CN110821147A - Expansion joint shear wall combination template capable of being assembled and disassembled quickly - Google Patents

Expansion joint shear wall combination template capable of being assembled and disassembled quickly Download PDF

Info

Publication number
CN110821147A
CN110821147A CN201911249888.1A CN201911249888A CN110821147A CN 110821147 A CN110821147 A CN 110821147A CN 201911249888 A CN201911249888 A CN 201911249888A CN 110821147 A CN110821147 A CN 110821147A
Authority
CN
China
Prior art keywords
square tube
template
steel square
expansion joint
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911249888.1A
Other languages
Chinese (zh)
Inventor
李家雨
莫礼悦
蓝宇源
程聪武
农富诚
覃焕
李壤
林琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Original Assignee
GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co filed Critical GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Priority to CN201911249888.1A priority Critical patent/CN110821147A/en
Publication of CN110821147A publication Critical patent/CN110821147A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a rapidly-assembled and rapidly-disassembled expansion joint shear wall combined template, which comprises a combined template and a plurality of opposite-pulling screw rods, wherein the combined template comprises a steel template, a longitudinal steel square tube, a transverse steel square tube and a nut, the longitudinal steel square tube and the transverse steel square tube are respectively and fixedly connected to the back surface of the steel template in a criss-cross manner, opposite-pulling screw holes are formed in the cross connection position of the longitudinal steel square tube and the transverse steel square tube, the opposite-pulling screw holes simultaneously penetrate through the longitudinal steel square tube, the transverse steel square tube and the steel template, the nut is welded on the surface of the longitudinal steel square tube or the surface of the transverse steel square tube outside the opposite-pulling screw holes, the screw holes of the nut correspond to the opposite-pulling screw holes, and the opposite-pulling screw rods can penetrate through. The combined template is suitable for sealing the expansion joint shear wall template, can solve the problem of difficult sealing and fastening of the expansion joint shear wall template, reduces the quality problems of expansion and mold explosion and the like, and can be repeatedly used.

Description

Expansion joint shear wall combination template capable of being assembled and disassembled quickly
Technical Field
The invention relates to the technical field of building construction, in particular to a template of an expansion joint shear wall.
Background
In construction engineering projects, a lot of main bodies are divided into two or more units, expansion joints are arranged between the units, the expansion joints are arranged into large-area shear walls twice, and because the distance between the expansion joints is small and generally ranges from 200mm to 300mm, when the main bodies are poured, one side of a shear wall template is installed firstly, and after the shear wall template is reinforced, the later installed shear wall template is difficult to perforate and reinforce a pulling screw rod, and the template is also difficult to dismantle. In the conventional method, a common template is mostly installed, and then the common template is tensioned by a split screw according to the conventional method. The prior method has the following defects: 1. the installation of the template is difficult: the installation of the template at the position close to the expansion joint is difficult because the installation position is narrow; 2. the template is difficult to remove; 3. the template is difficult to fasten: the template close to the expansion joint is difficult to be effectively fastened in a conventional template fastening mode due to the narrow position, and quality defects such as mold expansion, mold explosion and the like are easily caused; 4. in the template, the dismantling process is often too difficult, so that part of the template cannot be dismantled, and the material waste is caused.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, and provides a rapid assembling and disassembling expansion joint shear wall combined template which is suitable for sealing expansion joint shear wall templates, can solve the problem of difficult mold sealing and fastening of expansion joint shear wall templates, reduces the quality problems of mold expansion, mold explosion and the like, and can be repeatedly used.
The technical scheme adopted by the invention for realizing the purpose is as follows: the utility model provides an expansion joint shear force wall built-up plate who installs and removes fast, including built-up plate and many counter-pull screw rods, built-up plate includes the steel form, vertical steel square tube, horizontal steel square tube, the nut, vertical steel square tube and horizontal steel square tube be vertically and horizontally staggered's fixed connection respectively at the back of steel form, vertical steel square tube and horizontal steel square tube cross connection department are equipped with the counter-pull screw, the counter-pull screw runs through vertical steel square tube simultaneously, horizontal steel square tube and steel form, the nut welding is on the surface of vertical steel square tube or horizontal steel square tube in the counter-pull screw outside, and the screw and the counter-pull screw position of nut correspond each other, the counter-pull screw that can pass built-up plate and the position of taut positioning built-up plate.
The further technical scheme of the invention is as follows: the upper end of the steel formwork is also connected with a U-shaped hanging ring used for hoisting the combined formwork.
The invention discloses a rapidly-assembled and disassembled expansion joint shear wall combined template, which has the following beneficial effects:
1. the quick-assembly and disassembly expansion joint shear wall combined template is convenient to obtain materials during manufacturing, and can be made of various materials such as steel, aluminum alloy and the like;
2. the expansion joint shear wall combined template which is quickly assembled and disassembled is simple to manufacture, and can be self-made according to the expansion joint shear wall on a construction site, so that the requirements of different drawings can be met;
3. according to the expansion joint shear wall combined template capable of being quickly assembled and disassembled, the U-shaped hanging ring is arranged at the top end of the template, the template can be integrally assembled and disassembled in a hoisting mode, the difficulty and danger of assembling and disassembling the template at a narrow position are reduced, the assembly and disassembly are simple and convenient, steel products can be recycled, and materials are saved;
4. the expansion joint shear wall combined template which is quickly assembled and disassembled can be manufactured on site and can also be produced in batch in an industrialized mode, and the construction period can be effectively shortened and the construction progress can be accelerated by adopting the batch production in the industrialized mode;
5. the expansion joint shear wall combined template which is quickly assembled and disassembled can greatly improve the assembling and disassembling efficiency of the template at the position of the expansion joint shear wall, the pulling screw rod can pass through the hole and screw in the nut to tighten and reinforce the combined template, the integral tightness of the template is enhanced, the expansion and the explosion of the template are prevented, the quality defect of concrete is reduced, the integral tightness of the template is enhanced, and the concrete pouring quality is improved.
The invention will be further described with reference to the drawings and examples.
Drawings
FIG. 1 is a schematic front view of a shear wall composite formwork for an expansion joint with quick assembly and disassembly according to the present invention;
FIG. 2 is an enlarged partial view of FIG. 1;
FIG. 3 is a schematic view of the back structure of the assembled formwork of the shear wall with the rapidly assembled and disassembled expansion joint of the present invention;
FIG. 4 is an enlarged partial view of FIG. 3;
FIG. 5 is a schematic view of the assembled shear wall form for an expansion joint of the present invention, which is assembled and disassembled quickly, as a form of a shear wall on one side of the assembled shear wall form and a form of a plank sheathing (the assembled form is shown on the outer side);
FIG. 6 is a schematic view of the assembled shear wall form for an expansion joint of the present invention, which is assembled and disassembled quickly, as a form of a shear wall on one side of the assembled shear wall form and a form of a plank (the plank is illustrated on the outer side);
the reference numbers illustrate: 1-steel formwork, 2-transverse steel square tube, 3-longitudinal steel square tube, 4-U-shaped hanging ring, 5-split screw hole, 6-nut, 7-combined formwork, 8-expansion joint shear wall, 9-wood formwork, 10-plug formwork, 11-split screw and 12-split screw sleeve.
Detailed Description
As shown in fig. 1 to 4, the shear wall composite formwork for an expansion joint capable of being quickly assembled and disassembled of the present invention includes a composite formwork and a plurality of opposite-pulling screws. The combined template comprises a steel template, a longitudinal steel square tube, a transverse steel square tube and a nut. The steel template is a steel plate, the steel template is a steel plate with a proper specification selected according to the design size of the shear wall at the expansion joint of the drawing, the specification of the steel template is 800mm multiplied by 2500mm multiplied by 2mm as an example, the steel template is selected, and the steel template is spliced according to the size of the shear wall. Vertical steel square tube and horizontal steel square tube be vertically and horizontally staggered's fixed connection respectively at the back of steel form, and vertical steel square tube and horizontal steel square tube cross connection department are equipped with the split screw hole, run through vertical steel square tube, horizontal steel square tube and steel form simultaneously to the split screw hole. In the implementation process, the spacing between the tension screw holes is calculated according to a calculation book to perform paying-off positioning (the spacing between the tension screws is 450mm horizontally and longitudinally according to the calculation), and then a longitudinal steel square tube is welded at the back of the steel template every 450mm according to the back ridge spacing calculated by the calculation book to fix the steel template into a whole and fix the vertical deformation of the steel template. Wherein the longitudinal steel square tube is a steel square tube with the diameter of 80mm multiplied by 40mm multiplied by 2 mm. The back of the steel template is welded with a transverse steel square tube at intervals of 450mm according to a positioning line, the rigidity and the integrity of the combined template are enhanced, wherein the transverse steel square tube is a steel square tube with the thickness of 50mm multiplied by 2mm, the steel square tube directly connected with the steel template is thicker, and if the transverse steel square tube is directly connected with the steel template, the transverse steel square tube adopts the thicker steel square tube. Then split screw holes are formed in the upper surface of the combined template according to the positions of the split screw holes, and the split screw holes simultaneously penetrate through the longitudinal steel square tube, the transverse steel square tube and the steel template. And then the nut is welded on the surface of the longitudinal steel square tube or the surface of the transverse steel square tube outside the split screw hole, and the screw hole of the nut corresponds to the split screw hole in position. In the embodiment, the nut is welded on the outer side of the split bolt hole on the surface of the transverse steel square tube. Of course, if the transverse steel square tube is directly connected to the back of the steel formwork, and the longitudinal steel square tube is vertically connected to the surface of the transverse steel square tube, the nut is welded to the surface of the longitudinal steel square tube outside the split screw hole. The opposite-pulling screw rod can pass through the opposite-pulling screw hole of the combined template to tighten and position the position of the combined template. The steel form upper end still is connected with the U-shaped rings that are used for hoisting the built-up form, is equipped with two U-shaped rings in this embodiment, and two U-shaped rings weld respectively at the back of steel form upper end, and every U-shaped ring simultaneously with one of them vertical steel square tube upper end both sides surface welded fastening, can strengthen the connection stability of U-shaped ring like this.
The construction process can be implemented according to the following steps: (1) hoisting the combined template to the designated position of the expansion joint, and primarily fixing the combined template by placing a steel square tube (or wood imitation) and a supporting device at the rear side at the two ends of the combined template in a padding way; (2) installing and fixing a wood template on the inner side of the expansion joint shear wall, adjusting the positions of the wood template and the combined template by a pry bar according to a wall position line and a starting and stopping line of the template, forming a hole at the corresponding position of the wood template and installing a split screw sleeve, enabling a split screw to penetrate through the split screw sleeve from one side of the wood template and be screwed into a nut of the combined template until the split screw protrudes out of the nut by more than 50mm, adjusting the split screw to be approximately horizontal, measuring the verticality and correcting the elevation by a supporting plate, enabling the verticality, the levelness and the elevation to meet the design requirements, immediately screwing a bolt after the inner template is in place by a steel pipe, and tightening and fixing the combined template and the wood template (figures 5-6); (3) a plug template (the plug template is also a wood template) is arranged on the side surface, the joint of the template is tight, and slurry leakage during concrete pouring is prevented; (4) then pouring concrete; (5) removing the formwork of the shear wall formwork at the expansion joint when the strength of the concrete reaches a formwork removal standard, removing pipe clamps at two sides, taking down the short steel pipes, screwing out the counter-pulling screw rods, removing the counter-pulling screw rods and the fixing devices at two ends, taking down the long steel pipes, sequentially removing the inner side wood formwork and the lateral plug formwork, and finally removing the combined formwork; (6) when dismantling the split screw, earlier with the instrument to split bolt unscrewing, then through rotatory split screw, unscrew the split screw from the composite mold board, treat all to pull the screw and all back of unscrewing, dismantle the composite mold board promptly, the handling is placed to the assigned position to it is clean, so that use next time.
The following matters are noted during construction: (1) at the joint of the wood template and the combined template, a steel template in the combined template is required to wrap the wood template so as to prevent slurry leakage caused by overlarge slab joints; (2) before the die assembly, whether embedded pipe fittings such as reinforcing steel bars, water and electricity are omitted or not is checked, and the method is correct; (3) after the templates are installed, checking whether the wood template and the plug template, and the plug template and the combined template are tight, firm and reliable, and preventing the phenomena of slurry leakage and slab staggering; (4) after the template is installed, whether the fasteners, the bolts and the inclined struts are fastened and stable or not and whether the abutted seams and the lower openings of the template are tight or not are comprehensively checked.
The above embodiments are only preferred embodiments of the present invention, and the structure of the present invention is not limited to the forms of the above embodiments, and any modifications, equivalents and the like within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (2)

1. The utility model provides an expansion joint shear force wall built-up plate of installing and removing fast, characterized in that, including built-up plate (7) and many counter-pull screw rods (11), built-up plate (7) includes steel form (1), vertical steel square tube (3), horizontal steel square tube (2), nut (6), vertical steel square tube (3) and horizontal steel square tube (2) vertically and horizontally staggered fixed connection respectively are at the back of steel form (1), vertical steel square tube (3) and horizontal steel square tube (2) cross connection department are equipped with counter-pull screw hole (5), counter-pull screw hole (5) run through vertical steel square tube (3), horizontal steel square tube (2) and steel form (1) simultaneously, nut (6) welding is at the surface of vertical steel square tube (3) or the surface of horizontal steel square tube (2) outside counter-pull screw hole (5), and the screw hole and the counter-pull screw hole (5) position of nut (6) correspond to each other, the opposite-pulling screw rod (11) can pass through the opposite-pulling screw hole (5) of the combined template (7) to tighten and position the position of the combined template (7).
2. The shear wall built-up plate for an expansion joint capable of being assembled and disassembled quickly as claimed in claim 1, wherein the upper end of the steel form (1) is further connected with a U-shaped hanging ring (4) for hanging up the built-up plate.
CN201911249888.1A 2019-12-09 2019-12-09 Expansion joint shear wall combination template capable of being assembled and disassembled quickly Pending CN110821147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911249888.1A CN110821147A (en) 2019-12-09 2019-12-09 Expansion joint shear wall combination template capable of being assembled and disassembled quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911249888.1A CN110821147A (en) 2019-12-09 2019-12-09 Expansion joint shear wall combination template capable of being assembled and disassembled quickly

Publications (1)

Publication Number Publication Date
CN110821147A true CN110821147A (en) 2020-02-21

Family

ID=69545342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911249888.1A Pending CN110821147A (en) 2019-12-09 2019-12-09 Expansion joint shear wall combination template capable of being assembled and disassembled quickly

Country Status (1)

Country Link
CN (1) CN110821147A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287451A (en) * 2020-02-25 2020-06-16 中国二十二冶集团有限公司 Expansion joint formwork supporting tool
CN113090010A (en) * 2021-03-31 2021-07-09 晟通科技集团有限公司 Wall formwork, wall formwork frame and wall formwork elevation positioning method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287451A (en) * 2020-02-25 2020-06-16 中国二十二冶集团有限公司 Expansion joint formwork supporting tool
CN113090010A (en) * 2021-03-31 2021-07-09 晟通科技集团有限公司 Wall formwork, wall formwork frame and wall formwork elevation positioning method

Similar Documents

Publication Publication Date Title
CN109707173B (en) Construction method of assembly type laminated beam plate installation auxiliary device
CN103161309A (en) Narrow deformation joint inner side template installation and construction method
CN110630011A (en) Template reinforcing system for double shear walls at deformation joint and construction method thereof
CN110821147A (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN210976588U (en) Template reinforcing system for double shear walls at deformation joint
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN109457872B (en) Cast-in-situ frame column reinforcement cage prefabricated construction device and construction method
CN106677537A (en) Formwork supporting method for frame beam columns at settlement joint between main building and attached building of civil architecture
CN212078667U (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN111851987A (en) Construction method of attached short-limb I-steel flower basket pull rod knot type cantilever frame
CN215055279U (en) Thickness control device for steel plate concrete shear wall symmetrical wall body
CN214644692U (en) Post-tensioning precast concrete supporting member and inner supporting system
CN211898553U (en) Fixing template of underground pipe gallery band steel edge rubber waterstop
CN210947726U (en) Simple and easy anchor clamps of building templates
CN212773459U (en) Wall pouring template applied to expansion joint side
CN211369523U (en) Template system of expansion joint shear force wall
CN111236313A (en) Fixing template and reinforcing method for steel-edge rubber water stop of underground pipe gallery belt
CN112502160A (en) Post-tensioning precast concrete supporting member, inner supporting system and construction method
CN112302035A (en) Prefabricated hollow steel pipe concrete supporting member, inner supporting system and construction method
CN112302034A (en) Prefabricated hollow concrete supporting member, inner supporting system and construction method
CN112627510A (en) Structural deformation joint synchronous construction formwork reinforcing device and construction method
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN220848691U (en) Formwork structure of shear wall
CN111005561A (en) Reinforced concrete structure sleeve and using method thereof
CN111002432A (en) Prefabricated constructional column template and using method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination