JPH0270822A - Temporary post erection method and device - Google Patents

Temporary post erection method and device

Info

Publication number
JPH0270822A
JPH0270822A JP22122788A JP22122788A JPH0270822A JP H0270822 A JPH0270822 A JP H0270822A JP 22122788 A JP22122788 A JP 22122788A JP 22122788 A JP22122788 A JP 22122788A JP H0270822 A JPH0270822 A JP H0270822A
Authority
JP
Japan
Prior art keywords
temporary support
hole
screwed
temporary
cap nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22122788A
Other languages
Japanese (ja)
Inventor
Takazo Okano
岡野 登三
Ryoji Sasaki
佐々木 良司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP22122788A priority Critical patent/JPH0270822A/en
Publication of JPH0270822A publication Critical patent/JPH0270822A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To increase the degree of accuracy of erection and to promote efficiency, energy saving and security by screwing and inserting a temporary post loaded with a temporary stopping holder and cap nut and a connection bar steel provided with a screw section and using a pliers having a guide member. CONSTITUTION:Concrete 2 is placed to the bottom of a temporary post erecting hole 1, installing a holder (A) having a vertical and horizontal erecting position adjustment crosspiece on the ground surface, hanging a temporary post (B) loaded with a cap nut on the surface thereof in the hole 1, and it is held temporarily to the holder (A). After that, a pliers (C) is hung on the temporary post (B) through a guide member 12 vertically provided to the lower end thereof, and a connection bar steel (D) to be screwed and inserted to the upper end surface of the pliers from a connection bar steel insertion hole of the top of the pliers (C) is screwed to connect the temporary post (B) to the pliers (C) vertically through the screw section and cap nut. The temporary post (B) is inserted to the concrete 2, and after hardening, the pliers (C) is removed and eliminated, then the erection of the temporary post (B) is completed.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は地下構築工法の一つである逆打ら工法において
、上部短体支持用仮支柱を地中の掘削孔に建入れるため
の仮支柱建入れ工法及び装置に係るものである。
Detailed Description of the Invention (Industrial Field of Application) The present invention is a method for erecting temporary struts for supporting the upper short body into excavated holes underground in the reverse casting method, which is one of the underground construction methods. This relates to the method and equipment for constructing pillars.

(従来の技術) 第15A図乃至第15E図は従来の仮支柱建入工法の工
程を示し、仮支柱建入孔(a)に臨む地盤面に仮支柱建
入架台(b)を設置し、ガイド用角鋼管(C)の頭部支
持台((1)を所定位置にセットするとともに、前記建
入孔(a)内にコンクリ−) (e)を所定高さに打設
する。(第15A図参照) 図中(f)はケーシングパイプである。
(Prior Art) Figures 15A to 15E show the steps of the conventional temporary support construction method, in which a temporary support installation frame (b) is installed on the ground facing the temporary support installation hole (a), Set the head support ((1) of the guide square steel pipe (C) at a predetermined position, and pour concrete (e) into the construction hole (a) at a predetermined height. (See Figure 15A) In the figure, (f) is a casing pipe.

次いでガイド用鋼管(C)とのクリヤランスを少なくす
るように、スペーサー(樽を取付けた仮支柱(h)を建
込み、(第15B図及び第16図並に第17図参照)ヤ
ツトコ(i)を吊下ろして仮支柱ら)とボルト(j)で
接続するとともに、仮支柱(h)を架台(b)にセ・ン
トする。(第15C図参照) 更に垂直精度調整ジヤツキ(k)を使用してガイド用角
鋼管(C)の垂直を確認して(第16図参照)仮支柱(
h)をヤツトコ(i)とともに前記ガイド用角管(C)
を案内として仮支柱建入孔(al内に吊下ろし、仮支柱
(h)を未硬化コンクリート(e)中に挿入する。(第
15D図参照) 前記コンクリート(e)の硬化後、梯子と命綱とを使用
して前記建入孔(a)内に作業員が入り、仮支柱(h)
とヤツトコ0)との接続ボルト0)を撤去して同ヤツト
コ(i)を吊上げ、一連の作業を完了する。(第15E
図参照) (発明が解決しようとする課題) 前記従来の工法では、仮支柱の頭部1両位置しベルが多
種類ある場合、その高さに応じた多数のヤツトコを必要
とし、コスト高になる。
Next, install a temporary support (h) with a spacer (barrel attached) so as to reduce the clearance with the guide steel pipe (C) (see Figures 15B, 16, and 17). is suspended and connected to the temporary support (h) with bolts (j), and the temporary support (h) is placed on the frame (b). (See Figure 15C) Furthermore, use the vertical accuracy adjustment jack (k) to check the verticality of the guide square steel pipe (C) (see Figure 16) and install the temporary support (
h) together with Yatsutoko (i) and the square guide tube (C).
Using as a guide, suspend the temporary support (h) into the uncured concrete (e) and insert it into the uncured concrete (e). (See Figure 15D) A worker enters the construction hole (a) using the temporary support (h).
Remove the connecting bolt 0) between the robot (i) and the robot (i), and complete the series of operations. (15th E
(See figure) (Problem to be solved by the invention) In the conventional construction method described above, when one head of a temporary support is located and there are many types of bells, a large number of bells are required depending on the height, resulting in high costs. Become.

