KR20010104585A - Fixation Device and Apparatus for Mounting Checking Plate in a Bent - Google Patents

Fixation Device and Apparatus for Mounting Checking Plate in a Bent Download PDF

Info

Publication number
KR20010104585A
KR20010104585A KR1020000025860A KR20000025860A KR20010104585A KR 20010104585 A KR20010104585 A KR 20010104585A KR 1020000025860 A KR1020000025860 A KR 1020000025860A KR 20000025860 A KR20000025860 A KR 20000025860A KR 20010104585 A KR20010104585 A KR 20010104585A
Authority
KR
South Korea
Prior art keywords
bolt
fixing
piers
pier
guide groove
Prior art date
Application number
KR1020000025860A
Other languages
Korean (ko)
Other versions
KR100353882B1 (en
Inventor
박현철
Original Assignee
박현철
주식회사 로드맥스 엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박현철, 주식회사 로드맥스 엔지니어링 filed Critical 박현철
Priority to KR1020000025860A priority Critical patent/KR100353882B1/en
Publication of KR20010104585A publication Critical patent/KR20010104585A/en
Application granted granted Critical
Publication of KR100353882B1 publication Critical patent/KR100353882B1/en

Links

Abstract

본 발명은 교각의 하부 슬래브에 설치되어 교각의 상태를 점검하기 위한 통행로인 교각 난간 점검대를 고정 부착시키기 위한 고정장치에 관한 것으로써, 특히 종래 앙카설치 방식에서의 각종 문제점을 해소하여 간단하고 편리한 설치작업을 이루는데 적당한 교각에 점검대를 설치하기 위한 고정장치 및 그 고정방법에 관한 것이다.The present invention relates to a fixing device for fixedly attaching a pier railing checker, which is installed in a lower slab of a pier and is a passage for checking the state of a pier, and in particular, solves various problems in the conventional anchor installation method and is simple and convenient. The present invention relates to a fixing device for installing a check table on a pier suitable for accomplishing the installation work and a method of fixing the same.

상기 목적을 달성하기 위해 본 발명은 교각의 슬래브 일정위치에 상하 일정 간격으로 매입 설치되는 길이방향의 전,후면에 각각 안내홈을 갖는 레일과, 상기 각각의 레일의 안내홈에 머리가 삽입안내되는 볼트와, 상기 볼트를 상하 일정 간격으로 유지하기 위해 상,하부에 볼트의 로드가 관통되는 구멍을 일정간격으로 갖는 간격편과, 상기 볼트의 로드에는 너트를 체결하여 상기 간격편을 고정하고, 상기 안내홈에 가이드되어 교각 슬래브에 배근된 수직 철근에 접촉되어 용접 또는 결속끈으로 고정되고 전면의 안내홈에는 교각 슬래브 거푸집에 콘크리트 붓기시 메움 방지용으로 삽입되는 실링과, 교각 슬래브의 타설후 상기 실링을 제거한 안내홈에는 대상물 고정수단으로써, 머리가 삽입되어 가이드되는 볼트에 대상물을 관통하여 고정하는 너트로 구성된 것을 특징으로 한다.In order to achieve the above object, the present invention is a rail having guide grooves on the front and rear surfaces in the longitudinal direction, which are installed at predetermined intervals up and down at a predetermined position of the slab of the piers, and the head is guided to the guide grooves of the respective rails. A bolt and a gap piece having a predetermined gap therebetween in order to maintain the bolt at regular intervals up and down, and a bolt between the bolt rod and the rod of the bolt to fix the gap piece, and The guide groove is guided by the guide groove and is reinforced by welding or binding straps in contact with the vertical reinforcing bar on the pier slab. Removed guide groove as a means for fixing the object, the nut is inserted into the head guided by the nut to fix the object The generated features.

그리고 설치방법은 양면으로 안내홈을 갖는 상하 한쌍의 레일을 간격편의 구멍의 끼워지는 볼트와, 이 볼트의 머리가 상기 안내홈에 삽입 가이드되어 일정 상하 간격을 유지하며, 교각의 배근에 접촉되어 용접 및 결속되는 단계와, 상기 교각의 거푸집 설치후, 콘크리트 치기후 타설하여 양생후 일정 섹타의 비계틀을 설치한 후, 상기 안내홈을 통하여 역시 좌우 일정간격을 유지시키는 간격편의 구멍에 끼워지는 볼트를 고정수단으로 가이드하여 적어도 좌우 한쌍의 고정브래킷을 결합하여 너트를 고정한 후 일정 섹타 단위의 점검대를 설치한 후, 이를 작업공간으로 하여 교각의 스템 전 둘레에 걸쳐 상기 고정브래킷의 고정 및 점검대 설치를 순차적으로 해서 된 것을 특징으로 한다.And the installation method is the upper and lower pair of rails having guide grooves on both sides of the bolts to be inserted into the hole of the gap piece, the head of the bolt is guided to the guide grooves to maintain a constant vertical gap, and contact with the reinforcement of the piers to weld And the step of binding, after the formwork of the piers are installed, after the concrete is laid and installed in the scaffolding frame of a certain sector after curing, the bolt is inserted into the hole of the interval piece to maintain the left and right constant intervals through the guide grooves Guide at least one pair of left and right fixing brackets to fix the nut, and then install a check table of a certain sector unit, and use it as a working space to fix and fix the fixing brackets around the stem of the piers. Characterized in that sequentially made.

