CN208415290U - Outdoor substation's Steel Structure foundation construction structure - Google Patents

Outdoor substation's Steel Structure foundation construction structure Download PDF

Info

Publication number
CN208415290U
CN208415290U CN201820900784.7U CN201820900784U CN208415290U CN 208415290 U CN208415290 U CN 208415290U CN 201820900784 U CN201820900784 U CN 201820900784U CN 208415290 U CN208415290 U CN 208415290U
Authority
CN
China
Prior art keywords
foundation
column
rippers
rippers layer
hard soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820900784.7U
Other languages
Chinese (zh)
Inventor
贺攀
李开彦
黄新
卢波
胡非
熊明
尹志超
张文浩
王劲松
侯天燕
余建明
武艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huangshi Power Co Ltd Hubei Power Co Ltd
Huangshi Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
Huangshi Power Co Ltd Hubei Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huangshi Power Co Ltd Hubei Power Co Ltd filed Critical Huangshi Power Co Ltd Hubei Power Co Ltd
Priority to CN201820900784.7U priority Critical patent/CN208415290U/en
Application granted granted Critical
Publication of CN208415290U publication Critical patent/CN208415290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of outdoor substation Steel Structure foundation construction structures, including Center stake pilum and several groups prothetic group column, in the centrally disposed pile foundation of Center stake pilum, the center pile foundation includes hard soil foundation and the first rippers layer basis, the hard soil foundation and the first rippers layer basis makees skeleton by steel mesh and has concreting to constitute, hard soil foundation is arranged in hard soil layer, first rippers layer basis instrument is in rippers layer, the first rippers layer basis instrument is in the top of hard soil foundation, the structure design of the utility model is reasonable, Center stake pilum is supported by hard soil foundation and the first rippers layer basis, hard soil foundation effectively raises the longitudinal load-bearing of steelframe structure, effectively alleviate the beveling sedimentation of soil layer in the first rippers layer of inverted triangle, further increase steel Framework stability of foundation, prothetic group column are connect with center pile foundation, the further lateral traction for improving steelframe structure.

Description

Outdoor substation's Steel Structure foundation construction structure
Technical field
The utility model relates to a kind of outdoor substation Steel Structure foundation construction structures.
Background technique
With urban construction and the rapid development of power grid, the construction of substation is also evolving.It is built according to substation In energy-saving and environmental protection, antidetonation, standardized requirement, found in research and application, steel construction with excellent bearing capacity, With preferable stability, since the steelframe structure figure of large-scale outdoor substation is larger, load bearing equipment is more, therefore needs to reinforce bottom The stability on portion basis, thicker region of especially loosening the soil really directly adopt piling and are easy to happen irregular sedimentation, influence steelframe The stability of structure entirety, and then influence the normal work of transformer equipment.
Utility model content
The purpose of the utility model is to overcome the above deficiencies in the existing technologies, and provide a kind of structure design conjunction Reason, outdoor substation's Steel Structure foundation construction structure.
The technical scheme in the invention for solving the above technical problem is: a kind of Steel Structure foundation construction of outdoor substation Structure, including Center stake pilum and several groups prothetic group column, it is described in the centrally disposed pile foundation of Center stake pilum Center pile foundation includes hard soil foundation and the first rippers layer basis, and the hard soil foundation and the first rippers layer are basic Skeleton is made by steel mesh and has concreting to constitute, hard soil foundation is arranged in hard soil layer, and the first rippers layer basis is set It sets in rippers layer, the first rippers layer basis instrument is on the top of hard soil foundation, the first rippers layer basis Section is in inverted trapezoidal and is provided centrally with the first slot position, the Center stake pilum include first foundation sleeve column, connecting column and First support column, the first foundation sleeve column, connecting column and the first support column are provided with the flange for the connection that cooperates Disk, the first foundation sleeve column are plugged in first slot position on the first rippers layer basis and pour fixation with hard soil foundation, Connecting column is socketed in the cavity of first foundation socket column, the first foundation sleeve column, connecting column and the first support column Ring flange is successively socketed and relatively fixed by Pseudobulbus Bletillae (Rhizoma Bletillae) and the first rippers layer basis from top to bottom, and several groups prothetic group column is in Heart pile foundation column concentrically surrounds arrangement, and the prothetic group column is arranged on the basis of the second rippers layer, and prothetic group column includes the second basis set Column and the second support column, the second rippers layer basis instrument have the second slot position of the basic sleeve column of socket second, and described the Two basic sleeve columns are plugged in the second slot position and pour fixation, the described second basic sleeve column and second with the second rippers layer basis The ring flange of support column is overlapped mutually and passes through Pseudobulbus Bletillae (Rhizoma Bletillae) and fixes with the second rippers layer basis, first support column and second Support column is connected and fixed by connection frame.
Further: the connecting rod includes first connecting rod and the second connecting rod, the first connecting rod and Outside wall surface of the one end of second connecting rod by bolt part respectively with the first support column and the second support column is fixed, and described first The other end of connecting rod is provided with the first fixed disk, and the other end of second connecting rod is provided with the second fixed disk, described The first fixed disk and the edge of the second fixed disk be provided with several through-holes for wearing bolt part, bolt part is threaded through through-hole Above so that the first fixed disk and the second fixed disk are fixed to each other, fixing groove is arranged in the end face of first fixed disk, described Four groups of edges of fixing groove are each provided with one group of elastic block rubber, and four groups of elastic block rubbers are around composition mounting groove Position, second fixed disk are provided with the fixed block being equipped in mounting groove, any wall surface of the fixed block with The wall surface of fixing groove is in 45 °.
Further: the ground surface of the rippers layer is additionally provided with carrying steel plate.
The utility model compared with prior art, has the following advantages that and effect: reasonable in design, Center stake pilum is logical It crosses hard soil foundation and the first rippers layer basis is supported, the longitudinal direction that hard soil foundation effectively raises steelframe structure is held It carries, is settled in the beveling that the first rippers layer of inverted triangle effectively alleviates soil layer, further increase steelframe structure stability of foundation, it is auxiliary Pedestal is arranged on the basis of the second rippers layer, the further lateral traction for improving steelframe structure, while the first terminal pad and second Terminal pad is by the mutual restrictive function of fixed block and elastic block rubber, effective first support bar and the second support bar alleviated Horizontal swing effect further increases the whole stability in steelframe structure basis so that steelframe structure basis have good load, Resistance to compression and anti-seismic performance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment Shi Wai substation Steel Structure foundation construction structure.
Fig. 2 is the structural schematic diagram of the utility model embodiment the first fixed disk and the second fixed disk.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing and by embodiment, and following embodiment is pair The explanation of the utility model and the utility model is not limited to following embodiment.
Referring to Fig. 1-Fig. 2, a kind of outdoor substation's Steel Structure foundation construction structure of the present embodiment, including Center stake pilum with And several groups prothetic group column, in the centrally disposed pile foundation of Center stake pilum, the center pile foundation includes hard soil layer Basis 3 and the first rippers layer basis 41, bone is made by steel mesh in the hard soil foundation 3 and the first rippers layer basis 41 Frame simultaneously has concreting composition, and hard soil foundation 3 is arranged in hard soil layer 1, and the first rippers layer basis 41 is arranged in rippers layer 2 In, the top of hard soil foundation 3, basic 41 sections of first rippers layer are arranged in the first rippers layer basis 41 In inverted trapezoidal and be provided centrally with the first slot position, the Center stake pilum include first foundation sleeve column 51, connecting column 52 and First support column 53, the first foundation sleeve column 51, connecting column 52 and the first support column 53 are provided with mutual cooperation and connect The ring flange connect, the first foundation sleeve column 51 be plugged in first slot position on the first rippers layer basis 41 and with hard soil layer base Plinth 3 pours fixation, and connecting column 52 is socketed in the cavity of first foundation socket column, the first foundation sleeve column 51, connecting column 52 and first support column 53 ring flange successively from top to bottom be socketed and by Pseudobulbus Bletillae (Rhizoma Bletillae) 6 and the first rippers layer basis 41 relatively Fixed, several groups prothetic group column is in concentrically surround arrangement to Center stake pilum, and the prothetic group column setting is on the second rippers layer basis On 42, prothetic group column includes that the second basic sleeve column 71 and the second support column 72, the second rippers layer basis 42 are provided with socket Second slot position of the second basic sleeve column 71, the described second basic sleeve column 71 be plugged in the second slot position and with the second rippers layer base Plinth 42 pours fixation, and the ring flange of the described second basic sleeve column 71 and the second support column 72 is overlapped mutually and passes through Pseudobulbus Bletillae (Rhizoma Bletillae) 6 Fixed with the second rippers layer basis 42, first support column 53 and the second support column 72 is connected and fixed by connection frame, institute The connecting rod stated includes first connecting rod 81 and the second connecting rod 82, the first connecting rod 81 and the second connecting rod 82 Outside wall surface of the one end by bolt part 84 respectively with the first support column 53 and the second support column 72 is fixed, the first connecting rod 81 other end is provided with the first fixed disk 88, and the other end of second connecting rod 82 is provided with the second fixed disk 89, institute The edge of the first fixed disk 88 and the second fixed disk 89 stated is provided with several through-holes 83 for wearing bolt part 84, bolt part 84 are threaded through on through-hole 83 first fixed disk 88 and the second fixed disk 89 are fixed to each other, first fixed disk 88 Fixing groove 85 is arranged in end face, and four groups of edges of the fixing groove 85 are each provided with one group of elastic block rubber 86, and described four For group elastic block rubber 86 around installation slot position is constituted, second fixed disk 89, which is provided with, is equipped with consolidating in mounting groove Determine block 87, any wall surface of the fixed block 87 and the wall surface of fixing groove 85 are in 45 °, and the ground surface of the rippers layer 2 is also It is provided with carrying steel plate 9, the present embodiment is related to a kind of constructing structure on steelframe structure basis for substation, guarantees steelframe structure bottom The load-carrying properties in portion ensure that cylindrical steel can be used in the excellent performance for the steelframe structure that steelframe structure basis top is set up, the present embodiment Pipe passes sequentially through ring flange connection and sets up upwards in turn to the steelframe structure of substation, and the structure design of the utility model is reasonable, Center stake pilum passes through hard soil foundation 3 and the first rippers layer basis 41 is supported, and hard soil foundation 3 effectively raises The longitudinal load-bearing of steelframe structure settles in the beveling that the first rippers layer 2 of inverted triangle effectively alleviates soil layer, further increases steel Framework stability of foundation, prothetic group column are connect with center pile foundation, the further lateral traction for improving steelframe structure, while first connects It connects disk 88 and the second terminal pad 89 passes through the mutual restrictive function of fixed block 87 and elastic block rubber 86, it is effective to alleviate first The horizontal swing of strut and second support bar acts on, and the whole stability in steelframe structure basis is further increased, so that steelframe structure base Plinth has good load, resistance to compression and anti-seismic performance.
Above content is only illustrate to examples for clearly illustrating the present invention described in this specification.The utility model Person of ordinary skill in the field can make various modifications or additions to the described embodiments or using class As mode substitute, content without departing from the utility model specification or surmount model defined in the claims It encloses, all should belong to the protection range of the utility model.

Claims (3)

1. a kind of outdoor substation Steel Structure foundation construction structure, it is characterised in that: auxiliary including Center stake pilum and several groups Pilum, in the centrally disposed pile foundation of Center stake pilum, the center pile foundation includes hard soil foundation and the One rippers layer basis, the hard soil foundation and the first rippers layer basis make skeleton by steel mesh and have concreting It constitutes, hard soil foundation is arranged in hard soil layer, and the first rippers layer basis instrument is in rippers layer, the first rippers layer base The top of hard soil foundation is arranged in plinth, and the first rippers layer basis section is in inverted trapezoidal and is provided centrally with the first slot Position, the Center stake pilum include first foundation sleeve column, connecting column and the first support column, the first foundation sleeve column, Connecting column and the first support column are provided with the ring flange for the connection that cooperates, and the first foundation sleeve column is plugged in first Fixation is poured in first slot position on rippers layer basis and with hard soil foundation, connecting column is socketed in the cavity of first foundation socket column Interior, the ring flange of the first foundation sleeve column, connecting column and the first support column is successively socketed from top to bottom and by ground spiral shell Silk is relatively fixed with the first rippers layer basis, and several groups prothetic group column is in concentrically surround arrangement, the prothetic group to Center stake pilum Column is arranged on the basis of the second rippers layer, and prothetic group column includes the second basic sleeve column and the second support column, second rippers layer Basis instrument has the second slot position of the basic sleeve column of socket second, and the described second basic sleeve column is plugged in the second slot position and with the Two rippers layer bases pour fixation, the ring flange of the described second basic sleeve column and the second support column be overlapped mutually and pass through spiral shell Silk is fixed with the second rippers layer basis, and first support column and the second support column are connected and fixed by connecting rod.
2. outdoor substation according to claim 1 Steel Structure foundation construction structure, it is characterised in that: the connecting rod Part includes first connecting rod and the second connecting rod, and one end of the first connecting rod and the second connecting rod passes through bolt part and distinguishes It is fixed with the outside wall surface of the first support column and the second support column, it is fixed that the other end of the first connecting rod is provided with first Disk, the other end of second connecting rod are provided with the second fixed disk, the side of first fixed disk and the second fixed disk Along several through-holes being provided with for wearing bolt part, bolt part, which is threaded through on through-hole, makes the first fixed disk and the second fixed disk It is fixed to each other, fixing groove is arranged in the end face of first fixed disk, and four groups of edges of the fixing groove are each provided with one Group elastic block rubber, four groups of elastic block rubbers are provided with cooperation around installation slot position, second fixed disk is constituted Fixed block in mounting groove is set, and any wall surface of the fixed block and the wall surface of fixing groove are in 45 °.
3. outdoor substation according to claim 1 Steel Structure foundation construction structure, it is characterised in that: the rippers layer Ground surface be additionally provided with carrying steel plate.
CN201820900784.7U 2018-06-11 2018-06-11 Outdoor substation's Steel Structure foundation construction structure Active CN208415290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820900784.7U CN208415290U (en) 2018-06-11 2018-06-11 Outdoor substation's Steel Structure foundation construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820900784.7U CN208415290U (en) 2018-06-11 2018-06-11 Outdoor substation's Steel Structure foundation construction structure

Publications (1)

Publication Number Publication Date
CN208415290U true CN208415290U (en) 2019-01-22

Family

ID=65111984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820900784.7U Active CN208415290U (en) 2018-06-11 2018-06-11 Outdoor substation's Steel Structure foundation construction structure

Country Status (1)

Country Link
CN (1) CN208415290U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469179A (en) * 2019-08-15 2019-11-19 国网河北省电力有限公司无极县供电分公司 10 KV distribution transformer electric pole construction methods
CN112144560A (en) * 2020-09-07 2020-12-29 焦作大学 Concrete combination ground pillar for civil construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469179A (en) * 2019-08-15 2019-11-19 国网河北省电力有限公司无极县供电分公司 10 KV distribution transformer electric pole construction methods
CN112144560A (en) * 2020-09-07 2020-12-29 焦作大学 Concrete combination ground pillar for civil construction

Similar Documents

Publication Publication Date Title
CN208415290U (en) Outdoor substation's Steel Structure foundation construction structure
CN201377077Y (en) Double-hoop bracket for single-column bent cap in bridge construction
CN108755385A (en) A kind of only Cable-stayed Bridge with Slanted Pylon structure and construction method of active balance main span horizontal force
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN209099386U (en) A kind of reinforcement protection device of bridge pile foundation
CN106480899A (en) A kind of full landform self-balancing column foot attachment structure
CN201588413U (en) Reinforcing structure for concrete bracket in original workshop
CN205811032U (en) A kind of roofing miniaturization ready-package communication antenna support bar
CN211201134U (en) Horizontal support truss structure of attached lifting scaffold
CN211227914U (en) Composite reinforcement structure of highway subgrade soft soil layer
CN210002235U (en) Large-span asymmetric cable-stayed bridge counterweight structure
CN211171668U (en) Bridge reinforcing apparatus
CN209976062U (en) Constructional engineering frame roof beam reinforcing apparatus
CN203891055U (en) Steel-structure base device for tower crane
CN208251060U (en) A kind of flexible pile composite foundation structure
CN207362673U (en) One kind is without bearing list limb Continuous Rigid-Frame Bridge with Thin-Wall Piers
CN206052764U (en) A kind of full landform self-balancing column foot attachment structure
CN103726505B (en) Offshore wind plant wind turbine foundation
CN206971227U (en) A kind of pattern foundation pit supporting structure ruggedized construction
CN217999066U (en) Take raft foundation building's basement to reform transform structure
CN112593527A (en) Hydraulic engineering cantilever ecological hydraulic retaining wall structure
CN214574101U (en) Lattice column connecting structure for tower crane foundation for building construction
CN203307836U (en) Tower crane pile reinforcing structure
CN206438424U (en) A kind of bridge strengthening device with shock insulation function
CN205742251U (en) Single-pipe tower pedestal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant