KR20110010248A - Multi u-head bracket apparatus for bridge construction - Google Patents
Multi u-head bracket apparatus for bridge construction Download PDFInfo
- Publication number
- KR20110010248A KR20110010248A KR1020090067702A KR20090067702A KR20110010248A KR 20110010248 A KR20110010248 A KR 20110010248A KR 1020090067702 A KR1020090067702 A KR 1020090067702A KR 20090067702 A KR20090067702 A KR 20090067702A KR 20110010248 A KR20110010248 A KR 20110010248A
- Authority
- KR
- South Korea
- Prior art keywords
- head
- bridge
- screw thread
- horizontal member
- thread
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
The present invention relates to a bracket device for supporting the yoke material for slab and cantilever formwork of the bridge in the construction of the bridge, the bridge is easy to move and use, free to install and dismantle, high bridge ratio It relates to a multi-head bracket device.
Bridge construction is a large-scale construction that involves a lot of manpower and time. When looking at the construction process, after constructing the abutment and the pier, which is the pillar part, a plurality of main girders are arranged in parallel between the piers and the piers. Install it. Then, after constructing the supporting beams with steel frame on the housing, the construction of slab and cantilever, which is the bottom plate of the bridge, is started.
The slab construction first installs temporary equipment such as scaffolding, supports, lumber and yoke for supporting loads such as formwork and concrete between parallel housings. Subsequently, after installing the formwork on the support and the yoke, etc., the reinforcing bar is reinforced. Finally, the concrete is poured and cured.
The support device and the bracket device for supporting the yoke material for the slab formwork of the conventional bridge as described above in the installation of the fixture between the housing, the torch (torch) in the field according to the required dimensions of the steel pipe or steel pipe And the like, and a method of fixing the temporary fixture by attaching a bolt or the like to the housing is mainly used.
The support device and the bracket device for supporting the yoke material for the slab formwork of the conventional bridges are a lot of waste of steel materials such as steel pipes or square pipes, and the risk of accidents is high due to the construction process such as cutting and welding.
In addition, if the skill of the skilled worker is not guaranteed, it takes a lot of construction time and difficult to secure the construction quality, there is a disadvantage that is uneconomical low lease rate to reuse the installed fixtures.
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems of the related art.
The purpose is to provide an economical multi-head bracket device for bridge construction, which is easy to install and dismantle, safe and high in ratio in the yoke-supporting bracket device for the slab formwork of the bridge.
In order to solve the above technical problem, the present invention is a bracket device for supporting the yoke for the slab formwork of the bridge,
The bracket device is formed in the center of the
In the shape of a horn in the horizontal direction of the upper and lower openings, the
According to the present invention, the following effects are expected.
First, multi-head brackets for bridge construction using multi-heads that can be easily adjusted by using a male threaded rod formed with opposite threads on the upper and lower surfaces of the upper and lower parts with large rotations, resulting in large vertical displacement. Provide a device.
Second, there is no waste of steel materials such as steel pipes or square tubes by using the ready-made bracket device, and the construction process such as cutting and welding is omitted, thereby providing a multi-head bracket device for bridge workers using less risk of accidents.
Third, even if the skill of the skilled worker is not guaranteed, it does not require a lot of construction time and provides a bridge construction multi-head bracket device for the construction quality secured.
Fourth, it provides a high economic ratio multi-head bracket device for bridge construction for high reuse rate to reuse the installed fixtures.
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.
1 is an exploded perspective view showing a multi-head used in the multi-head bracket device for a bridge engineer of the present invention, Figure 2 is an exploded perspective view showing a multi-head head bracket device for a bridge engineer of the present invention.
In the bracket device for supporting the yoke material for the slab formwork of the bridge, the multi-head bracket device for a bridge worker of the present invention, the multi-head (100); And a bracket (60).
The multi-head 100,
The
The male threaded
Although the
The upper head (20) is a portion in which the yoke member supporting the slab form is mounted, the U-shaped
The lower head 40 has a screw hole in the upper surface thereof, and the
The
In the shape of a horn in the horizontal direction of the upper and lower openings, the
The
The
The length of the pedestal 66 is similar to the length of one end spanning the dwelling of the
The other end of the
Hereinafter, an implementation method of the first embodiment will be described.
After finishing the construction of bridges, shifts and housing bridges, prior to the formwork of slabs, the pair of multi-head bracket devices for bridge construction of the present invention face each other on the vertical surfaces of the bridge housing housings and housing bridges. Insert and install.
Subsequently, the yoke material is temporarily fixed to the
After installing the slab formwork, by adjusting the
Hereinafter, the implementation method of the second embodiment will be described.
After completing the construction of bridges, bridges and housings, prior to the cantilever formwork, the multi-head bracket device for bridge constructions of the present invention is installed in the vertical vertical side of the housings of the bridges.
Subsequently, the yoke material is temporarily fixed to the upper side of the
After installing the slab formwork, by adjusting the
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention. Therefore, the claims of the present invention include modifications and variations that fall within the true scope of the invention.
1 is a perspective view showing a multi-head used in the multi-head bracket device for a bridge construction for the present inventors.
2 is an exploded perspective view showing a multi-head bracket device for a bridge construction for the present inventors.
<Explanation of symbols for the main parts of the drawings>
10: male thread rod 12: height adjustment bar
14: Upper thread mount 16: Lower thread mount
18: fixing nut 20: upper oil head
22: U-head channel 24: saturation pipe
30: lower head 40: bracket
61: horizontal member 62: vertical member
64: inclined material 66: pedestal
70: handrail mount 80: fixing device
100: M-head
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090067702A KR20110010248A (en) | 2009-07-24 | 2009-07-24 | Multi u-head bracket apparatus for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090067702A KR20110010248A (en) | 2009-07-24 | 2009-07-24 | Multi u-head bracket apparatus for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20110010248A true KR20110010248A (en) | 2011-02-01 |
Family
ID=43770813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090067702A KR20110010248A (en) | 2009-07-24 | 2009-07-24 | Multi u-head bracket apparatus for bridge construction |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20110010248A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278682A (en) * | 2014-10-29 | 2015-01-14 | 浙江博雷重型机床制造有限公司 | Sway brace support for foundation pit protecting plate |
CN104294828A (en) * | 2014-10-29 | 2015-01-21 | 浙江博雷重型机床制造有限公司 | Supporting structure of foundation pit |
KR20190044332A (en) * | 2017-10-20 | 2019-04-30 | 롯데건설 주식회사 | The system supporting post for supporting hunch |
CN109972527A (en) * | 2019-04-24 | 2019-07-05 | 中铁十二局集团有限公司 | A kind of pump pipe fixing device and bridge pier shaft suitable for bridge pier shaft |
KR102513956B1 (en) * | 2022-10-19 | 2023-03-27 | (주)대우강건 | Bracket structure for bridge construction |
KR102590046B1 (en) * | 2023-06-22 | 2023-10-18 | 주식회사 에이치와이코넨 | Slab support device and slab construction method using the same |
-
2009
- 2009-07-24 KR KR1020090067702A patent/KR20110010248A/en not_active Application Discontinuation
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278682A (en) * | 2014-10-29 | 2015-01-14 | 浙江博雷重型机床制造有限公司 | Sway brace support for foundation pit protecting plate |
CN104294828A (en) * | 2014-10-29 | 2015-01-21 | 浙江博雷重型机床制造有限公司 | Supporting structure of foundation pit |
CN104294828B (en) * | 2014-10-29 | 2016-01-27 | 浙江博雷重型机床制造有限公司 | A kind of foundation pit supporting construction |
CN104278682B (en) * | 2014-10-29 | 2016-05-11 | 浙江博雷重型机床制造有限公司 | A kind of bearing diagonal support of foundation ditch backplate |
KR20190044332A (en) * | 2017-10-20 | 2019-04-30 | 롯데건설 주식회사 | The system supporting post for supporting hunch |
CN109972527A (en) * | 2019-04-24 | 2019-07-05 | 中铁十二局集团有限公司 | A kind of pump pipe fixing device and bridge pier shaft suitable for bridge pier shaft |
CN109972527B (en) * | 2019-04-24 | 2024-01-30 | 中铁十二局集团有限公司 | Pump pipe fixing device suitable for bridge pier shaft and bridge pier shaft |
KR102513956B1 (en) * | 2022-10-19 | 2023-03-27 | (주)대우강건 | Bracket structure for bridge construction |
KR102590046B1 (en) * | 2023-06-22 | 2023-10-18 | 주식회사 에이치와이코넨 | Slab support device and slab construction method using the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101011417B1 (en) | System Formwork for FSM | |
KR20110010248A (en) | Multi u-head bracket apparatus for bridge construction | |
JP4929331B2 (en) | Steel frame exposed column base construction method | |
KR101131079B1 (en) | Multi U-head Support Apparatus For Bridge Construction | |
CN110656762A (en) | Three-section type pull rod overhanging outer scaffold and construction method thereof | |
JP2006312869A (en) | Form support mechanism and placing method | |
KR200226626Y1 (en) | Bracket for Supporting Flooring Slab Form of Bridge | |
JP6821853B1 (en) | Formwork support structure | |
JP2014190116A (en) | Construction method of concrete slab | |
CN218668525U (en) | A assembled device that is used for steel construction building board of encorbelmenting to support | |
JP3189564U (en) | Fall prevention fence for concrete structures | |
KR100946192B1 (en) | Apparatus for removing and coupling forms | |
JP2008267030A (en) | Method and device for supporting anchor bolt for building structure | |
KR20120003729U (en) | System support Head | |
JP3602479B2 (en) | Bridge deck slab mounting structure | |
KR200392341Y1 (en) | Fixing Device for Aerial Scaffolding | |
KR100357488B1 (en) | A table form system with an additional beam form | |
KR100840279B1 (en) | Suspension hanger for slab form | |
KR20020001480A (en) | Steel form for slab concrete applicable to P.C. beam or Steel Box methods | |
CN112962945A (en) | Corner bracket structure and construction method | |
KR100433700B1 (en) | Mold system for slab concrete of bridge | |
JP5812554B1 (en) | Mounting bracket and mounting structure for strut mooring | |
KR100924522B1 (en) | Hull block edge clamp | |
KR102059081B1 (en) | Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof | |
KR200347093Y1 (en) | Mold system for slab concrete of bridge |