Description

교각에 점검대를 설치하기 위한 고정장치 및 그 고정방법{Fixation Device and Apparatus for Mounting Checking Plate in a Bent}Fixing device and mounting method for installing check platform on pier {{Fixation Device and Apparatus for Mounting Checking Plate in a Bent}

본 발명은 교각의 하부 슬래브에 설치되어 교각의 상태를 점검하기 위한 통행로인 교각 점검대를 교각에 고정 부착시키기 위한 고정장치에 관한 것으로써, 특히 종래 앙카설치 방식에서의 각종 문제점을 해소하여 간단하고 편리한 설치작업을이루는데 적당한 교각에 점검대를 고정하기 위한 장치 및 그 방법에 관한 것이다.The present invention relates to a fixing device for fixedly attaching a pier inspection stand to a pier, which is installed in the lower slab of the pier and is a passage for checking the state of the pier, and in particular, solves various problems in the conventional anchor installation method. The present invention relates to a device and a method for fixing a check table to a suitable pier to accomplish a convenient installation work.

일반적으로 교각에는 교량의 건설을 마치고 차후 유지보수 등의 관계로, 교각의 하부에 점검대를 설치한다. 교각에서 상부 슬래브에는 차도 또는 인도가 부설되고, 그 하부 스템상의 슬래브와의 사이에 연석으로 받혀진 스틸박스거더가 개재되는데, 교각의 유지보수 및 관리의 차원에서 상기 스템상의 슬래브에는 교각점검을 위한 통로인 점검대가 설치된다.In general, pier is installed on the lower part of the pier, after the construction of the bridge after the maintenance of the bridge. In the pier, the upper slab is provided with a driveway or sidewalk, and a steel box girder, which is curbed with the slab on the lower stem, is interposed. A checkout, a passage, is installed.

이러한 점검대는 점검자가 보행시 부주의로 인한 추락사고 등을 방지하기 위하여 교각의 바깥쪽으로 난간을 가지고, 교각쪽으로는 교각의 일정위치에 고정하기 위한 고정브래킷을 가지며, 물론 사람이 통행 가능한 발판을 설치해서 이루어진다.These checkers have railings on the outside of the piers to prevent accidental fall while the inspector walks, and fixed brackets for fixing them to a certain position on the piers on the piers. Is done.

이러한 점검대는 단순히 철재의 길이재를 절단하여 용접방식에 의해 설치함에 따라 교각에서 점검대가 차지하는 하중이 과다하여, 교량의 설계 하중에 영향을주고 있으며, 특히 부식 등의 이유로 용융 아연 도금을 하는 등 피복의 후공정이 필요하며, 설치후 유지관리의 어려움이 있다.As the inspection stand is simply cut by the length of the steel and installed by welding method, the load occupied by the inspection stand in the bridge is excessive, affecting the design load of the bridge, especially hot dip galvanizing due to corrosion etc. It requires post-processing and there is difficulty in maintenance after installation.

즉, 주된 교각점검 외에 이를 위한 난간대의 점검사항에 따른 관리업무의 불편함이 있는 것이다.That is, in addition to the main pier inspection, there is an inconvenience in the management work according to the check items of the railing for this purpose.

따라서 근래에는 알루미늄재질로써 금형으로 찍어서 만든 난간 포스트에 발판을 쉽게 조립할 수 있게 하고, 경량화와 내부식성을 좋게 한 제품이 사용되고 있다.Therefore, in recent years, aluminum has been used to make it easy to assemble the scaffolding railing post made of a mold made of aluminum, and to reduce the weight and corrosion resistance.

그러나 이러한 점검대 역시 교각에 고정시키기 위해서는 드릴로 점검대의 고정브래킷이 고정될 위치에 구멍을 뚫고 여기에 앵커를 심어서 고정하는 방식(이 방식은 드릴링에 의한 진동 등의 영향이 교각의 양생에 중대한 문제점을 갖게 함으로써 금지된 시공법이다)과 교각을 성형하기 위한 배근과 거푸집 설치단계에서 앵커을 묻어서 콘크리트를 타설하는 방법이 널리 사용된다.However, in order to fix such a check table to a pier, a hole is drilled at a position where the fixing bracket of the check table is to be fixed and an anchor is planted therein (this method has a significant effect on the curing of the pier. It is a prohibited construction method by having a problem) and the method of placing concrete by burying anchor at the installation stage of reinforcement and formwork for forming the piers is widely used.

그러나 상기 방식에는 교각의 시공업자와 교각 점검대의 시공업자가 서로 틀린데 따라 각각의 설계 상황이 일치하지 않아 실제로 점검대를 교각에 고정할 때 기 설치된 앵커와 점검대의 고정브래킷에 형성된 체결공이 일치하지 않아서 종전의 방식대로 드릴링을 하는 등으로 이중의 어려움이 있는 것이다.However, in the above method, the contractor of the pier and the contractor of the pier checker are different from each other, so the design situation of each pier does not coincide with each other. There is a double difficulty, such as drilling in the manner of.

또한 종래의 방식에 의하면 점검대를 위하여 교각의 전 둘레에 걸쳐서 별도의 비계설치 공사를 해야 하는 문제가 있다.In addition, according to the conventional method, there is a problem that a separate scaffolding installation should be performed over the entire circumference of the pier for the inspection stand.

따라서 본 발명은 이상과 같은 문제점을 해결하기 위해 창안된 것으로, 본 발명의 목적은 설치가 용이하고 설치를 위한 부대설치가 간단히 이루어지고 교각에 부착 고정이 쉽게 이루어지며, 그 부착 고정력 또한 안정된 고정장치를 제공함에 그 목적이 있다.Therefore, the present invention has been devised to solve the above problems, the object of the present invention is easy to install and the installation for the installation is simply made and easy to attach to the pier, the fixing fixing force is also stable fixing device The purpose is to provide.

상기 목적을 달성하기 위해 본 발명은 교각의 슬래브 일정위치에 상하 일정 간격으로 매입 설치되는 길이방향의 전,후면에 각각 안내홈을 갖는 레일과,In order to achieve the above object, the present invention provides a rail having guide grooves on the front and rear surfaces in the longitudinal direction, each of which is installed at regular intervals up and down at a predetermined position of the slab of the piers;

상기 각각의 레일의 안내홈에 머리가 삽입안내되는 볼트와,Bolts that guide the head is inserted into the guide groove of each rail,

상기 볼트를 상하 일정간격으로 유지하기 위해 상,하부에 볼트의 로드가 관통되는 구멍을 일정간격으로 갖는 간격편과,A spacing piece having holes at a predetermined interval through which the rods of the bolt pass through the upper and lower portions so as to maintain the bolt at a predetermined interval up and down;

상기 볼트의 로드에는 너트를 체결하여 상기 간격편을 고정하고, 상기 안내홈에 가이드되어 교각 슬래브에 배근된 수직 철근에 접촉되어 용접 또는 결속끈으로 고정되고,Fixing the gap piece by fastening the nut to the rod of the bolt, the guide groove is guided by the guide groove and contact with the vertical reinforcing bar reinforcement to the pier slab is fixed by welding or tie straps,

전면의 안내홈에는 교각 슬래브 거푸집에 콘크리트 붓기시 메움방지용으로 삽입되는 실링과,The guide groove on the front has a sealing that is inserted to prevent filling when concrete is poured into the pier slab formwork,

교각 슬래브의 타설후 상기 실링을 제거한 안내홈에는 대상물 고정수단으로써, 머리가 삽입되어 가이드되는 볼트에 대상물을 관통하여 고정하는 너트로 구성된 것을 특징으로 한다.The guide groove from which the sealing is removed after the piercing slab is cast is characterized in that it consists of a nut for fixing the object through a bolt inserted and guided as an object fixing means.

여기서 대상물 고정수단은 대상물의 고정브래킷에 형성된 수평 체결공의 수에 맞는 볼트의 머리를 상기 레일의 안내홈에 가이드시키되, 상기 대상물의 고정브래킷에 천공된 체결공의 간격으로 구멍을 갖는 간격편을 볼트의 로드에 끼워 볼트간의 간격을 세팅해서 대상물의 고정브래킷에 천공된 체결공에 관통시켜 너트로 고정한 것을 특징으로 한다.Here, the object fixing means guides the head of the bolt corresponding to the number of horizontal fastening holes formed in the fixing bracket of the object to the guide groove of the rail, but has an interval piece having a hole at the interval of the fastening hole drilled in the fixing bracket of the object. It is characterized in that it is fixed by a nut by passing through the fastening holes drilled in the fixing bracket of the object by setting the gap between the bolts to fit the rod of the bolt.

상기 레일은 교각 슬래브 거푸집의 외측에서 내측으로 경사지는 테이퍼면을 갖게 형성된 것을 특징으로 한다.The rail is characterized in that it has a tapered surface inclined inward from the outside of the pier slab formwork.

양면으로 안내홈을 갖는 상하 한쌍의 레일을 간격편의 구멍의 끼워지는 볼트와, 이 볼트의 머리가 상기 안내홈에 삽입 가이드되어 일정 상하 간격을 유지하며, 교각의 배근에 접촉되어 용접 및 결속되는 단계와,The upper and lower pair of rails having guide grooves on both sides are inserted into the bolts of the holes of the gap pieces, and the heads of the bolts are guided and inserted into the guide grooves to maintain a constant vertical gap. Wow,

상기 교각의 거푸집 설치후, 콘크리트 치기후 타설하여 양생후 일정 섹타의 비계틀을 설치한 후, 상기 안내홈을 통하여 역시 좌우 일정간격을 유지시키는 간격편의 구멍에 끼워지는 볼트를 고정수단으로 가이드하여 적어도 좌우 한쌍의 고정브래킷을 결합하여 너트를 고정한 후 일정 섹타 단위의 점검대를 설치한 후, 이를 작업공간으로 하여 교각의 스템 전 둘레에 걸쳐 상기 고정브래킷의 고정 및 점검대 설치를 순차적으로 해서 된 것을 특징으로 한다.After installation of the formwork of the piers, after placing the concrete after placing the scaffolding frame of a certain sector after curing, guide the bolts that are inserted into the hole of the gap piece to maintain the left and right constant intervals through the guide groove at least by fixing means. After fixing a nut by combining a pair of left and right fixing brackets, install a check table of a certain sector unit, and use it as a work space to fix the fixing bracket and install the check table sequentially around the stem of the piers. It features.

도 1은 교각에 점검대가 설치된 상태의 측면도1 is a side view of a check stand installed on the piers

도 2는 본 발명의 고정장치를 보이는 단면도2 is a cross-sectional view showing a fixing device of the present invention

도 3은 도 2의 요부 확대도3 is an enlarged view illustrating main parts of FIG. 2;

도 4는 본 발명의 분리 사시도4 is an exploded perspective view of the present invention

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10A, 10B : 레일 10C : 테이퍼면10A, 10B: Rail 10C: Taper Side

11A, 11B : 안내홈 12 : 볼트11A, 11B: Guide groove 12: Bolt

13 : 간격편 13A : 구멍13: space piece 13A: hole

14 : 너트 15 : 간격편14 Nut 15 Spacer Piece

15A : 구멍 16 : 볼트15A: Hole 16: Bolt

17 : 너트 S : 실링17: nut S: sealing

이하에서 본 발명을 바람직한 실시예의 첨부된 도면에 의해 보다 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings of preferred embodiments.

먼저 본 발명의 구성을 설명하면, 교각(100)의 스템(100) 일정위치에 상하 일정간격으로 매입 설치되는 길이방향의 전,후면에 각각 안내홈(11A,11B)을 갖는 레일(10A,10B)과,First, the configuration of the present invention, the rails (10A, 10B) having guide grooves (11A, 11B) in the front and rear, respectively, in the longitudinal direction that is installed at regular intervals up and down at a predetermined position of the stem (100) of the piers (100) )and,

상기 각각의 레일안내홈(11B)에 머리가 삽입안내되는 볼트(12)와,Bolts 12 and the head is guided to each of the rail guide groove (11B),

상기 볼트(12)를 상하 일정간격으로 유지하기 위해 상,하부에 볼트의 로드가 관통되는 구멍(13A)을 일정간격으로 갖는 간격편(13)과,In order to maintain the bolt 12 at regular intervals up and down intervals 13 and the hole 13A through which the rod of the bolt penetrates at regular intervals, and

상기 볼트(12)의 로드에는 너트(14)를 체결하여 상기 간격편(13)을 고정하고, 상기 안내홈(11B)에 가이드되어 교각 스템(110)에 배근된 수직철근(111)에 접촉되어 용접 또는 결속끈으로 고정되고,The nut 12 is fastened to the rod of the bolt 12 to fix the spacer 13, and is in contact with the vertical reinforcement 111 guided by the guide groove 11B and reinforcement to the pier stem 110. Fixed by welding or ties,

레일(10A,10B) 전면의 안내홈(11A)에는 교각 스템(110)의 거푸집에 콘크리트 붓기시 메움방지용으로 삽입되는 실링(S)과,A guide groove (11A) in front of the rail (10A, 10B) and the sealing (S) is inserted to prevent filling when pouring concrete into the formwork of the pier stem 110,

교각의 타설후 상기 실링(S)을 제거한 안내홈(11A)에는 대상물인 고정브래킷 (200) 고정수단으로써, 머리가 삽입되어 가이드되는 볼트(16)의 로드에 대상물을 관통하여 고정하는 너트(17)로 구성된 것을 특징으로 한다.The guide groove 11A from which the sealing S is removed after the casting of the pier is fixed by the fixing bracket 200 as an object, and a nut 17 for fixing the object through the rod of the bolt 16 through which the head is inserted and guided. It is characterized by consisting of).

상기에서 대상물 고정수단은 대상물의 고정브래킷에 형성된 좌우로 수평한 위치의 체결공의 수에 맞는 볼트(16)의 머리를 상기 레일(10A,10B)의 안내홈(11A)에 가이드시키되, 상기 대상물의 고정브래킷(200)에 천공된 체결공(210,220) 각각의 수평간격으로 구멍(15A)을 갖는 간격편(15)을 볼트(16)의 로드에 끼워 볼트간의 간격을 세팅해서 상기 로드를 고정브래킷에 천공된 체결공 각각에 관통시켜 너트 (17)로 고정한 것을 특징으로 한다.Wherein the object fixing means guides the head of the bolt 16 to the guide groove 11A of the rail (10A, 10B) to the number of fastening holes in the horizontal position left and right formed on the fixing bracket of the object, the object The rods of the bolts 16 by inserting the spacer pieces 15 having the holes 15A into the rods of the bolts 16 at horizontal intervals of each of the fastening holes 210 and 220 drilled in the fixing brackets 200 of the fixing brackets 200, and setting the gaps between the bolts. Penetrating through each of the fastening holes in the characterized in that it is fixed with a nut (17).

한편, 상기 레일(10A,10B)은 교각 거푸집의 외측에서 내측으로 경사지는 테이퍼면(10C)을 갖게 형성된 것을 특징으로 한다.On the other hand, the rail (10A, 10B) is characterized in that it is formed having a tapered surface (10C) inclined inward from the outside of the bridge formwork.

그리고 설치방법은 양면으로 안내홈(11A,11B)을 갖는 상하 한쌍의 레일(10A, 10B)을 간격편(13)의 구멍(13A)의 끼워지는 볼트(12)와, 이 볼트의 머리가 상기 안내홈(11B)에 삽입가이드되어 일정 상하 간격을 유지하며, 교각의 배근에 접촉되어 용접 및 결속되는 단계와;The installation method includes a bolt 12 into which the upper and lower pairs of rails 10A and 10B having guide grooves 11A and 11B on both sides are fitted into the holes 13A of the spacer pieces 13, and the heads of the bolts are described above. Inserting and guiding the guide groove 11B to maintain a predetermined vertical gap, and contacting and welding and binding the back muscles of the piers;

상기 교각의 거푸집 설치후, 콘크리트 치기후 타설하여 양생후 일정 섹타의 비계틀을 설치한 후, 상기 안내홈(11A)을 통하여 역시 좌우 일정간격을 유지시키는 간격편(15)의 구멍(15A)에 끼워지는 볼트(16)를 고정수단으로 가이드하여 적어도 좌우 한쌍의 고정브래킷(200)을 결합하여 너트(17)를 고정한 후 일정 섹타 단위의 점검대를 설치한 후, 이를 작업공간으로 하여 교각의 스템 전 둘레에 걸쳐 상기 고정브래킷의 고정 및 점검대 설치를 순차적으로 해서 된 것을 특징으로 한다.After installation of the formwork of the piers, and after pouring concrete to install the scaffolding of a certain sector after curing, and through the guide groove (11A) in the hole (15A) of the interval piece 15 also to maintain a constant left and right intervals Guide the bolts (16) to be fitted by means of fixing means to secure the nuts (17) by combining at least one pair of fixing brackets (200), and then install a check table in a certain sector unit, and then use the stem as a working space. It is characterized in that the fixing bracket and the installation of the inspection stand in sequence over the entire circumference.

이상과 같이 구성된 본 발명의 작용을 설치상태에 따라 살펴보기로 한다.The operation of the present invention configured as described above will be described according to the installation state.

먼저 본 발명의 설치는 교각을 형성하기 위한 배근작업과 거푸집작업에서 이루어진다.First, the installation of the present invention is made in the reinforcement work and formwork for forming the piers.

본 발명에서 레일(10A,10B)은 동일한 구조의 상하 한쌍으로써, 대체로 교각의 설치 위치상에서 점검대를 구성하는 고정브래킷(200)의 상하 체결공(210,220)의 위치에 맞는 상하 간격으로 세팅한다. 이는 상기 볼트(12)를 상하 일정 간격으로 유지하기 위해 상기 볼트의 로드를 간격편(13)의 구멍(13A)에 끼워서 너트(14)를 체결하고, 이 볼트의 머리를 레일의 안내홈(11B)에 가이드시킴으로써 레일을 상하 정위치에 세팅시킨다.In the present invention, the rail (10A, 10B) is a pair of upper and lower of the same structure, it is set in the upper and lower intervals in accordance with the position of the upper and lower fastening holes (210, 220) of the fixing bracket 200 constituting the inspection stand, generally on the installation position of the piers. This inserts the rod of the bolt into the hole 13A of the spacer piece 13 so as to maintain the bolt 12 at regular intervals up and down to fasten the nut 14, and the head of the bolt is guide groove 11B of the rail. Guide rail) to set the rails up and down.

이렇게 상기 안내홈에 가이드되어 교각 슬래브에 배근된 수직 철근에 볼트의 로드 접촉되면 용접 또는 결속끈으로 고정되고, 레일 전면의 안내홈(11A)에는 실링(S)을 채워 넣는다. 이렇게 하여 거푸집의 설치가 완료되면 콘크리트 붓기와 양생 및 타설작업하여, 본 발명의 장치가 교각의 상하 일정 위치 둘레에 설치가 완료된다.When the guide rod is guided by the guide groove and the rod of the bolt contact with the vertical reinforcement to the pier slab is fixed by welding or binding straps, the sealing groove (S) is filled in the guide groove (11A) of the front rail. In this way, when the installation of the formwork is completed, the concrete pouring and curing and pouring work, the device of the present invention is completed installation around the upper and lower fixed position of the piers.

따라서 상하 레일은 정위치에서 간격편(13)에 의해 상하 간격을 일정하게 유지시키고, 또 그것은 교각의 수직철근(111)에 용접 또는 결속끈으로 안정되게 지지된다.Therefore, the up-and-down rail keeps the vertical space constant by the spacing piece 13 at a fixed position, and it is stably supported by welding or binding straps on the vertical reinforcing bars 111 of the piers.

이때 레일의 상하 테이퍼면(10C)은 콘크리트 붓기작업에서 페이스트가 걸리지 않고 잘 흘러 유되는 기능을 갖기 위해서이다.At this time, the upper and lower tapered surface 10C is to have a function that flows well without the paste in the pouring of concrete.

또 안쪽의 안내홈(11B)에는 볼트머리가 삽입되어 있는 위치를 제외하고는 콘크리트 페이스트가 충전되어 양생되므로써, 안내레일(10A,10B)이 간접적으로 배근에 고정된 것과 더불어서, 본 발명의 주요 장치가 교각에 안정되게 고정되게 하는 이유가 될 것이다.In addition, the interior guide grooves 11B are filled with concrete paste except for the position where the bolt head is inserted and cured, so that the guide rails 10A and 10B are indirectly fixed to the reinforcement. Would be the reason for keeping the pier stable.

한편 레일 전면에 기 삽입시키는 실링(S)은 차후에 볼트(16)가 안내되어 점검대를 고정시킬때 장애가 되지 않게 하기 위해 존재하며, 이것은 교각의 양생단계 이후 점검대의 설치 직전에 인출해 낸다.On the other hand, the sealing (S) that is already inserted into the front of the rail is present to prevent the obstacle when the bolt 16 is guided to fix the inspection table, which is drawn out just before the installation of the inspection platform after the curing step of the piers.

이후에 작업은 다음과 같이 이루어진다.After that, the work is done as follows.

먼저 교각의 상부 위치까지 한 섹타의 비계틀 내지는 사다리를 설치한다.First, one sector scaffolding or ladder is installed to the upper position of the piers.

이후 점검대의 고정브래킷(200)을 적어도 좌우로 2개소 이상을 설치한다. 이는 간격편(13)에 의해 고정브래킷의 양측 체결공 각각에 맞게 설정된 고정수단의 볼트(16) 머리를 상하 레일의 안내홈(11A)에 각각 가이드하여 고정브래킷의 체결공을 상기 고정수단의 전방으로 돌출된 로드에 끼우고 너트(17)로 체결함으로써 교각에 부착 고정된다.Thereafter, at least two fixing brackets 200 are installed on at least two sides. This guides the bolt 16 heads of the fixing means set to the respective fastening holes on both sides of the fixing bracket by the spacer pieces 13 to the guide grooves 11A of the upper and lower rails, respectively, so that the fixing holes of the fixing bracket are moved forward of the fixing means. It is attached to the rod protruding by fastening with a nut 17 is fixed to the pier attachment.

이렇게 적어도 좌우 2개소 이상의 고정브래킷을 고정한 후에는 하나의 발판을 세팅하여 다음 작업을 위한 작업공간을 확보하므로 별도의 설치를 위한 비계틀이 없이도 연속 작업이 가능해지는 것이다(고정브래킷은 "U"자형으로써 난간대와 발판대 및 고정브래킷의 기능을 함께 가진다).After fixing at least two fixed brackets at the left and right in this way, by setting one footing to secure a working space for the next work, continuous work is possible without a scaffolding for separate installation (fixing brackets have a “U” shape). Railings, scaffolding and fixed brackets).

상기 점검대에 관한 것은 본 출원인의 실용신안등록 제148809호에 의해 잘 기술되어 있고, 본 발명의 요지가 아니라 이하 설명을 생략한다.The check table is well described by the Utility Model Registration No. 148809 of the present applicant, and the following description is omitted, rather than the gist of the present invention.

한편, 바람직하게는 본 발명의 설치가 완료된 이후에는 레일의 전면에 노출되는 안내홈(11A)에 기 삽입되어 있던 실링(S)을 이용하여 부분적이나마 되끼우기를 하여 마감함으로써 깔끔한 마감이 될 수 있을 것이다.On the other hand, preferably after the installation of the present invention by using a sealing (S) that was previously inserted into the guide groove (11A) that is exposed to the front of the rail can be finished by partial repetitive finish can be a clean finish will be.

이상과 같이 구성되고 작용되는 본 발명은 설치가 용이하고, 설치를 위한 부대 설비가 간단히 이루어지고 교각에 부착 고정이 쉽게 이루어지고, 그 부착 고정력 또한 안정된 고정장치를 제공하는 효과가 있다.The present invention constituted and operated as described above is easy to install, the auxiliary equipment for the installation is made easily, the attachment and fixing is easily made to the piers, and the attachment fixing force is also effective to provide a stable fixing device.

Claims (4)

교각의 슬래브 일정위치에 상하 일정간격으로 매입 설치되는 길이방향의 전,후면에 각각 안내홈(11A,11B)을 갖는 레일(10A,10B)과,Rails 10A and 10B having guide grooves 11A and 11B on the front and rear sides of the longitudinal direction, each of which is installed at regular intervals up and down at a predetermined position of the slab of the piers, 상기 각각의 레일의 안내홈(11B)에 머리가 삽입안내되는 볼트(12)와,A bolt 12 to which the head is guided to the guide groove 11B of each rail, 상기 볼트(12)를 상하 일정 간격으로 유지하기 위해 상,하부에 볼트의 로드가 관통되는 구멍(13A)을 일정간격으로 갖는 간격편(13)과,In order to maintain the bolt 12 at regular intervals up and down intervals 13 and the hole 13A through which the rod of the bolt penetrates at regular intervals, and 상기 볼트의 로드에는 너트(14)를 체결하여 상기 간격편을 고정하고, 상기 안내홈에 가이드되어 교각에 배근된 수직철근에 접촉되어 용접 또는 결속끈으로 고정되고,The bolt 14 is fastened to the rod of the bolt to fix the gap piece, and is contacted with a vertical reinforcing bar guided by the guide groove and placed in a pier to be fixed by welding or a tie. 전면의 안내홈(11A)에는 교각 거푸집에 콘크리트 붓기시 메움방지용으로 삽입되는 실링(S)과,In the front guide groove (11A) and the sealing (S) is inserted to prevent filling when pouring concrete into the bridge formwork, 교각 슬래브의 타설후 상기 실링(S)을 제거한 안내홈(11A)에는 대상물 고정수단으로써, 머리가 삽입되어 가이드되는 볼트(16)에 대상물을 관통하여 고정하는 너트(17)로 구성된 것을 특징으로 한 교각에 점검대를 설치하기 위한 고정장치.The guide groove 11A from which the sealing S is removed after the piercing slab is cast is configured as a nut 17 for fixing the object through a bolt 16 to which the head is inserted and guided as an object fixing means. Fixtures for installing checkpoints on piers. 제 1항에 있어서, 대상물 고정수단을 대상물의 고정브래킷(200)에 상하 각각에 형성된 좌우 일정 간격의 체결공의 수에 맞는 볼트(16)의 머리를 상기 레일의 안내홈(11A)에 가이드시키되, 상기 대상물의 고정브래킷에 천공된 좌우 체결공의 간격으로 구멍(15A)을 갖는 간격편(15)을 볼트(16)의 로드에 끼워 볼트간의 간격을세팅해서 대상물의 고정브래킷에 천공된 체결공에 관통시켜 너트(17)로 고정한 것을 특징으로 한 교각에 점검대를 설치하기 위한 고정장치.According to claim 1, wherein the object fixing means guides the head of the bolt (16) corresponding to the number of fastening holes at regular intervals left and right formed on the fixing bracket 200 of the object to the guide groove (11A) of the rail, A fastening hole drilled in the fixing bracket of the object by inserting the gap pieces 15 having holes 15A into the rods of the bolt 16 at intervals of the left and right fastening holes drilled in the fixing bracket of the object to set the spacing between the bolts. Fixing device for installing the inspection stand on the piers, characterized in that penetrated through and fixed with a nut (17). 제 1항 또는 제 2항에 있어서, 상기 레일(10A,10B)은 교각 거푸집의 외측에서 내측으로 경사지는 테이퍼면(10C)을 갖게 형성된 것을 특징으로 한 교각에 점검대를 설치하기 위한 고정장치.The fixing device according to claim 1 or 2, wherein the rails (10A, 10B) have tapered surfaces (10C) which are inclined inward from the outside of the pier formwork. 양면으로 안내홈(11A,11B)을 갖는 상하 한쌍의 레일(10A,10B)을 간격편(13)의 구멍(13A)의 끼워지는 볼트(12)와, 이 볼트의 머리가 상기 안내홈(11B)에 삽입가이드되어 일정 상하 간격을 유지하며, 교각의 배근에 접촉되어 용접 및 결속되는 단계와;A bolt 12 into which the upper and lower pairs of rails 10A and 10B having guide grooves 11A and 11B on both sides are fitted into the hole 13A of the gap piece 13, and the head of the bolt is the guide groove 11B. Inserted into the guide) to maintain a constant vertical interval, and contacting and welding and binding the reinforcement of the piers; 상기 교각의 거푸집 설치후, 콘크리트 치기후 타설하여 양생후 일정 섹타의 비계틀을 설치한 후, 상기 안내홈(11A)을 통하여 역시 좌우 일정간격을 유지시키는 간격편(15)의 구멍(15A)에 끼워지는 볼트(16)를 고정수단으로 가이드하여 적어도 좌우 한쌍의 고정브래킷(200)을 결합하여 너트(17)를 고정한 후 일정 섹타 단위의 점검대를 설치한 후, 이를 작업공간으로 하여 교각의 스템 전 둘레에 걸쳐 상기 고정브래킷의 고정 및 점검대 설치를 순차적으로 해서 된 것을 특징으로 한 교각에 점검대를 설치하기 위한 고정방법.After installation of the formwork of the piers, and after pouring concrete to install the scaffolding of a certain sector after curing, and through the guide groove (11A) in the hole (15A) of the interval piece 15 also to maintain a constant left and right intervals Guide the bolts (16) to be fitted by means of fixing means to secure the nuts (17) by combining at least one pair of fixing brackets (200), and then install a check table in a certain sector unit, and then use the stem as a working space. A fixing method for installing a check table in a pier, characterized in that the fixing bracket and the check table installation of the fixing bracket sequentially over the entire circumference.
KR1020000025860A 2000-05-15 2000-05-15 Fixation Device and Apparatus for Mounting Checking Plate in a Bent KR100353882B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000025860A KR100353882B1 (en) 2000-05-15 2000-05-15 Fixation Device and Apparatus for Mounting Checking Plate in a Bent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000025860A KR100353882B1 (en) 2000-05-15 2000-05-15 Fixation Device and Apparatus for Mounting Checking Plate in a Bent

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000013705U Division KR200206699Y1 (en) 2000-05-15 2000-05-15 Fixation Device for Mounting Checking Plate in a Bent

Publications (2)

Publication Number Publication Date
KR20010104585A true KR20010104585A (en) 2001-11-26
KR100353882B1 KR100353882B1 (en) 2002-09-27

Family

ID=45812937

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000025860A KR100353882B1 (en) 2000-05-15 2000-05-15 Fixation Device and Apparatus for Mounting Checking Plate in a Bent

Country Status (1)

Country Link
KR (1) KR100353882B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100430600B1 (en) * 2001-06-20 2004-05-12 정호개발 주식회사 Inspective Handrail-bracket of bridge
KR100782667B1 (en) * 2007-01-18 2007-12-07 주식회사 로드맥스 엔지니어링 Embedded device for fixing inspection facilites of bridge
KR100860592B1 (en) * 2007-06-20 2008-09-26 삼성물산 주식회사 Temporary system for vertical structure using precast concreat block
CN102409610A (en) * 2011-11-18 2012-04-11 中铁十五局集团有限公司 Flaw detection car in body of high-speed rail bridge
CN108797341A (en) * 2018-07-05 2018-11-13 深圳市必发达科技有限公司 It is a kind of to facilitate the garden landscape bridge for accepting tourist's junk
KR102194744B1 (en) * 2020-02-27 2020-12-23 박현철 Safety installing structure of main column for inspection passage
KR20220112615A (en) * 2021-02-04 2022-08-11 (주)이알코리아 Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101302458B1 (en) * 2012-10-11 2013-09-02 이재호 Cast-in anchor channel with sub-anchor

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100430600B1 (en) * 2001-06-20 2004-05-12 정호개발 주식회사 Inspective Handrail-bracket of bridge
KR100782667B1 (en) * 2007-01-18 2007-12-07 주식회사 로드맥스 엔지니어링 Embedded device for fixing inspection facilites of bridge
KR100860592B1 (en) * 2007-06-20 2008-09-26 삼성물산 주식회사 Temporary system for vertical structure using precast concreat block
CN102409610A (en) * 2011-11-18 2012-04-11 中铁十五局集团有限公司 Flaw detection car in body of high-speed rail bridge
CN108797341A (en) * 2018-07-05 2018-11-13 深圳市必发达科技有限公司 It is a kind of to facilitate the garden landscape bridge for accepting tourist's junk
KR102194744B1 (en) * 2020-02-27 2020-12-23 박현철 Safety installing structure of main column for inspection passage
KR20220112615A (en) * 2021-02-04 2022-08-11 (주)이알코리아 Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie

Also Published As

Publication number Publication date
KR100353882B1 (en) 2002-09-27

Similar Documents

Publication Publication Date Title
CN201221206Y (en) Movable anti-electricity protection shed rack
KR100353882B1 (en) Fixation Device and Apparatus for Mounting Checking Plate in a Bent
KR102221132B1 (en) Cut-off slope inspection road and its construction method
KR100603901B1 (en) Girder bridge construction make use of a part existing girder and that execution method
KR200206699Y1 (en) Fixation Device for Mounting Checking Plate in a Bent
KR20040092254A (en) Fixation device and apparatus for mounting checking plate in a bent
CN112282049B (en) Reinforced concrete superposed primary and secondary beam connecting joint and construction method thereof
KR200361531Y1 (en) A checking stand for bridge maintenance care with three steps separation type
KR100688149B1 (en) Supporting structure of parapet for steel bridge
KR100373783B1 (en) A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same
JP2913436B2 (en) Mobile formwork method and equipment used for the method
CN216194090U (en) Wet seam attached construction platform of precast box girder
FR2704570A1 (en) Device for reinforcing overhangs of bridges and its implementation method
KR200303255Y1 (en) Rail for checking pier and fixing apparatus thereof
JP5807883B1 (en) Suspended scaffolding
KR100557880B1 (en) Apparatus for fixing bridge checking device to bridge
JP2017172144A (en) Junction structure and junction method between road floor slab and pca wall balustrade
CN107604829B (en) A kind of pier cap beam tensioning assembled tensioning job platform and preparation method thereof
KR200402793Y1 (en) Rail and roller Type device for hanging scaffold of bridge slab
JP2003056186A5 (en)
CN216947914U (en) Highway construction assembled escape way
KR100554473B1 (en) Check road structure of cutting the ground part of road
KR200397402Y1 (en) A pillar For Bridge Inspection
CN216689086U (en) Whole construction system of rectangle post steel mould
CN214362935U (en) High mound rollover construction reinforcement ligature protection frame

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120904

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20130903

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20140902

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20150902

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20160913

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20170912

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20180906

Year of fee payment: 17

FPAY Annual fee payment

Payment date: 20190909

Year of fee payment: 18