また短尺のガイド用鋼管の垂直精度で仮支柱を含めた全
体の建入精度を決定するため、建入精度に難点がある。
In addition, since the vertical accuracy of the short guide steel pipe determines the overall erection accuracy including the temporary support, there is a problem with the erection accuracy.

更に仮支柱建入孔に作業員が入り仮支柱とヤツトコとの
接合ボルトを撤去するため危険を伴ない、更にまたヤツ
トコと仮支柱との接続、取外しに多くの時間を要する。
Furthermore, it is dangerous because a worker enters the temporary support installation hole and removes the connecting bolt between the temporary support and the support, and furthermore, it takes a lot of time to connect and remove the support and the temporary support.

本発明は前記従来技術の有する問題点に鑑みて提案され
たもので、その目的とする処は、建入精度が高く、効率
がよく、省力化が図られるとともに安全性が向トされる
仮支柱建入工法及び装置を提供する点にある。
The present invention has been proposed in view of the problems of the prior art described above, and its purpose is to achieve high construction accuracy, high efficiency, labor saving, and improved safety. The purpose of this invention is to provide a method and equipment for constructing pillars.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係る仮支柱建入工
法は、地盤に仮支柱建入孔を掘削するとともに、同孔底
部にコンクリートを打設し、前記建入孔に臨む地盤面に
架台を設置し、次いで部材表面に袋ナツトが装架された
仮支柱を前記建入孔に吊込むとともに、前記架台に仮支
持し、次いで下端にねじ部を有する接続棒鋼が上端面よ
り垂直に螺挿され、且つ下端部に前記仮支柱に可摺動的
に接触するガイド部材が垂設されたヤツトコを、同ガイ
ド部材を案内として前記仮支柱上に吊下ろすとともに、
上端部より前記接続棒鋼を甥回してその下端ねじ部を前
記仮支柱の袋ナツトに螺着し、次いで前記ヤツトコ及び
仮支柱を前記建入孔内に吊下げて同孔底部の未硬化コン
クリート中に前記仮支柱を挿入し、次いで同コンクリー
トの硬化後、前記接続用螺桿を逆方向に螺回して前記袋
ナツトとの螺着を解除したのち、前記ヤツトコを吊上げ
撤去することを特徴とするものである。
(Means for Solving the Problems) In order to achieve the above object, the temporary support construction method according to the present invention involves excavating a temporary support installation hole in the ground, and pouring concrete at the bottom of the hole. A pedestal is installed on the ground facing the construction hole, and then a temporary support with a cap nut attached to the surface of the member is suspended into the construction hole, temporarily supported by the pedestal, and then a threaded portion is attached to the lower end. A rod having a connection bar having the same structure is screwed vertically from the upper end surface, and a guide member that slidably contacts the temporary support is hung at the lower end of the rod, and the rod is suspended over the temporary support using the guide member as a guide. As you lower it,
Turn the connecting steel bar from the upper end and screw the lower end threaded part into the cap nut of the temporary support, then suspend the rod and temporary support into the construction hole and insert it into the unhardened concrete at the bottom of the hole. The temporary support is inserted into the concrete, and then, after the concrete has hardened, the connecting screw is screwed in the opposite direction to release the screw from the cap nut, and the rod is lifted up and removed. It is.

また本発明に係る仮支柱建入装置は、仮支柱建入孔に臨
む地盤面に設置された仮支柱の仮止用架台と、部材表面
に袋ナツトが装架された仮支柱と、下端部に前記袋ナツ
トに螺着するねじ部を有する接続棒鋼が上端面より垂直
に螺挿され、且つ下端部に前記仮支柱に可摺動的に接触
するガイド部材が垂設されたヤツトコとより構成されて
いる。
Further, the temporary support installation device according to the present invention includes a temporary support mount installed on the ground surface facing the temporary support installation hole, a temporary support with a cap nut mounted on the surface of the member, and a lower end portion of the temporary support support. A connecting steel bar having a threaded portion that is screwed onto the cap nut is screwed vertically from the upper end surface, and a guide member that slidably contacts the temporary support is provided vertically at the lower end. has been done.

