KR20220112615A - Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie - Google Patents
Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie Download PDFInfo
- Publication number
- KR20220112615A KR20220112615A KR1020210016365A KR20210016365A KR20220112615A KR 20220112615 A KR20220112615 A KR 20220112615A KR 1020210016365 A KR1020210016365 A KR 1020210016365A KR 20210016365 A KR20210016365 A KR 20210016365A KR 20220112615 A KR20220112615 A KR 20220112615A
- Authority
- KR
- South Korea
- Prior art keywords
- anchor
- formwork
- form tie
- pipe
- bolt
- Prior art date
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 78
- 238000010276 construction Methods 0.000 title claims abstract description 51
- 238000009434 installation Methods 0.000 title claims abstract description 35
- 238000010168 coupling process Methods 0.000 claims abstract description 8
- 238000005859 coupling reaction Methods 0.000 claims abstract description 8
- 238000009415 formwork Methods 0.000 claims description 99
- 230000003014 reinforcing effect Effects 0.000 claims description 26
- 238000000034 method Methods 0.000 claims description 19
- 238000005266 casting Methods 0.000 claims description 13
- 230000008569 process Effects 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 description 7
- 238000009933 burial Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- UDPGUMQDCGORJQ-UHFFFAOYSA-N (2-chloroethyl)phosphonic acid Chemical compound OP(O)(=O)CCCl UDPGUMQDCGORJQ-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000008531 maintenance mechanism Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B13/00—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
- F16B13/04—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
- F16B13/045—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front having axially compressing parts allowing the clamping of an object tightly to the wall
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B37/00—Nuts or like thread-engaging members
- F16B37/04—Devices for fastening nuts to surfaces, e.g. sheets, plates
- F16B37/041—Releasable devices
- F16B37/042—Releasable devices locking by rotation
Abstract
Description
본 발명은 교량의 콘크리트 구조물 형성을 위해 설치되는 거푸집의 폼타이를 활용하여 점검시설을 볼트결합시킬 수 있는 앵커수단이 교각 측벽에 선매립으로 시공될 수 있도록 한 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체에 관한 것으로, 보다 상세하게는 교각 형성전 거푸집에 설치되는 폼타이를 이용하여 폼타이 작업을 수행함과 동시에 교각 형성후 교량 점검시설의 지지브래킷이 볼트 결합될 수 있는 앵커수단이 교각 측벽에 선매립으로 장착 구성될 수 있도록 함으로서, 비용 절감뿐만 아니라 작업의 편리성과 구조 안전성 등을 획기적으로 향상시키도록 한 거푸집용 폼타이를 활용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체에 관한 것이다.The present invention is for the installation of a bridge inspection facility using a formwork form tie so that an anchor means capable of bolting the inspection facility can be built in pre-buried on the side wall of the pier by using the form tie of the formwork installed for the formation of the concrete structure of the bridge. It relates to a method for constructing a pre-buried anchor set and its structure, and more specifically, it is possible to perform form tie work using a form tie installed on the formwork before pier formation, and at the same time, after pier formation, the support bracket of the bridge inspection facility can be bolted A pre-buried anchor set for the installation of bridge inspection facilities using form ties to dramatically improve work convenience and structural safety as well as cost savings by allowing the anchor means to be installed on the side wall of the pier by pre-burial. It relates to a construction method and a structure thereof.
교량의 점검시설은 교량의 구조물 각 부위에서 기능상태, 노후 및 결함 등의 확인점검과 유지보수 등 교량 관리효율의 향상을 도모하기 위한 목적으로 교량의 콘크리트 교각 측벽에 설치된다. 이는 교량의 안전점검과 유지관리 및 시설보수, 보강작업 시설 및 장착구 작업시설로서 교량 시공의 유지 및 관리 측면에 유용하며, 교통 제한없이 상시 확인점검이 가능하여 도로관리의 효율성을 극대화하기 위한 시설이다.The bridge inspection facility is installed on the side wall of the concrete pier of the bridge for the purpose of improving the bridge management efficiency such as checking and repairing the functional condition, old age, and defects in each part of the bridge structure. This is useful for the maintenance and management of bridge construction as a safety inspection and maintenance, facility repair, reinforcement work facility, and fitting work facility. to be.
통상 교량의 콘크리트 구조물인 교각을 제작하기 위해서는 거푸집(FormWork)을 설치하고, 그 내부 공간에 철근을 설치한 다음 콘크리트를 타설하여 완성한다. 그러나 거푸집 내부 공간에 콘크리트를 타설하고 양생하는 과정에서 콘크리트의 팽창력(측압)이 발생하여 거푸집이 변형되고, 결국 콘크리트 구조물이 변형되어 성형되기 때문에 거푸집의 변형 방지 및 고정력 향상을 시키기 위하여 폼타이(Form Tie)를 설치하여 적용한다. 참고로 폼타이(Form Tie)는 콘크리트 시공에서 거푸집을 정확한 위치에 정확한 치수로 시공하기 위하여 사용하는 조임기구로서, 거푸집의 일정한 간격과 세퍼레이터의 역할도 하는 철선이나 꺽쐬, 볼트 따위를 통틀어 이른다.In order to manufacture a pier, which is a concrete structure of a bridge, a formwork is installed, reinforcing bars are installed in the interior space, and then concrete is poured to complete it. However, in the process of pouring and curing concrete in the inner space of the form, the expansion force (lateral pressure) of the concrete is generated and the form is deformed, and eventually the concrete structure is deformed and formed. Tie) is installed and applied. For reference, a form tie is a fastening device used to construct a formwork at an accurate location and with precise dimensions in concrete construction.
이러한 폼타이는 도 3의 거푸집 폼타이가 철근(40) 사이에 삽입 고정되어 양쪽의 거푸집(30)에 매립 설치되는 폼타이 시공도와, 도 4 및 도 5의 기존의 통상적인 교각(10)의 콘크리트 구조물을 형성시키기 위한 양쪽의 거푸집(30) 사이에 구성되어 설치되었던 분리상태 사시도 및 결합상태 단면도에서 보는 것처럼, 일반적으로 PVC파이프(51)와 상기 PVC파이프(51) 내부에 길이방향으로 삽입되어 양쪽 거푸집(30)의 폼타이홀(32)로 단부가 통과되어 노출되는 세파볼트(50), 그리고 상기 세파볼트(50)를 일정간격으로 폼타이홀(32)이 관통된 거푸집(30)의 바깥쪽 측면에 고정하기 위한 컵와샤(52)와 주물너트(54) 및 상기 폼타이홀(32)에 밀착 고정되는 홀지지와셔(53) 등을 포함하여 구성되는 것이 보통이다.Such a form tie is a form tie construction drawing in which the formwork form tie of FIG. 3 is inserted and fixed between the
즉, 폼타이는 일반적으로 한쪽 거푸집(30)의 한 방향을 기준으로 양쪽 거푸의 내부 공간에 철근(40)을 통과하여 수평방향의 일정간격으로 설치하게 되는데, 폼타이가 설치된 거푸집(30)의 내부 공간에 콘크리트 타설 및 양생 후 통상 철근 사이에 삽입 통과되어 설치된 PVC파이프(51)를 제외한 세파볼트(50) 및 기타 구성 부품들은 분리하게 때문에, 콘크리트 구조물인 교각(10) 내부에는 PVC파이프(51)가 매설되어 있는 형태로 콘크리트 구조물이 형성 완성된다. 결국 기존에 교각(10) 형성시에 적용된 폼타이는 단순하게 거푸집(30)을 고정하는 기본 기능만이 발휘되는 정도였다.That is, the form tie is generally installed at regular intervals in the horizontal direction by passing through the
이와 같이 교각(10)의 콘크리트 구조물 형성 작업시 거푸집(30)에 적용 설치되는 폼타이는, 먼저 상기 거푸집(30) 내부 공간에 철근(40)을 설치 배근할 때 상기 철근(40) 사이로 폼타이를 구성하는 PVC파이프(51)가 통과 설치되고, 이후 상기 PVC파이프(51)가 콘크리트 타설작업에 따른 충격이나 진동 등으로 위치 변동되지 않고 거푸집(30)의 폼타이홀(32) 위치에 안정되게 고정 결합되어 유지될 수 있도록, 상기 거푸집(30)의 폼타이홀(32)을 통해 상기 PVC파이프(51) 내부로 세파볼트(50)를 삽입 결속시키고 양쪽 거푸집(30) 외측으로 노출된 상기 세파볼트(50)의 단부에 대해 컵와셔(52) 및 홀지지와셔(53)와 주물너트(54) 등으로 결속 고정시켜 마무리 작업하는 것이 보통이다.As such, the form tie applied and installed to the
그리고 거푸집(30) 내부 공간에 철근(40)과 함께 폼타이가 설치 완료되면 상기 거푸집(30) 내부 공간으로 콘크리트를 타설 및 양생 작업하게 되고, 콘크리트 양생 처리후 콘크리트 구조물인 교각(10)에서 거푸집(30)을 제거하기 위하여 거푸집(30) 간의 패널연결나사를 제거할 때 동시에 폼타이를 구성하는 컵와셔(52) 및 주물너트(54)와 함께 세파볼트(50)까지 외부로 분리 제거하게 된다.And when the form tie together with the reinforcing
참고로 도 1에 도시한 개략적인 교량 구조도에서 보는 바와 같이, 교량의 점검시설(20)은 콘크리트 교량구조물인 교각(10) 측면에 일정 간격으로 앵커수단인 통상 앵커볼트(14)가 매립 형성되고, 상기 교각(10) 측벽의 앵커볼트(14)와 볼트 결합되는 지지브래킷(22)을 포함하여 수직 및 수평의 포스트와 바닥 통로 등의 구성수단이 일체 구조화되는 형태로 형성되는 것이 보통이다.For reference, as shown in the schematic bridge structure diagram shown in Fig. 1, the
한편, 일반적으로 폼타이가 적용 설치된 거푸집(30)의 내부 공간에 콘크리트 타설 및 양생작업으로 콘크리트 구조물이 형성된 교각(10)에 대한 앵커수단의 매립방식은 도 2의 앵커수단인 앵커볼트(14) 시공도에서 보는 것처럼, 교각(10) 측벽에 노출된 폼타이의 세파볼트(50) 단부와는 별도로 앵커구멍(12)을 성형한 후 앵커수단인 별도의 앵커볼트(14)을 외부에서 삽입하고 점검시설(20)의 지지브래킷(22)을 상기 앵커볼트(14)에 대해 볼트 결합시켜 교량의 점검시설(20)을 설치 완성하게 되는 후매립 시공방식이 있으나, 현재는 앵커수단의 후매립 시공방식이 구조적으로 작업상의 안전사고 및 불편을 많아 이를 개선하고자 거푸집 설치 후 콘크리트 타설 전에 자력 및 용접 등을 이용하여 앵커수단을 콘크리트 구조물인 교각의 형성과정에서 그 내부공간에 함께 미리 설치되도록 하는 앵커수단 선매립 시공방식이 적용되고 있는 추세이다.On the other hand, in general, the embedding method of the anchor means for the
그러나 후매립 앵커볼트 시공방식의 경우, 구조적으로 노출된 세파볼트(50)와는 별도로 앵커구멍(12)의 천공작업 및 앵커삽입 고정단계에서 결합강도 저하에 따른 안전상 문제가 발생할 수 있고, 또한 지금까지 소개된 점검시설(20)을 결합 고정시키기 위한 앵커수단(앵커세트)의 선매립 시공방식의 경우에도 앵커세트의 장착 정밀도 유지의 어려움은 물론, 복잡한 앵커세트 설치작업의 높은 난이도와 많은작업공수가 필요하기 때문에 비용 상승의 요인이 발생된다는 구조적인 불편이 문제가 해소되지 못하였다. However, in the case of the post-buried anchor bolt construction method, a safety problem may occur due to a decrease in bonding strength in the drilling operation of the
본 발명은 이와 같은 기존에 개시된 앵커볼트 기능의 앵커수단(앵커세트)가 후매립되는 시공방식은 물론 선매립 시공구조 모두의 교량 점검시설용 매립형 고정 지지수단들이 갖는 앵커수단의 시공장치 및 시공방법들이 갖는 제반 불편한 한계와 문제들을 구조적으로 확실하게 해결하고자 하고자 개발된 것으로, 기본적으로 교량의 콘크리트 구조물 형성을 위해 설치되는 거푸집에 적용된 폼타이에 대해 거푸집을 고정하는 단순 기능이 아닌 점검시설을 볼트 결합시킬 수 있는 선매립 시공구조의 앵커수단 기능이 발휘되는 앵커세트가 교각 측벽에 형성될 수 있도록 함으로서, 교각의 콘크리트 구조물 형성될 때의 거푸집을 고정하는 단순 기능뿐만 아니라 교량의 점검시설을 별도의 앵커수단 설치작업 없이도 바로 편리하게 볼트결합시킬 수 있는 앵커 기능까지 발휘될 수 있어, 앵커수단을 장착 설치하기 위한 비용 절감뿐만 아니라 작업의 편리성과 구조 안전성 등을 획기적으로 향상시키도록 한 거푸집용 폼타이를 활용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체를 제공하고자 함을 그 목적으로 한다.The present invention provides a construction method in which the anchor means (anchor set) of the previously disclosed anchor bolt function is post-buried as well as the construction apparatus and construction methods of the anchor means having the embedded fixed support means for the bridge inspection facility of all of the pre-buried construction structures. It was developed to structurally solve all the inconvenient limitations and problems of the bridge. Basically, it is not a simple function of fixing the form to the form tie applied to the form that is installed for the formation of the concrete structure of the bridge, but it is a function of bolting the inspection facility. By allowing an anchor set that exhibits the function of an anchor means of a pre-buried construction structure to be formed on the side wall of the pier, not only the simple function of fixing the formwork when the concrete structure of the pier is formed, but also the inspection facility of the bridge as a separate anchor means Utilizes form ties for formwork that not only reduce costs for mounting and installation of anchoring means, but also dramatically improve work convenience and structural safety, as the anchor function can be conveniently combined without installation work. Its purpose is to provide a method for constructing a pre-buried anchor set for installation of a bridge inspection facility and its structure.
상기와 같은 목적을 달성하기 위한 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 구조체는, 먼저 콘크리트 구조물인 교각을 형성하기 위해 거푸집 내부 공간에 콘크리트를 타설하고 양생하는 과정에서 콘크리트의 팽창력(측압)이 발생하여 거푸집이 변형되는 것을 방지하고자 상기 거푸집 내부 공간에 배근되는 철근 사이로 폼타이를 구성하는 고정파이프 및 이동파이프를 통과시켜 양쪽 거푸집 사이에 결속 고정하고, 점검시설이 결합 고정되는 브래킷앵커볼트 및 상기 폼타이의 이동파이프와 결합 고정되는 파이트앵커볼트가 형성된 앵커세트를 상기 거푸집 양쪽 내측에 장착한 후에 상기 거푸집의 폼타이홀을 통해 폼타이를 구성하는 세파볼트를 이들 앵커세트의 파이프앵커볼트 및 폼타이의 파이프 내부로 삽입하여 결속수단으로 결합 고정하는 시공 원리로서 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법이 구현될 수 있다.The method and structure of the pre-embedded anchor set construction method and structure for the installation of a bridge inspection facility using a formwork form tie of the present invention for achieving the above object is a process of pouring and curing concrete in the inner space of the formwork to form a pier which is a concrete structure first In order to prevent the form from deforming due to the expansion force (lateral pressure) of the concrete, the fixed pipe and the moving pipe constituting the form tie are passed between the reinforcing bars placed in the inner space of the form to bind and fix between both forms, and the inspection facility is Sepa bolts constituting the form tie through the form tie hole of the form after mounting the anchor set formed with the bracket anchor bolt to be coupled and fixed and the pipe anchor bolt to be coupled and fixed to the moving pipe of the form tie on both sides of the form As a construction principle in which the pipe anchor bolt of the anchor set and the pipe of the form tie are inserted into the pipe of the form tie and combined and fixed with a binding means, the construction method of the pre-embedded anchor set for the installation of the bridge inspection facility using the formwork form tie can be implemented.
즉, 상기 거푸집의 내부 공간에 폼타이와 함께 설치 구성되는 앵커세트는 상기 거푸집의 내부 공간에 철근을 배근하고 점검시설이 볼트결합되는 앵커볼트의 장착위치가 결정되면 폼타이의 구성 부품인 중간의 고정파이프와 양쪽의 이동파이프를 서로 나사방향을 달리하는 작동너트와 고정너트로서 나사결합하여 상기 철근 사이에 삽입하는 단계와, 상기 거푸집 내측의 폼타이홀 위치에 파이프앵커볼트 및 브래킷앵커볼트가 설치 형성된 앵커세트를 장착하고 양쪽의 이동파이프를 조임 및 풀림기능이 발휘되는 작동너트와 고정너트의 회전 조작으로 이송 조임동작시켜 상기 앵커세트의 파이프앵커볼트와 나사결합하는 단계와, 상기 거푸집 내측의 폼타이홀 위치에 장착 고정된 앵커세트의 파이프앵커볼트와 함께 폼타이를 구성하는 고정파이프 및 이동파이프 내부로 세파볼트를 삽입하고 컵와셔와 주물너트를 포함한 결합수단으로 상기 세파볼트를 거푸집의 폼타이홀에 결합 고정하는 단계와, 상기 거푸집 내측에 앵커세트가 장착되면서 관통된 폼타이홀이 폼타이를 구성하는 세파볼트로서 밀폐된 거푸집 내부 공간으로 콘크리트의 타설 및 양생작업을 통해 콘크리트 구조물의 교각을 형성하는 단계와, 상기 교각의 외측에 장착된 거푸집의 패널연결나사를 제거하여 거푸집을 분리하는 동시에 폼타이를 구성하는 컵와셔 및 주물너트를 세파볼트와 함께 분리시켜 제거한 후에 점검시설의 지지브래킷을 앵커세트의 해당 브래킷앵커볼트에 대해 볼트결합하는 단계를 포함하여 작업 실시됨을 특징으로 한다.That is, the anchor set installed together with the form tie in the inner space of the formwork is reinforced with reinforcing bars in the inner space of the formwork, and when the mounting position of the anchor bolt to which the inspection facility is bolted is determined, the middle part of the form tie The steps of screwing the fixed pipe and the moving pipes on both sides as an operating nut and a fixed nut having different screw directions to each other and inserting them between the reinforcing bars, and a pipe anchor bolt and a bracket anchor bolt are installed at the form tie hole position inside the formwork Mounting the formed anchor set and screwing with the pipe anchor bolt of the anchor set by transferring and tightening the moving pipe on both sides by rotating the actuating nut and the fixing nut, which exhibits tightening and loosening functions, and the form inside the formwork. Insert the Sepha bolt into the fixed pipe and the moving pipe constituting the form tie together with the pipe anchor bolt of the anchor set mounted at the tie hole position, and insert the Sepa bolt into the form tie of the formwork with a coupling means including a cup washer and a casting nut. The step of coupling and fixing to the hole, and the form tie hole penetrated while the anchor set is mounted inside the formwork is a Sepa bolt constituting the form tie. Forming step, and removing the panel connecting screw of the formwork mounted on the outside of the pier to separate the formwork, and at the same time remove the cup washer and casting nut constituting the form tie together with the Sepa bolt and remove the support bracket of the inspection facility It is characterized in that the work is carried out, including the step of bolting to the corresponding bracket anchor bolt of the anchor set.
그리고 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법을 구현하기 위한 기술적 구성원리로서 거푸집 내부 공간에 콘크리트를 타설하고 양생하는 과정에서 콘크리트의 팽창력(측압)이 발생하여 거푸집의 변형 방지와 고정력 향상을 설치되는 폼타이와 함께 콘크리트 구조체인 교각 측벽에 앵커세트가 선매립 시공되도록 구성되되, 상기 거푸집 내부 공간에 배근된 철근 사이로 각각 양측 단부에 나사 형성된 중간의 고정파이프와 상기 고정파이프 양쪽의 이동파이프가 삽입 설치되고, 상기 중간의 고정파이프를 중심으로 양쪽의 이동파이프 사이에는 회전작동을 통해 조임 및 풀림기능이 발휘되면서 이들 고정파이프와 이동파이프가 이송 조임동작될 수 있도록 작동너트와 고정너트가 결속 설치되며, 이들 고정파이프와 이동파이프 내부로 양측 단부에 나사 형성된 세파볼트가 삽입되어 양쪽 거푸집의 폼타이홀을 통해 단부가 노출되어 컵와셔 및 볼트지지와셔와 잠금너트를 통해 결합 고정되고, 앵커고정판의 사측에 점검시설의 지지브래킷이 볼트결합될 수 있도록 브래킷앵커볼트가 설치 형성되면서 상기 이동파이프 및 세파볼트가 삽입 통과되어 결속 고정될 수 있도록 파이프앵커볼트가 설치 형성되는 앵커세트를 포함하여 장치 구성된다.And as a technical principle for realizing the construction method of the pre-buried anchor set for the installation of a bridge inspection facility using the formwork form tie of the present invention, the expansion force (lateral pressure) of the concrete is generated in the process of pouring and curing the concrete in the space inside the formwork. The anchor set is constructed so that the anchor set is pre-buried on the side wall of the pier, which is a concrete structure, together with a form tie installed to prevent deformation and improve fixing power, and the fixing pipe in the middle and the fixing pipe screwed at both ends respectively between the reinforcing bars in the inner space of the formwork The moving pipes on both sides of the pipe are inserted and installed, and the tightening and loosening functions are exhibited through rotation between the moving pipes on both sides around the fixed pipe in the middle, and the actuating nut so that these fixed pipes and the moving pipe can be transported and tightened. and the fixing nut are installed, and the sepha bolts threaded at both ends are inserted into these fixing pipes and the moving pipes, the ends are exposed through the form tie holes of both forms, and the cup washers and bolt support washers are combined with the lock nut Anchor set in which the pipe anchor bolt is installed and formed so that the moving pipe and the Sepa bolt can be inserted and fixed while the bracket anchor bolt is installed and formed so that the support bracket of the inspection facility can be bolted to the four side of the anchor fixing plate The device consists of
특히, 상기 앵커세트는 점검시설의 지지브래킷이 볼트결합되는 브래킷앵커볼트가 폼타이의 세파볼트 및 이동파이프가 결합고정되는 파이프앵커볼트의 위치(높이)보다 높거나 낮게 조절될 수 있도록 선택적으로 설치 구성되며, 중간의 고정파이프를 중심으로 양쪽의 이동파이프가 위치 조절될 때 조임 및 풀림기능의 작동너트와 고정너트의 해당 나사산이 서로 반대방향으로 형성되어 한방향이 잠기면 다른 한방향이 풀리는 이송 조임기능이 발휘될 수 있도록 구성됨이 바람직하다.In particular, the anchor set is selectively installed so that the bracket anchor bolt to which the support bracket of the inspection facility is bolted can be adjusted higher or lower than the position (height) of the pipe anchor bolt to which the Sepa bolt of the form tie and the moving pipe are coupled and fixed When the moving pipes on both sides are positioned centering on the fixed pipe in the middle, the screw thread of the actuating nut and the fixed nut for tightening and loosening functions is formed in opposite directions, so when one direction is locked, the other direction is released. It is desirable to be configured so that it can be exhibited.
이와 같은 본 발명에 따른 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체는, 교각 형성전 거푸집에 설치되는 폼타이를 이용하여 폼타이 작업을 수행함과 동시에 교각 형성후 교량 점검시설의 지지브래킷이 볼트 결합될 수 있는 앵커수단이 교각 측벽에 선매립으로 장착 구성될 수 있도록 함으로서, 비용 절감뿐만 아니라 작업의 편리성과 구조 안전성 등을 향상시킬수 있을 뿐만 아니라 점검시설 설치용 앵커수단 자체의 비용도 구조적으로 절감할 있고, 그 설치 및 결속작업도 해당 점검시설에 맞게 정확한 설정위치에 장착이 가능하면서도 획기적으로 단순화되고 현장 작업의 안정성 및 편리성은 물론 구조적으로도 작업 공수의 절감과 견고한 앵커구조의 결속상태를 제공할 수 있다.The method for constructing a pre-buried anchor set for installation of a bridge inspection facility using a formwork form tie according to the present invention and its structure are, at the same time, performing a form tie operation using a form tie installed in the formwork before forming a pier and inspecting the bridge after forming the pier. By allowing the anchor means to which the support bracket of the facility can be bolted to be mounted and configured to be pre-buried on the side wall of the pier, not only cost reduction but also work convenience and structural safety can be improved, and the anchor means for installation of the inspection facility itself The cost can be reduced structurally, and the installation and binding work can also be installed at the correct setting position for the inspection facility, but it is also dramatically simplified. can provide a binding state of
아울러 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 및 그 구조체는, 기존의 선매립 시공방식에서 해결하지 못해던 철재거푸집에 앵커수단이 부착된 좁은 공간상태에서 철근을 조심스럽게 배근해야만 하는 작업상의 어려움을 없앨 수 있고, 기존의 선매립 앵커 시공방식에서 콘크리트 타설시 콘크리트의 타설 압력과 측압력에 의해 앵커수단들이 정위치에서 변형되거나 탈착될 수 있는 제반 문제와 불편을 구조적으로 해결할 수 있다. In addition, the method for constructing a pre-buried anchor set for installation of a bridge inspection facility using a formwork form tie of the present invention and a structure thereof, and the structure thereof, provide a reinforcing bar in a narrow space condition with an anchor means attached to a steel formwork, which could not be solved by the existing pre-burial construction method. It is possible to eliminate the difficulties in the work that must be placed carefully, and to avoid various problems and inconveniences that the anchor means can be deformed or detached from the correct position due to the concrete pouring pressure and lateral pressure when pouring concrete in the existing pre-buried anchor construction method. can be solved structurally.
이는 특히, 별도의 앵커수단을 형성 설치시키는 시공 작업없이 교각 형성시 필수적으로 적용되는 거푸집 폼타이를 활용하여 구조적으로 앵커수단의 소량화 및 단순화를 통한 비용 절감과 작업의 용이성과 안정성은 물론, 해당 점검시설 및 폼타이의 적합한 장착위치에 맞게 앵커볼트의 위치변경이 다양하게 적용될 수 있는 앵커세트를 통해 점검시설 및 폼타이 설치작업이 편리하게 실시될 수 있으면서 결합상태의 견고성도 구조적으로 확실하게 유지할 수 있는 전혀 새로운 선매립 앵커세트 구조체의 시공방법으로서 그 다양한 실시가 제공될 수 있을 것으로 기대된다.In particular, it utilizes the formwork form tie, which is essential when forming a pier without the construction work of forming and installing a separate anchor means, structurally, reducing costs through the miniaturization and simplification of the anchor means, as well as ease and stability of work, and the corresponding Through the anchor set that can apply various changes in the position of anchor bolts according to the proper installation location of the inspection facility and form tie, inspection facilities and form tie installation work can be carried out conveniently while maintaining the rigidity of the combined state structurally It is expected that various implementations can be provided as a construction method of a completely new pre-embedded anchor set structure that can be built.
도 1과 도 2는 종래의 교량 점검시설 결속수단으로 앵커볼트가 교각에 후매립으로 결속되고 점검시설의 지지브래킷이 볼트결합된 상태의 시공방식을 보인 전체 교량의 개략적인 사시도와 단계별 시공도.
도 3은 종래의 거푸집 내부에 콘크리트를 타설하고 양생하는 과정에서 콘크리트의 팽창력(측압)이 발생하여 거푸집이 변형되는 것을 방지하고자 철근 사이로 통과되어 양쪽 거푸집 사이에 설치되어 결속 고정되는 폼타이의 단계별 시공도.
도 4와 도 5는 종래의 양쪽 거푸집 사이에 설치 구성되어 PVC파이프 내부로 삽입되면서 거푸집 외측에 각각 노출된 세파볼트 단부에 대해 폼타이를 구성하는 컵와셔 및 홀지지와셔와 주물너트 등이 결합 고정되는 분리상태 사시도와 결속상태 단면도.
도 6과 도 7은 본 발명에 따른 콘크리트 구조물인 교각 형성작업시에 필수적으로 적용되는 거푸집 폼타이에 대해 교량의 점검시설을 편리하게 볼트결합시킬 수 있는 앵커기능의 앵커세트가 응용 실시될 수 있도록 하여, 앵커세트의 앵커볼트가 교각에 선매립으로 설치 시공되어 점검시설의 지지브래킷이 간단하고도 안정되게 볼트결합되는 시공방식을 보인 단계별 시공도와 거푸집의 철근 사이로 앵커세트를 포함한 폼타이가 설치된 확대도.
도 8과 도 9는 본 발명의 양쪽 거푸집 사이에 설치 구성되어 작동너트와 고정너트의 작동 조절을 통해 조임 및 풀림 이동되는 고정파이프와 양쪽의 이동파이프 내부로 세파볼트가 삽입되면서 양쪽의 거푸집 내측에는 점검시설과의 결속 높이에 따라 해당 앵커볼트의 장착 높이가 선택 조절될 수 있는 앵커세트가 설치되고, 이들 양쪽의 거푸집 외측에 각각 노출된 세파볼트 단부에 대해 컵와셔 및 홀지지와셔와 주물너트 등이 결합 고정되는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트에 대한 분리상태 사시도와 결속상태 단면도.
도 10은 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방식으로 형성된 교각 외측의 앵커세트의 해당 앵커볼트에 대해 교량의 점검시설을 구성하는 지지브래킷이 볼트결합된 결속상태 단면도.
도 11a 내지 도 11c는 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법에 적용되어 점검시설의 지지브래킷 및 폼타이의 파이프 결속위치에 맞게 해당 브래킷앵커볼트 및 파이프앵커볼트가 설치 구성된 앵커볼트 위치별 앵커세트 사시도.1 and 2 are a schematic perspective view and a step-by-step construction diagram of the entire bridge showing the construction method in a state in which anchor bolts are bonded to the piers by post-burial and the support brackets of the inspection facility are bolted as the conventional bridge inspection facility binding means.
3 is a step-by-step construction of a form tie that is passed between reinforcing bars and installed between both formwork to prevent the formwork from being deformed due to the generation of expansion force (lateral pressure) of the concrete in the process of pouring and curing the concrete inside the conventional formwork. do.
4 and 5 are conventionally installed between both formwork and inserted into the PVC pipe, and the cup washer and hole support washer and the casting nut constituting the form tie are fixed to the ends of the Sepha bolts exposed to the outside of the formwork, respectively. A perspective view of the separated state and a cross-sectional view of the bond state.
6 and 7 show an anchor set with an anchor function that can conveniently bolt the inspection facility of a bridge to a formwork form tie, which is essential when forming a pier, which is a concrete structure according to the present invention. Therefore, a step-by-step construction drawing showing a construction method in which the support brackets of the inspection facility are bolted together simply and stably as the anchor bolts of the anchor set are installed and constructed by pre-buried in the pier, and the expanded form tie including the anchor set is installed between the reinforcing bars of the formwork. do.
8 and 9 are a fixed pipe that is installed between both forms of the present invention and is tightened and loosened through operation control of the actuating nut and the fixed nut, and the sepha bolts are inserted into the moving pipes of both sides. An anchor set with which the mounting height of the corresponding anchor bolt can be selectively adjusted according to the binding height with the inspection facility is installed, and cup washers, hole support washers, casting nuts, etc. Separated state perspective view and binding state cross section for pre-buried anchor set for bridge inspection facility installation using this combined and fixed formwork tie.
10 is a cross-sectional view in which the support bracket constituting the inspection facility of the bridge is bolted to the corresponding anchor bolt of the anchor set outside the pier formed by the construction method of the pre-buried anchor set for the installation of the bridge inspection facility using the formwork form tie of the present invention; .
11a to 11c are applied to the construction method of the pre-buried anchor set for the installation of the bridge inspection facility using the formwork form tie of the present invention. A perspective view of the anchor set by location of the installed and configured anchor bolts.
이하, 첨부된 바람직한 실시예들의 도면을 참고하여 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체에 대한 구체적인 구성원리 및 단계별 시공작업의 단계별 작동관계를 첨부한 바람직한 실시예의 도면을 참조하여 좀더 상세히 설명하도록 한다.Hereinafter, with reference to the accompanying drawings of preferred embodiments, the construction method of the pre-embedded anchor set for the installation of the bridge inspection facility using the formwork form tie of the present invention and the specific structural principle for the structure and the step-by-step operation relationship of the step-by-step construction work are attached. It will be described in more detail with reference to the drawings of the embodiment.
