CN201221206Y - Movable anti-electricity protection shed rack - Google Patents
Movable anti-electricity protection shed rack Download PDFInfo
- Publication number
- CN201221206Y CN201221206Y CNU2008201130820U CN200820113082U CN201221206Y CN 201221206 Y CN201221206 Y CN 201221206Y CN U2008201130820 U CNU2008201130820 U CN U2008201130820U CN 200820113082 U CN200820113082 U CN 200820113082U CN 201221206 Y CN201221206 Y CN 201221206Y
- Authority
- CN
- China
- Prior art keywords
- electricity
- shielding
- frame
- roofing
- packaged type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a mobile electricity-shielding protective shed, which comprises a steel-structural roofing, frameworks assembled on both sides and electricity-shielding boards; wherein, traveling wheels are arranged on the lower ends of the frameworks; a mobile track is arranged under the traveling wheels; and the electricity-shielding boards are connected with the lower side of the roofing through electricity-shielding board suspenders. The mobile electricity-shielding protective shed resolves the problem on how to protect the existing railroad line during the cantilever-casting construction of each section of articulated beams, and avoids the construction of an ultra-long fixed electricity-shielding shed, therefore the safety and use flexibility of the electricity-shielding shed are improved, and meanwhile, the structure is simplified. The mobile electricity-shielding protective shed is characterized by safety, reliability, use flexibility and simple structure. The mobile electricity-shielding protective shed is widely applicable to safety protection in the construction of cast-in-place bridges and prefabricated hoisting bridges spanning electrified railway lines in operation, or other spanning structures.
Description
Affiliated technical field
The utility model relates to strides the safety protection equipment that uses on the electric railway business line on a kind of, the anti-electricity protection of especially a kind of packaged type frame.
Background technology
China's urban development is very rapid, because the infrastructure in early stage is not enough to the estimation of local economic development, a lot of cities all are faced with form, especially urban road that enlarging transforms and stand in the breach and transform in advance, thereby, stride the overpass bridge of railway on many and need build.Whole nation arterial railway main line has all become electric railway through nearly more than 10 years transformation, on stride construction of railways, the greatest problem that is faced is: fall arrest problem and anti-electric problem between operational period.These two problems do not solve, and construction safety and railway line up train safety can't guarantee.Common means of defence is: adopt a kind of fixedly gate-type steel work of cross-line, all-insulated plate is hung on steel work, on the gate-type structure ceiling is installed again, play the measure of anti-electricity and preventing dropped material.But the shortcoming of this structure: 1, can not integral hoisting, normally a Pin one Pin installs, and so, blocks main points often, and is bigger to the railway operation influence; 2, this fixed structure usually can not be applied in a flexible way in practice of construction.When the operation place was moved, mounted anti-electric frame was just ineffective, reinstalled after must removing, and perhaps will drop into corresponding increase with preventing that electric frame does very longly; 3, structure is comparatively complicated, and processing and installation difficulty are big.
Summary of the invention
Its purpose of the utility model just is to provide the anti-electricity protection of a kind of packaged type frame, for reducing the adverse effect of construction period to the railway operation, the use flexibility that improves anti-electric frame, make simple and directization of structure simultaneously, have safe and reliablely, use flexibly characteristic of simple structure.
The technical scheme that realizes above-mentioned purpose and take, comprise steel work roofing and the framework that is installed on both sides, and all-insulated plate, described framework lower end is provided with travelling wheel, the travelling wheel lower end is provided with moving track, and described all-insulated plate is connected the roofing lower end through the all-insulated plate suspension rod.
Compared with prior art this device has the following advantages.
1 owing to adopted the anti-electric scaffolding structure design of packaged type, not only solved because of the operating area change cause fixed anti-electric frame protection less than problem, also greatly reduce interference to the existing line driving, have simple for structurely, be easy to processing, lifting and move characteristics very easily.It is the good safeguard of striding the existing electrified railway construction.
2, owing to adopted the anti-electric scaffolding structure design of packaged type, thereby efficiently solve each sections of cantilever perfusion tie-beam construction period protection question, avoided having set up the fixed anti-electric frame of overlength existing line, whole construction course safety is smooth, obtains good effect.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is this apparatus structure schematic front view;
Fig. 2 is this device frame structural representation front view;
Fig. 3 is the three-dimensional schematic views of this apparatus structure.
The specific embodiment
Embodiment
Comprise steel work roofing 5 and the framework 4 that is installed on both sides, and all-insulated plate 7, as shown in Figure 1, described framework 4 lower ends are provided with travelling wheel 2, and travelling wheel 2 lower ends are provided with moving track, and described all-insulated plate 7 is connected roofing 5 lower ends through all-insulated plate suspension rod 6.
Described framework 4 comprises column 8 and framework and the all-insulated plate suspension rod be made up of intercolumniation scissors bar, crossbeam, longeron, purlin, horizontal wind resistance pull bar, as shown in Figure 2.
Described travelling wheel 2 is welded on framework 4 columns 8.
Described moving track comprises seat concrete 1, sleeper 3, fastener and rail.
Described all-insulated plate 7 is the global formation curve-shaped electricity preventing board, and is symmetrical arranged two along roofing 5 centers.
Described roofing 5 is provided with wire gauze, the wooden plywood of preventing fires.
Have defective and deficiency at original structure, for reducing the adverse effect of construction period to the railway operation, the use flexibility that improves anti-electric frame makes simple and directization of structure simultaneously, need transform anti-electric frame, thoroughly addresses the above problem.
The anti-electric frame of packaged type is made up of moving track, travelling wheel 2, framework 4 structures, all-insulated plate 7 and roofing 5 four parts.Its overall structure as shown in Figure 3, moving track comprises that seat concrete 1, sleeper 3, fastener and rail form, travelling wheel 2 is welded on framework 4 columns 8.Framework 4 structures comprise: column 8, intercolumniation scissors bar, crossbeam, longeron, purlin, horizontal wind resistance pull bar, all-insulated plate suspension rod etc.All-insulated plate 7 is the global formation structure, hangs on the frame construction through suspension rod, and roofing 5 is made up of wire gauze, the wooden plywood depression bar of fire prevention etc.Anti-electric frame move through travelling wheel 2 under the column 8, manpower promotes and can finish, curve-shaped electricity preventing board 7 hangs under contact net, effectively prevents contact net static to personal injury, and can avoid rainwater to cause the conduction accident.
(1) processing and the installation of anti-electric frame
1. according to the design drawing blanking, each rod member classifying and numbering identifies clearly, and the mismachining tolerance of rod member is controlled in the 3mm.In the processing space travelling wheel and upright bridge welding are connected into one.
2. near needs are set up the existing line of anti-electric frame, flatten an about 40m of area
2The place, and pad last layer ballast is as the assembly unit place.
3. column is good by the design pitch yaw, measure vertical pole ' s span and Diagonal Dimension with steel ruler, manually be adjusted to accurate position.Connect longeron up and down and put into the position by design attitude, between per two root posts up and down longeron be connected with the column full weld, and then the scissors bar is burn-on.
4. after all the company of weldering finishes with heel post, adopt crane that column is sling together with longeron, temporary fixed with cable wind rope, manually to adjust left and right sides column spacing, and measure Diagonal Dimension, error is controlled in the 10mm, and perpendicularity deviation is not more than 0.2%.
5. set up scaffold between two product columns, the crossbeam truss is winched to column top, manually be adjusted to firm welding behind the design attitude with crane.
6. installing bottom layer wind resistance pull bar and all-insulated plate suspension rod.
7. all-insulated plate is installed.
8. the top layer purlin is installed.
9. lay the D4 wire gauze, lay the wooden plywood of fire prevention.
10. the roofing depression bar is installed.
(2) walking rails is installed
1. railway bed lateral sulcus end face is cleaned out, measured track centerline by the design span of anti-electric frame with steel ruler.
2. use the C20 plain concrete with the levelling of lateral sulcus end face earlier, thinnest part thickness is not less than 5cm.
3. swing in sleeper by design pitch, build the C20 concrete between pillow, in order to fixing sleeper.
4. the traveling rail is installed.
5. strand rail spacing about checking is squeezed into railway spike after errorless, fixedly rail.
(3) the anti-electric frame of lifting
Application is blocked fragmentary order and the order that has a power failure, and adopts crane will prevent that electric frame integral body hangs in place in blocking point.The big or small visual site condition of crane is determined, is adopted the 50t crane to get final product (the heavily about 11t of 10 meters long anti-electric frame) generally speaking.
(4) case history
Xin Jie river grand bridge 68# ~ 72# pier and existing Beijing-Guangzhou Railway intersect, and corresponding existing Beijing-Guangzhou Railway mileage K2242+280 ~+310 are designed to that (48+2 * 80+48) the m prestressed concrete continuous beam is striden existing Beijing-Guangzhou Railway, headroom 9.73m.Its particular location as shown in Figure 1.Wherein the 68# pier is in existing Beijing-Guangzhou Railway roadbed center and must treats that existing line changes and can construct after moving that 69# ~ 72# continuous beam pier is execution conditions specifically.In order to prevent that the Construction of continuous beam water from down trickling, instrument touches the contact netting twine and other objects drop, influence constructor's personal safety and train traffic safety, determine in existing Beijing-Guangzhou Railway K2242+280 ~+310 scopes, to set up removable anti-electric frame and protect.
Continuous beam adopts the construction of cantilever Hanging Basket method merogenesis, and the long 3m of every joint 10 saves totally, and striding existing Beijing-Guangzhou Railway continuous beam has 7 sections, packaged type antistatic frame design length 10m, span 11.3m.
Anti-electric frame parts concentrate on the processing of agitator reinforcing bar canopy, be transported to 69# pier on-site consolidation, adopt a disposable lifting of 50t crane to put in place, anti-electric frame all is provided with pull rope for four jiaos during lifting, accident collision existing line electric power facility when avoiding crane job, tie up on the fixing all around crab-bolt with windproof hawser after lifting is finished, prevent that electric frame is free to slide.
Adopt the anti-electric frame of packaged type, efficiently solve each sections of cantilever perfusion tie-beam construction period protection question to existing line, avoided having set up the fixed anti-electric frame of overlength, whole construction course safety is smooth, obtains good effect.
Claims (6)
1, the anti-electricity protection of a kind of packaged type frame, comprise steel work roofing (5) and be installed on the framework (4) of both sides, and all-insulated plate (7), it is characterized in that, described framework (4) lower end is provided with travelling wheel (2), travelling wheel (2) lower end is provided with moving track, and described all-insulated plate (7) is connected roofing (5) lower end through all-insulated plate suspension rod (6).
2, the anti-electricity protection of a kind of packaged type according to claim 1 frame is characterized in that described framework (4) comprises column (8) and framework and the all-insulated plate suspension rod be made up of intercolumniation scissors bar, crossbeam, longeron, Purlin bar, horizontal wind resistance pull bar.
3, the anti-electricity protection of a kind of packaged type according to claim 1 and 2 frame is characterized in that described travelling wheel (2) is welded on the upright of frame (8).
4, the anti-electricity protection of a kind of packaged type according to claim 1 frame is characterized in that described moving track comprises seat concrete (1), sleeper (3), fastener and rail.
5, the anti-electricity protection of a kind of packaged type according to claim 1 frame is characterized in that described all-insulated plate (7) is the global formation curve-shaped electricity preventing board, and is symmetrical arranged two along roofing (5) center.
6, the anti-electricity protection of a kind of packaged type according to claim 1 frame is characterized in that described roofing (5) is provided with wire gauze, the wooden plywood of preventing fires.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201130820U CN201221206Y (en) | 2008-07-02 | 2008-07-02 | Movable anti-electricity protection shed rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201130820U CN201221206Y (en) | 2008-07-02 | 2008-07-02 | Movable anti-electricity protection shed rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201221206Y true CN201221206Y (en) | 2009-04-15 |
Family
ID=40574716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201130820U Expired - Fee Related CN201221206Y (en) | 2008-07-02 | 2008-07-02 | Movable anti-electricity protection shed rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201221206Y (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899906A (en) * | 2010-07-21 | 2010-12-01 | 重庆建工脚手架有限公司 | Safety construction method for horizontal protective shed |
CN102162301A (en) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | Method and device for preserving temperature and humidity and protecting during concrete construction in winter |
CN102277960A (en) * | 2011-04-22 | 2011-12-14 | 内蒙古优技钢品有限公司 | Construction shield and construction method |
CN102383615A (en) * | 2011-08-08 | 2012-03-21 | 谢立丰 | Assembled movable electricity preventing protective shed |
CN102444082A (en) * | 2010-10-15 | 2012-05-09 | 中铁五局(集团)有限公司 | Light shelf protection structure for over crossing electrified railway bridge |
CN102936873A (en) * | 2012-11-21 | 2013-02-20 | 中铁四局集团第四工程有限公司 | Contact net line protection system for continuous beam construction of overpass electrified railway |
CN105908986A (en) * | 2016-05-23 | 2016-08-31 | 中国建筑第二工程局有限公司 | Construction method of glass daylighting roof protection frame |
CN106193639A (en) * | 2016-07-08 | 2016-12-07 | 中建三局集团有限公司 | Assembled rail safety rope hangar system |
CN106836233A (en) * | 2016-12-19 | 2017-06-13 | 徐州工程学院 | A kind of carbon tetrachloride processing pond pure frame support meanss and its method of work |
CN107227858A (en) * | 2017-08-01 | 2017-10-03 | 中国水利水电第七工程局成都水电建设工程有限公司 | Overhead bridge pier safe construction safeguard structure under high-voltage line |
CN107893378A (en) * | 2017-11-03 | 2018-04-10 | 中交铁道设计研究总院有限公司 | A kind of anti-electric canopy and construction method across a plurality of existing electrified railway |
CN108301513A (en) * | 2017-12-29 | 2018-07-20 | 湖北华舟重工应急装备股份有限公司 | A kind of shield device for Combat Readiness Steel Bridge |
CN109457988A (en) * | 2018-11-27 | 2019-03-12 | 中铁十四局集团第工程发展有限公司 | A kind of construction safety protection canopy |
CN109798139A (en) * | 2019-01-31 | 2019-05-24 | 中铁十四局集团建筑工程有限公司 | A kind of frame structure and its construction method suitable for the protection of huge solution cavity |
CN109944451A (en) * | 2019-04-11 | 2019-06-28 | 中交二公局第五工程有限公司 | Across both wired construction safety protection device and its construction method in one kind |
CN110158988A (en) * | 2019-06-28 | 2019-08-23 | 中冶建工集团有限公司 | A kind of building protection steel structure support and its quick method for dismounting |
CN110792037A (en) * | 2019-10-30 | 2020-02-14 | 中铁三局集团第六工程有限公司 | Multipoint floor type steel frame protection method for bridge structure close to high-voltage line |
CN114233028A (en) * | 2021-12-31 | 2022-03-25 | 中铁五局集团有限公司 | Construction method of movable protective shed during construction of steel structure main body of traffic junction station platform |
-
2008
- 2008-07-02 CN CNU2008201130820U patent/CN201221206Y/en not_active Expired - Fee Related
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899906A (en) * | 2010-07-21 | 2010-12-01 | 重庆建工脚手架有限公司 | Safety construction method for horizontal protective shed |
CN102444082A (en) * | 2010-10-15 | 2012-05-09 | 中铁五局(集团)有限公司 | Light shelf protection structure for over crossing electrified railway bridge |
CN102162301A (en) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | Method and device for preserving temperature and humidity and protecting during concrete construction in winter |
CN102277960A (en) * | 2011-04-22 | 2011-12-14 | 内蒙古优技钢品有限公司 | Construction shield and construction method |
CN102383615A (en) * | 2011-08-08 | 2012-03-21 | 谢立丰 | Assembled movable electricity preventing protective shed |
CN102936873A (en) * | 2012-11-21 | 2013-02-20 | 中铁四局集团第四工程有限公司 | Contact net line protection system for continuous beam construction of overpass electrified railway |
CN102936873B (en) * | 2012-11-21 | 2015-10-28 | 中铁四局集团第四工程有限公司 | On across electric railway Construction of continuous beam contact net lines guard system |
CN105908986A (en) * | 2016-05-23 | 2016-08-31 | 中国建筑第二工程局有限公司 | Construction method of glass daylighting roof protection frame |
CN105908986B (en) * | 2016-05-23 | 2018-03-13 | 中国建筑第二工程局有限公司 | Construction method of glass daylighting roof protection frame |
CN106193639A (en) * | 2016-07-08 | 2016-12-07 | 中建三局集团有限公司 | Assembled rail safety rope hangar system |
CN106836233B (en) * | 2016-12-19 | 2019-06-21 | 徐州腾睿智能装备有限公司 | A kind of carbon tetrachloride processing pond pure frame support device and its working method |
CN106836233A (en) * | 2016-12-19 | 2017-06-13 | 徐州工程学院 | A kind of carbon tetrachloride processing pond pure frame support meanss and its method of work |
CN107227858A (en) * | 2017-08-01 | 2017-10-03 | 中国水利水电第七工程局成都水电建设工程有限公司 | Overhead bridge pier safe construction safeguard structure under high-voltage line |
CN107893378A (en) * | 2017-11-03 | 2018-04-10 | 中交铁道设计研究总院有限公司 | A kind of anti-electric canopy and construction method across a plurality of existing electrified railway |
CN108301513A (en) * | 2017-12-29 | 2018-07-20 | 湖北华舟重工应急装备股份有限公司 | A kind of shield device for Combat Readiness Steel Bridge |
CN109457988A (en) * | 2018-11-27 | 2019-03-12 | 中铁十四局集团第工程发展有限公司 | A kind of construction safety protection canopy |
CN109798139A (en) * | 2019-01-31 | 2019-05-24 | 中铁十四局集团建筑工程有限公司 | A kind of frame structure and its construction method suitable for the protection of huge solution cavity |
CN109944451A (en) * | 2019-04-11 | 2019-06-28 | 中交二公局第五工程有限公司 | Across both wired construction safety protection device and its construction method in one kind |
CN109944451B (en) * | 2019-04-11 | 2023-06-16 | 中交二公局第五工程有限公司 | Upper span existing line construction safety protection device and construction method thereof |
CN110158988A (en) * | 2019-06-28 | 2019-08-23 | 中冶建工集团有限公司 | A kind of building protection steel structure support and its quick method for dismounting |
CN110792037A (en) * | 2019-10-30 | 2020-02-14 | 中铁三局集团第六工程有限公司 | Multipoint floor type steel frame protection method for bridge structure close to high-voltage line |
CN114233028A (en) * | 2021-12-31 | 2022-03-25 | 中铁五局集团有限公司 | Construction method of movable protective shed during construction of steel structure main body of traffic junction station platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201221206Y (en) | Movable anti-electricity protection shed rack | |
CN104562936B (en) | A kind of tie-rod steel pipe arch bridge construction method continuously | |
CN105421248B (en) | Large-Span Continuous girder span building up station turns and closure construction method | |
CN106978777B (en) | A kind of make-shift bridge device | |
CN103437299A (en) | Construction method for one-time turning of large-span T-shaped single pier | |
CN105239510A (en) | Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method | |
CN111485500B (en) | Construction method and structure for transversely lengthening and reinforcing by retreating and dismantling diamond hanging basket | |
CN205954489U (en) | Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support | |
CN102605717A (en) | Pier-top longitudinal support scaffolding method | |
CN107060823A (en) | Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis | |
CN103866696A (en) | Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge | |
CN205205685U (en) | Span wire pier is function portal device at most | |
CN206873495U (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN102220741A (en) | Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines | |
RU2495184C1 (en) | Method to disassemble bridge span and device for realisation of this method | |
CN102659027B (en) | Variable-span transit method for girder-erecting gantry crane | |
CN206986640U (en) | A kind of travelling bridge device for being used for track slab pavement and removing | |
CN102635061B (en) | Mountain stream river-crossing inclined zipper trestle and hoisting method thereof | |
CN107366229A (en) | Both a kind of construction method of wired transom pier bent cap | |
CN107217685A (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN103225411B (en) | Both wired protection canopy | |
CN202017181U (en) | Falsework for constructing steel and concrete combined beam crossing over conventional route and arranged parallel to existing line | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN204589817U (en) | A kind of reinforcing mat posture fence operation integrated apparatus | |
CN106245531A (en) | Steel structural bridge installation method is hung under bilateral derrick type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090415 Termination date: 20110702 |