加强座24外侧,且与雨棚13固定连接。所述雨棚13包括支撑钢板131,及垂直固定于支撑钢板131前侧的横梁132,及分别与横梁132和支撑钢板131固定连接的板框架,及安装于板框架中的聚碳酸酯板133;所述板框架由中框134和前框135组成;所述前框135固定于横梁132前端;所述中框134其前侧与前框135固定,其后侧与支撑钢板131上端固定。所述预制钢管8与支撑钢板131焊接固定。As shown in Figures 3 and 4, the structure of the integral prefabricated balcony is basically the same as that of Embodiment 1, wherein each of the reinforcing seats 24 is provided with a blind hole 7 along its height direction; the blind hole 7 is installed through the There is a prefabricated steel pipe 8; the reinforcing seat 24 is provided with a connecting hole 9 along its width direction for communicating with the blind hole 7; the prefabricated steel pipe 8 is provided with a through hole 10 coaxial with the connecting hole 9; The upper end of the steel pipe 8 extends into the blind hole 7 of the reinforcing seat 24, and is fixedly connected with the reinforcing seat 24 by the fastening bolt 11 and the fastening nut 12; the lower end of the prefabricated steel pipe 8 is exposed outside the reinforcing seat 24, and Fixed connection with canopy 13. The canopy 13 includes a support steel plate 131, a beam 132 vertically fixed to the front side of the support steel plate 131, a plate frame fixedly connected to the beam 132 and the support steel plate 131 respectively, and a polycarbonate plate 133 installed in the plate frame The plate frame consists of a middle frame 134 and a front frame 135; the front frame 135 is fixed to the front end of the beam 132; The prefabricated steel pipe 8 and the supporting steel plate 131 are welded and fixed.

实施例3:Example 3:

如图5所示的整体预制阳台,其结构与实施例2基本相同,其中,所述预制钢管8与支撑钢板131上分别开设有正对设置有螺纹孔(未图示);所述预制钢管8与支撑钢板131通过螺栓14和螺母固定连接。As shown in FIG. 5, the structure of the integral prefabricated balcony is basically the same as that of Embodiment 2, wherein the prefabricated steel pipe 8 and the supporting steel plate 131 are respectively provided with threaded holes (not shown) facing each other; 8 and the supporting steel plate 131 are fixedly connected by bolts 14 and nuts.

实施例4:Example 4:

如图6所示的整体预制阳台,其结构与实施例1基本相同,其中,所述底板下21方沿其长度方向间隔设置有若干个加强座24,且相邻加强座24之间间距相同。As shown in FIG. 6 , the structure of the integral prefabricated balcony is basically the same as that of Embodiment 1, wherein a plurality of reinforcing seats 24 are arranged at intervals along the length direction of the bottom 21 side of the bottom plate, and the spacing between adjacent reinforcing seats 24 is the same. .

实施例5:Example 5:

如图7和图8所示的整体预制阳台,其结构与实施例1基本相同,其中,所述围墙23其高度不小于120cm,且围墙23上方一体浇筑有绿化台15。所述绿化台15其底部向内侧倾斜,且其倾斜低端开设有排水孔16。The structure of the integral prefabricated balcony shown in Figures 7 and 8 is basically the same as that of Embodiment 1, wherein the height of the enclosure wall 23 is not less than 120 cm, and the green platform 15 is integrally cast above the enclosure wall 23 . The bottom of the greening table 15 is inclined inward, and a drainage hole 16 is opened at the lower end of the inclination.