仮支柱の建入精度をよくするために、前記架台には互い
に直交するX、Y方向に夫々水平移動自在なX方向、及
びY方向各仮支柱位置調整用横架材が装架されている。
In order to improve the construction accuracy of the temporary support, horizontal members for adjusting the position of the temporary support in the X and Y directions, which are horizontally movable in the X and Y directions perpendicular to each other, are mounted on the frame. .

また前記ヤツトコはその頂部に、軸心の対称位置に、接
続棒鋼挿入孔が穿設された接続棒鋼固定用ピースが配設
されている。
Further, on the top of the rod, a piece for fixing the connecting rod is provided, which has a connecting rod insertion hole drilled at a symmetrical position of the axis.

更に接続棒鋼の上端には、前記ヤツトコの固定ピースに
対する固定ナツトの螺着用ねじ部と、接続棒鋼回動用工
具の係止部が設けられる。
Further, the upper end of the connecting bar is provided with a screw portion for screwing a fixing nut into the fixing piece of the rod and a locking portion for a tool for rotating the connecting bar.

(作用) 本発明においては前記したように、仮支柱建入孔に臨む
地盤面に架台を設置し、前記建入孔内に、部材表面に袋
ナツトが装架された仮支柱を吊込んで前記架台に仮支持
し、同仮支柱上にヤツトコをその下端部に垂設され仮支
柱に可摺動的に接触するガイド部材を介して吊下ろし、
前記ヤツトコの上端面に垂直に螺挿された接続棒鋼を螺
回して前記仮支柱の部材表面に装架された袋ナラ1−に
螺着することによって、仮支柱はヤツトコに正確に垂直
に接続される。
(Function) As described above, in the present invention, a frame is installed on the ground facing the temporary support installation hole, and a temporary support with a cap nut mounted on the member surface is suspended into the installation hole. Temporarily supported on the pedestal, and suspended from the temporary support via a guide member that is suspended from the lower end and slidably contacts the temporary support;
The temporary support is connected to the support exactly perpendicularly by screwing a connecting steel bar screwed vertically into the upper end surface of the support and screwing it into the hollow nut 1- installed on the surface of the member of the temporary support. be done.

この状態で前記ヤツトコ及び仮支柱を前記建入孔内に吊
下ろし、同孔底部の未硬化コンクリート中に前記仮支柱
を挿入し、同コンクリートの硬化を待って前記仮支柱を
建入孔内に固定する。
In this state, the above-mentioned Yatsutoko and temporary support are suspended into the construction hole, the temporary support is inserted into the unhardened concrete at the bottom of the hole, and after the concrete hardens, the temporary support is inserted into the construction hole. Fix it.

しかるのち、前記ヤツトコの頂部より接続鋼棒を前とは
反対方向に鯉回して、同接続鋼棒を前記袋ナツトより取
外すことによって、前記ヤツトコと仮支柱との接合を解
除し、同ヤツトコのみ吊上げ撤去し、前記建入孔に対す
る仮支柱の建込を完了するものである。
After that, the connecting steel rod is rotated from the top of the rod in the opposite direction to the previous direction, and the connecting steel rod is removed from the cap nut to release the connection between the rod and the temporary support, and only the rod is removed. It will be hoisted up and removed, and the erection of temporary supports for the construction hole will be completed.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

地盤に仮支柱建入孔(1)を掘削し、回礼(+)の底部
にコンクリート(2)を打設し、前記建入孔(1)に臨
んで地盤面に仮支柱建入用の架台(A)を設置する。
Drill a temporary support installation hole (1) in the ground, pour concrete (2) at the bottom of the circumference (+), and install a frame for temporary support installation on the ground facing the construction hole (1). Install (A).

(第1A図参照) 図中(3)はケーシングである。(See Figure 1A) (3) in the figure is the casing.

前記架台(A)は第2図及び第3図に示すように、脚部
に架台レベル調節ジヤツキ(4)が装架され、上部には
X方向の建入位置調整用横架材(5)がX方向に水平に
移動自在に装架され、同横架材(5)トにX方向の建入
位置調整用横架材(6)がX方向に水平に移動自在に装
架されている。
As shown in Figs. 2 and 3, the pedestal (A) has pedestal level adjustment jacks (4) mounted on its legs, and a horizontal member (5) for adjusting the construction position in the X direction on its upper part. is installed so as to be movable horizontally in the X direction, and a horizontal member (6) for adjusting the construction position in the X direction is installed on the horizontal member (5) so as to be freely movable horizontally in the X direction. .

而して前記ジヤツキ(4)によって架台(A)のレベル
を調整したのち、X方向及びY方向各建入位置調整用横
架材(5)(6)を移動調整してヤツトコの中心軸線よ
りヤツトコ断面の1/2よりやや大きいめのx、y位置
に固定する。
After adjusting the level of the pedestal (A) using the jack (4), move and adjust the horizontal members (5) and (6) for adjusting the construction position in the X and Y directions so that they are aligned with the center axis of the frame. Fix it at an x and y position that is slightly larger than 1/2 of the cross section.

次いでクレーンによってH形鋼製の仮支柱(B)を前記
横架材(5)(6)の中に、頭部が同横架材(5)(6
)より約1m突出するように挿入し、第4図及び第5図
に示すようにウェッブに設けた透孔(7)にかんざし棒
鋼(8)を挿入して前記横架材(6)に係止し、前記架
台(A)に仮支柱(B)を仮止めする。(第1B図参照
) なお前記仮支柱(B)には軸心に対して点対称位置に、
後述のヤツトコに装架された接続棒鋼に対応する部位に
おいて袋ナツト(9)が溶着されている。
Next, a temporary support (B) made of H-beam steel is placed into the horizontal members (5) and (6) by a crane, so that the head part of the horizontal member (5) and (6)
), and as shown in Figures 4 and 5, insert the hairpin bar (8) into the through hole (7) provided in the web to engage the horizontal member (6). and temporarily fix the temporary support (B) to the pedestal (A). (See Figure 1B) The temporary support (B) has a point symmetrical position with respect to the axis.
A cap nut (9) is welded to a portion corresponding to a connecting steel bar mounted on the shaft, which will be described later.

(第4図及び第5図参照) 次いでヤツトコ(C)を仮支柱(B)上に吊下ろす。(See Figures 4 and 5) Next, hang the Yatsutoko (C) onto the temporary support (B).

同ヤツトコ(C)は前記仮支柱(B)と同一断面のH形
鋼より構成され、頂部には軸心と点対称位置に、接続棒
鋼挿入孔00が穿設された接続棒鋼固定用ピース(11
)が溶着され、また相対するフランジの上端部対向面に
は、ウェブ両側に前記仮支柱(B)のフランジ面に可摺
動的に接触する溝型鋼製のガイド部材02)が垂設され
ている。(第6図乃至第9図参照) 図中面は吊フックである。
The same rod (C) is made of H-beam steel with the same cross section as the temporary support (B), and the connection bar fixing piece ( 11
) are welded, and guide members 02) made of grooved steel are vertically installed on both sides of the web to slidably contact the flange surfaces of the temporary struts (B). ing. (See Figures 6 to 9) The surface in the figure is a hanging hook.

而して前記ヤツトコ(C)の接続棒鋼固定用ピース(1
1)の接続棒鋼挿入孔00)には接続棒鋼CD)を挿貫
し、前記ピース(11)に固定する。
Then, the connecting steel bar fixing piece (1
A connecting rod CD) is inserted into the connecting rod insertion hole 00) of 1) and fixed to the piece (11).

前記接続棒鋼(D)は、下端に前記袋ナツト(9)に対
する螺着用の下端ねじ部04が設けられ、−上部には前
記ピース(11)に支持ナツトθつを介して固定される
上部ねじ部θ0が設けられ、上端部には扁平部に成形さ
れたスパナ−の如き回動工具の係止部Q′7)が設けら
れている。図中側は座金である。(第1O図乃至第12
図参照) 而して接続棒鋼(D)を装架したヤツトコ(C)はガイ
ド部材(12)によって案内され、前記仮支柱(B)上
に吊下ろされ、前記接続棒鋼(D)を回動して下端ねじ
部04を仮支柱(B)の袋ナツト(9)に螺着し、接続
棒1 (D)の上部ねじ部0ωを支持ナツト0ωで緊締
して接続棒鋼固定用ピース(11)に固定することによ
って、前記ヤツトコ(C)と仮支柱(B)とは精確に垂
直に接続される。(第1C図及び第6図参11q )な
おこの際、予め前記架台(A)のレベルを測定して、支
持ナツト0ωにより仮支柱(B)の天端が所定の高さに
なるように、接続棒11n(n)の長さを調整しておく
The connecting steel bar (D) is provided with a lower end screw portion 04 for screwing into the cap nut (9) at the lower end, and an upper screw portion fixed to the piece (11) via two support nuts θ. A portion θ0 is provided, and a locking portion Q'7) for a rotary tool such as a spanner is provided at the upper end portion. The side in the figure is the washer. (Figures 1O to 12
(See figure) The rod (C) on which the connecting steel bar (D) is mounted is guided by the guide member (12), suspended on the temporary support (B), and rotates the connecting steel bar (D). Then, screw the lower end threaded part 04 into the cap nut (9) of the temporary support (B), tighten the upper threaded part 0ω of the connecting rod 1 (D) with the support nut 0ω, and attach the connecting bar fixing piece (11). By fixing it to , the support (C) and the temporary support (B) are precisely connected vertically. (See Figure 1C and Figure 6 11q) At this time, measure the level of the pedestal (A) in advance, and use the support nut 0ω to ensure that the top of the temporary support (B) is at a predetermined height. Adjust the length of the connecting rod 11n(n) in advance.

かくしてヤツトコ(C)と仮支柱(B)とを接合したの
ち、クレーンによって両者を吊トげ、かんざし棒1ii
1(8)を架台(^)における前記横架材(6)より上
方に隔離させて抜取り、しかるのちヤツトコ(C)の頭
部が前記横架材(6)に接触するまで吊下げて仮支柱(
B)を未硬化コンクリート(2)中に挿入する。
After joining the Yatsutoko (C) and the temporary support (B) in this way, they were both hoisted up by a crane and the hairpin 1ii
1 (8) is isolated above the horizontal member (6) on the frame (^) and removed, and then suspended until the head of the robot (C) comes into contact with the horizontal member (6). Pillar (
B) is inserted into uncured concrete (2).

(第1D図参照) 而して同コンクリートが硬化すると、地上部で前記接続
棒鋼(D)をスパナ−を介して前とは反対方向に螺回し
て袋ナツト(9)より取外し、ヤツトコ(C)を吊上げ
、(第1E図参照)前記架台(八)を次の場所に設置す
るとともに、前記ヤツトコ(C)を再使用する。
(See Figure 1D) When the concrete hardens, the above-mentioned connecting steel bar (D) is removed from the cap nut (9) by screwing it in the opposite direction using a spanner at the above-ground level. ) (see Figure 1E) and install the pedestal (8) at the next location, and reuse the holder (C).

(発明の効果) 本発明によれば仮支柱には袋ナツトを取付け、ヤツトコ
頂部には同袋ナツトに螺着する下端ねじ部を有する接続
棒鋼を垂直に螺挿し、同ヤツトコを下部に垂設したガイ
ド部材を案内として仮支柱建入孔に吊込まれ、且つ架台
に仮支持された前記仮支柱上に吊下ろし、前記接続棒鋼
を螺回してその下端ねじ部を前記袋ナウトに螺着し、仮
支柱をヤツI・コに接続棒鋼を介して懸吊された状態で
仮支柱建入孔に吊込むので建入れ精度がよい。
(Effects of the Invention) According to the present invention, a cap nut is attached to the temporary support, a connecting bar having a lower end threaded portion that is screwed into the cap nut is vertically screwed into the top of the pole, and the pole is hung down at the bottom. Using the guide member as a guide, the temporary support is suspended in the temporary support installation hole and suspended onto the temporary support that is temporarily supported by the frame, and the connecting steel bar is screwed to screw the lower end threaded portion into the cap nut. The installation accuracy is good because the temporary support is suspended through the steel bar connected to the I/C and then hung into the temporary support installation hole.

また仮支柱の建入が終了すると、ヤツトコのE部から接
続棒鋼を反対方向に螺回して前記袋ナツトより取外し、
ヤツトコを吊−Lげ除去するようにしているので仮支柱
建入孔に入る作業がなくなり安全であり、ヤツトコと仮
支柱との接続、解体はヤツトコ上部における接続棒鋼の
回動作業だけでよいので、作業が簡単で高能率である。
When the construction of the temporary support is completed, the connecting steel bar is screwed in the opposite direction from the E section of the Yatsutoko and removed from the cap nut.
Since the Yatsutoko is lifted and removed, there is no need to enter the temporary support installation hole, making it safer. Connection and disassembly of the Yatsutoko and the temporary support only requires rotating the connecting steel bar at the top of the Yatsutoko. , easy to work and high efficiency.

更に本発明によればヤツトコの製作本数は1本ですみ、
接続棒鋼を数種類製作するだけでよいので、極めて経済
的である。
Furthermore, according to the present invention, only one Yatsutoko can be produced.
It is extremely economical because it is only necessary to manufacture several types of connecting steel bars.

請求項2の発明は前記架台と、部材表面に袋ナツトが装
架された仮支柱と、同袋ナツト螺着用ねじ部を下端に有
する接続棒鋼が上端部より垂直に螺挿され、且つ下部よ
り前記仮支柱に可IH動的に接触するガイド部材が垂設
されたヤツトコとによって仮支柱建入装置を構成したこ
とによって前記仮支柱建入工法を効率よ(遂行しうるち
のである。
The invention according to claim 2 is characterized in that the above-mentioned frame, a temporary support having a cap nut mounted on the surface of the member, and a connecting steel bar having a screw portion for screwing the cap nut at the lower end are screwed vertically from the upper end, and from the lower part. The temporary support construction method can be carried out efficiently by configuring a temporary support installation device with a guide member vertically attached to the temporary support that makes dynamic contact with the temporary support.

請求項3の発明は、前記架台に互いに直交するX、X方
向に夫々水平移動自在なX方向及びY方向各仮支柱位置
調整用横架材を装架したことによって、仮支柱の柱芯位
置を正確に決めることができる。
The invention according to claim 3 is characterized in that the column center position of the temporary support is adjusted by mounting horizontal members for adjusting the position of the temporary support in the X and Y directions, which are horizontally movable in the X and X directions perpendicular to each other. can be determined accurately.

請求項4の発明は、前記ヤツトコの頂部において軸心と
対称位置に接続棒鋼挿入孔が穿設された接続棒鋼固定用
ピースを配設したことによって、同t!続棒鋼を介して
前記ヤツトコより仮支柱を正確に垂直に懸垂しうるよう
にしたものである。
According to the fourth aspect of the invention, a connection bar fixing piece having a connection bar insertion hole drilled at a position symmetrical to the axis is disposed on the top of the rod, so that the same t! The temporary support can be accurately suspended vertically from the above-mentioned rod via the connecting steel bar.

請求項5の発明は前記接続棒鋼の上端に、前記ヤツトコ
の固定ピースに対する支持ナツトの螺着用上部ねじ部と
、接続棒鋼回動用工具の係止部とを設けたことにより、
接続棒鋼の螺回による仮支柱とヤツトコと接続、解体作
業が容易に行なわれるようにしたものである。
The invention according to claim 5 provides an upper end of the connecting bar with an upper screw portion for screwing a support nut onto the fixing piece of the yutoko, and a locking portion of a tool for rotating the connecting bar.
This makes it easy to connect the temporary support to the YATSUTOKO by screwing the connecting steel bar, and to easily perform dismantling work.

【図面の簡単な説明】[Brief explanation of the drawing]

第1A図乃至第1E図は本発明に係る仮支柱建入工法の
一実施例の1程を示す縦断面図、第2図及び第3図は夫
々架台の正面図波に平面図、第4図及び第5図は夫々仮
支柱の部分正面図波に平面図、第6図はヤツトコと仮支
柱との接合部を示す正面図、第7図はヤツトコの平面図
、第8図はその部分側面図、第9図は第6図の矢視IX
−IX図、第1θ図及び第11図波に第12図は夫々接
続棒鋼の正面図及び平面図波に底面図、第13図及び第
14図は夫々架台におけるヤツトコのセット部分を示す
縦断面図波に平面図第15A図乃至15E図は従来の仮
支柱建入工法の工程を示す縦断面図、第16図は従来工
法における架台に対するヤツトコのセット部分を示す縦
断面図、第17図は第16図の矢視X■−X■図である
。 (A)−・架台      (B)・−・仮支柱(C)
・−ヤツトコ    (D)−・−接続棒鋼(]]l−
−仮仮支柱孔大孔 (2)−コンクリート(5)−・X
方向の建入位置調整横架材(6)−・Y方向の建入位置
調整横架材(9)−袋ナツト     (llI)−接
続棒鋼挿入孔(11)−一接続棒鋼固定用ビース 0クーガイド部材 Q4)・−接続棒鋼の下端ねじ部 θつ・・ナツト 0ω−接続棒鋼の上部ねじ部 0力・−回動工具の係上部 代理人 弁理士 岡 本 重 文 外2名 肩4固 躬11囚 渭13区
Figures 1A to 1E are vertical sectional views showing a first embodiment of the temporary support construction method according to the present invention, Figures 2 and 3 are a front view of the frame, a plan view, and 5 and 5 are respectively partial front views and plan views of the temporary support, FIG. 6 is a front view showing the joint between the Yatsutoko and the temporary support, FIG. 7 is a plan view of the Yatsutoko, and FIG. 8 is its part. Side view, Figure 9 is taken from arrow IX in Figure 6.
Figures -IX, 1θ, and 11 are the front and bottom views of the connecting steel bar, respectively, and Figures 13 and 14 are longitudinal cross-sections showing the set portion of the rod in the frame, respectively. Figures 15A to 15E are vertical cross-sectional views showing the steps of the conventional temporary support construction method, Figure 16 is a vertical cross-sectional view showing the setting part of the support for the frame in the conventional construction method, and Figure 17 is the plan view. 16 is a view taken along arrows X■-X■ in FIG. 16. (A) - Frame (B) - Temporary support (C)
・-Yatsutoko (D)--Connection bar (]]l-
- Large temporary support hole (2) - Concrete (5) - X
Horizontal frame member (6) for adjusting the erection position in the Y direction - Horizontal frame member (9) for adjusting the erection position in the Y direction - Cap nut (lll) - Connection bar insertion hole (11) - Bead 0 for fixing the connection steel bar Guide member Q4) - Lower end threaded part of the connecting bar θ - Nut 0 ω - Upper threaded part of the connecting bar 0 force - Agent for the rotating tool section Patent attorney Shige Okamoto 2 people outside the text Shoulder 4 Rigidity 11 Prisoner Wei 13th District

Claims (5)

【特許請求の範囲】[Claims] (1)地盤に仮支柱建入孔を掘削するとともに、同孔底
部にコンクリートを打設し、前記建入孔に臨む地盤面に
架台を設置し、次いで部材表面に袋ナットが装架された
仮支柱を前記建入孔に吊込むとともに、前記架台に仮支
持し、次いで下端にねじ部を有する接続棒鋼が上端面よ
り垂直に螺挿され、且つ下端部に前記仮支柱に可摺動的
に接触するガイド部材が垂設されたヤツトコを、同ガイ
ド部材を案内として前記仮支柱上に吊下ろすとともに、
上端部より前記接続棒鋼を螺回してその下端ねじ部を前
記仮支柱の袋ナットに螺着し、次いで前記ヤツトコ及び
仮支柱を前記建入孔内に吊下げて同孔底部の未硬化コン
クリート中に前記仮支柱を挿入し、次いで同コンクリー
トの硬化後、前記接続用螺桿を逆方向に螺回して前記袋
ナットとの螺着を解除したのち、前記ヤツトコを吊上げ
撤去することを特徴とする仮支柱建入工法。
(1) A temporary support installation hole was excavated in the ground, concrete was poured at the bottom of the hole, a frame was installed on the ground facing the construction hole, and cap nuts were then installed on the surface of the member. A temporary support is suspended into the construction hole and temporarily supported on the frame, and then a connecting steel bar having a threaded portion at the lower end is screwed vertically from the upper end surface, and a lower end is slidably attached to the temporary support. Suspend the rod on which a guide member that comes into contact with is suspended above the temporary support using the guide member as a guide,
The connecting steel bar is screwed from the upper end, and its lower end threaded part is screwed into the cap nut of the temporary support, and then the rod and the temporary support are suspended in the construction hole and inserted into the unhardened concrete at the bottom of the hole. The temporary support is inserted into the concrete, and then, after the concrete has hardened, the connection screw is screwed in the opposite direction to release the screw connection with the cap nut, and the support is lifted up and removed. Pillar construction method.
(2)仮支柱建入孔に臨む地盤面に設置された仮支柱の
仮止用架台と、部材表面に袋ナットが装架された仮支柱
と、下端部に前記袋ナットに螺着するねじ部を有する接
続棒鋼が上端面より垂直に螺挿され、且つ下端部に前記
仮支柱に可摺動的に接触するガイド部材が垂設されたヤ
ツトコとよりなることを特徴とする仮支柱建入装置。
(2) A temporary support frame installed on the ground facing the temporary support installation hole, a temporary support with a cap nut mounted on the member surface, and a screw screwed into the cap nut at the lower end. A temporary support structure characterized in that a connecting steel bar having a section is screwed vertically from an upper end surface, and a guide member is suspended from a lower end portion to slidably contact the temporary support support. Device.
(3)前記架台には互いに直交するX、Y方向に夫々水
平移動自在なX方向、及びY方向各仮支柱位置調整用横
架材が装架された請求項2記載の仮支柱建入装置。
(3) The temporary support erecting device according to claim 2, wherein horizontal members for adjusting the position of the temporary support in the X and Y directions, which are horizontally movable in the X and Y directions perpendicular to each other, are mounted on the frame. .
(4)前記ヤツトコの頂部には、軸心の対称位置に、接
続棒鋼挿入孔が、穿設された接続棒鋼固定用ピースが配
設された請求項2記載の仮支柱建入装置。
(4) The temporary support erecting device according to claim 2, wherein a connecting rod fixing piece having connecting rod insertion holes drilled at symmetrical positions of the axis is disposed on the top of the rod.
(5)前記接続棒鋼の上端には、前記ヤツトコにおける
固定ピースに対する支持ナットの螺着用ねじ部と、接続
棒鋼回動用工具の係止部とを具えた請求項2記載の仮支
柱建入装置。
(5) The temporary support erecting device according to claim 2, wherein the upper end of the connecting bar is provided with a threaded portion for screwing a support nut into the fixing piece in the rod and a locking portion for a tool for rotating the connecting bar.
JP22122788A 1988-09-06 1988-09-06 Temporary post erection method and device Pending JPH0270822A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22122788A JPH0270822A (en) 1988-09-06 1988-09-06 Temporary post erection method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22122788A JPH0270822A (en) 1988-09-06 1988-09-06 Temporary post erection method and device

Publications (1)

Publication Number Publication Date
JPH0270822A true JPH0270822A (en) 1990-03-09

Family

ID=16763462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22122788A Pending JPH0270822A (en) 1988-09-06 1988-09-06 Temporary post erection method and device

Country Status (1)

Country Link
JP (1) JPH0270822A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04185815A (en) * 1990-11-19 1992-07-02 Mitani Sekisan Co Ltd Regulating method and guider for horizontal direction of structural core column
JP2016113775A (en) * 2014-12-12 2016-06-23 ジャパンパイル株式会社 Pile pedestal device
CN108775153A (en) * 2018-05-22 2018-11-09 浙江省送变电工程有限公司 Conduit lifting device and method for the perfusion of power transmission tower concrete filled steel tube high-altitude

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58218515A (en) * 1982-06-09 1983-12-19 Takenaka Komuten Co Ltd Method and apparatus for erecting structural center pillar at reverse-casting time
JPS5938377A (en) * 1982-08-26 1984-03-02 Canon Inc Plasma cvd device
JPS6153915A (en) * 1984-08-22 1986-03-18 Marufuji Shiitopairu Kk Method of driving down sheathing material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58218515A (en) * 1982-06-09 1983-12-19 Takenaka Komuten Co Ltd Method and apparatus for erecting structural center pillar at reverse-casting time
JPS5938377A (en) * 1982-08-26 1984-03-02 Canon Inc Plasma cvd device
JPS6153915A (en) * 1984-08-22 1986-03-18 Marufuji Shiitopairu Kk Method of driving down sheathing material

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04185815A (en) * 1990-11-19 1992-07-02 Mitani Sekisan Co Ltd Regulating method and guider for horizontal direction of structural core column
JPH089866B2 (en) * 1990-11-19 1996-01-31 三谷セキサン株式会社 Horizontal adjustment method for structural columns
JP2016113775A (en) * 2014-12-12 2016-06-23 ジャパンパイル株式会社 Pile pedestal device
CN108775153A (en) * 2018-05-22 2018-11-09 浙江省送变电工程有限公司 Conduit lifting device and method for the perfusion of power transmission tower concrete filled steel tube high-altitude

Similar Documents

Publication Publication Date Title
CN108999394B (en) Construction process of floor type scaffold rotary cantilever type scaffold
CN109138457B (en) Support system for installing prefabricated building and construction method thereof
JP2011001717A (en) Method for connecting precast column and foundation, and temporary receiving frame
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
KR20110010247A (en) Multi u-head support apparatus for bridge construction
JPH0270822A (en) Temporary post erection method and device
CN216616848U (en) Beam plate post-cast strip supporting and mold sealing structure
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
CN112681732A (en) Supporting system of assembled composite membrane shell beam and construction method thereof
JP3436104B2 (en) Steel pipe construction method
JP2001311247A (en) Construction method for concrete structure
CN110847529A (en) Simple to operate's pin-connected panel railing
CN220814906U (en) Scaffold for cast-in-situ stairs
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
JPH0371537B2 (en)
KR200322141Y1 (en) Temporary apparatus support structure for pier of bridge
JP7470011B2 (en) Method for constructing underground structures and lifting equipment
CN214885399U (en) Adjustable operation construction equipment of steel column
KR102361789B1 (en) Supporter for installating horizontal member of supporting system
CN215484786U (en) Be used for pre-buried stop device of rag bolt
CN209891088U (en) Bailey beam traction device
CN210003017U (en) But adopt prefabricated construction of concrete prefabricated section to enclose fender
KR100458945B1 (en) temporary bracket for construction of precast concrete beam bridge and the installation method using the same
JPH10299004A (en) Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column