기본적으로 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법 및 그 구조체에 적용된 폼타이는, 도 8 및 도 9에 도시한 양쪽 거푸집 사이에 설치 구성되어 작동너트(64)와 고정너트(65)의 작동 조절을 통해 조임 및 풀림 이동되는 고정파이프(67)와 양쪽의 이동파이프(68) 내부로 세파볼트(50)가 삽입되면서 양쪽의 거푸집(30) 내측에는 해당 파이프와의 결속 높이에 따라 해당 앵커볼트의 장착 높이가 선택 조절될 수 있는 앵커세트(60)가 설치되고 이들 양쪽의 거푸집(30) 외측에 각각 노출된 세파볼트(50) 단부에 대해 컵와셔(52) 및 홀지지와셔(53)와 주물너트(54) 등이 결합 고정되는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체의 분리상태 및 결속상태 단면구조를 통해 쉽게 이해될 수 있다.Basically, the method of constructing a pre-buried anchor set for installation of a bridge inspection facility using the formwork form tie of the present invention and the form tie applied to the structure are installed between both forms shown in FIGS. 8 and 9, and the actuating
즉, 교각(10)의 콘크리트 구조물 형성시 거푸집(30)의 변형이 방지되도록 하는 기본적인 고정 기능과 함께 교각(10) 형성후 외부의 점검시설(20)을 별도의 앵커볼트 설치작업 없이도 바로 폼타이에 함께 구성된 앵커세트(60)의 해당 브래킷앵커볼트(63)를 통해 간단하면서도 편리하게 볼트 결합될 수 있도록 하는 앵커 기능이 제공될 수 있어, 교각(10)의 형성과정에서 필수적으로 사용되는 폼타이의 기본 기능에 앵커 기능을 포함시킨 전혀 새로운 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법으로 작용될 수 있는 구성원리를 발휘하게 된다.That is, in addition to the basic fixing function to prevent the deformation of the
이는 거푸집(30) 내부 공간에 콘크리트를 타설하고 양생하는 과정에서 콘크리트의 팽창력(측압)이 발생하여 거푸집(30)의 변형 방지와 고정력 향상을 설치되는 폼타이를 구성함에 있어 도 6의 단계별 시공도 및 도 7의 상세 구조도에서 보는 것처럼, 상기 거푸집(30)의 내부 공간에 배근된 철근(40) 사이로 각각 양측 단부에 나사 형성된 중간의 고정파이프(67)와 상기 고정파이프(67) 양쪽의 이동파이프(68)가 삽입 설치되고, 상기 중간의 고정파이프(67)를 중심으로 양쪽의 이동파이프(68) 사이에는 회전작동을 통해 조임 및 풀림기능이 발휘되면서 이들 고정파이프(67)와 이동파이프(68)가 이송 조임동작될 수 있도록 작동너트(64)와 고정너트(65)가 결속 설치되며, 이들 중간의 고정파이프(67)와 양쪽의 이동파이프(68) 내부로 양측 단부에 나사 형성된 세파볼트(50)가 삽입되어 양쪽 거푸집(30)의 관통된 폼타이홀(32)을 통해 나사 형성된 단부가 노출되어 컵와셔(52) 및 볼트지지와셔(53)와 잠금너트(54) 등을 통해 결합 고정된다. 참고로 볼트지지와셔(53)는 거푸집(30)의 폼타이홀(32)으로 폼타이를 구성하는 세파볼트(50)가 흔들림없이 안정되게 통과되어 위치 고정될 수 있도록 지지 고정하는 기능이 발휘될 수 있다.This is a step-by-step construction diagram of FIG. 6 in constructing a form tie installed to prevent deformation of the
그리고 앵커고정판(60)의 사측에 점검시설(20)의 지지브래킷(22)이 볼트결합될 수 있도록 브래킷앵커볼트(63)가 설치 형성되면서 이동파이프(68) 및 상기 이동파이프(68) 내부의 세파볼트(50)가 함께 삽입 통과되어 결속 고정될 수 있도록 파이프앵커볼트(62)가 설치 형성되는 앵커세트(60)를 포함하여 본 발명에 따른 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체가 구성 실시될 수 있다.And while the
특히, 상기 앵커세트(60)는 도 11a 내지 도 11c의 본 발명에 적용시킨 앵커세트(60)의 다양한 실시예의 구조에서 보는 것처럼, 점검시설(20)의 지지브래킷(22)이 볼트결합되는 브래킷앵커볼트(63)가 폼타이의 세파볼트(50) 및 이동파이프(68)가 결합고정되는 파이프앵커볼트(62)의 위치(높이)보다 높거나 낮게 조절될 수 있도록 선택적으로 설치 구성됨이 바람직하며, 폼타이를 구성하는 중간의 고정파이프(67)를 중심으로 양쪽의 이동파이프(68)가 위치 조절될 때 조임 및 풀림기능의 작동너트(64)와 고정너트(65)의 해당 나사산이 서로 반대방향으로 형성되어 한방향이 잠기면 다른 한방향이 풀리는 이송 조임기능이 발휘될 수 있도록 구성된다.In particular, the anchor set 60 is a bracket to which the
또한 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체는, 앵커세트(60)가 폼타이 축방향의 폼타이홀(32) 위치 혹은 이동파이프(68) 중앙을 기준으로 앵커고정판(61)의 상하부 좌우로 적어도 4개 이상의 브래킷앵커볼트(63)가 장착 구성되는데, 점검시설(20)의 지지브래킷(22)에 대한 앵커수단인 이들 브래킷앵커볼트(63) 선단의 거푸집(30) 내측과의 접촉부위는 밀폐패킹(66)이 삽입 구성되어 콘크리트나 이물질 등이 삽입되는 것을 방지하도록 구성됨이 바람직하다. 나아가 본 발명은 거푸집(30)의 폼타이 축방향의 파이프 위치가 장착하고자 하는 앵커볼트보다 높은 경우나 낮은 경우에는 앵커세트의 앵커고정판(61)을 폼타이 축방향의 파이프 위치를 기준으로 그 상부나 하부에 위치하도록 적용하는 것이 가능하다.In addition, in the pre-buried anchor set structure for installing a bridge inspection facility using a formwork form tie of the present invention, the anchor set 60 is an anchor fixing plate based on the position of the
이와 같은 구성원리의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체를 적용한 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법은, 도 6에 도시한 본 발명에 따른 콘크리트 구조물인 교각 형성작업시에 필수적으로 적용되는 거푸집(30) 폼타이에 대해 교량의 점검시설을 편리하게 볼트결합시킬 수 있는 앵커기능의 앵커세트(60)가 응용 실시될 수 있도록 하여 앵커수단인 앵커세트(60)의 브래킷앵커볼트(63)가 교각(10)에 선매립으로 설치 시공되어 점검시설(20)의 지지브래킷(22)이 간단하고도 안정되게 볼트결합되는 시공방식을 보인 단계별 시공도 및 도 7에 도시한 거푸집(30)의 철근(40) 사이로 앵커세트(60)를 포함한 폼타이가 설치된 확대도에서 보는 것처럼, 교각(10) 형성전 거푸집(30)에 설치되는 폼타이를 이용하여 폼타이 작업을 수행함과 동시에 교각(10) 형성후 교량 점검시설(20)의 지지브래킷(22)이 볼트 결합될 수 있는 앵커수단이 교각(10) 측벽에 선매립으로 장착 구성될 수 있도록 함으로서, 비용 절감뿐만 아니라 작업의 편리성과 구조 안전성 등을 획기적으로 향상시킬 수 있는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법이 구현 실시될 수 있다.The construction method of the pre-buried anchor set for the installation of the bridge inspection facility using the formwork form tie of the present invention to which the pre-burial anchor set structure for the installation of the bridge inspection facility using the formwork form tie of the same principle is applied is according to the present invention shown in FIG. The anchor set 60 of the anchor function that can conveniently bolt the inspection facility of the bridge can be applied to the
먼저, 교각(10)의 콘크리트 구조물을 형성하기 위한 통상의 거푸집(30)을 설치하는 단계가 실시되며, 이때 당연히 상기 거푸집(30)에는 폼타이가 설치되는 폼타이홀(32)이 천공되면서 이들 거푸집(30) 간에는 통상의 패널연결나사로써 연결 구성됨은 물론이다.First, the step of installing a
그리고 거푸집(30) 설치단계 후에는 상기 거푸집(30)의 내부 공간에 교각의 내구성을 확보하기 위한 통상적인 철근(40)의 배근작업을 실시히는 단계가 수행되며, 이후 점검시설(20)이 볼트결합되는 앵커볼트(브래킷앵커볼트)의 장착위치가 결정되면 폼타이의 구성 부품인 중간의 고정파이프(67)와 양쪽의 이동파이프(68)를 서로 나사방향을 달리하는 작동너트(64)와 고정너트(65)로써 나사결합하여 상기 철근(40) 사이에 삽입하는 단계가 실시된다.And after the
계속해서 교량의 점검시설(20)이 볼트결합되는 앵커볼트의 장착위치인 앵커세트(60)의 브래킷앵커볼트(63)에 대한 장착위치(높이)가 결정되면, 폼타이의 구성 부품으로 분리 구조인 중간의 고정파이프(67)와 양쪽의 이동파이프(68)를 서로 나사방향을 달리하는 작동너트(64)와 고정너트(65)로써 나사결합하여 상기 철근(40) 사이에 삽입하는 단계가 실시된다.If the mounting position (height) for the
계속해서 양쪽의 거푸집(30) 내측의 폼타이홀(32) 위치에 파이프앵커볼트(62) 및 브래킷앵커볼트(63)가 설치 형성된 앵커세트(60)를 장착하고, 양쪽의 이동파이프(65)를 조임 및 풀림기능이 발휘되는 작동너트(64)와 고정너트(65)의 회전 조작으로 이송 조임동작시켜 상기 앵커세트(60)의 파이프앵커볼트(62)와 나사결합하여 동일 선상으로 일체 구조화시키는 단계를 실시한다. 이때 거푸집(30)의 폼타이홀(32) 위치에 장착되는 앵커세트(60)는 중간의 고정파이프(67)와 양쪽의 이동파이프(68) 사이에 풀림 및 조임수단으로 나사결합된 작동너트(64) 및 고정너트(65)의 조작 이송으로 상기 거푸집(30)의 내측에 확실하게 장착 고정될 수 있다.Subsequently, the anchor set 60 in which the
그리고 거푸집(30) 내측의 폼타이홀(32) 위치에 장착 고정된 앵커세트(60)의 파이프앵커볼트(62)와 함께 폼타이를 구성하는 고정파이프(67) 및 이동파이프(68) 내부로 역시 양쪽 단부에 나사 형성된 세파볼트(50)를 삽입하고, 컵와셔(52)와 주물너트(54) 및 홀지지와셔(53)를 포함한 결합수단으로 상기 세파볼트(50)를 거푸집(30)의 폼타이홀(32)에 대해 결합 고정하는 단계가 실시됨으로서, 본 발명에서 적용되는 폼타이가 교각(10)을 형성하기 위한 콘크리트를 타설 압력에 대한 기본적인 고정 기능뿐만 아니라 콘크리트 구조물인 상기 교각(10)의 선매립 앵커수단으로서 편리하게 교량의 점검시설(20)을 볼트결합시킬 수 있는 앵커 기능이 발휘될 수 있도록 한다.And the fixed
이를 구현하기 위해 본 발명에 따른 앵커세트(60)를 구비한 폼타이를 철근(40)이 배근된 거푸집(30)의 내부 공간에 설치하는 시공 단계 이후, 폼타이를 구성하는 세파볼트(50)의 분리 제거와 함께 점검시설의 선매립 시공구조의 상기 앵커세트(60)를 통한 볼트결합의 작업이 구조적으로 보다 편리하고도 안정되게 실시될 수 있다.Sepa bolts (50) constituting the form tie after the construction step of installing the form tie having the anchor set (60) according to the present invention in the inner space of the formwork (30) on which the reinforcing bar (40) is reinforced to implement this The work of bolting through the anchor set 60 of the pre-buried construction structure of the inspection facility along with the separation and removal of the structurally can be carried out more conveniently and stably.
즉, 거푸집(30) 내측에 앵커세트(60)가 장착되면서 관통된 폼타이홀(32)이 폼타이를 구성하는 세파볼트(50)로써 밀폐된 거푸집(30)의 내부 공간으로 통상의 콘크리트의 타설 및 양생작업을 통한 콘크리트 구조물의 교각을 형성하는 단계가 실시된다.That is, the
그리고 교각(10)의 외측에 장착된 거푸집(30)의 패널연결나사를 제거하여 상기 거푸집(30)을 분리하는 동시에 폼타이를 구성하는 컵와셔(52) 및 주물너트(54) 등의 결속수단을 세파볼트(50)와 함께 분리시켜 제거하는 단계를 실시한 다음, 점검시설(20)의 지지브래킷(22)을 본 발명에 따른 선매립 앵커세트(60)의 해당 브래킷앵커볼트(63)에 대해 볼트결합하는 단계를 실시함으로서, 교량의 콘크리트 구조물인 교각(10) 형성을 위해 설치되는 거푸집(30)의 폼타이를 활용하여 점검시설(20)을 볼트결합시킬 수 있는 앵커수단인 앵커세트(60)를 교각 측벽에 선매립으로 시공될 수 있도록 한 본 발명의 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법이 구현될 수 있다.And at the same time removing the panel connection screw of the
10 : 교각
12 : 볼트구멍
14 : 앵커볼트
20 : 점검시설
22 : 지지브래킷
24 : 고정볼트
26 : 난간발판
30 : 거푸집
32 : 폼타이홀
40 : 철근
50 : 세파볼트
52 : 컵와셔
53 : 홀지지와셔
54 : 주물너트
60 : 앵커세트
61 : 앵커고정판
62 : 파이프앵커볼트
63 : 브래킷앵커볼트
64 : 작동너트
65 : 고정너트
66 : 밀폐패킹
67 : 고정파이프
68 : 이동파이프10: pier 12: bolt hole
14: anchor bolt 20: inspection facility
22: support bracket 24: fixing bolt
26: handrail 30: formwork
32: form tie hole 40: reinforcing bar
50: sepa bolt 52: cup washer
53: hole support washer 54: casting nut
60: anchor set 61: anchor fixing plate
62: pipe anchor bolt 63: bracket anchor bolt
64: operating nut 65: fixing nut
66: sealing packing 67: fixed pipe
68: moving pipe
Claims (4)
점검시설이 결합 고정되는 브래킷앵커볼트 및 상기 폼타이의 이동파이프와 결합 고정되는 파이트앵커볼트가 형성된 앵커세트를 상기 거푸집 양쪽 내측에 장착한 후에 상기 거푸집의 폼타이홀을 통해 폼타이를 구성하는 세파볼트를 이들 앵커세트의 파이프앵커볼트 및 폼타이의 파이프 내부로 삽입하여 결합 고정하는 것을 특징으로 하는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법.In order to prevent the form from being deformed due to the expansion force (lateral pressure) of the concrete being generated in the process of pouring and curing concrete in the inner space of the form to form a pier, which is a concrete structure, a form tie is formed between the reinforcing bars placed in the inner space of the form. Passing through the pipe and fixing the bond between the two forms,
Sepa constituting a form tie through the form tie hole of the form after mounting the anchor set with the bracket anchor bolt to which the inspection facility is coupled and fixed and the pipe anchor bolt which is coupled and fixed to the moving pipe of the form tie on both sides of the form A pre-embedded anchor set construction method for installing a bridge inspection facility using a formwork form tie, characterized in that the bolt is inserted into the pipe anchor bolt of the anchor set and the pipe of the form tie and fixed.
상기 거푸집의 내부 공간에 폼타이와 함께 설치 구성되는 앵커세트는 상기 거푸집의 내부 공간에 철근을 배근하고 점검시설이 볼트결합되는 앵커볼트의 장착위치가 결정되면 폼타이의 구성 부품인 중간의 고정파이프와 양쪽의 이동파이프를 서로 나사방향을 달리하는 작동너트와 고정너트로서 나사결합하여 상기 철근 사이에 삽입하는 단계와,
상기 거푸집 내측의 폼타이홀 위치에 파이프앵커볼트 및 브래킷앵커볼트가 설치 형성된 앵커세트를 장착하고 양쪽의 이동파이프를 조임 및 풀림기능이 발휘되는 작동너트와 고정너트의 회전 조작으로 이송 조임동작시켜 상기 앵커세트의 파이프앵커볼트와 나사결합하는 단계와,
상기 거푸집 내측의 폼타이홀 위치에 장착 고정된 앵커세트의 파이프앵커볼트와 함께 폼타이를 구성하는 고정파이프 및 이동파이프 내부로 세파볼트를 삽입하고 컵와셔와 주물너트를 포함한 결합수단으로 상기 세파볼트를 거푸집의 폼타이홀에 결합 고정하는 단계와,
상기 거푸집 내측에 앵커세트가 장착되면서 관통된 폼타이홀이 폼타이를 구성하는 세파볼트로서 밀폐된 거푸집 내부 공간으로 콘크리트의 타설 및 양생작업을 통해 콘크리트 구조물의 교각을 형성하는 단계와,
상기 교각의 외측에 장착된 거푸집의 패널연결나사를 제거하여 거푸집을 분리하는 동시에 폼타이를 구성하는 컵와셔 및 주물너트를 세파볼트와 함께 분리시켜 제거한 후에 점검시설의 지지브래킷을 앵커세트의 해당 브래킷앵커볼트에 대해 볼트결합하는 단계를 포함하여 작업 실시되는 것을 특징으로 하는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 시공방법.The method according to claim 1,
The anchor set installed together with the form tie in the inner space of the formwork is reinforced with reinforcing bars in the inner space of the formwork, and when the mounting position of the anchor bolt to which the inspection facility is bolted is determined, the fixing pipe in the middle which is a component of the form tie and inserting between the reinforcing bars by screwing the moving pipes on both sides as an operating nut and a fixing nut having different screw directions to each other,
An anchor set with pipe anchor bolts and bracket anchor bolts installed is installed at the form tie hole position inside the formwork, and the moving pipe on both sides is transferred and tightened by rotating the operation nut and the fixed nut, which exhibits tightening and loosening functions. A step of screwing with the pipe anchor bolt of the anchor set;
The Sepa bolt is inserted into the fixed pipe and the moving pipe constituting the form tie together with the pipe anchor bolt of the anchor set mounted and fixed at the position of the form tie hole inside the form, and the Sepa bolt is a coupling means including a cup washer and a casting nut. a step of coupling and fixing the to the form tie hole of the formwork;
Forming a pier of a concrete structure through a concrete pouring and curing operation into an enclosed space inside the formwork, wherein the form tie hole penetrated while the anchor set is mounted inside the formwork is a Sepha bolt constituting the form tie;
Remove the formwork by removing the panel connecting screw of the formwork mounted on the outside of the pier, and at the same time remove the cupwasher and casting nut constituting the form tie together with the Sepa bolt. A pre-embedded anchor set construction method for installing a bridge inspection facility using a formwork form tie, characterized in that the work is carried out including the step of bolting the anchor bolts.
상기 거푸집 내부 공간에 배근된 철근 사이로 각각 양측 단부에 나사 형성된 중간의 고정파이프와 상기 고정파이프 양쪽의 이동파이프가 삽입 설치되고,
상기 중간의 고정파이프를 중심으로 양쪽의 이동파이프 사이에는 회전작동을 통해 조임 및 풀림기능이 발휘되면서 이들 고정파이프와 이동파이프가 이송 조임동작될 수 있도록 작동너트와 고정너트가 결속 설치되며,
이들 고정파이프와 이동파이프 내부로 양측 단부에 나사 형성된 세파볼트가 삽입되어 양쪽 거푸집의 폼타이홀을 통해 단부가 노출되어 컵와셔 및 볼트지지와셔와 잠금너트를 통해 결합 고정되고,
앵커고정판의 사측에 점검시설의 지지브래킷이 볼트결합될 수 있도록 브래킷앵커볼트가 설치 형성되면서 상기 이동파이프 및 세파볼트가 삽입 통과되어 결속 고정될 수 있도록 파이프앵커볼트가 설치 형성되는 앵커세트를 포함하여 장치 구성되는 것을 특징으로 하는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체.In the process of pouring and curing concrete in the space of the formwork, the expansion force (lateral pressure) of the concrete is generated, preventing deformation of the formwork and improving the fixing power. ,
Between the reinforcing bars reinforced in the inner space of the formwork, a middle fixed pipe screwed at both ends, respectively, and a moving pipe on both sides of the fixed pipe are inserted and installed,
Between the moving pipes on both sides of the fixed pipe in the center, the fastening and loosening functions are exhibited through rotation, and the actuating nut and the fixed nut are installed so that these fixed and moving pipes can be transferred and tightened.
Sepa bolts threaded at both ends are inserted into these fixed pipes and moving pipes, the ends are exposed through the form tie holes of both forms, and they are coupled and fixed through cup washers, bolt support washers, and lock nuts,
Including an anchor set in which a bracket anchor bolt is installed and formed so that the support bracket of the inspection facility can be bolted to the four side of the anchor fixing plate, and the pipe anchor bolt is installed so that the moving pipe and Sepa bolt can be inserted and fixed A pre-embedded anchor set structure for the installation of a bridge inspection facility using a formwork form tie, characterized in that the device is configured.
상기 앵커세트는 점검시설의 지지브래킷이 볼트결합되는 브래킷앵커볼트가 폼타이의 세파볼트 및 이동파이프가 결합고정되는 파이프앵커볼트의 위치(높이)보다 높거나 낮게 조절될 수 있도록 선택적으로 설치 구성되며, 중간의 고정파이프를 중심으로 양쪽의 이동파이프가 위치 조절될 때 조임 및 풀림기능의 작동너트와 고정너트의 해당 나사산이 서로 반대방향으로 형성되어 한방향이 잠기면 다른 한방향이 풀리는 이송 조임기능이 발휘될 수 있도록 구성되는 것을 특징으로 하는 거푸집 폼타이를 이용한 교량 점검시설 설치용 선매립 앵커세트 구조체.4. The method according to claim 3,
The anchor set is selectively installed so that the bracket anchor bolt to which the support bracket of the inspection facility is bolted can be adjusted higher or lower than the position (height) of the pipe anchor bolt to which the Sepa bolt of the form tie and the moving pipe are fixed. , when the moving pipes on both sides are positioned around the fixed pipe in the middle, the screw threads of the tightening and loosening function and the corresponding thread of the fixed nut are formed in opposite directions, so that when one direction is locked, the other direction is released. A pre-embedded anchor set structure for the installation of a bridge inspection facility using a formwork form tie, characterized in that it is configured to be able to
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210016365A KR102441003B1 (en) | 2021-02-04 | 2021-02-04 | Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020210016365A KR102441003B1 (en) | 2021-02-04 | 2021-02-04 | Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20220112615A true KR20220112615A (en) | 2022-08-11 |
KR102441003B1 KR102441003B1 (en) | 2022-09-06 |
Family
ID=82803253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020210016365A KR102441003B1 (en) | 2021-02-04 | 2021-02-04 | Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102441003B1 (en) |
Citations (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR0125654Y1 (en) * | 1995-08-31 | 1998-10-15 | 김재연 | Device for tying wall forms |
JP2000064606A (en) * | 1998-08-24 | 2000-02-29 | Ohbayashi Corp | Constructional method for reinforced concrete wall body |
KR200200431Y1 (en) | 2000-04-15 | 2000-10-16 | 이성우 | Composite Space Panel for Slab and Lining Construction of Structures |
KR200200941Y1 (en) | 2000-05-25 | 2000-10-16 | 장성근 | A body bolt for concrete form |
KR20010104585A (en) * | 2000-05-15 | 2001-11-26 | 박현철 | Fixation Device and Apparatus for Mounting Checking Plate in a Bent |
KR200326090Y1 (en) | 2003-05-07 | 2003-09-13 | 삼목정공주식회사 | Do concrete placing chapter for slip form construction |
KR200352435Y1 (en) | 2004-03-02 | 2004-06-04 | 조순암 | The sepatie of a molding flask reclamation |
KR200365933Y1 (en) | 2004-07-27 | 2004-10-28 | 브이에스엘코리아 주식회사 | Multistage mould of bridge |
KR200381348Y1 (en) | 2005-01-19 | 2005-04-12 | 구자삼 | Concrete matrix interval regulation structure |
KR20050076059A (en) * | 2004-01-19 | 2005-07-26 | 최규석 | Form for using construction of a pier |
KR20060016371A (en) * | 2004-08-17 | 2006-02-22 | (주) 선암기술연구소 | Bridge inspection equipment fixed by laid nut |
KR200417368Y1 (en) | 2006-01-10 | 2006-05-26 | 이강선 | Rebar and Piping Attachment Formwork |
KR100697302B1 (en) | 2004-07-27 | 2007-03-20 | 브이에스엘코리아 주식회사 | Method for building and removing mould of bridge and multistage mould |
KR100707685B1 (en) | 2004-10-23 | 2007-04-17 | 이근식 | A embeded anchor with socket nut |
KR20080114300A (en) | 2007-06-27 | 2008-12-31 | 서위광 | The joint for building cast |
KR20100037696A (en) | 2008-10-02 | 2010-04-12 | 이근식 | A embeded anchor |
KR20100012572U (en) * | 2009-06-10 | 2010-12-20 | 곽성용 | Safety device for maintaining an interval of Euroform |
KR101168682B1 (en) * | 2010-01-28 | 2012-07-27 | 코오롱글로벌 주식회사 | Scaffold supporter used in girder |
KR101170327B1 (en) * | 2012-05-11 | 2012-08-03 | 주식회사 누리플랜 | A sidewalk enlargement installation using slabe |
KR101215330B1 (en) | 2012-02-15 | 2013-01-04 | 주식회사 에스엠에스 | Angle assembly type bridge inspection passage |
KR101437150B1 (en) | 2012-07-02 | 2014-09-02 | 명성산업개발 주식회사 | Bridge safety check system |
KR101641339B1 (en) | 2014-12-29 | 2016-07-29 | 서보산업 주식회사 | Device for maintaining distance of concrete mold and method for constructing concrete building |
KR102062843B1 (en) | 2017-08-18 | 2020-01-07 | (주)기산정공 | Concrete form fixing unit connected to form tie |
KR102078267B1 (en) | 2019-02-28 | 2020-02-18 | 현빈개발 주식회사 | Rebar fixed type Pre-embedded Prefabricated Anchor for Bridge Inspection Facility and Method for constructing this same |
KR20200046412A (en) | 2018-10-24 | 2020-05-07 | 신영기술개발(주) | Landfill facility for bridge inspection structure and construction method |
KR102108417B1 (en) | 2018-06-18 | 2020-05-11 | 주식회사 신원알피씨 | magnetic type jig for anchor bolt installation for facility construction of concrete structure and method of construction concrete structure using the jig |
KR102116934B1 (en) | 2019-02-28 | 2020-05-29 | 현빈개발 주식회사 | Pressurized type Pre-embedded Anchor by Pressurized for Bridge Inspection Facility and Method for constructing this same |
KR102166856B1 (en) * | 2020-04-13 | 2020-10-16 | 다산기업 주식회사 | Pre installation type bridge stairway fixing unit and method for constructing bridge stairway using this same |
KR102181972B1 (en) * | 2020-07-20 | 2020-11-24 | 주식회사 에스티 | Bridge inspection facility construction method and bridge inspection facility constructed thereby |
KR20210009227A (en) * | 2019-07-16 | 2021-01-26 | 김문호 | embeded anchor and construction method thereof |
-
2021
- 2021-02-04 KR KR1020210016365A patent/KR102441003B1/en active IP Right Grant
Patent Citations (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR0125654Y1 (en) * | 1995-08-31 | 1998-10-15 | 김재연 | Device for tying wall forms |
JP2000064606A (en) * | 1998-08-24 | 2000-02-29 | Ohbayashi Corp | Constructional method for reinforced concrete wall body |
KR200200431Y1 (en) | 2000-04-15 | 2000-10-16 | 이성우 | Composite Space Panel for Slab and Lining Construction of Structures |
KR20010104585A (en) * | 2000-05-15 | 2001-11-26 | 박현철 | Fixation Device and Apparatus for Mounting Checking Plate in a Bent |
KR200200941Y1 (en) | 2000-05-25 | 2000-10-16 | 장성근 | A body bolt for concrete form |
KR200326090Y1 (en) | 2003-05-07 | 2003-09-13 | 삼목정공주식회사 | Do concrete placing chapter for slip form construction |
KR20050076059A (en) * | 2004-01-19 | 2005-07-26 | 최규석 | Form for using construction of a pier |
KR200352435Y1 (en) | 2004-03-02 | 2004-06-04 | 조순암 | The sepatie of a molding flask reclamation |
KR200365933Y1 (en) | 2004-07-27 | 2004-10-28 | 브이에스엘코리아 주식회사 | Multistage mould of bridge |
KR100697302B1 (en) | 2004-07-27 | 2007-03-20 | 브이에스엘코리아 주식회사 | Method for building and removing mould of bridge and multistage mould |
KR20060016371A (en) * | 2004-08-17 | 2006-02-22 | (주) 선암기술연구소 | Bridge inspection equipment fixed by laid nut |
KR100707685B1 (en) | 2004-10-23 | 2007-04-17 | 이근식 | A embeded anchor with socket nut |
KR200381348Y1 (en) | 2005-01-19 | 2005-04-12 | 구자삼 | Concrete matrix interval regulation structure |
KR200417368Y1 (en) | 2006-01-10 | 2006-05-26 | 이강선 | Rebar and Piping Attachment Formwork |
KR20080114300A (en) | 2007-06-27 | 2008-12-31 | 서위광 | The joint for building cast |
KR20100037696A (en) | 2008-10-02 | 2010-04-12 | 이근식 | A embeded anchor |
KR20100012572U (en) * | 2009-06-10 | 2010-12-20 | 곽성용 | Safety device for maintaining an interval of Euroform |
KR101168682B1 (en) * | 2010-01-28 | 2012-07-27 | 코오롱글로벌 주식회사 | Scaffold supporter used in girder |
KR101215330B1 (en) | 2012-02-15 | 2013-01-04 | 주식회사 에스엠에스 | Angle assembly type bridge inspection passage |
KR101170327B1 (en) * | 2012-05-11 | 2012-08-03 | 주식회사 누리플랜 | A sidewalk enlargement installation using slabe |
KR101437150B1 (en) | 2012-07-02 | 2014-09-02 | 명성산업개발 주식회사 | Bridge safety check system |
KR101641339B1 (en) | 2014-12-29 | 2016-07-29 | 서보산업 주식회사 | Device for maintaining distance of concrete mold and method for constructing concrete building |
KR102062843B1 (en) | 2017-08-18 | 2020-01-07 | (주)기산정공 | Concrete form fixing unit connected to form tie |
KR102108417B1 (en) | 2018-06-18 | 2020-05-11 | 주식회사 신원알피씨 | magnetic type jig for anchor bolt installation for facility construction of concrete structure and method of construction concrete structure using the jig |
KR20200046412A (en) | 2018-10-24 | 2020-05-07 | 신영기술개발(주) | Landfill facility for bridge inspection structure and construction method |
KR102078267B1 (en) | 2019-02-28 | 2020-02-18 | 현빈개발 주식회사 | Rebar fixed type Pre-embedded Prefabricated Anchor for Bridge Inspection Facility and Method for constructing this same |
KR102116934B1 (en) | 2019-02-28 | 2020-05-29 | 현빈개발 주식회사 | Pressurized type Pre-embedded Anchor by Pressurized for Bridge Inspection Facility and Method for constructing this same |
KR20210009227A (en) * | 2019-07-16 | 2021-01-26 | 김문호 | embeded anchor and construction method thereof |
KR102166856B1 (en) * | 2020-04-13 | 2020-10-16 | 다산기업 주식회사 | Pre installation type bridge stairway fixing unit and method for constructing bridge stairway using this same |
KR102181972B1 (en) * | 2020-07-20 | 2020-11-24 | 주식회사 에스티 | Bridge inspection facility construction method and bridge inspection facility constructed thereby |
Also Published As
Publication number | Publication date |
---|---|
KR102441003B1 (en) | 2022-09-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6857156B1 (en) | Modular bridge structure construction and repair system | |
US6904636B2 (en) | Deck-to-girder connections for precast or prefabricated bridge decks | |
KR100837608B1 (en) | J.K Bracket Method | |
CN109707173B (en) | Construction method of assembly type laminated beam plate installation auxiliary device | |
KR100854224B1 (en) | Precast half depth cantilever deck and constructing method of such bridge deck | |
KR100622935B1 (en) | Horizontal extension joint structuer and joint method using thereof | |
KR100770006B1 (en) | Vertical connection steel-bar reinforcing structure of precast concreate column | |
JP2018021403A (en) | Floor slab replacement method for steel composite girder, and pc floor slab | |
KR101131079B1 (en) | Multi U-head Support Apparatus For Bridge Construction | |
KR102441003B1 (en) | Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie | |
JP2002194704A (en) | Method for constructing girder | |
CN110821147A (en) | Expansion joint shear wall combination template capable of being assembled and disassembled quickly | |
JPS5916621B2 (en) | How to build side walls of underground tanks | |
KR102004854B1 (en) | Aseismatic Reinforcement Steel Frame with Anchor Plate and Aseismatic Reinforcement Method using thereof | |
CN214644692U (en) | Post-tensioning precast concrete supporting member and inner supporting system | |
US6036165A (en) | Method and apparatus for constructing a building unit | |
CN211773849U (en) | Installation abutment of counter-force calibration device of truck scale | |
KR100695491B1 (en) | A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof | |
KR100865133B1 (en) | A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof | |
CN112302034A (en) | Prefabricated hollow concrete supporting member, inner supporting system and construction method | |
JP2002332645A (en) | Foundation structure of rail for ground-traveling crane and laying method for foundation | |
CN214497525U (en) | Prefabricated hollow concrete supporting member and inner supporting system | |
JP2003193491A (en) | Method for mounting air conditioning equipment and the like in underground space | |
JP2001311247A (en) | Construction method for concrete structure | |
KR20020033988A (en) | Upgrading method of R.C. Structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |