KR102059081B1 - Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof - Google Patents

Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof Download PDF

Info

Publication number
KR102059081B1
KR102059081B1 KR1020170137340A KR20170137340A KR102059081B1 KR 102059081 B1 KR102059081 B1 KR 102059081B1 KR 1020170137340 A KR1020170137340 A KR 1020170137340A KR 20170137340 A KR20170137340 A KR 20170137340A KR 102059081 B1 KR102059081 B1 KR 102059081B1
Authority
KR
South Korea
Prior art keywords
temporary
steel
pipe
scaffold
bracket
Prior art date
Application number
KR1020170137340A
Other languages
Korean (ko)
Other versions
KR20190030134A (en
Inventor
이상식
Original Assignee
이상식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to KR20170117205 priority Critical
Priority to KR1020170117205 priority
Application filed by 이상식 filed Critical 이상식
Publication of KR20190030134A publication Critical patent/KR20190030134A/en
Application granted granted Critical
Publication of KR102059081B1 publication Critical patent/KR102059081B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges

Abstract

본 발명은 강교의 거더를 따라 설치되는 강교용 가설 브래킷 및 이를 이용한 비계 설치공법에 관한 것으로서, 강(鋼) 거더의 턱에 걸리는 "ㄷ"자 형태의 걸림부(110); 상기 걸림부(110)의 일측에 나사체결되어 나사산을 따라 전후진이 가능하고, 상기 걸림부(110)의 상부 내측면이 강 거더의 턱에 밀착고정되도록 하는 고정볼트(120); 상기 걸림부(110)의 하부 외측에 결합되어 하향 연장되는 수직지주(210); 상기 걸림부(110)의 하부 외측 또는 상기 수직지주(210)의 상부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 상부 작업용 파이프(410)가 거치되는 상부거치부(310); 상기 수직지주(210)의 하부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 하부 작업용 파이프(420)가 거치되는 하부거치부(320); 및, 상기 수직지주(210)의 하단부에 구비되어 가시설용 비계 파이프(430)가 거치되는 비계거치부(330);를 포함하여 구성되는 강교용 가설 브래킷을 사용하는 것을 특징으로 한다.The present invention relates to a steel bridge temporary bracket and a scaffolding installation method using the same, which is installed along the girder of the steel bridge, the engaging portion 110 of the "c" shape hanging on the jaw of the steel girder; A fastening bolt 120 capable of fastening back and forth along the screw thread by screwing to one side of the catching part 110 and fixing the upper inner surface of the catching part 110 to the jaw of the steel girder; A vertical support 210 coupled to the lower outer side of the locking part 110 and extending downward; An upper mounting portion 310 provided at a lower outer side of the locking portion 110 or an upper one side of the vertical support 210 to which an upper working pipe 410 is temporarily used in a temporary installation process; A lower mounting part 320 provided at one lower side of the vertical support 210 to which a lower work pipe 420 is temporarily used in a temporary installation process; And a scaffold mounting portion 330 provided on the lower end of the vertical support 210 to which the scaffold pipe 430 for the temporary facility is mounted.

Description

강교용 가설 브래킷 및 이를 이용한 비계 설치공법{Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof}Temporary Bracket for Steel Bridge and Scaffold Installation Method using equivalent}
강교의 거더를 따라 설치되는 강교용 가설 브래킷에 관한 것으로서, 강 거더 하부의 턱을 따라 쉽게 설치하여 고정할 수 있고, 비계를 안정적으로 확장 설치할 수 있으며, 특히 이미 건설이 완료되어 차량 통행이 이루어지고 있는 기존 교량의 점검이나 유지보수가 필요한 경우에도 차량 통제나 바지선 동원을 하지 않고 비계를 안전하고 편리하게 설치할 수 있는 것을 특징으로 한다. It is a temporary bracket for steel bridges installed along the girder of steel bridges, and it can be easily installed and fixed along the chin of the lower part of the steel girder, and the scaffold can be stably extended and installed. Even if the existing bridges need to be inspected or maintained, the scaffold can be safely and conveniently installed without vehicle control or barge mobilization.
일반적으로 강재빔 또는 강판으로 건설되는 교량인 강교는 콘크리트를 타설하여 상판 슬래브를 형성하게 된다.In general, steel bridges, which are bridges constructed of steel beams or steel plates, are poured with concrete to form top slabs.
이러한 슬래브 형성은 콘크리트 타설 전에 동바리를 먼저 설치하여야만 되는데, 현재까지 사용되어온 기존의 가설공법으로는 이미 축조된 교각 사이에 거더를 지지하기 위한 가교각을 설치하고 교각 하부 지반으로부터 시스템 서포트 등을 사용하여 동바리를 설치한 후 그 상부로 슬래브 콘크리트 타설을 위한 거푸집을 설치하는 동바리 공법, 교각 상부로 목재 동바리를 설치하는 목재 동바리 공법 또는 기계화된 동바리공과 거푸집을 사용하여 1 스팬을 한번에 시공하는 이동식 비계 공법 등을 들 수 있다.Such slab formation requires the installation of a copper bar before concrete placement. The existing construction method that has been used up to now is to install a bridge angle to support the girders between the already constructed piers, and to use the system support from the bottom of the piers. After installing the copper barrier, the copper barrier method to install the formwork for slab concrete casting on the upper part, the wooden copper barrier method to install the wooden copper barrier on the upper part of the pier, or the mobile scaffolding method to construct one span at a time using mechanized copper ball and formwork Can be mentioned.
하지만 교각 하부 지반으로부터 동바리를 설치하는 동바리 공법은 가설높이가 높아지면 많은 자재와 인력을 필요로 하고 형하공간이 가설공간으로 확보되어야 하는 단점이 뒤따르며, 동바리 및 거푸집의 설치와는 별도로 작업자의 작업공간을 확보하기 위해서는 거더 상부에 돌출된 스터드 볼트에서 철선을 연결한 후 측면으로 내려 단관비계를 묶어 작업발판 또는 안전망 등의 가설재를 설치하는 비계작업이 선행되어야만 한다.However, the Dongbari method of installing Dongbari from the lower part of the bridge has the disadvantage of requiring a lot of materials and manpower when the height of the construction height is high, and the geometry space must be secured as a temporary space.In addition to the installation of Dongbari and formwork, In order to secure space, the scaffolding work must be preceded by connecting the steel wires from the stud bolts protruding from the upper part of the girder and then lowering it to the side to tie up the scaffolding scaffolding and to install temporary materials such as work scaffolding or safety nets.
한편, 목재 동바리를 설치하는 공법은 각재를 절단하여 거더와 거더사이에 작업대 및 슬래브 동바리를 소요 간격으로 설치한 후 합판 등으로 슬래브 거푸집을 조립하는 방식으로 이루어지는데, 목재 동바리는 가공성이 좋고 초기 비용이 저렴한 반면 부재 자체의 강성이 좋지 않아 좁은 간격으로 설치되어야 하고 설치와 해체작업이 반복되면서 쉽게 파손되어 전용율을 떨어뜨리며 결과적으로 가설공사비를 증대시킨다.On the other hand, the method of installing wood clubs is made by cutting corners and installing workbenches and slab clubs between the girders and girders at required intervals and then assembling slab formwork with plywood, etc. While it is inexpensive, the rigidity of the member itself is not good, so it must be installed at narrow intervals, and as the installation and dismantling work is repeated, it is easily broken, which lowers the capacity ratio and consequently increases the construction cost.
또한, 이동식 비계 공법에서는 지반에서부터 동바리를 설치할 필요가 없어 형하공간이나 지반 등의 조건에 좌우되지 않고 시공할 수 있으나 설치작업이 복잡하고 대형장비의 투입이 필수적이다.In addition, in the mobile scaffolding method, it is not necessary to install the copper bar from the ground, so it can be installed without being influenced by the conditions of the mold space or the ground, but the installation work is complicated and the input of large equipment is essential.
[선행기술문헌][Preceding technical literature]
등록특허 제10-0570261호Patent Registration No. 10-0570261
등록특허 제10-1185578호Patent Registration No. 10-1185578
상기 문제점을 해결하고자 안출된 본 발명은 종래의 가설공법의 문제점을 해소하면서 공중작업이 어려운 강교의 공사에서 간단한 조립 및 설치만으로 강(鋼) 거더의 하부에 가설프레임을 완성하고, 가설프레임 위로 비계를 설치함으로써 슬래브 콘크리트 타설이나 교량의 유지보수를 간편하게 수행하는 강교용 가설 브래킷 및 비계 설치공법을 제공하는데 그 목적이 있다.The present invention devised to solve the above problems completes the construction frame at the bottom of the steel girder only by simple assembly and installation in the construction of steel bridge difficult to work while solving the problems of the conventional construction method, scaffolding over the construction frame The purpose is to provide a temporary installation bracket and scaffolding installation method for steel bridges to easily perform slab concrete pouring or bridge maintenance.
상기한 목적을 달성하기 위하여 창작된 본 발명의 기술적 구성은 다음과 같다.Technical composition of the present invention created to achieve the above object is as follows.
본 발명은 강교의 거더를 따라 설치되는 강교용 가설 브래킷 및 이를 이용한 비계 설치공법에 관한 것으로서, 강(鋼) 거더의 턱에 걸리는 "ㄷ"자 형태의 걸림부(110); 상기 걸림부(110)의 일측에 나사체결되어 나사산을 따라 전후진이 가능하고, 상기 걸림부(110)의 상부 내측면이 강 거더의 턱에 밀착고정되도록 하는 고정볼트(120); 상기 걸림부(110)의 하부 외측에 결합되어 하향 연장되는 수직지주(210); 상기 걸림부(110)의 하부 외측 또는 상기 수직지주(210)의 상부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 상부 작업용 파이프(410)가 거치되는 상부거치부(310); 상기 수직지주(210)의 하부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 하부 작업용 파이프(420)가 거치되는 하부거치부(320); 및, 상기 수직지주(210)의 하단부에 구비되어 가시설용 비계 파이프(430)가 거치되는 비계거치부(330);를 포함하여 구성되는 강교용 가설 브래킷을 사용하는 것을 특징으로 한다.The present invention relates to a steel bridge temporary bracket and a scaffolding installation method using the same, which is installed along the girder of the steel bridge, the engaging portion 110 of the "c" shape hanging on the jaw of the steel girder; A fastening bolt 120 capable of fastening back and forth along the screw thread by screwing to one side of the catching part 110 and fixing the upper inner surface of the catching part 110 to the jaw of the steel girder; A vertical support 210 coupled to the lower outer side of the locking part 110 and extending downward; An upper mounting portion 310 provided at a lower outer side of the catching portion 110 or an upper one side of the vertical support 210 to which an upper working pipe 410 is temporarily used in a temporary installation process; A lower mounting portion 320 provided at one lower side of the vertical support 210 to which a lower work pipe 420 is temporarily used in a temporary installation process; And a scaffold mounting portion 330 provided on the lower end of the vertical support 210 to which the scaffold pipe 430 for the temporary facility is mounted.
본 발명의 구성에 따른 기술적 효과는 다음과 같다.Technical effects according to the configuration of the present invention are as follows.
첫째, 이미 건설이 완료(슬래브가 형성)되어 공용 중인 강교량인 경우에도 공중작업이 어려움을 극복하고 교량의 형하 조건에 관계없이 강(鋼) 거더의 하부에 비계를 연속적으로 설치할 수 있다.First, even in the case of steel bridges in which construction is already completed (slabs formed), aerial work can overcome difficulties and scaffolds can be continuously installed at the bottom of steel girders regardless of the geometry of the bridge.
둘째, 회동밀착부(130)를 사용할 경우 걸림부(110)를 강 거더의 턱에 쉽게 설치하여 고정시킬 수 있고, 설치된 걸림부(110)가 강 거더의 턱에서 이탈되는 것을 효과적으로 방지할 수 있다.Second, when using the rotational close contact portion 130 can be easily fixed by fixing the locking portion 110 to the jaw of the steel girder, it can effectively prevent the installed locking portion 110 is separated from the jaw of the steel girder. .
셋째, 걸림부(110)에서 연결되는 수직지주(210)는 파이프 자재를 사용함으로써 별도 보강을 하지 않더라도 흔들림이 없고 바람의 영향을 적게 받아 작업자가 안전하게 작업할 수 있으며, 교량의 점검이나 유지보수 작업을 편리하게 수행할 수 있다.Third, the vertical support 210 connected from the engaging portion 110 can be safely operated by the operator without the shake and less influence of the wind even if not separately reinforced by using the pipe material, inspection or maintenance work of the bridge This can be done conveniently.
도1은 본 발명의 걸림부(110)의 구체적 실시예로서, (a) 고정볼트(120)만 사용되는 경우, (b) 회동밀착부(130)가 사용되는 경우, (c) 또 다른 형태의 회동밀착부(130)가 사용되는 경우를 각각 도시한다.
도2는 회동밀착부(130)가 구비될 경우 강 거더의 턱에 끼워 걸치는 작업은 용이하나 일단 턱에 끼워진 상태에서는 쉽게 이탈되지 않는 구조임을 도시한다.
도3은 회동밀착부(130)를 탄성지지하는 스프링부(140)가 추가된 경우를 도시한다.
도4는 걸림부(110)의 하부에 구멍이 천공된 파이프, 아이볼트, 파이프클램프를 결합한 경우를 도시한다.
도5는 걸림부(110)와 수직지주(210)가 결합된 다양한 실시예로서, (a) 상부거치부(310), 하부거치부(320) 및 비계거치부(330)가 모두 같은 방향으로 결합되는 경우, (b) 비계거치부(330)가 상부거치부(310) 및 하부거치부(320)와 직각을 이루도록 다른 방향으로 결합되는 경우를 각각 도시한다.
도6 내지 도8은 비계 설치공법에 따른 과정을 도시한다.
도9 내지 도11은 비계 설치공법에 따른 또 다른 과정을 도시한다.
1 is a specific embodiment of the locking portion 110 of the present invention, (a) when only the fixing bolt 120 is used, (b) when the rotating contact portion 130 is used, (c) another form The case where the rotational close contact portion 130 of the is used, respectively.
Figure 2 shows that when the rotational close contact portion 130 is provided is easy to be fitted to the jaw of the steel girders, but once the structure is not easily detached from the jaw.
3 illustrates a case in which a spring part 140 for elastically supporting the rotational contact part 130 is added.
4 illustrates a case in which a hole, a pipe, an eye bolt, and a pipe clamp are coupled to a lower portion of the locking portion 110.
Figure 5 is a various embodiments in which the engaging portion 110 and the vertical support 210 is coupled, (a) the upper mounting portion 310, the lower mounting portion 320 and the non-base mounting portion 330 all in the same direction When combined, (b) shows the case where the scaffolding portion 330 is coupled in different directions to form a right angle with the upper portion 310 and the lower portion 320.
6 to 8 show a process according to the scaffold installation method.
9 to 11 show another process according to the scaffold installation method.
이하에서는 본 발명의 구체적 실시예를 첨부도면을 참조하여 보다 상세히 설명한다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.
본 발명은 강교의 거더를 따라 설치되는 강교용 가설 브래킷에 관한 것이다.The present invention relates to a steel bracket temporary bracket that is installed along the girder of the steel bridge.
강교용 가설 브래킷은 도1(a)에 도시된 것처럼 걸림부(110)와 고정볼트(120)만으로 구성될 수도 있고, 도1(b)나 도1(c)처럼 회동밀착부(130)가 추가된 형태로 구성될 수도 있다.Steel bridge construction bracket may be composed of only the locking portion 110 and the fixing bolt 120, as shown in Figure 1 (a), as shown in FIG. It may be configured in an additional form.
걸림부(110)는 도1(a)에 도시된 것처럼 강(鋼) 거더의 턱에 걸리는 "ㄷ"자 형태의 부재이며, 고정볼트(120)가 걸림부(110)의 일측에 나사체결되어 나사산을 따라 전후진이 가능하다.The locking portion 110 is a member of the "c" shape that is caught on the jaw of the steel girders as shown in Figure 1 (a), the fixing bolt 120 is screwed to one side of the locking portion 110 Forward and backward along the threads is possible.
이러한 고정볼트(120)를 조여주면 걸림부(110)의 상부 내측면이 강 거더의 턱에 밀착고정되어 걸림부(110)가 강 거더의 턱에서 이탈되는 것을 방지하게 된다.Tightening the fixing bolt 120 is fixed to the upper inner surface of the locking portion 110 in close contact with the jaw of the steel girder to prevent the locking portion 110 is separated from the jaw of the steel girder.
이러한 걸림부(110)의 하부에는 파이프가 일체로 결합되어 수직지주(210)를 삽입결합할 수 있다.A pipe is integrally coupled to the lower portion of the locking portion 110 to insert and insert the vertical support 210.
도1(b)의 경우도 걸림부(110)는 전체적으로 "ㄷ"자 형태의 부재가 사용되는데, 구조적 강도를 보강하기 위한 보강재가 용접결합될 수 있다.Also in the case of Figure 1 (b), the locking portion 110 is used as a member of the "C" shape as a whole, the reinforcement for reinforcing the structural strength can be welded.
회동밀착부(130)는 걸림부(110)에 핀결합되어 회동하는 구조가 되는데, 고정볼트(120)를 조임에 따라 고정볼트(120)의 단부가 회동밀착부(130)의 내측면에 맞닿아 회동밀착부(130)를 밀어서 회동시키게 된다. 회동밀착부(130)에는 걸림부(110)의 상부 내측면을 향하여 곡면의 밀착면(131)이 구비되어 있는데, 회동밀착부(130)가 회동하면 걸림부(110)의 상부내측면과 회동밀착부(130)의 밀착면(131) 사이에 강 거더의 턱이 밀착고정되어 걸림부(110)가 강 거더의 턱에서 이탈되는 것이 방지된다.Rotating contact portion 130 has a structure that is pin-coupled to the locking portion 110 to rotate, the end of the fixing bolt 120 is fitted to the inner surface of the rotating contact portion 130 by tightening the fixing bolt 120. It is rotated by pushing the contact tight contact portion 130. Rotating contact portion 130 is provided with a curved contact surface 131 toward the upper inner surface of the locking portion 110, when the rotating contact portion 130 rotates with the upper inner surface of the locking portion 110 The jaw of the steel girder is tightly fixed between the contact surfaces 131 of the contact portion 130 to prevent the locking portion 110 from being separated from the jaw of the steel girder.
도1(c)의 경우 회동밀착부(130)의 형태가 일부 변형된 것으로서 고정볼트(120)에 의하여 회동하면서 걸림부(110)를 강 거더의 턱에 고정시키는 기능은 동일하다.In the case of Figure 1 (c) is a part of the shape of the rotational close contact portion 130 is modified by the fixing bolt 120 while the function of fixing the locking portion 110 to the jaw of the girder is the same.
도2에 도시된 것처럼 회동밀착부(130)가 구비된 걸림부(110)를 강 거더의 턱에 끼워 넣으면 회동밀착부(130)가 강 거더의 턱(11)에 밀려 시계반대 방향으로 회전하면서 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 살짝 벌어져 강 거더의 턱(11)이 쉽게 삽입될 수 있고, 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이에 강 거더의 턱(11)이 밀착된 상태에서 걸림부(110)가 잡아당겨지거나 흔들려 강 거더의 턱(11)이 이탈되는 방향으로 움직이면 회동밀착부(130)가 시계 방향으로 회전하면서 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 좁혀지면서 걸림부(110)가 강 거더의 턱(11)에서 분리되는 것을 방지하게 된다.As shown in FIG. 2, when the engaging portion 110 provided with the rotational contact portion 130 is inserted into the jaw of the steel girder, the rotational contact portion 130 is pushed against the jaw 11 of the steel girder and rotated counterclockwise. The gap between the contact surface 131 of the rotational contact portion 130 and the upper inner surface of the locking portion 110 is slightly opened so that the jaw 11 of the steel girder can be easily inserted, and the adhesion of the rotational contact portion 130 In the direction in which the jaw portion 110 is pulled or shaken in a state in which the jaw 11 of the steel girder is in close contact between the surface 131 and the upper inner surface of the catching portion 110, the jaw 11 of the steel girder is separated. As the rotational contact portion 130 rotates clockwise as the movement moves, the gap between the contact surface 131 of the rotational contact portion 130 and the upper inner side of the upper portion of the locking portion 110 is narrowed, so that the locking portion 110 of the steel girder is closed. It is to prevent the separation from the jaw (11).
다시 말하면, 걸림부(110)와 강 거더의 결착을 쉽게 함과 동시에 분리이탈의 위험을 방지할 수 있는 구조가 되는데, 고정볼트(120)에 의하여 회동밀착부(130)의 밀착면(131)과 걸림부(11)의 상부 내측면 사이에 강 거더의 턱(11)이 완전히 밀착된 상태가 아니라도(예를 들어, 강교용 가설 브래킷의 걸림부(110)가 강 거더의 턱(11)에 거치되어 가설치된 상태) 걸림부(110)가 강 거더의 턱(11)에서 빠져나오는 방향으로 움직이면 강 거더의 턱(11)에 회동밀착부(130)의 밀착면(131)이 맞닿아 회동밀착부(130)가 시계 방향으로 회전하면서 밀착면(131)에 강 거더의 턱(11)에 밀착되어 이탈을 방지하게 되는 구조이다.In other words, it becomes a structure that facilitates the fastening of the engaging portion 110 and the steel girders and at the same time prevents the risk of separation and separation, the contact surface 131 of the rotational contact portion 130 by the fixing bolt 120. Even if the jaw 11 of the steel girder is not completely in contact with the upper inner surface of the engaging portion 11 (for example, the engaging portion 110 of the steel bridge construction bracket is the jaw 11 of the steel girder). When the locking portion 110 moves in a direction exiting from the jaw 11 of the steel girder, the contact surface 131 of the rotational contact portion 130 comes into contact with the jaw 11 of the steel girder. Rotating contact portion 130 is rotated in the clockwise direction is in close contact with the jaw 11 of the steel girder on the contact surface 131 to prevent the separation.
도3은 회동밀착부(130)를 탄성지지하는 스프링부(140)가 추가된 경우를 도시하는데, 스프링부(140)는 도3에 도시된 2가지 형태처럼 걸림부(110)와 회동밀착부(130) 사이에 설치되며, 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 좁혀지는 방향으로 회동밀착부(130)을 탄성지지하게 된다.FIG. 3 illustrates a case in which a spring part 140 for elastically supporting the rotational contact part 130 is added, and the spring part 140 has the locking part 110 and the rotational contact part as shown in FIG. 3. It is installed between the 130, the elastic contact portion 130 is elastically supported in a direction in which the distance between the contact surface 131 of the rotational contact portion 130 and the upper inner surface of the locking portion 110 is narrowed.
이러한 스프링부(140)는 특정 형태의 탄성부재로 한정되는 것은 아니며, 회동밀착부(130)를 탄성지지할 수 있는 기능만 충족된다면 다양한 형태의 코일 스프링, 판 스프링, 토션 스프링이 선택될 수 있다.The spring 140 is not limited to a specific shape of the elastic member, and various types of coil springs, leaf springs, and torsion springs may be selected if only a function capable of elastically supporting the rotational contact portion 130 is satisfied. .
아울러, 첨부도면에 별도로 상세히 도시하지 않았으나 스프링부(140)에 의하여 탄성지지되는 회동밀착부(130)의 회동 각도를 적절한 범위 내로 한정시키기 위한 스토퍼(stopper)가 구비되는 것이 바람직하다. In addition, although not shown in detail in the accompanying drawings, it is preferable that a stopper is provided for limiting the rotation angle of the rotational contact portion 130 that is elastically supported by the spring portion 140 within an appropriate range.
이러한 스토퍼는 회동밀착부(130)의 회동 영역에 구비되어 미리 설정된 범위 이상으로 회동할 경우 회동밀착부(130)와 접촉하여 회동밀착부(130)의 추가 회동을 방지할 수 있는 형태나 구조라면 어떤 것이라도 무방하다.If the stopper is provided in the rotational region of the rotational contact portion 130, if the rotation or more than a predetermined range in contact with the rotational contact portion 130 to prevent further rotation of the rotational contact portion 130, Anything is ok.
이와 같이 스프링부(140)가 구비될 경우 고정볼트(120)가 조여지지 않은 상태에서도 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 좁혀지는 방향으로 회동밀착부(130)을 탄성지지하게 되고, 강 거더의 턱(11)을 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이로 밀어 넣으면 스프링부(140)에 의하여 탄성지지된 상태로 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 벌어지면서 강 거더의 턱(11)이 삽입되어 안착되는 구조가 된다. 아울러 스프링부(140)에 의하여 회동밀착부(130)의 밀착면(131)과 걸림부(110)의 상부 내측면 사이의 간격이 좁혀지는 방향으로 탄성력이 상시 작용하고 있어 고정볼트(120)가 조여지지 않은 상태에서도 걸림부(110)와 강 거더의 분리 이탈이 효과적으로 방지될 수 있어 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 작업을 보다 편리하고 안전하게 수행할 수 있다.As such, when the spring 140 is provided, the gap between the contact surface 131 of the rotational contact portion 130 and the upper inner side surface of the locking portion 110 is narrowed even when the fixing bolt 120 is not tightened. The elastic contact portion 130 is elastically supported in the direction, and the jaw 11 of the steel girder is pushed between the contact surface 131 of the rotation contact portion 130 and the upper inner surface of the locking portion 110 to have a spring portion ( A structure in which the jaw 11 of the steel girder is inserted and seated while the gap between the contact surface 131 of the rotational contact portion 130 and the upper inner side surface of the locking portion 110 is widened while being elastically supported by 140. Becomes In addition, the elastic force is constantly acting in the direction in which the distance between the contact surface 131 of the rotational contact portion 130 and the upper inner surface of the locking portion 110 is narrowed by the spring portion 140, so that the fixing bolt 120 Separation and separation of the locking portion 110 and the steel girder can be effectively prevented even in the state that is not tightened, so that the mounting portion 110 of the steel bridge construction bracket to the jaw 11 of the steel girder is more convenient to install Can be done safely.
도4는 걸림부(110)의 하부에 구멍이 천공된 파이프, 아이볼트, 파이프클램프를 결합한 경우를 각각 도시하는데, 이러한 파이프나 아이볼트, 파이프클램프 등은 수직지주(210)나 그 밖의 작업용 파이프들을 걸림부(110)에 결합하기 위한 용도로 사용된다.4 illustrates a case where the pipes, eye bolts, and pipe clamps having holes drilled in the lower portion of the catching part 110 are combined, respectively, such pipes, eye bolts, pipe clamps, and the like. It is used for the purpose of coupling the vertical support 210 or other working pipes to the locking portion 110.
도5는 걸림부(110)와 수직지주(210)가 결합된 다양한 실시예로서, 도5(a)는 상부거치부(310), 하부거치부(320) 및 비계거치부(330)가 모두 같은 방향으로 결합되는 경우를 도시하고, 도5(b)는 비계거치부(330)가 상부거치부(310) 및 하부거치부(320)와 직각을 이루도록 다른 방향으로 결합되는 경우를 각각 도시한다.Figure 5 is a various embodiments in which the engaging portion 110 and the vertical support 210 is coupled, Figure 5 (a) is the upper mounting portion 310, lower mounting portion 320 and the non-base mounting portion 330 5 (b) shows a case in which the non-base mounting portion 330 is coupled in different directions to form a right angle with the upper mounting portion 310 and the lower mounting portion 320, respectively. .
수직지주(210)는 걸림부(110)의 하부 외측에 결합되어 하향 연장되는데, 적절한 규격의 파이프로 제작되어 걸림부(110)의 하부에 핀이나 볼트 등으로 탈착 가능한 구조로 결합됨이 바람직하다.Vertical support 210 is coupled to the lower outer side of the locking portion 110 is extended downward, it is preferable to be made of a pipe of a suitable standard coupled to the lower structure of the locking portion 110 in a removable structure such as a pin or bolt. .
상부거치부(310)는 도5에 도시된 것처럼 수직지주(210)의 상부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 상부 작업용 파이프(410)를 거치하는 역할을 수행한다. 이러한 상부거치부(310)는 도5에 도시된 것처럼 U볼트를 너트로 체결하는 형태에 한정되는 것은 아니며 상부 작업용 파이프(410)가 통과하면서 거치될 수 있다면 어떤 형태의 구조라도 무방하다. 아울러, 첨부도면에 별도로 도시하지 않았으나 이러한 상부거치부(310)는 걸림부(110)의 하부 외측에 직접 결합되는 구조가 될 수도 있다.The upper mounting portion 310 is provided on the upper side of the vertical support 210 as shown in Figure 5 serves to mount the upper work pipe 410 temporarily used in the installation process of the temporary facility. The upper mounting portion 310 is not limited to the form of fastening the U bolt with a nut, as shown in Figure 5, and may be any type of structure if the upper work pipe 410 can be mounted while passing through. In addition, although not shown separately in the accompanying drawings, the upper mounting portion 310 may be a structure that is directly coupled to the lower outer side of the locking portion (110).
하부거치부(320)는 수직지주(210)의 하부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 하부 작업용 파이프(420)를 거치하는 역할을 수행한다. 이러한 하부거치부(320)도 도5에 도시된 것처럼 U볼트 구조에 한정되는 것은 아니며 하부 작업용 파이프(420)가 통과하면서 거치될 수 있다면 어떤 형태의 구조라도 무방하다.The lower mounting portion 320 is provided at one lower side of the vertical support 210 to serve to mount the lower work pipe 420 temporarily used in the installation process of the temporary facility. The lower mounting portion 320 is not limited to the U-bolt structure as shown in FIG. 5, and may be any type of structure as long as the lower working pipe 420 can be mounted while passing therethrough.
비계거치부(330)는 수직지주(210)의 하단부에 구비되어 가시설용 비계 파이프(430)를 거치하는 역할을 한다.Scaffolding unit 330 is provided on the lower end of the vertical support 210 serves to mount the scaffolding pipe 430 for the temporary facility.
이러한 비계거치부(330)는 도5에 도시된 것처럼 U볼트를 수직지주(210)의 하단부에 직접 용접결합하는 형태에 한정되는 것은 아니며, 가시설용 비계 파이프(430)가 통과하면서 거치될 수 있다면 어떤 형태의 구조라도 무방하다.The scaffolding unit 330 is not limited to the form of directly welding the U bolt to the lower end of the vertical support 210, as shown in Figure 5, if the scaffolding pipe 430 for the temporary facility can be mounted while passing through Any type of structure may be used.
또한 비계거치부(330)는 도5(a)에 도시된 것처럼 상부거치부(310)에 거치되는 상부 작업용 파이프(410), 하부거치부(320)에 거치되는 하부 작업용 파이프(420) 및 비계거치부(330)에 거치되는 가시설용 비계 파이프(430)가 모두 같은 방향으로 나란하게 배열될 수 있도록 상부거치부(310), 하부거치부(320) 및 비계거치부(330)가 같은 방향을 향하는 구조가 될 수도 있고, 도5(b)에 도시된 것처럼 상부거치부(310)에 거치되는 상부 작업용 파이프(410)와 하부거치부(320)에 거치되는 하부 작업용 파이프(420)는 같은 방향으로 나란하게 배열되고, 비계거치부(330)에 거치되는 가시설용 비계 파이프(430)는 이들과는 서로 직교하는 방향으로 배열될 수 있도록 비계거치부(330)만 다른 방향을 향하는 구조가 될 수도 있다.In addition, the scaffolding unit 330 is the upper work pipe 410 mounted on the upper mounting portion 310, the lower work pipe 420 mounted on the lower mounting portion 320 and the scaffolding as shown in Figure 5 (a) The upper mounting portion 310, the lower mounting portion 320 and the scaffolding portion 330 in the same direction so that all of the scaffolding pipes 430 mounted on the mounting portion 330 can be arranged side by side in the same direction. The upper working pipe 410 mounted on the upper mounting portion 310 and the lower working pipe 420 mounted on the lower mounting portion 320 may have the same direction as illustrated in FIG. 5 (b). Arranged side by side, the scaffolding pipe 430 for the temporary equipment mounted on the scaffolding unit 330 may have a structure in which only the scaffolding unit 330 faces in a different direction so that the scaffolding unit 330 can be arranged in a direction perpendicular to each other. have.
이하에서는 도5에 도시된 강교용 가설 브래킷을 이용한 비계 설치공법에 대하여 살펴본다.Hereinafter, the scaffold installation method using the steel bridge temporary bracket shown in FIG. 5 will be described.
도5(a)와 같이 상부거치부(310), 하부거치부(320) 및 비계거치부(330)가 모두 같은 방향을 향하는 구조인 강교용 가설 브래킷을 이용한 비계 설치공법의 과정은 다음과 같다.The process of the scaffolding installation method using the temporary mounting bracket for steel bridges in which the upper mounting portion 310, the lower mounting portion 320 and the scaffolding portion 330 all face the same direction as shown in FIG. .
(1) 제1단계(도6 참조)(1) First step (see Fig. 6)
강(鋼) 거더의 턱(11)에 "ㄷ"자 형태의 걸림부(110)를 거치하고, 고정볼트(120)를 조여 강교용 가설 브래킷을 강 거더의 좌우 양측을 따라 미리 설정된 간격으로 고정설치하는 과정이다.The hook portion 110 of the "c" shape is mounted on the jaw 11 of the steel girder, and the fixing bolt 120 is tightened to fix the steel bridge temporary bracket at predetermined intervals along the left and right sides of the steel girder. The installation process.
(2) 제2단계(도6 참조)(2) Second Step (see Fig. 6)
강 거더의 좌우 양측 각각에 고정설치된 강교용 가설 브래킷 각각의 비계거치부(330)를 관통하여 강 거더의 길이 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하는 과정이다.It is a process of installing the temporary scaffolding pipe 430 for the temporary girder arranged in the longitudinal direction of the steel girders through the scaffolding unit 330 of each of the steel bridge construction brackets fixed to the left and right sides of the steel girder.
(3) 제3단계(도6 참조)(3) Third step (see Fig. 6)
강 거더의 좌우 양측을 따라 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 과정이다.The process of installing a plurality of work scaffold support pipe 510 to intersect the scaffold pipe 430 for temporary installation installed along the left and right sides of the steel girders, and install the work scaffold 520 on top of the work scaffold support pipe 510. to be.
첨부도면에 별도로 도시되지 않았으나 가시설용 비계 파이프(430), 작업발판 지지 파이프(510), 작업발판(520)들은 적절한 방법으로 상호 결속하여 결합상태가 안정적으로 유지되게 한다.Although not shown separately in the accompanying drawings, the scaffolding pipe 430, the work scaffold support pipe 510, and the work scaffold 520 for temporary equipment are coupled to each other in an appropriate manner to maintain a stable state of engagement.
(4) 제4단계(도6 참조)(4) 4th step (refer FIG. 6)
강 거더에 고정되어 작업발판(520)의 설치가 완료된 강교용 가설 브래킷(도면 좌측에서 두번째)의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷(도면 좌측에서 세번째)의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 과정이다.The upper mounting portion 310 of the steel bridge construction bracket (second from the left side of the drawing) fixed to the steel girder and the installation of the work scaffold 520 is completed, and the upper mounting portion of the steel bridge construction bracket (third from the left side of the drawing) to be additionally installed. Using the upper work pipe 410 penetrating through the 310 is a process of mounting to the jaw portion 11 of the steel girders to be additionally installed at a predetermined interval to the temporary girdle 11 of the steel girders. .
가설치하는 과정에서는 걸림부(110)의 고정볼트(120)가 적절히 조여진 상태에서 걸림부(110)를 강 거더의 턱(11)에 삽입하여 거치함으로써 고정볼트(120)의 추가 조임이 없더라도 걸림부(110)가 강 거더의 턱(11)에서 쉽게 이탈되지 않도록 한다.In the temporary installation process, the fixing bolt 120 of the locking portion 110 is properly tightened so that the locking portion 110 can be inserted into the jaw 11 of the steel girder to be mounted even if there is no additional tightening of the fixing bolt 120. The part 110 is not easily separated from the jaw 11 of the steel girder.
(5) 제5단계(도7(a) 참조)(5) 5th step (refer FIG. 7 (a))
강 거더에 고정된 강교용 가설 브래킷(도면 좌측에서 두번째)과 강 거더에 가설치된 강교용 가설 브래킷(도면 좌측에서 세번째) 각각의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 다수의 임시발판 지지 파이프(610)를 설치하고, 임시발판 지지 파이프(610)의 상부에 임시발판(620)을 설치하는 과정이다. 이러한 과정에서 임시로 설치되었던 상부 작업용 파이프(410)는 미리 제거한다.Steel work temporary bracket (second from left of drawing) fixed to the steel girders and steel work temporary brackets (third from the left of the drawing) installed on the steel girders, the lower work pipe 420 passing through the lower mounting portion 320 respectively It is a process of installing, a plurality of temporary scaffold support pipe 610 to intersect the lower work pipe 420, and to install a temporary scaffold 620 on top of the temporary scaffold support pipe 610. The upper work pipe 410 temporarily installed in this process is removed in advance.
임시발판(620)의 설치가 완료되면 가설치된 강교용 가설 브래킷(도면 좌측에서 세번째)은 임시발판(620)을 타고 접근하여 고정볼트(120)를 조임으로써 강 거더의 턱(11)에 고정되도록 한다.When the installation of the temporary scaffold 620 is completed, the temporary installation bracket for the steel bridge (third from the left side of the drawing) is fixed to the jaw 11 of the steel girder by approaching the temporary scaffold 620 and tightening the fixing bolt 120. Be sure to
(6) 제6단계(도7(b) 참조)(6) Sixth Step (see Fig. 7 (b))
강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정볼트(120)를 조여 고정한 강교용 가설 브래킷(도면 좌측에서 세번째)의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷(도면 좌측에서 네번째)의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 과정이다.After installation of the temporary stool 620 is installed on the steel girders, the temporary mounting bracket for the steel bridge to be additionally installed with the upper mounting portion 310 of the steel bridge temporary bracket (third from the left side of the drawing) fixed by tightening the fixing bolt 120 By using the upper working pipe 410 penetrating the upper mounting portion 310 of the fourth (left side of the drawing) to the hook portion 110 of the steel bridge construction bracket to be additionally installed at a predetermined interval to the jaw of the steel girders ( 11) It is the process of installing temporarily.
(7) 제7단계(도8(a) 참조)(7) 7th step (refer to FIG. 8 (a))
강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정볼트(120)를 조여 고정한 강교용 가설 브래킷(도면 좌측에서 세번째)의 하부거치부(320)와 추가로 설치된 강교용 가설 브래킷(도면 좌측에서 네번째)의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 임시발판 지지 파이프(610)를 추가 설치하고, 임시발판 지지 파이프(610) 상부에 임시발판(620)을 추가 설치하는 과정이다. 이러한 과정에서 임시로 설치되었던 상부 작업용 파이프(410)는 미리 제거한다.After the installation of the temporary scaffold 620 is installed on the steel girders, the lower mounting portion 320 of the steel bridge construction bracket (third from the left side of the drawing) fixed by tightening the fixing bolt 120 and the steel bridge construction bracket ( The lower work pipe 420 penetrating through the lower mounting part 320 of the fourth from the left side of the drawing is installed, and the temporary scaffold support pipe 610 is further installed to intersect the lower work pipe 420, and the temporary scaffold support pipe 610 is a process of installing a temporary scaffold 620 on the top. The upper work pipe 410 temporarily installed in this process is removed in advance.
임시발판(620)의 설치가 완료되면 추가로 가설치된 강교용 가설 브래킷(도면 좌측에서 네번째)은 추가 설치된 임시발판(620)을 타고 접근하여 고정볼트(120)를 조임으로써 강 거더의 턱(11)에 고정되도록 한다.When the installation of the temporary scaffold 620 is completed, additionally installed temporary bridge for the steel bridge (fourth from the left side of the drawing) is approached by additionally installed temporary scaffold 620 to tighten the fixing bolt 120 by the jaw of the steel girders ( 11).
(8) 제8단계(도8(b) 참조)(8) Eighth Step (see Fig. 8 (b))
강 거더의 좌우 양측 각각에 추가 설치된 강교용 가설 브래킷 각각의 비계거치부(330)를 관통하여 강 거더의 길이 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하고, 강 거더의 좌우 양측을 따라 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 추가 설치하는 과정이다.A temporary scaffolding pipe 430 arranged in the longitudinal direction of the steel girder is installed through the scaffolding portion 330 of each steel bridge construction bracket additionally installed on each of the left and right sides of the steel girder, and along the left and right sides of the steel girder. Installing a plurality of scaffold support pipe 510 to intersect the installed scaffolding pipe 430 for installation, and additionally install the scaffold 520 on top of the scaffold support pipe 510.
이러한 과정에서 임시로 설치된 하부 작업용 파이프(420), 임시발판 지지 파이프(610), 임시발판(620) 등은 제거하여 작업발판(520)의 추가 설치 작업에 활용한다.In this process, the temporarily installed lower work pipe 420, temporary scaffold support pipe 610, temporary scaffold 620, and the like are removed and used for additional installation work of the scaffold 520.
첨부도면에 세부적으로 도시하지 않았으나 작업발판(520), 작업발판 지지 파이프(510), 가시설용 비계 파이프(430), 수직지주(210)들은 적절한 방법으로 상호 결속하여 결합상태가 안정적으로 유지되게 한다.Although not shown in detail in the accompanying drawings, the working scaffold 520, the working scaffold support pipe 510, the temporary scaffolding pipe 430, and the vertical supports 210 are coupled to each other in an appropriate manner to maintain a stable coupling state. .
상기한 제4단계 내지 제8단계 과정을 반복하면 강 거더의 하부를 따라 작업발판(520)을 연속적으로 설치할 수 있게 된다.By repeating the above-described fourth to eighth steps, the working scaffold 520 can be continuously installed along the lower portion of the steel girder.
도5(b)와 같이 비계거치부(330)가 상부거치부(310) 및 하부거치부(320)와 다른 방향을 향하는 구조인 강교용 가설 브래킷을 이용한 비계 설치공법의 과정은 다음과 같다.As shown in FIG. 5 (b), the scaffolding mounting portion 330 has a structure in which the scaffolding mounting portion 330 faces a different direction from the upper mounting portion 310 and the lower mounting portion 320.
(1) 제1단계(도9 참조)(1) First step (see Fig. 9)
강(鋼) 거더의 턱에 "ㄷ"자 형태의 걸림부(110)를 거치하고, 고정볼트(120)를 조여 강교용 가설 브래킷을 강 거더의 좌우 양측을 따라 미리 설정된 간격으로 고정설치하는 과정이다.The process of fixing the steel bracket girders 110 at predetermined intervals along the left and right sides of the steel girder by tightening the fixing bolt 120 to the jaw portion 110 of the steel girders. to be.
(2) 제2단계(도9 참조)(2) Second Step (see Fig. 9)
강 거더의 좌우 양측에 고정설치된 강교용 가설 브래킷의 비계거치부(330)를 관통하여 강 거더의 폭 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하는 과정이다.It is a process of installing the scaffolding pipe 430 for the temporary installation arranged in the width direction of the steel girder through the scaffolding unit 330 of the steel bridge construction bracket fixed to the left and right sides of the steel girder.
(3) 제3단계(도9 참조)(3) Third step (see Fig. 9)
강 거더의 폭 방향으로 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 과정이다.It is a process of installing a plurality of working scaffold support pipes 510 to intersect the scaffolding pipe 430 for temporary installation installed in the width direction of the steel girder, and installing the working scaffold 520 on top of the working scaffold support pipe 510. .
첨부도면에 별도로 도시되지 않았으나 가시설용 비계 파이프(430), 작업발판 지지 파이프(510), 작업발판(520)들은 적절한 방법으로 상호 결속하여 결합상태가 안정적으로 유지되게 한다.Although not shown separately in the accompanying drawings, the scaffolding pipe 430, the work scaffold support pipe 510, and the work scaffold 520 for temporary equipment are coupled to each other in an appropriate manner to maintain a stable state of engagement.
(4) 제4단계(도9 참조)(4) 4th step (refer FIG. 9)
강 거더에 고정되어 작업발판(520)의 설치가 완료된 강교용 가설 브래킷의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷(도면 좌측에서 네번째)의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱에 거치하여 가설치하는 과정이다.It is fixed to the steel girders penetrating the upper mounting portion 310 of the steel bridge temporary bracket is completed installation of the working footrest 520 and the upper mounting portion 310 of the steel bridge temporary bracket (fourth from the left side of the drawing) to be additionally installed Using the upper work pipe 410 is a process of mounting the hook portion 110 of the steel bridge construction bracket to be additionally installed according to a predetermined interval to the jaw of the steel girder to temporarily install.
가설치하는 과정에서는 걸림부(110)의 고정볼트(120)가 적절히 조여진 상태에서 걸림부(110)를 강 거더의 턱(11)에 삽입하여 거치함으로써 고정볼트(120)의 추가 조임이 없더라도 걸림부(110)가 강 거더의 턱(11)에서 쉽게 이탈되지 않도록 한다.In the temporary installation process, the fixing bolt 120 of the locking portion 110 is properly tightened so that the locking portion 110 can be inserted into the jaw 11 of the steel girder to be mounted even if there is no additional tightening of the fixing bolt 120. The part 110 is not easily separated from the jaw 11 of the steel girder.
(5) 제5단계(도10(a) 참조)(5) 5th step (refer FIG. 10 (a))
강 거더에 고정된 강교용 가설 브래킷(도면 좌측에서 세번째까지)과 강 거더에 가설치된 강교용 가설 브래킷(도면 좌측에서 네번째) 각각의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 다수의 임시발판 지지 파이프(610)를 설치하고, 임시발판 지지 파이프(610)의 상부에 임시발판(620)을 설치한다.Pipes for lower work 420 penetrating the lower mounting portion 320 of the steel bridge temporary bracket (fourth to the left side of the drawing) fixed to the steel girders and the steel bridge temporary bracket (fourth to the left of the drawing) installed on the steel girders. Install a plurality of temporary scaffold support pipe 610 to intersect the lower working pipe 420, and install a temporary scaffold 620 on top of the temporary scaffold support pipe 610.
이러한 과정에서 임시로 설치되었던 상부 작업용 파이프(410)는 미리 제거한다.The upper work pipe 410 temporarily installed in this process is removed in advance.
임시발판(620)의 설치가 완료되면 가설치된 강교용 가설 브래킷(도면 좌측에서 네번째)은 임시발판(620)을 타고 접근하여 고정볼트(120)를 조임으로써 강 거더의 턱(11)에 고정되도록 한다.When the installation of the temporary scaffold 620 is completed, the temporary installation bracket for the steel bridge (fourth from the left side of the drawing) is fixed to the jaw 11 of the steel girder by accessing the temporary scaffold 620 and tightening the fixing bolt 120. Be sure to
(6) 제6단계(도10(a) 참조)(6) Sixth Step (see Fig. 10 (a))
강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷(도면 좌측에서 네번째)의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷(도면 좌측에서 다섯번째)의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱에 거치하여 가설치하는 과정이다. 도10(a)에는 상부 작업용 파이프(410)를 이용하는 과정의 도시는 생략되었는데, 도9의 경우와 같은 방식으로 작업이 이루어지게 된다.Temporary scaffold brackets (fourth from the left side of the drawing) fixed to the steel girders and temporarily installed after completion of the installation of the temporary scaffold 620, and temporary steel brackets (fifth from the left side of the drawing) By using the upper working pipe 410 penetrating the upper mounting portion 310 of the mounting portion 110 of the steel bridge construction bracket to be additionally installed according to a predetermined interval to install the temporary girder jaw It is a process. In FIG. 10 (a), a process of using the upper work pipe 410 is omitted, but the work is performed in the same manner as in FIG. 9.
(7) 제7단계(도10(b) 참조)(7) 7th step (refer to FIG. 10 (b))
강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷(도면 좌측에서 네번째)의 하부거치부(320)와 추가로 설치된 강교용 가설 브래킷(도면 좌측에서 다섯번째)의 하부거치부(320)를 관통하도록 하부 작업용 파이프(420)를 이동시키면서, 하부 작업용 파이프(420)와 교차하도록 임시발판 지지 파이프(610)를 추가 설치하고, 임시발판 지지 파이프(610) 상부에 임시발판(620)을 추가 설치하고, 추가로 설치된 임시발판(620)을 타고 접근하여 추가로 가설치된 강교용 가설 브래킷(도면 좌측에서 다섯번째)의 고정볼트(120)를 조여주는 과정이다.Temporary scaffolding 620 is installed on the steel girders and the temporary mounting bracket for the steel bridge (fourth from the left side of the drawing), which is fixed after the installation of the temporary scaffold 620, and the temporary mounting bracket for the steel bridge (fifth from the left side of the drawing) are additionally installed. While moving the lower work pipe 420 to penetrate the lower mounting portion 320 of the, while additionally installing the temporary scaffold support pipe 610 to intersect the lower work pipe 420, the temporary scaffold support pipe 610 above After installing the temporary scaffold 620, and additionally installed by accessing the temporary scaffold 620 installed is a process of tightening the fixing bolt 120 of the temporary installation bracket for the steel bridge (fifth from the left side of the drawing).
(8) 제8단계(도11 참조)(8) 8th step (refer FIG. 11)
강 거더의 좌우 양측에 설치된 강교용 가설 브래킷의 비계거치부(330)를 관통하여 강 거더의 폭 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하고, 강 거더의 폭 방향으로 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 과정이다.A scaffold for temporary installation installed in the width direction of the steel girder by installing the scaffolding pipe 430 arranged in the width direction of the steel girder by penetrating the scaffolding unit 330 of the steel bridge temporary bracket installed on the left and right sides of the steel girder. A plurality of working scaffold support pipes 510 are installed to intersect the pipe 430, and a working scaffold 520 is installed on an upper portion of the working scaffold support pipe 510.
이러한 과정에서 임시로 설치된 하부 작업용 파이프(420), 임시발판 지지 파이프(610), 임시발판(620) 등은 제거하여 작업발판(520)의 추가 설치 작업에 활용한다.In this process, the temporarily installed lower work pipe 420, temporary scaffold support pipe 610, temporary scaffold 620, and the like are removed and used for additional installation work of the scaffold 520.
첨부도면에 세부적으로 도시하지 않았으나 작업발판(520), 작업발판 지지 파이프(510), 가시설용 비계 파이프(430), 수직지주(210)들은 적절한 방법으로 상호 결속하여 결합상태가 안정적으로 유지되게 한다.Although not shown in detail in the accompanying drawings, the working scaffold 520, the working scaffold support pipe 510, the temporary scaffolding pipe 430, and the vertical supports 210 are coupled to each other in an appropriate manner to maintain a stable coupling state. .
상기한 제4단계 내지 제8단계 과정을 반복하면 강 거더의 하부를 따라 작업발판(520)을 연속적으로 설치할 수 있게 된다.By repeating the above-described fourth to eighth steps, the working scaffold 520 can be continuously installed along the lower portion of the steel girder.
상기한 바와 같이 본 발명의 구체적 실시예를 첨부도면을 참조하여 설명하였으나 본 발명의 보호범위가 반드시 이러한 실시예에만 한정되는 것은 아니며 본 발명의 기술적 요지를 변경하지 않는 범위 내에서 다양한 설계변경, 공지기술의 부가나 삭제, 단순한 수치한정 등의 경우 본 발명의 보호범위에 속함을 분명히 한다.As described above, specific embodiments of the present invention have been described with reference to the accompanying drawings, but the protection scope of the present invention is not necessarily limited to these embodiments, and various design changes and notifications are made within the scope of not changing the technical gist of the present invention. In the case of addition or deletion of technology, simple numerical limitations, etc., the scope of the present invention is clearly clarified.
110:걸림부
120:고정볼트
130:회동밀착부
131:밀착면
140:스프링부
210:수직지주
310:상부거치부
320:하부거치부
330:비계거치부
410:상부 작업용 파이프
420:하부 작업용 파이프
430:가시설용 비계 파이프
510:작업발판 지지 파이프
520:작업발판
610:임시발판 지지 파이프
620:임시발판
11:턱
110: catching part
120: fixing bolt
130: Rotating contact part
131: close contact
140: spring part
210: vertical holding
310: upper part
320: lower part
330: scaffolding
410: pipe for upper work
420: pipe for bottom work
430: scaffolding pipes
510: work scaffold support pipe
520: scaffolding
610: temporary scaffold support pipe
620: Temporary Scaffolding
11: Jaw

Claims (8)

  1. 강교의 거더를 따라 설치되는 강교용 가설 브래킷에 관한 것으로서,
    강(鋼) 거더의 턱(11)에 걸리는 "ㄷ"자 형태의 걸림부(110);
    상기 걸림부(110)의 일측에 나사체결되어 나사산을 따라 전후진이 가능하고, 상기 걸림부(110)의 상부 내측면이 강 거더의 턱에 밀착고정되도록 하는 고정볼트(120); 및,
    상기 걸림부(110)에 핀결합되어 회동하고, 상기 걸림부(110)의 상부 내측면을 향하여 곡면의 밀착면(131)이 구비된 회동밀착부(130);가 더 포함되고,
    상기 고정볼트(120)를 조임에 따라 상기 회동밀착부(130)가 회동하면서 상기 걸림부(110)의 상부 내측면과 상기 회동밀착부(130)의 밀착면(131) 사이에 강 거더의 턱이 밀착고정되는 것을 특징으로 하는 강교용 가설 브래킷.
    As for the temporary bracket for steel bridge installed along the girder of the steel bridge,
    Hanging part 110 of the "c" shape is caught on the jaw 11 of the steel girder;
    A fastening bolt 120 capable of fastening back and forth along the screw thread by screwing to one side of the catching part 110 and fixing the upper inner surface of the catching part 110 to the jaw of the steel girder; And,
    It is further pinched to the engaging portion 110, the rotational contact portion 130 is provided with a contact surface 131 of the curved surface toward the upper inner surface of the engaging portion 110;
    As the fixing bolt 120 is tightened, the rotating contact part 130 rotates while the jaw of the steel girder is disposed between the upper inner surface of the locking part 110 and the contact surface 131 of the rotating contact part 130. Temporary bracket for steel bridges, characterized in that the closely fixed.
  2. 제1항에서,
    상기 걸림부(110)와 상기 회동밀착부(130) 사이에 설치되어 상기 회동밀착부(130)의 밀착면(131)과 상기 걸림부(110)의 상부 내측면 사이의 간격이 좁혀지는 방향으로 상기 회동밀착부(130)을 탄성지지하는 스프링부(140);
    가 더 포함되는 것을 특징으로 하는 강교용 가설 브래킷..
    In claim 1,
    Installed between the locking portion 110 and the rotational contact portion 130 in a direction in which the distance between the contact surface 131 of the rotational contact portion 130 and the upper inner surface of the locking portion 110 is narrowed. A spring unit 140 for elastically supporting the rotational contact unit 130;
    Temporary bracket for steel bridges, characterized in that it further comprises ..
  3. 제1항 또는 제2항에서,
    상기 걸림부(110)의 하부 외측에 결합되어 하향 연장되는 수직지주(210);
    상기 걸림부(110)의 하부 외측 또는 상기 수직지주(210)의 상부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 상부 작업용 파이프(410)가 거치되는 상부거치부(310);
    상기 수직지주(210)의 하부 일측에 구비되어 가시설 설치 과정에서 임시로 사용되는 하부 작업용 파이프(420)가 거치되는 하부거치부(320); 및,
    상기 수직지주(210)의 하단부에 구비되어 가시설용 비계 파이프(430)가 거치되는 비계거치부(330);
    를 더 포함하여 구성되는 것을 특징으로 하는 강교용 가설 브래킷.
    The method of claim 1 or 2,
    A vertical support 210 coupled to the lower outer side of the locking part 110 and extending downward;
    An upper mounting portion 310 provided at a lower outer side of the catching portion 110 or an upper one side of the vertical support 210 to which an upper working pipe 410 is temporarily used in a temporary installation process;
    A lower mounting portion 320 provided at one lower side of the vertical support 210 to which a lower work pipe 420 is temporarily used in a temporary installation process; And,
    A scaffolding base 330 which is provided at a lower end of the vertical support 210 to which a scaffold pipe 430 for a temporary facility is mounted;
    Temporary bracket for steel bridges, characterized in that further comprises.
  4. 제3항에서,
    상기 상부거치부(310)에 거치되는 상부 작업용 파이프(410), 상기 하부거치부(320)에 거치되는 하부 작업용 파이프(420) 및 상기 비계거치부(330)에 거치되는 가시설용 비계 파이프(430)가 모두 같은 방향으로 나란하게 배열되도록 상기 상부거치부(310), 상기 하부거치부(320) 및 상기 비계거치부(330)가 같은 방향을 향하는 구조인 것을 특징으로 하는 강교용 가설 브래킷.
    In claim 3,
    Upper work pipe 410 mounted on the upper mounting portion 310, lower work pipe 420 mounted on the lower mounting portion 320 and the scaffolding pipe 430 for temporary equipment mounted on the scaffolding portion 330. ) The upper mounting portion 310, the lower mounting portion 320 and the scaffolding portion 330 is a structure for the steel bridge, characterized in that the same direction so that all arranged side by side in the same direction.
  5. 제3항에서,
    상기 상부거치부(310)에 거치되는 상부 작업용 파이프(410)와 상기 하부거치부(320)에 거치되는 하부 작업용 파이프(420)는 같은 방향으로 나란하게 배열되고,
    상기 비계거치부(330)에 거치되는 가시설용 비계 파이프(430)는 상부 작업용 파이프(410) 및 하부 작업용 파이프(420)와 서로 직교하는 방향으로 배열되도록 상기 비계거치부(330)는 상기 상부거치부(310) 및 상기 하부거치부(320)와 다른 방향을 향하는 구조인 것을 특징으로 하는 강교용 가설 브래킷.
    In claim 3,
    The upper work pipe 410 mounted to the upper mounting portion 310 and the lower work pipe 420 mounted to the lower mounting portion 320 are arranged side by side in the same direction,
    The scaffolding unit 330 is mounted on the scaffolding unit 330 so that the scaffolding unit 330 is arranged in a direction orthogonal to the upper work pipe 410 and the lower work pipe 420. Temporary bracket for steel bridges, characterized in that the structure facing the other direction 310 and the lower mounting portion 320.
  6. 제4항에 기재된 강교용 가설 브래킷을 이용한 비계 설치공법에 관한 것으로서,
    강(鋼) 거더의 턱(11)에 "ㄷ"자 형태의 걸림부(110)를 거치하고, 고정볼트(120)를 조여 강교용 가설 브래킷을 강 거더의 좌우 양측을 따라 미리 설정된 간격으로 고정설치하는 제1단계;
    강 거더의 좌우 양측 각각에 고정설치된 강교용 가설 브래킷 각각의 비계거치부(330)를 관통하여 강 거더의 길이 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하는 제2단계;
    강 거더의 좌우 양측을 따라 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 제3단계;
    강 거더에 고정되어 작업발판(520)의 설치가 완료된 강교용 가설 브래킷의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 제4단계;
    강 거더에 고정된 강교용 가설 브래킷과 강 거더에 가설치된 강교용 가설 브래킷 각각의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 다수의 임시발판 지지 파이프(610)를 설치하고, 임시발판 지지 파이프(610)의 상부에 임시발판(620)을 설치하고, 가설치된 강교용 가설 브래킷의 고정볼트(120)를 조여주는 제5단계;
    강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱에 거치하여 가설치하는 제6단계;
    강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷의 하부거치부(320)와 추가로 설치된 강교용 가설 브래킷의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 임시발판 지지 파이프(610)를 추가 설치하고, 추가 설치된 임시발판 지지 파이프(610) 상부에 임시발판(620)을 추가 설치하고, 추가로 가설치된 강교용 가설 브래킷의 고정볼트를 조여주는 제7단계; 및,
    강 거더의 좌우 양측 각각에 설치된 강교용 가설 브래킷 각각의 비계거치부(330)를 관통하여 강 거더의 길이 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하고, 강 거더의 좌우 양측을 따라 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 제8단계;
    를 포함하여 구성되는 것을 특징으로 하는 강교용 가설 브래킷을 이용한 비계 설치공법.
    Regarding the scaffolding installation method using the steel bridge temporary bracket described in claim 4,
    The hook portion 110 of the "c" shape is mounted on the jaw 11 of the steel girder, and the fixing bolt 120 is tightened to fix the steel bridge temporary bracket at predetermined intervals along the left and right sides of the steel girder. A first step of installing;
    A second step of installing a temporary scaffolding pipe 430 arranged in a longitudinal direction of the steel girder by penetrating the scaffolding unit 330 of each of the steel bridge temporary brackets fixed to the left and right sides of the steel girder;
    Installing a plurality of work scaffold support pipe 510 to intersect the scaffold pipe 430 for the temporary installation installed along the left and right sides of the steel girders, and install the work scaffold 520 on top of the work scaffold support pipe 510. Step 3;
    The upper work pipe 410 which is fixed to the steel girders and penetrates the upper mounting portion 310 of the steel bridge temporary bracket on which the installation of the work scaffold 520 is completed and the upper mounting portion 310 of the steel bridge temporary bracket to be additionally installed. A fourth step of mounting the hooking portion 110 of the steel bridge temporary bracket to be additionally installed at a predetermined interval using the jaw 11 of the steel girder;
    Install the lower working pipe 420 passing through the lower mounting portion 320 of the steel bridge temporary bracket fixed to the steel girder and the steel bridge temporary bracket installed to the steel girder, and intersect with the lower working pipe 420. A fifth for installing a plurality of temporary scaffold support pipes 610, installing a temporary scaffold 620 on top of the temporary scaffold support pipe 610, and tightening the fixing bolt 120 of the temporary steel bracket temporary bracket installed thereon. step;
    After the installation of the temporary scaffold 620 is temporarily installed on the steel girders for the upper work through the upper mounting portion 310 of the fixed steel bridge construction bracket and the upper mounting portion 310 of the steel bridge temporary bracket to be installed additionally A sixth step of installing the hook portion 110 of the steel bridge temporary bracket to be additionally installed at a predetermined interval using the pipe 410 to be temporarily installed on the jaw of the steel girder;
    After installation of the temporary scaffold 620 is installed on the steel girders, the lower work pipes passing through the lower mounting portion 320 of the fixed steel bridge construction brackets and the lower mounting portion 320 of the steel bridge construction brackets further installed 420 is installed, and the temporary scaffold support pipe 610 is further installed to intersect the lower work pipe 420, and the temporary scaffold 620 is additionally installed on the additional temporary scaffold support pipe 610, and further installed. A seventh step of tightening the fixing bolt of the steel construction temporary bracket installed in the furnace; And,
    A temporary scaffolding pipe 430 arranged in the longitudinal direction of the steel girder is installed through the scaffolding portion 330 of each steel bridge temporary bracket installed on each of the left and right sides of the steel girder, and is installed along the left and right sides of the steel girder. An eighth step of installing a plurality of scaffold support pipes 510 to intersect the scaffold pipe 430 for temporary installation and installing a scaffold 520 on top of the scaffold support pipe 510;
    Scaffolding installation method using the steel bridge temporary bracket, characterized in that comprising a.
  7. 제5항에 기재된 강교용 가설 브래킷을 이용한 비계 설치공법에 관한 것으로서,
    강(鋼) 거더의 턱(11)에 "ㄷ"자 형태의 걸림부(110)를 거치하고, 고정볼트(120)를 조여 강교용 가설 브래킷을 강 거더의 좌우 양측을 따라 미리 설정된 간격으로 고정설치하는 제1단계;
    강 거더의 좌우 양측에 고정설치된 강교용 가설 브래킷의 비계거치부(330)를 관통하여 강 거더의 폭 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하는 제2단계;
    강 거더의 폭 방향으로 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 제3단계;
    강 거더에 고정되어 작업발판(520)의 설치가 완료된 강교용 가설 브래킷의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 제4단계;
    강 거더에 고정된 강교용 가설 브래킷과 강 거더에 가설치된 강교용 가설 브래킷 각각의 하부거치부(320)를 관통하는 하부 작업용 파이프(420)를 설치하고, 하부 작업용 파이프(420)와 교차하도록 다수의 임시발판 지지 파이프(610)를 설치하고, 임시발판 지지 파이프(610)의 상부에 임시발판(620)을 설치하고, 가설치된 강교용 가설 브래킷의 고정볼트(120)를 조여주는 제5단계;
    강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷의 상부거치부(310)와 추가로 설치될 강교용 가설 브래킷의 상부거치부(310)를 관통하는 상부 작업용 파이프(410)를 이용하여 미리 설정된 간격에 따라 추가로 설치될 강교용 가설 브래킷의 걸림부(110)를 강 거더의 턱(11)에 거치하여 가설치하는 제6단계;
    강 거더에 가설치되어 임시발판(620)의 설치가 완료된 후 고정된 강교용 가설 브래킷의 하부거치부(320)와 추가로 설치된 강교용 가설 브래킷의 하부거치부(320)를 관통하도록 하부 작업용 파이프(420)를 이동시키고, 하부 작업용 파이프(420)와 교차하도록 임시발판 지지 파이프(610)를 추가 설치하고, 추가 설치된 임시발판 지지 파이프(610) 상부에 임시발판(620)을 추가 설치하고, 추가로 가설치된 강교용 가설 브래킷의 고정볼트(120)를 조여주는 제7단계; 및,
    강 거더의 좌우 양측에 설치된 강교용 가설 브래킷의 비계거치부(330)를 관통하여 강 거더의 폭 방향으로 배열되는 가시설용 비계 파이프(430)를 설치하고, 강 거더의 폭 방향으로 설치된 가시설용 비계 파이프(430)와 교차하도록 다수의 작업발판 지지 파이프(510)를 설치하고, 작업발판 지지 파이프(510)의 상부에 작업발판(520)을 설치하는 제8단계;
    를 포함하여 구성되는 것을 특징으로 하는 강교용 가설 브래킷을 이용한 비계 설치공법.
    Regarding the scaffolding installation method using the temporary bracket for steel bridges of claim 5,
    The hook portion 110 of the "c" shape is mounted on the jaw 11 of the steel girder, and the fixing bolt 120 is tightened to fix the steel bridge temporary bracket at predetermined intervals along the left and right sides of the steel girder. A first step of installing;
    A second step of installing a temporary scaffolding pipe 430 arranged in a width direction of the steel girder by penetrating the scaffolding unit 330 of the steel bridge temporary bracket fixedly installed at both sides of the steel girder;
    Third to install a plurality of work scaffold support pipe 510 to intersect the scaffold pipe 430 for the temporary installation installed in the width direction of the steel girder, and to install the work scaffold 520 on the work scaffold support pipe 510. step;
    The upper work pipe 410 which is fixed to the steel girders and penetrates the upper mounting portion 310 of the steel bridge temporary bracket on which the installation of the work scaffold 520 is completed and the upper mounting portion 310 of the steel bridge temporary bracket to be additionally installed. A fourth step of installing the hooking part 110 of the steel bridge temporary bracket to be additionally installed at a predetermined interval using the jaw 11 of the steel girder;
    Install the lower working pipe 420 passing through the lower mounting portion 320 of the steel bridge temporary bracket fixed to the steel girder and the steel bridge temporary bracket installed to the steel girder, and intersect with the lower working pipe 420. A fifth for installing a plurality of temporary scaffold support pipes 610, installing a temporary scaffold 620 on top of the temporary scaffold support pipe 610, and tightening the fixing bolt 120 of the temporary steel bracket temporary bracket installed thereon. step;
    After the installation of the temporary scaffold 620 is temporarily installed on the steel girders for the upper work through the upper mounting portion 310 of the fixed steel bridge construction bracket and the upper mounting portion 310 of the steel bridge temporary bracket to be installed additionally A sixth step of installing the hook portion 110 of the steel bridge temporary bracket to be additionally installed at a predetermined interval using the pipe 410 to be temporarily installed on the jaw 11 of the steel girder;
    After installation of the temporary scaffold 620 is installed on the steel girder, the lower mounting portion 320 of the fixed steel bridge construction bracket and the lower mounting portion 320 of the steel bridge construction bracket additionally installed lower work pipe Move 420, and additionally install the temporary scaffold support pipe 610 to intersect the lower work pipe 420, and additionally install the temporary scaffold 620 on top of the additionally installed temporary scaffold support pipe 610, add A seventh step of tightening the fixing bolts 120 of the temporary mounting bracket for the steel bridge installed in the furnace; And,
    A scaffold for temporary installation installed in the width direction of the steel girder by installing the scaffolding pipe 430 arranged in the width direction of the steel girder by penetrating the scaffolding unit 330 of the steel bridge temporary bracket installed on the left and right sides of the steel girder. An eighth step of installing a plurality of working scaffold support pipes 510 to intersect the pipe 430 and installing the working scaffold 520 on top of the working scaffold support pipe 510;
    Scaffolding installation method using a steel bridge temporary bracket, characterized in that configured to include.
  8. 삭제delete
KR1020170137340A 2017-09-13 2017-10-23 Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof KR102059081B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR20170117205 2017-09-13
KR1020170117205 2017-09-13

Publications (2)

Publication Number Publication Date
KR20190030134A KR20190030134A (en) 2019-03-21
KR102059081B1 true KR102059081B1 (en) 2019-12-24

Family

ID=66036756

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020170137340A KR102059081B1 (en) 2017-09-13 2017-10-23 Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof
KR1020180083407A KR102127345B1 (en) 2017-09-13 2018-07-18 Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020180083407A KR102127345B1 (en) 2017-09-13 2018-07-18 Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof

Country Status (1)

Country Link
KR (2) KR102059081B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101185578B1 (en) * 2009-07-28 2012-09-24 이상식 Temporary Construction Bracket

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2592393Y2 (en) * 1993-09-14 1999-03-17 日鐵建材工業株式会社 Metal fittings for fixing temporary handrail supports
KR200383907Y1 (en) * 2005-02-22 2005-05-10 이정호 Device for fixing safety net
KR200479671Y1 (en) * 2011-10-21 2016-02-25 한국전력공사 one-touch earthing equipment on line
KR101588978B1 (en) * 2014-11-24 2016-01-28 김현식 Fixing apparatus of scaffold and structure body

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101185578B1 (en) * 2009-07-28 2012-09-24 이상식 Temporary Construction Bracket

Also Published As

Publication number Publication date
KR102127345B1 (en) 2020-06-26
KR20190030155A (en) 2019-03-21
KR20190030134A (en) 2019-03-21

Similar Documents

Publication Publication Date Title
US2577979A (en) Scaffold supporting structure
US20200199870A1 (en) Formwork system
US10612573B2 (en) Bracing clamp for beams
KR102059081B1 (en) Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof
KR101131079B1 (en) Multi U-head Support Apparatus For Bridge Construction
KR100433700B1 (en) Mold system for slab concrete of bridge
KR100373783B1 (en) A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same
WO2015011641A1 (en) Semi rigid precast wall system
JPH1171897A (en) Scaffold support device for placing concrete
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
KR20120003729U (en) System support Head
KR200347093Y1 (en) Mold system for slab concrete of bridge
KR100812262B1 (en) Device for preventing falling of gangform and method for constructing reinforced concrete structure using the same
KR200222611Y1 (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
KR200413590Y1 (en) Scaffold and construction structure thereof
KR20020001480A (en) Steel form for slab concrete applicable to P.C. beam or Steel Box methods
JP5409955B1 (en) Steel bridge structure
JP2654935B2 (en) Construction method of ribbed slab and spacer for rib reinforcement
KR102289940B1 (en) A Study on the Hypothesis Tread Plates for Framed Construction
US9777490B2 (en) Falsework hook and fastener
KR100840279B1 (en) Suspension hanger for slab form
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
JP5119729B2 (en) Wall-connecting bracket and wall-connecting method
JP2014190116A (en) Construction method of concrete slab
KR200245284Y1 (en) A temporary bracket for construction of precast concrete beam bridge

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right