CN202081669U - Integrated flange coupling three-pipe tower communication base station - Google Patents
Integrated flange coupling three-pipe tower communication base station Download PDFInfo
- Publication number
- CN202081669U CN202081669U CN2011201399275U CN201120139927U CN202081669U CN 202081669 U CN202081669 U CN 202081669U CN 2011201399275 U CN2011201399275 U CN 2011201399275U CN 201120139927 U CN201120139927 U CN 201120139927U CN 202081669 U CN202081669 U CN 202081669U
- Authority
- CN
- China
- Prior art keywords
- tower
- machine room
- base station
- pipe
- sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Support Of Aerials (AREA)
Abstract
The utility model discloses an integrated flange coupling three-pipe tower communication base station, which mainly consists of a container-type machine room and an assembling type three-pipe tower. The container-type machine room comprises a machine room framework body; a support rod seat is welded at the top of a middle vertical post of the machine room framework body; fixing channel steel is arranged at the side face of the machine room framework body; the assembling type three-pipe tower comprises at least two tower sections; two adjacent tower sections are connected by a triangular flange welded inside the lower tower section; the bottom tower section is flatly adhered to the fixing channel steel and is locked by a hoop; and one end of a support rod is fixedly connected with the support rod seat, while the other end is fixedly connected with the tower body of the assembling type three-pipe tower via the hoop. The integrated flange coupling three-pipe tower communication base station can be adaptive to the rapid development of modern mobile communication, shortens the construction period of a base station and can be quickly deployed; the height range can achieve 35 m so as to be convenient for the centralization and standardization management of the base station construction and avoid removal risks due to the base station construction.
Description
Technical field
The utility model relates to a kind of communication base station, and particularly a kind of GSM machine room that is applied to is connected three pipe tower communication base stations with the unitary flange that antenna-feedback system is combined into one.
Background technology
Along with the economy rapid growth of China, city scope in all parts of the country constantly enlarges, and communication, volume of transmitted data improve constantly, and the mobile communication coverage also constantly enlarges thereupon.Can rent or set up simple and easy board house at the high-rise building end face for the down town, and set up simple antenna pole carry antenna, then need to set up separately respectively communications equipment room and communication tower bar for the not intensive place of surrounding city building and cover requirement to satisfy with anti-theft feature.Along with the continuous expansion of city size, having to again remove and rebuild in original iron tower and base station of setting up, therefore can cause very big waste and inconvenience.
The utility model content
Technical problem to be solved in the utility model provides a kind of can being transported to by automobile and lays behind the place just the unitary flange of can Fast Installation and coming into operation and connect three pipe tower communication base stations.
The utility model solves the problems of the technologies described above by following technical solution:
The utility model unitary flange connects three pipe tower communication base stations and mainly is made up of container-type machine room and assembly type three pipe towers; Described container comprises the machine room frame body 1 of hexahedron steel work, and the middle standing pillar welded top of machine room frame body 1 has the strut socket that is used for fixing strut 2, and the side of machine room frame body 1 is equipped with fixedly channel-section steel 5; Described assembly type three pipe towers comprise at least two sections tower sections, adopt the triangle flange 7 that is welded on hypomere tower intersegmental part to connect between adjacent two sections tower sections, bottom column section 3 smooth fixedly channel-section steels 5 also adopt anchor ear 6 lockings, one end of strut 2 is fixedlyed connected with strut socket, and the other end adopts anchor ear to fixedly connected with the body of the tower of assembly type three pipe towers.
Described machine room frame body 1 adopts rectangular steel pipe to do skeleton.
The container-type machine room that the utility model unitary flange connects three pipe tower communication base stations employings is to do skeleton with rectangular steel pipe, be welded into the hexahedron steel structure frame, in lifting and transportation, bear moving that the weight of equipment in the base station and machine room end face communication tower bar caused to satisfy, static load, assembly type three pipe towers adopt the assembling of triangle flange connected mode simultaneously, and by fixedly channel-section steel and strut are fixed on the container-type machine room, realized the communication base station that machine room and antenna-feedback system are combined into one, can adapt to the fast development of present mobile communication, shortening the base station construction cycle also can dispose fast, altitude range can reach 35 meters, be convenient to the centralization standardized management of base station construction, evade the removal risk that causes in the base station construction.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the connection diagram between the two tower sections of assembly type three pipe towers among Fig. 1.
Among the figure:
1---the machine room frame body
2---strut
3---the bottom column section
4---the second tower section
5---fixing channel-section steel
6---anchor ear
7---the triangle flange
The specific embodiment
The utility model will be further described below in conjunction with accompanying drawing:
As shown in Figure 1, the utility model mainly is made up of container-type machine room and assembly type three pipe towers.
The container-type machine room comprises machine room frame body 1, machine room frame body 1 adopts rectangular steel pipe to do skeleton, be welded into the hexahedron steel structure frame, the middle part column welded top of machine room frame body 1 has the strut socket that is used for fixing strut 2, and the side of machine room frame body 1 is welded with fixedly channel-section steel 5.
Assembly type three pipe towers mainly are made of bottom column section 3 and 4 assemblings of the second tower section, and bottom column section 3 adopts the triangle flange 7 that is welded on bottom column section 3 inside to be connected with the second tower section 4, as shown in Figure 2; Bottom column section 3 is flattened on fixedly on the channel-section steel 5 and adopts anchor ear 6 lockings, and an end of strut 2 is fixedlyed connected with strut socket, and the other end is fixedlyed connected with the body of the tower employing anchor ear that assembly type three is managed towers.
Container-type machine room of the present utility model adopts rectangular steel pipe to do skeleton, be welded into the hexahedron steel structure frame, can satisfy communication base station and in lifting and transportation, bear the dynamic and static load that station equipment weight and machine room end face communication tower bar are caused, assembly type three pipe towers adopt triangle flange connected mode to assemble simultaneously, and by fixedly channel-section steel and strut are fixed on the container-type machine room, realized the communication base station that machine room and antenna-feedback system are combined into one, adapt to the fast development of present mobile communication, shorten the base station construction cycle and also can dispose fast.
Assembly type three pipe towers of the present utility model also can adopt the tower section more than two sections to assemble as required, and the connected mode between two sections neighbouring tower sections is to adopt the triangle flange that is welded on hypomere tower intersegmental part to connect equally.
Claims (2)
1. unitary flange connects three pipe tower communication base stations, it is characterized in that, it mainly is made up of container-type machine room and assembly type three pipe towers; Described container comprises the machine room frame body (1) of hexahedron steel work, and the middle standing pillar welded top of machine room frame body (1) has the strut socket that is used for fixing strut (2), and the side of machine room frame body (1) is equipped with fixedly channel-section steel (5); Described assembly type three pipe towers comprise at least two sections tower sections, adopt the triangle flange (7) that is welded on hypomere tower intersegmental part to connect between adjacent two sections tower sections, the smooth fixedly channel-section steel of bottom column section (3) (5) also adopts anchor ear (6) locking, one end of strut (2) is fixedlyed connected with strut socket, and the other end adopts anchor ear to fixedly connected with the body of the tower of assembly type three pipe towers.
2. unitary flange according to claim 1 connects three pipe tower communication base stations, it is characterized in that, described machine room frame body (1) adopts rectangular steel pipe to do skeleton.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201399275U CN202081669U (en) | 2011-05-05 | 2011-05-05 | Integrated flange coupling three-pipe tower communication base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201399275U CN202081669U (en) | 2011-05-05 | 2011-05-05 | Integrated flange coupling three-pipe tower communication base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202081669U true CN202081669U (en) | 2011-12-21 |
Family
ID=45342305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201399275U Expired - Fee Related CN202081669U (en) | 2011-05-05 | 2011-05-05 | Integrated flange coupling three-pipe tower communication base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202081669U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704717A (en) * | 2012-05-09 | 2012-10-03 | 电联工程技术股份有限公司 | Lifting support leg for mobile integrated base station |
CN104265050A (en) * | 2014-10-17 | 2015-01-07 | 国家电网公司 | Tower column for fast first-aid repair |
CN105960733A (en) * | 2013-12-21 | 2016-09-21 | 康普技术有限责任公司 | Pre-assembled cell site sector |
JP2021180359A (en) * | 2020-05-11 | 2021-11-18 | 株式会社Nttドコモ | Container type base station |
-
2011
- 2011-05-05 CN CN2011201399275U patent/CN202081669U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704717A (en) * | 2012-05-09 | 2012-10-03 | 电联工程技术股份有限公司 | Lifting support leg for mobile integrated base station |
CN102704717B (en) * | 2012-05-09 | 2014-07-30 | 电联工程技术股份有限公司 | Lifting support leg for mobile integrated base station |
CN105960733A (en) * | 2013-12-21 | 2016-09-21 | 康普技术有限责任公司 | Pre-assembled cell site sector |
CN104265050A (en) * | 2014-10-17 | 2015-01-07 | 国家电网公司 | Tower column for fast first-aid repair |
JP2021180359A (en) * | 2020-05-11 | 2021-11-18 | 株式会社Nttドコモ | Container type base station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202039618U (en) | Container-type integrated communication base station | |
CN202081669U (en) | Integrated flange coupling three-pipe tower communication base station | |
CN201377077Y (en) | Double-hoop bracket for single-column bent cap in bridge construction | |
CN204898706U (en) | Steel pipe pile foundation communication tower structure | |
CN204152259U (en) | A kind of newly-built multi-functional communications base station of greenbelt | |
CN104265045B (en) | Base station communication signal transmitting tower | |
CN201605849U (en) | Integral base station | |
CN204920400U (en) | Tower room integration communication base station | |
CN203066090U (en) | Assembled bracing structure for steel sheet piling cofferdam construction | |
CN206220630U (en) | The platform of communication base station tower and day manifolding | |
CN102409877A (en) | Fast communication base station | |
CN204326672U (en) | Novel rapid-installation formula many ribs type base station towers | |
CN205811032U (en) | A kind of roofing miniaturization ready-package communication antenna support bar | |
CN203094023U (en) | Tower mast turning type emergency communication vehicle | |
CN206174583U (en) | Integration ready -package integrated communication tower | |
CN201486200U (en) | Self-machine room type steel tube tower | |
CN204152284U (en) | A kind of not damaged formula roofing communication tower | |
CN201635470U (en) | Steel-structured communication tower | |
CN202550057U (en) | Antenna holding pole device | |
CN2911096Y (en) | Iron tower having machine room | |
CN203808573U (en) | Integrally assembled communication base station structure | |
CN202431029U (en) | Integrated beautification base station | |
CN204112826U (en) | Novel base station communication signal launching tower | |
CN204189939U (en) | The ruggedized construction of original support lever frame of communication antenna transformation | |
CN203247920U (en) | Frame structure used for 220kV or 500kV or 1000kV transformer station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111221 Termination date: 20150505 |
|
EXPY | Termination of patent right or utility model |