本发明的整体预制阳台,安装时,将吊装工具与阳台本体其底板上预留的吊装钢筋连接,并利用吊装工具将阳台本体吊装至预安装位;阳台本体就位后,将底板和侧板的预埋钢筋与建筑主体连接,并采用混凝土一体浇筑固定,此处的预埋钢筋与建筑主体浇筑固定方法为现有技术中的钢筋浇筑方法,在此不再详述其具体操作步骤;在底板两侧设置侧板,可增加阳台本体与建筑主体之间的固定面积,提高牢固性,且可将侧板作为用于固定空调外机的设备平台,减少设备平台的安装成本;在侧板后侧设置与建筑主体连接的连接柱,可提高阳台本体与建筑主体之间的连接强度,提高整体稳固性,尤其适用于突出于建筑主体外侧的凸阳台设计,增加阳台本体与建筑主体之间的固定连接面积;在连接柱上设置有多个凹槽,并将连接柱的凹槽与建筑主体之间用混凝土进行填充和密封,增强了连接柱与建筑主体之间的连接性,提高了阳台本体与建筑主体之间的的相互作用力,增强了阳台本体与建筑主体件的咬合能力,提高稳固程度和安全性;在底板下方的加强座上之间安装用于与雨棚连接的预制钢管,可将雨棚直接与预制钢管连接,无需再在建筑主体的墙体表面开设安装孔,组装更加便捷,且整体建筑楼房的雨棚安装更加整齐,美化了建筑楼房的外观;具体地,将预制钢管上端插入至盲孔中,接着将紧固螺栓依次穿过加强座其盲孔上的连接孔和预制钢管上的通孔,并利用紧固螺母进行固定;之后,在加强座两侧面浇筑混凝土,使得混凝土层17能够覆盖紧固螺栓和紧固螺母,即将紧固螺栓和紧固螺母埋入加强座的混凝土层中;可根据雨棚的支撑钢板结构,在露出于加强座外部的预制钢管上开设用于与雨棚的支撑钢板连接的螺纹孔,或者将预制钢管直接与支撑钢板焊接固定;若围墙高度较低时,在围墙上栏板的预留孔,便于在后期施工过程中安装栏板,减少施工工程量,提高施工效率;若围墙高度较高时,可根据设计要求需要在围墙上增设用于种植或摆放绿植的绿化台,营造良好的生活环境,更好地满足客户需求。For the overall prefabricated balcony of the present invention, during installation, the hoisting tool is connected to the hoisting steel bars reserved on the bottom plate of the balcony body, and the balcony body is hoisted to the pre-installation position by the hoisting tool; after the balcony body is in place, the bottom plate and the side plate are The pre-embedded steel bars are connected with the main body of the building, and are fixed by integral casting with concrete. The pouring and fixing method of the pre-embedded steel bars and the main body of the building is the reinforcing bar pouring method in the prior art, and its specific operation steps will not be described in detail here; Side plates are arranged on both sides of the bottom plate, which can increase the fixed area between the balcony body and the building body, improve the firmness, and can use the side plates as an equipment platform for fixing the air conditioner external unit, reducing the installation cost of the equipment platform; The connection column connected to the main body of the building is arranged on the back side, which can improve the connection strength between the balcony body and the main body of the building, and improve the overall stability. There are several grooves on the connecting column, and the grooves of the connecting column and the main body of the building are filled and sealed with concrete, which enhances the connection between the connecting column and the main body of the building and improves the The interaction force between the balcony body and the building body enhances the occlusal ability of the balcony body and the building body, and improves the stability and safety; between the reinforcing seats under the bottom plate, a prefabricated structure for connecting with the canopy is installed. The steel pipe can directly connect the canopy to the prefabricated steel pipe, and there is no need to open installation holes on the wall surface of the main body of the building. The assembly is more convenient, and the installation of the canopy in the overall building is more tidy, which beautifies the appearance of the building. Specifically, Insert the upper end of the prefabricated steel pipe into the blind hole, then pass the fastening bolts through the connecting hole on the blind hole of the reinforcing seat and the through hole on the prefabricated steel pipe in turn, and use the fastening nuts to fix it; then, on both sides of the reinforcing seat Concrete is poured so that the concrete layer 17 can cover the tightening bolts and tightening nuts, that is, the tightening bolts and tightening nuts are buried in the concrete layer of the reinforcement seat; according to the supporting steel plate structure of the canopy, the outer surface of the reinforcement seat can be exposed. The prefabricated steel pipe is provided with threaded holes for connecting with the supporting steel plate of the canopy, or the prefabricated steel pipe is directly welded and fixed with the supporting steel plate; if the height of the fence is low, the reserved holes in the fence plate on the fence are convenient for the later construction process. Install fences in the middle to reduce the amount of construction work and improve the construction efficiency; if the height of the fence is high, a greening table for planting or placing green plants can be added on the fence according to the design requirements to create a good living environment, better to meet customer needs.

上述实施例,仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。The above embodiments are only preferred embodiments of the present invention, so all equivalent changes or modifications made according to the structures, features and principles described in the scope of the patent application of the present invention are included in the scope of the patent application of the present invention.

Claims (10)

1.一种整体预制阳台,包括预埋钢筋和阳台本体;所述预埋钢筋其一端伸入至阳台本体内部,其另一端穿过阳台本体,并与建筑主体浇筑连接;其特征在于:所述阳台本体包括底板,及固定于底板两侧的侧板,及围设于底板和侧板外围的围墙,及设置于底板下方的多个加强座,及垂直设置于侧板后侧的连接柱;所述底板和侧板分别通过预埋钢筋与建筑主体连接;所述围墙一体浇筑于底板和侧板前侧;所述连接柱沿其高度间隔设置有多个凹槽;所述凹槽与建筑主体之间填充有混凝土浇筑层。1. an integral prefabricated balcony, comprising pre-embedded steel bars and a balcony body; one end of the pre-embedded steel bars extends into the interior of the balcony body, and the other end passes through the balcony body, and is connected with the main body of the building by pouring; it is characterized in that: The balcony body includes a bottom plate, side plates fixed on both sides of the bottom plate, a wall surrounding the bottom plate and the periphery of the side plate, a plurality of reinforcing seats arranged below the bottom plate, and a connecting column vertically arranged on the back side of the side plate. The bottom plate and the side plate are respectively connected with the main body of the building through embedded steel bars; the enclosure wall is integrally cast on the front side of the bottom plate and the side plate; Between the main body is filled with concrete pouring layer. 2.根据权利要求1所述的整体预制阳台,其特征在于:每一所述加强座中沿其高度方向设置有盲孔;所述盲孔中贯穿安装有预制钢管;所述加强座沿其宽度方向设有用于与盲孔联通的连接孔;所述预制钢管上开设有与连接孔同轴心的通孔;所述预制钢管其上端伸入至加强座的盲孔中,且其与加强座通过紧固螺栓和紧固螺母固定连接;所述预制钢管其下端露出于加强座外侧,且与雨棚固定连接。2 . The integrated prefabricated balcony according to claim 1 , wherein a blind hole is provided in each reinforcing seat along its height direction; a prefabricated steel pipe is installed through the blind hole; The width direction is provided with a connecting hole for communicating with the blind hole; the prefabricated steel pipe is provided with a through hole coaxial with the connecting hole; the upper end of the prefabricated steel pipe extends into the blind hole of the reinforcement seat, and the prefabricated steel pipe is connected with the reinforcement The seat is fixedly connected by tightening bolts and tightening nuts; the lower end of the prefabricated steel pipe is exposed outside the reinforcing seat and is fixedly connected with the canopy. 3.根据权利要求2所述的整体预制阳台,其特征在于:所述雨棚包括支撑钢板,及垂直固定于支撑钢板前侧的横梁,及分别与横梁和支撑钢板固定连接的板框架,及安装于板框架中的聚碳酸酯板;所述板框架由中框和前框组成;所述前框固定于横梁前端;所述中框其前侧与前框固定,其后侧与支撑钢板上端固定。3. The integrated prefabricated balcony according to claim 2, wherein the canopy comprises a supporting steel plate, a beam vertically fixed on the front side of the supporting steel plate, and a plate frame fixedly connected with the beam and the supporting steel plate respectively, and The polycarbonate plate installed in the plate frame; the plate frame is composed of a middle frame and a front frame; the front frame is fixed to the front end of the beam; the front side of the middle frame is fixed to the front frame, and the rear side of the middle frame is fixed to the supporting steel plate The top is fixed. 4.根据权利要求1所述的整体预制阳台,其特征在于:所述预制钢管与支撑钢板焊接固定。4 . The integral prefabricated balcony according to claim 1 , wherein the prefabricated steel pipe and the supporting steel plate are welded and fixed. 5 . 5.根据权利要求1所述的整体预制阳台,其特征在于:所述预制钢管与支撑钢板上分别开设有正对设置有螺纹孔;所述预制钢管与支撑钢板通过螺栓和螺母固定连接。5 . The integral prefabricated balcony according to claim 1 , wherein the prefabricated steel pipe and the support steel plate are respectively provided with threaded holes facing each other; the prefabricated steel pipe and the support steel plate are fixedly connected by bolts and nuts. 6 . 6.根据权利要求1所述的整体预制阳台,其特征在于:所述底板下方设置有两个加强座,且两加强座分别位于底板两侧。6 . The integrated prefabricated balcony according to claim 1 , wherein two reinforcing seats are arranged below the bottom plate, and the two reinforcing seats are respectively located on both sides of the bottom plate. 7 . 7.根据权利要求1所述的整体预制阳台,其特征在于:所述底板下方沿其长度方向间隔设置有若干个加强座,且相邻加强座之间间距相同。7 . The integrated prefabricated balcony according to claim 1 , wherein a plurality of reinforcing seats are arranged at intervals along the length direction below the bottom plate, and the spacing between adjacent reinforcing seats is the same. 8 . 8.根据权利要求1所述的整体预制阳台,其特征在于:所述围墙其高度不大于30cm,且围墙上开设有多个用于安装栏板的预留孔。8 . The integral prefabricated balcony according to claim 1 , wherein the height of the enclosure wall is not greater than 30 cm, and there are a plurality of reserved holes for installing the fence on the enclosure wall. 9 . 9.根据权利要求1所述的整体预制阳台,其特征在于:所述围墙其高度不小于120cm,且围墙上方一体浇筑有绿化台。9 . The integral prefabricated balcony according to claim 1 , wherein the height of the enclosure wall is not less than 120 cm, and a green platform is integrally poured above the enclosure wall. 10 . 10.根据权利要求9所述的整体预制阳台,其特征在于:所述绿化台其底部向内侧倾斜,且其倾斜低端开设有排水孔。10 . The integrated prefabricated balcony according to claim 9 , wherein the bottom of the green platform is inclined inward, and a drainage hole is opened at the lower end of the inclination. 11 .
CN201911049646.8A 2019-10-31 2019-10-31 Integral prefabricated balcony Pending CN110714529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911049646.8A CN110714529A (en) 2019-10-31 2019-10-31 Integral prefabricated balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911049646.8A CN110714529A (en) 2019-10-31 2019-10-31 Integral prefabricated balcony

Publications (1)

Publication Number Publication Date
CN110714529A true CN110714529A (en) 2020-01-21

Family

ID=69214662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911049646.8A Pending CN110714529A (en) 2019-10-31 2019-10-31 Integral prefabricated balcony

Country Status (1)

Country Link
CN (1) CN110714529A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197628A (en) * 2021-11-15 2022-03-18 刘旭 steel balcony

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172924Y (en) * 2008-02-27 2008-12-31 赵红宇 Novel awning
CN102312531A (en) * 2011-07-22 2012-01-11 张俊岭 Installing base for rainshed of balcony
CN207685993U (en) * 2018-01-03 2018-08-03 郑州中天建筑节能有限公司 A kind of prefabricated assembling type reinforced concrete balcony slab
CN208733804U (en) * 2018-06-23 2019-04-12 杜中萍 The prefabricated sunshade exterior wall of building
CN211922954U (en) * 2019-10-31 2020-11-13 山东汇富建设集团建筑工业有限公司 Integral prefabricated balcony

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172924Y (en) * 2008-02-27 2008-12-31 赵红宇 Novel awning
CN102312531A (en) * 2011-07-22 2012-01-11 张俊岭 Installing base for rainshed of balcony
CN207685993U (en) * 2018-01-03 2018-08-03 郑州中天建筑节能有限公司 A kind of prefabricated assembling type reinforced concrete balcony slab
CN208733804U (en) * 2018-06-23 2019-04-12 杜中萍 The prefabricated sunshade exterior wall of building
CN211922954U (en) * 2019-10-31 2020-11-13 山东汇富建设集团建筑工业有限公司 Integral prefabricated balcony

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197628A (en) * 2021-11-15 2022-03-18 刘旭 steel balcony

Similar Documents

Publication Publication Date Title
CN202346540U (en) Lift shaft wall using combined-type headframe assembly
CN110295667B (en) Construction method of prefabricated building house
CN110359551A (en) A kind of knockdown assembled arthitecutral structure
CN205637169U (en) Two curb plates support node of apron is stretched to outband of beam -ends concatenation
CN110714529A (en) Integral prefabricated balcony
CN107355087A (en) The extending old building steelframe structure of energy-efficient environment-friendly multifunctional
CN113737936A (en) Connecting structure and construction method of prefabricated combined duplex balcony
CN211922954U (en) Integral prefabricated balcony
CN209468856U (en) A prefabricated concrete column-beam connection node
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN212388680U (en) Closed structure of vertical drainage pipe in kitchen and toilet of residence
CN209053117U (en) A kind of assembled power supply unit bracket basis
CN215519166U (en) Full-assembly steel-concrete combined frame-support building structure system
CN213539408U (en) Curtain wall mounting structure
CN205444455U (en) Adopt environment -friendly type wall body's building window subassembly structure
CN211922959U (en) Integral prefabricated balcony module suitable for through-beam type steel frame
CN211369630U (en) External prestress assembly type frame-support reinforced structure of existing structure
JP4163329B2 (en) Building units and unit buildings
CN207646939U (en) A kind of double-layered precast facade structure of basement
JP3047783B2 (en) Reinforcement method of existing wooden building
CN201908370U (en) Straight-plate type concrete support structure provided with displacement type anti-seismic damper
CN113216386A (en) Full-assembly steel-concrete combined frame-support building structure system
CN221895931U (en) A modularized housing building module
CN220814602U (en) Wall cornice structure
CN222435731U (en) Assembled building convenient to installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination