JP4850151B2 - Hybrid tower for wind power generation and its construction method - Google Patents

Hybrid tower for wind power generation and its construction method Download PDF

Info

Publication number
JP4850151B2
JP4850151B2 JP2007224031A JP2007224031A JP4850151B2 JP 4850151 B2 JP4850151 B2 JP 4850151B2 JP 2007224031 A JP2007224031 A JP 2007224031A JP 2007224031 A JP2007224031 A JP 2007224031A JP 4850151 B2 JP4850151 B2 JP 4850151B2
Authority
JP
Japan
Prior art keywords
concrete
power generation
wind power
tower
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007224031A
Other languages
Japanese (ja)
Other versions
JP2009057713A (en
Inventor
隆司 大濱
昌明 柴田
昇孝 菅野
洋一 府内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyushu Electric Power Co Inc
Mitsubishi Heavy Industries Ltd
Original Assignee
Kyushu Electric Power Co Inc
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyushu Electric Power Co Inc, Mitsubishi Heavy Industries Ltd filed Critical Kyushu Electric Power Co Inc
Priority to JP2007224031A priority Critical patent/JP4850151B2/en
Publication of JP2009057713A publication Critical patent/JP2009057713A/en
Application granted granted Critical
Publication of JP4850151B2 publication Critical patent/JP4850151B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Description

この発明は、風力発電用ハイブリッドタワー及びハイブリッドタワーの施工法に関するものである。   The present invention relates to a hybrid tower for wind power generation and a method for constructing the hybrid tower.

従来、国内における風力発電所は、充分な風を受けることのできる立地条件のよい場所を選んで建設されてきた。しかし、今後建設される風力発電用タワーは、風速が低い場所へ建設される場合が考えられる。風速が低い場所へ建設される場合、風速は高い位置ほど大きいため、タワーの高さをより高くする必要が生じる。   Conventionally, wind power plants in Japan have been constructed by selecting locations with good location conditions that can receive sufficient wind. However, the tower for wind power generation to be constructed in the future may be constructed in a place where the wind speed is low. When the building is constructed in a place where the wind speed is low, the higher the wind speed is, the larger the height of the tower becomes.

例えば、特許文献1には、現場打PCコンクリート工法により、風力発電用タワーを建設する方法が開示されている。この工法は、タワーを円筒形の現場打コンクリートで製作するとともに、中ケーブル方式によって躯体を緊張するものである。このように、タワーを現場打PCコンクリートとすることにより、大型化を実現するとしている。
また、タワーの全体を鋼管で構築するものや、特許文献2に示すようにタワーの下部をPCあるいはPRC製部材とし、その上部を鋼製部材で構成するものも提案されている。
特開2005−248687号公報 登録実用新案第3074144号公報
For example, Patent Document 1 discloses a method of constructing a tower for wind power generation by an on-site PC concrete method. In this method, the tower is made of cylindrical cast-in-place concrete, and the frame is tensioned by a medium cable system. In this way, it is assumed that the tower will be made larger by using on-site PC concrete.
In addition, there are also proposed ones in which the entire tower is constructed of steel pipes, and as shown in Patent Document 2, the lower part of the tower is made of a PC or PRC member and the upper part is made of a steel member.
JP 2005-248687 A Registered Utility Model No. 3074144

しかし、従来の特に、70mを超える風力発電用タワーを鋼構造とした場合にタワーの直径が大きくなり、設置場所まで搬送するための制限を受けることとなり、運搬が困難であった。
また、鋼構造とした場合、鋼板の厚さが厚くなり、これを筒状に加工することは、加工上の困難を伴うものであった。
更に、コンクリート構造とした場合、風力発電用タワーの剛性は増すものの、コンクリートの自重によって地震時の慣性力も増すと云う欠点が存在した。また、コンクリート構造とした場合、建設に掛かる工期が鋼構造とした場合よりも長くなると云う欠点が存在した。
更にまた、特許文献2に示すタワーの下部をPCあるいはPRC製部材とし、その上部を鋼製部材で構成するものでは、コンクリート製タワーと鋼製タワーの接合部分についての具体的記載がなく、図に記載されたようにコンクリート製タワーの頂部の水平部分と鋼製タワー下端の水平なフランジを接合させる場合、通常、フランジ下面に充填される無収縮モルタル内に気泡等が滞留するという問題が存在した。
However, in particular, when a wind power generation tower exceeding 70 m is made of a steel structure, the diameter of the tower becomes large, and restrictions are imposed on the transportation to the installation place, making transportation difficult.
Moreover, when it was set as the steel structure, the thickness of the steel plate became thick, and processing this into a cylinder shape accompanied the difficulty on processing.
Further, when the concrete structure is used, the rigidity of the tower for wind power generation is increased, but there is a drawback that the inertia force at the time of earthquake is also increased due to the weight of the concrete. In addition, when the concrete structure is used, there is a drawback that the construction period for the construction is longer than that when the steel structure is used.
Furthermore, in the case where the lower part of the tower shown in Patent Document 2 is a PC or PRC member and the upper part is made of a steel member, there is no specific description of the joint between the concrete tower and the steel tower. When the horizontal part at the top of the concrete tower and the horizontal flange at the bottom of the steel tower are joined as described in, there is usually a problem that air bubbles etc. stay in the non-shrink mortar filled on the lower surface of the flange did.

この発明は上記に鑑み提案されたもので、風力発電用タワーの下部分を剛性の高いコンクリート構造とし、タワーの上部分を施工性に優れた鋼構造とすると共にコンクリート製タワーと鋼製タワーの接合部分を気泡等の抜け易い形状とし、耐風安定性および耐震性の向上を図り、接合部分の局部応力を抑えることのできる風力発電用ハイブリッドタワーを提供することを目的とする。   The present invention has been proposed in view of the above, and the lower part of the tower for wind power generation has a highly rigid concrete structure, and the upper part of the tower has a steel structure with excellent workability, and the concrete tower and the steel tower It is an object of the present invention to provide a hybrid tower for wind power generation in which the joint portion has a shape such as bubbles that can be easily removed, wind resistance stability and earthquake resistance are improved, and local stress at the joint portion can be suppressed.

上記目的を達成するために、本発明は基端部をプレストレストコンクリートで構成するとともに、その上に鋼製円筒を継ぎ足して中空タワーとした風力発電用ハイブリッドタワーであって、前記プレストレストコンクリートと鋼製円筒とをプレストレスを導入するための定着部を備えたアダプターリングを介して接続し、前記アダプターリング下端に形成したフランジ下面を下に凸の曲面形状としたことを特徴としている。   In order to achieve the above object, the present invention is a hybrid tower for wind power generation in which a base end portion is made of prestressed concrete and a steel cylinder is added to form a hollow tower, the prestressed concrete and the steel The cylinder is connected via an adapter ring having a fixing portion for introducing prestress, and the lower surface of the flange formed at the lower end of the adapter ring has a curved surface shape convex downward.

また、本発明において、前記プレストレストコンクリートが高さ方向に対して占める割合は、85%以下の範囲であることを特徴とする。   Moreover, in this invention, the ratio for which the said prestressed concrete accounts with respect to a height direction is the range of 85% or less, It is characterized by the above-mentioned.

また、本発明において、前記プレストレストコンクリートは、フーチング上に設置されるとともに、前記フーチング内に埋設された固定側定着装置と、前記プレストレストコンクリートの天端部と結んで挿通されたPC鋼材を緊張することによりプレストレスを付与したことを特徴とする。   In the present invention, the prestressed concrete is installed on the footing and tensions the fixed steel fixing device embedded in the footing and the PC steel material inserted through the top end of the prestressed concrete. This is characterized by prestressing.

また、本発明において、前記PC鋼材は、前記プレストレストコンクリート内周壁の一部に設置されたカップラーによって接続されたことを特徴としている。   Moreover, in this invention, the said PC steel materials are connected with the coupler installed in a part of said prestressed concrete inner peripheral wall, It is characterized by the above-mentioned.

また、本発明において、フーチングを施工するとともに、フーチング内に固定側定着装置を設置するフーチング施工工程と、フーチングの上に内型枠と外型枠を組立て、コンクリートを順次垂直に打設するコンクリート打設工程と、所定長に達したコンクリート筒の頂部に定着部を備えたアダプターリングを設置し、前記固定側定着装置と定着部との間にPC鋼材を挿通し、このPC鋼材を緊張することにより、コンクリート筒部にプレストレスを導入するプレストレス導入工程と、前記アダプターリングの上に鋼製円筒を垂直に継ぎ足してゆく、鋼製円筒取り付け工程とから成ることを特徴としている。   Further, in the present invention, a footing construction process for constructing a footing and installing a fixed side fixing device in the footing, a concrete in which an inner mold frame and an outer mold frame are assembled on the footing, and concrete is sequentially placed vertically. An adapter ring provided with a fixing portion is installed on the top of the concrete tube that has reached a predetermined length, and a PC steel material is inserted between the fixed-side fixing device and the fixing portion to tension the PC steel material. Thus, it is characterized by comprising a pre-stress introduction step of introducing pre-stress into the concrete cylinder portion, and a steel cylinder attachment step of vertically adding a steel cylinder on the adapter ring.

また、本発明において、前記コンクリート打設工程において、コンクリート筒の軸線方向にPC鋼材挿通用のシースを配置することを特徴とする。   In the present invention, in the concrete placing step, a PC steel material insertion sheath is disposed in the axial direction of the concrete cylinder.

この発明は上記した構成からなるので、以下に説明するような効果を奏することができる。   Since this invention consists of an above-described structure, there can exist an effect which is demonstrated below.

本発明では、基端部をプレストレストコンクリートで構成するとともに、その上に鋼製円筒を継ぎ足して中空タワーとした風力発電用ハイブリッドタワーであって、前記プレストレストコンクリートと鋼製円筒とをプレストレスを導入するための定着部を備えたアダプターリングを介して接続し、前記アダプターリング下端に形成したフランジ下面を下に凸の曲面形状としたので、剛性を保ちつつ、地震時慣性力の増加の少ない風力発電用ハイブリッドタワーを提供することができる。また、フランジ下面を下に凸の曲面形状とし、無収縮モルタル内に気泡等が留まることなく、抜け易い形状としたので接合性を向上することができる。更に、無収縮モルタルに局部応力が生じるのを抑制することができる。したがって、地震や台風に強く、施工性に優れた風力発電用ハイブリッドタワーとすることができる。また、工期の短縮を図るとともに、工事費の削減を達成することができる。   The present invention is a hybrid tower for wind power generation in which a base end portion is made of prestressed concrete and a steel cylinder is added thereon to form a hollow tower, and the prestressed concrete and the steel cylinder are introduced with prestress. It is connected via an adapter ring equipped with a fixing part to make the bottom surface of the flange formed on the lower end of the adapter ring a convex curved surface. A hybrid tower for power generation can be provided. In addition, since the flange lower surface has a curved surface shape that protrudes downward, and the bubbles are not retained in the non-shrinkable mortar, the shape can be easily removed, so that the bondability can be improved. Furthermore, local stress can be prevented from occurring in the non-shrink mortar. Therefore, it is possible to provide a hybrid tower for wind power generation that is resistant to earthquakes and typhoons and has excellent workability. In addition, the construction period can be shortened and the construction cost can be reduced.

また、本発明では、前記プレストレストコンクリートが高さ方向に対して占める割合は、85%以下の範囲であるので、タワーの下端部の剛性を高めるとともに、上端部の施工性を向上することができる。   Moreover, in this invention, since the ratio for which the said prestressed concrete accounts with respect to a height direction is the range of 85% or less, while improving the rigidity of the lower end part of a tower, the workability of an upper end part can be improved. .

また、本発明では、前記プレストレストコンクリートは、フーチング上に設置されるとともに、前記フーチング内に埋設された固定側定着装置と、前記プレストレストコンクリートの天端部と結んで挿通されたPC鋼材を緊張するので、コンクリート構造部にプレストレスを付与することができる。また、フーチングにPC鋼材を緊張するためのテンドンギャラリーを設ける必要がない。   Further, in the present invention, the prestressed concrete is installed on the footing and tensions the fixed steel fixing device embedded in the footing and the PC steel material inserted through the top end of the prestressed concrete. Therefore, prestress can be applied to the concrete structure. Moreover, there is no need to provide a tendon gallery for tensioning the PC steel material in the footing.

また、本発明では前記PC鋼材は前記プレストレストコンクリート内周壁の一部に設置されたカップラーによって接続されたので、フーチング内のデッドアンカーから伸びるPC鋼材と、コンクリート構造部にプレストレスを付与するPC鋼材との接続を容易にし、施工性を向上することができる。   In the present invention, since the PC steel is connected by a coupler installed on a part of the inner wall of the prestressed concrete, the PC steel that extends from the dead anchor in the footing and the PC steel that prestresses the concrete structure portion. Can be easily connected, and workability can be improved.

また、本発明において、フーチングを施工するとともに、フーチング内に固定側定着装置を設置するフーチング施工工程と、フーチングの上に内型枠と外型枠を組立てコンクリート筒を順次垂直に打設するコンクリート筒打設工程と、所定長に達したコンクリート筒の頂部に定着部を備えたアダプターリングを設置し、前記固定側定着装置と定着部との間にPC鋼材を挿通し、このPC鋼材を緊張することにより、コンクリート筒部にプレストレスを導入するプレストレス導入工程と、前記アダプターリングの上に鋼製円筒を垂直に継ぎ足してゆく、鋼製円筒取り付け工程とから成るので、およそ70mを超える高層タワーをコンクリートと鋼のハイブリッドタワーとすることができる。また、地震や台風に強い風力発電用ハイブリッドタワーを効率よく施工できる。   Further, in the present invention, a footing construction process for constructing a footing and installing a fixed-side fixing device in the footing, and a concrete in which an inner mold frame and an outer mold frame are assembled on the footing and a concrete cylinder is sequentially placed vertically. An adapter ring equipped with a fixing part is installed at the top of the concrete tube that has reached a predetermined length, and a PC steel material is inserted between the fixed-side fixing device and the fixing part, and the PC steel material is tensioned. As a result, it is composed of a pre-stress introduction process for introducing pre-stress into the concrete cylinder part, and a steel cylinder mounting process in which a steel cylinder is vertically added on the adapter ring. The tower can be a hybrid tower of concrete and steel. Moreover, it is possible to efficiently construct a hybrid tower for wind power generation that is resistant to earthquakes and typhoons.

また、本発明では、前記コンクリート筒打設工程において、コンクリート筒の軸線方向にPC鋼材挿通用のシースを配置するので、PC鋼材の挿通を容易にするとともに、コンクリート構造部へのプレストレス付与作業を容易にできる。   Further, in the present invention, in the concrete cylinder placing step, the PC steel material insertion sheath is disposed in the axial direction of the concrete cylinder, so that the PC steel material can be easily inserted and the prestressing operation to the concrete structure portion is performed. Can be easily done.

タワーの下部分の85%以下をコンクリート構造とし、残りの上部分を鋼構造とすることにより、重量の重いコンクリートを下部にして剛性を増し、軽量の鋼構造を上にして、耐震性、耐風安定性及び施工性を向上することができる。   85% or less of the lower part of the tower is made of a concrete structure, and the remaining upper part is made of a steel structure to increase the rigidity with the heavy concrete as the lower part, with the lighter steel structure up, making it earthquake and wind resistant. Stability and workability can be improved.

以下、一実施の形態を示す図面に基づいて本発明を詳細に説明する。図1は本発明に係る風力発電用ハイブリッドタワーの一例を示す要部断面図、図2は図1のA−A線断面図である。ここで、風力発電用ハイブリッドタワー10は、基端部11をプレストレストコンクリートで構成するとともに、その上に鋼製円筒12を継ぎ足して中空タワーとしたものであって、前記プレストレストコンクリートと鋼製円筒12とをプレストレスを導入するための定着部13を備えたアダプターリング14を介して接続している。   Hereinafter, the present invention will be described in detail with reference to the drawings illustrating an embodiment. FIG. 1 is a cross-sectional view of an essential part showing an example of a hybrid tower for wind power generation according to the present invention, and FIG. 2 is a cross-sectional view taken along line AA of FIG. Here, the hybrid tower 10 for wind power generation includes a base end portion 11 made of prestressed concrete and a steel cylinder 12 added to form a hollow tower, and the prestressed concrete and the steel cylinder 12 are added. Are connected via an adapter ring 14 having a fixing portion 13 for introducing prestress.

基端部(プレストレストコンクリート)11が高さ方向に対して占める割合は、85%以下の範囲とする。例えば、高さ100mのタワーの場合、下から85m以下を剛性の高いコンクリート構造とし、その上の15m以上を施工性に優れた鋼製円筒構造とする。このように下端に重量が重く、座屈に強いコンクリートを設置し、上端に軽い鋼製円筒を配置することにより、耐風安定性及び耐震性を向上することができる。なお、コンクリート部と鋼部の割合は、構造安定性、施工性、経済性を考慮して決定する。コンクリート部を長くすることにより、タワー全体の剛性が高くなり、固有振動数が高くなる。タワー全体の固有振動数は、取り付ける羽根(ブレード)の回転数、ナセルの質量等を考慮しつつ、共振を回避できるように選択する。   The proportion of the base end portion (prestressed concrete) 11 in the height direction is set to a range of 85% or less. For example, in the case of a tower having a height of 100 m, a concrete structure having high rigidity is set to 85 m or less from the bottom, and a steel cylindrical structure having excellent workability is set to 15 m or more on the top. Thus, wind resistant stability and seismic resistance can be improved by installing concrete which is heavy at the lower end and is resistant to buckling and a light steel cylinder is disposed at the upper end. In addition, the ratio of a concrete part and a steel part is determined in consideration of structural stability, workability, and economical efficiency. By lengthening the concrete part, the rigidity of the entire tower is increased and the natural frequency is increased. The natural frequency of the entire tower is selected so that resonance can be avoided in consideration of the rotation speed of blades (blades) to be attached, the mass of the nacelle, and the like.

基端部(プレストレストコンクリート)11は、固定側定着装置(デッドアンカー)16が内部に埋設されたフーチング15上に設置されている。固定側定着装置16からは、シースを介してPC鋼材17が上に向かって延設されている。また、基端部11のコンクリート筒の軸線方向には、PC鋼材挿通用のシース18が配置される。また、PC鋼材17は、例えば、第1段目の基端部(プレストレストコンクリート)11の内周壁の一部に設置されたカップラー20によって接続される。   The base end portion (prestressed concrete) 11 is installed on a footing 15 in which a fixed side fixing device (dead anchor) 16 is embedded. A PC steel material 17 extends upward from the fixed-side fixing device 16 via a sheath. Further, a PC steel material insertion sheath 18 is disposed in the axial direction of the concrete tube of the base end portion 11. Moreover, the PC steel material 17 is connected by the coupler 20 installed in a part of inner peripheral wall of the base end part (prestressed concrete) 11 of the 1st step, for example.

図3(a)は、カップラー継ぎ手箱を示す説明図、(b)は、カップラーを示す断面斜視図、図4は図3(a)のC−C線断面図である。カップラー継ぎ手箱19は、第1段目の基端部11の内周壁に開口して配置されている。カップラー継ぎ手箱19内では、PC鋼材17が複数のカップラー20によって接続されている。カップラー20は、外筒20aとこの外筒の内周に両端から螺合された内筒20bと、この内筒20bのテーパ状の内周に挿嵌されるとともに、中心にPC鋼材17を狭持して固定する係止部材20cとから構成されている。内筒20bは、外周に形成されたネジで外筒20aの内周と螺合するとともに、軸線の一方に向かって拡開したテーパ状の内周を有している。係止部材20cは、截頭円錐形をした部材が軸線方向に沿って2分割されており、中央にPC鋼材17を狭持する貫通孔20dを備えている。また、この貫通孔20dには、複数の凹凸が形状されている。凹凸は、環状であってもよい。   3A is an explanatory view showing the coupler joint box, FIG. 3B is a cross-sectional perspective view showing the coupler, and FIG. 4 is a cross-sectional view taken along the line CC of FIG. The coupler joint box 19 is disposed so as to open to the inner peripheral wall of the first-stage base end portion 11. In the coupler joint box 19, the PC steel material 17 is connected by a plurality of couplers 20. The coupler 20 is inserted into the outer cylinder 20a, the inner cylinder 20b screwed to the inner circumference of the outer cylinder from both ends, and the tapered inner circumference of the inner cylinder 20b, and the PC steel material 17 is narrowed at the center. The locking member 20c is held and fixed. The inner cylinder 20b is screwed with the inner circumference of the outer cylinder 20a with screws formed on the outer circumference, and has a tapered inner circumference that expands toward one of the axes. The locking member 20c has a frustoconical member divided into two along the axial direction, and includes a through hole 20d that holds the PC steel material 17 in the center. In addition, a plurality of irregularities are formed in the through hole 20d. The irregularities may be annular.

以上のように構成されたカップラー20は、カップラー継ぎ手箱19の中に配置されるとともに、PC鋼材の端末を分割された係止部材20cで狭持する。PC鋼材の端末を狭持した係止部材20cは、内筒20bのテーパ状の内周に挿嵌される。同様に他のPC鋼材17の端末を狭持した係止部材20cは、内筒20bの内周に挿嵌され、前記外筒20aで連結される。また、カップラー継ぎ手箱19の中には、複数のカップラー20が配置される。   The coupler 20 configured as described above is arranged in the coupler joint box 19 and sandwiches the end of the PC steel material with the divided locking member 20c. The locking member 20c holding the end of the PC steel material is inserted into the tapered inner periphery of the inner cylinder 20b. Similarly, the locking member 20c holding the end of another PC steel material 17 is inserted into the inner periphery of the inner cylinder 20b and connected by the outer cylinder 20a. A plurality of couplers 20 are disposed in the coupler joint box 19.

図5は図1のB−B線断面図、図6は図1におけるアダプターリング部を示す拡大縦断面図である。基端部11の天端には、無収縮モルタル21を約50mm充填し、その上にアダプターリング14を調整しながら仮据えする。無収縮モルタル21が所定の強度を発現した後、前記フーチング15の固定側定着装置16から連通して挿通されたPC鋼材17を図外の油圧ジャッキ等で緊張することにより基端部11にプレストレスを付与する。   5 is a cross-sectional view taken along line BB in FIG. 1, and FIG. 6 is an enlarged vertical cross-sectional view showing the adapter ring portion in FIG. The top end of the base end 11 is filled with about 50 mm of non-shrink mortar 21, and the adapter ring 14 is temporarily adjusted on the top. After the non-shrinkable mortar 21 exhibits a predetermined strength, the PC steel material 17 inserted through the fixed side fixing device 16 of the footing 15 is pretensioned to the base end portion 11 by tensioning it with a hydraulic jack or the like not shown. Add stress.

アダプターリング14は、上下端にそれぞれフランジ14a、22を有している。下端のフランジ14aは、下面が下に凸の曲面14bに形成されている。また、フランジ14aは、PC鋼材17の上端を定着する定着具40によって、プレストレストコンクリート部に圧着接合される。定着具40は、環状のフランジ14aに略等間隔で配置される。また、定格運転時に接合面の応力度は、コンクリートの許容応力度以下であるように設定する。アダプターリング14の上には、順次鋼製円筒12をフランジ22,23を介してボルト締め結合する。鋼製円筒12は、風力発電用ハイブリッドタワー10が所定の高さなるまで連結する。   The adapter ring 14 has flanges 14a and 22 at the upper and lower ends, respectively. The flange 14a at the lower end is formed as a curved surface 14b whose bottom surface is convex downward. In addition, the flange 14 a is pressure-bonded to the prestressed concrete portion by a fixing tool 40 that fixes the upper end of the PC steel material 17. The fixing tool 40 is disposed on the annular flange 14a at substantially equal intervals. In addition, the stress level of the joint surface during rated operation is set to be equal to or lower than the allowable stress level of concrete. A steel cylinder 12 is sequentially bolted onto the adapter ring 14 via flanges 22 and 23. The steel cylinder 12 is connected until the hybrid tower 10 for wind power generation reaches a predetermined height.

次に、以上のように構成された風力発電用ハイブリッドタワーは、剛性を保ちつつ、重量の増加を抑えて地震時慣性力の増加の少ないものとすることができる。   Next, the hybrid tower for wind power generation configured as described above can suppress the increase in weight and keep the increase in inertial force during an earthquake while maintaining rigidity.

次に、図7〜図15に従って本発明の風力発電用ハイブリッドタワーの施工手順について説明する。図7では、内型枠と外型枠の間に鉄筋、シース等を配置してコンクリートを打設形成した第1段目の基端部11に予め地組みした内部足場24をクレーン25で吊り上げ、埋め込みインサート26を利用して固定する。   Next, the construction procedure of the hybrid tower for wind power generation according to the present invention will be described with reference to FIGS. In FIG. 7, an internal scaffold 24 preliminarily assembled on the first-stage base end portion 11 in which a reinforcing bar, a sheath, and the like are placed between an inner mold frame and an outer mold frame to form concrete is lifted by a crane 25. Then, it is fixed using the embedded insert 26.

図8において、タワーの外径変化に対応する外部足場27をクレーン25で取り付ける。図9において、予め地組みされた内型枠28、鉄筋29、シース18を専用の吊り治具30を介してクレーンで架設する。下に設置されたブロック(基端部)の鉄筋、シースとそれぞれ接続する。   In FIG. 8, an external scaffold 27 corresponding to a change in the outer diameter of the tower is attached with a crane 25. In FIG. 9, the pre-assembled inner mold 28, the reinforcing bar 29, and the sheath 18 are installed with a crane via a dedicated lifting jig 30. Connect to the reinforcing bar and sheath of the block (base end) installed below.

図10では、外型枠31を吊り治具30を介してワイヤー32で吊りながらセットする。この際、内型枠28の中央に設置されたターゲット33と内部足場24の中央に設置されたターゲット34を測量器械35で測定し、内外型枠の建て方精度を確保する。また、外型枠31には、ブラケット足場36が取り付けられている。   In FIG. 10, the outer mold 31 is set while being hung with a wire 32 via a hanging jig 30. At this time, the target 33 installed at the center of the inner mold 28 and the target 34 installed at the center of the inner scaffold 24 are measured by the surveying instrument 35 to ensure the accuracy of the construction of the inner and outer molds. A bracket scaffold 36 is attached to the outer mold 31.

図11では、内型枠28,外型枠31の架設された部位にポンプ車37から配管38、ゴムホース39を通じてコンクリートを打設する。コンクリート打設に際しても、ターゲット33、34を測量器械35で随時測定し、タワーの精度を確保する。   In FIG. 11, concrete is placed from a pump wheel 37 through a pipe 38 and a rubber hose 39 to a site where the inner mold 28 and the outer mold 31 are installed. When placing concrete, the targets 33 and 34 are measured with the surveying instrument 35 as needed to ensure the accuracy of the tower.

図12では、コンクリート打設後の脱型手順を説明する。養生により打設したコンクリートが所定の強度を発現した後、図11に示す外型枠31は一括して引き抜き脱型する。その後、内型枠28は分割して脱型する。   In FIG. 12, the demolding procedure after concrete placement will be described. After the concrete cast by curing exhibits a predetermined strength, the outer mold frame 31 shown in FIG. Thereafter, the inner mold 28 is divided and removed.

図13では、新たに打設した部位に埋め込みインサート26を利用して、内部足場24をセットするとともに、外部足場27を電動チェーンブロック41を使用して次の作業位置へ引き上げる。電動チェーンブロック41は、コンクリート部の頂端に取り付けられた専用金具42によって支持される。   In FIG. 13, the internal scaffold 24 is set using the embedded insert 26 in the newly placed site, and the external scaffold 27 is pulled up to the next work position using the electric chain block 41. The electric chain block 41 is supported by a dedicated metal fitting 42 attached to the top end of the concrete portion.

図14では、外部足場27の位置を上昇させた後、次の階層のコンクリートを打設するための工程に移り、順次以上の工程を繰り返すことにより、プレストレストコンクリート部分を施工して行く。   In FIG. 14, after raising the position of the external scaffold 27, it moves to the process for placing concrete of the next hierarchy, and repeats the above process one by one, and the prestressed concrete part is constructed.

このようにして、コンクリート部分(基端部)が完成すると、図6で説明した様に、基端部11の天端に無収縮モルタル21を充填し、その上にアダプターリング14を調整しながら仮据えする。この際、フランジ14aの下面が下に凸の曲面14bに形成されているので、無収縮モルタル21内に気泡等が留まることがない。また、曲面とすることにより無収縮モルタルに局部応力が生じるのを抑えることができる。充填した無収縮モルタル21が所定の強度を発現した後、フーチング15の固定側定着装置16から連通して挿通されたPC鋼材17を図外の油圧ジャッキ等で緊張することにより基端部11にプレストレスを付与する。   In this way, when the concrete portion (base end portion) is completed, as described in FIG. 6, the top end of the base end portion 11 is filled with the non-shrink mortar 21, and the adapter ring 14 is adjusted on the top. Temporarily install. At this time, since the lower surface of the flange 14a is formed as a downwardly convex curved surface 14b, bubbles and the like do not remain in the non-shrink mortar 21. Moreover, it can suppress that local stress arises in a non-shrink mortar by setting it as a curved surface. After the filled non-shrink mortar 21 exhibits a predetermined strength, the PC steel material 17 inserted through the fixed side fixing device 16 of the footing 15 is tensioned with a hydraulic jack or the like not shown in the figure to the base end portion 11. Apply prestress.

また、アダプターリング14の上には順次、鋼製円筒がフランジをボルトで固定することにより、継ぎ足される。   Further, a steel cylinder is sequentially added onto the adapter ring 14 by fixing the flange with bolts.

図15は、フーチング15の上にプレストレストコンクリート製の基端部11を施工し、その上に鋼製のアダプターリング14、鋼製円筒12を施工し、ナセルを設置した状態を示す完成図である。このように構成された風力発電用ハイブリッドタワー10は、各部材の剛性等から固有振動数を算出し、共振の発生を防止している。   FIG. 15 is a completed view showing a state in which the base end portion 11 made of prestressed concrete is constructed on the footing 15, the steel adapter ring 14 and the steel cylinder 12 are constructed thereon, and the nacelle is installed. . The hybrid tower 10 for wind power generation configured as described above calculates the natural frequency from the rigidity of each member and prevents the occurrence of resonance.

尚、以上の実施例では、アダプターリング下端に形成したフランジ下面を下に凸の曲面形状とした例について説明したが、下に凸の多角形状としてもよい。例えば、五角形や六角形等である。また、フーチング内部にPC鋼材を緊張するためのテンドンギャラリーを設ける必要がないので、フーチング高さを低くできるとともに、メンテナンスを容易にすることができる。   In addition, although the above Example demonstrated the example which made the lower surface of the flange formed in the adapter ring lower end into the convex curved surface shape downward, it is good also as a downward convex polygonal shape. For example, a pentagon or a hexagon. Further, since it is not necessary to provide a tendon gallery for tensioning the PC steel material inside the footing, the footing height can be lowered and maintenance can be facilitated.

図1は、本発明に係る風力発電用ハイブリッドタワーの一例を示す要部断面図である。FIG. 1 is a cross-sectional view of an essential part showing an example of a hybrid tower for wind power generation according to the present invention. 図2は、図1のA−A線断面図である。2 is a cross-sectional view taken along line AA in FIG. 図3(a)は、カップラー継ぎ手箱を示す説明図、(b)は、カップラーを示す断面斜視図である。Fig.3 (a) is explanatory drawing which shows a coupler joint box, (b) is a cross-sectional perspective view which shows a coupler. 図4は、図3(a)のC−C線断面図である。FIG. 4 is a cross-sectional view taken along the line CC of FIG. 図5は、図1のB−B線断面図である。5 is a cross-sectional view taken along line BB in FIG. 図6は、図1におけるアダプターリング部を示す拡大縦断面図である。FIG. 6 is an enlarged longitudinal sectional view showing the adapter ring portion in FIG. 1. 図7は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 7 is an explanatory view showing a construction procedure of the hybrid tower for wind power generation. 図8は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 8 is an explanatory view showing a construction procedure of the hybrid tower for wind power generation. 図9は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 9 is an explanatory diagram showing a construction procedure of the hybrid tower for wind power generation. 図10は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 10 is an explanatory diagram showing a construction procedure of the hybrid tower for wind power generation. 図11は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 11 is explanatory drawing which shows the construction procedure of the hybrid tower for wind power generation. 図12は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 12 is explanatory drawing which shows the construction procedure of the hybrid tower for wind power generation. 図13は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 13 is an explanatory view showing a construction procedure of the hybrid tower for wind power generation. 図14は、同風力発電用ハイブリッドタワーの施工手順を示す説明図である。FIG. 14 is an explanatory diagram showing a construction procedure of the hybrid tower for wind power generation. 図15は、同風力発電用ハイブリッドタワーの完成状態を示す説明図である。FIG. 15 is an explanatory view showing a completed state of the hybrid tower for wind power generation.

符号の説明Explanation of symbols

10 風力発電用ハイブリッドタワー
11 基端部
12 鋼製円筒
13 定着部
14 アダプターリング
15 フーチング
16 固定側定着装置(デッドアンカー)
17 PC鋼材
18 シース
19 カップラー継ぎ手箱
20 カップラー
20a 外筒
20b 内筒
20c 係止部材
20d 貫通孔
21 無収縮モルタル
22 フランジ
23 フランジ
24 内部足場
25 クレーン
26 埋め込みインサート
27 外部足場
28 内型枠
29 鉄筋
30 吊り治具
31 外型枠
32 ワイヤー
33 ターゲット
34 ターゲット
35 測量器械
36 ブラケット足場
37 ポンプ車
38 配管
39 ゴムホース
40 定着具
41 電動チェーンブロック
42 専用金具
DESCRIPTION OF SYMBOLS 10 Hybrid tower 11 for wind power generation Base end part 12 Steel cylinder 13 Fixing part 14 Adapter ring 15 Footing 16 Fixed side fixing apparatus (dead anchor)
17 PC steel material 18 Sheath 19 Coupler joint box 20 Coupler 20a Outer tube 20b Inner tube 20c Locking member 20d Through hole 21 Non-shrink mortar 22 Flange 23 Flange 24 Internal scaffold 25 Crane 26 Embedded insert 27 External scaffold 28 Inner frame 29 Reinforcing bar 30 Hanging jig 31 External mold 32 Wire 33 Target 34 Target 35 Surveying instrument 36 Bracket scaffold 37 Pump car 38 Piping 39 Rubber hose 40 Fixing tool 41 Electric chain block 42 Dedicated metal fittings

Claims (6)

基端部をプレストレストコンクリートで構成するとともに、その上に鋼製円筒を継ぎ足して中空タワーとした風力発電用ハイブリッドタワーであって、
前記プレストレストコンクリートと鋼製円筒とをプレストレスを導入するための定着部を備えたアダプターリングを介して接続し、前記アダプターリング下端に形成したフランジ下面を下に凸の曲面形状としたことを特徴とする風力発電用ハイブリッドタワー。
A hybrid tower for wind power generation in which a base end portion is composed of prestressed concrete and a steel cylinder is added to form a hollow tower,
The prestressed concrete and the steel cylinder are connected via an adapter ring having a fixing portion for introducing prestress, and the flange lower surface formed at the lower end of the adapter ring has a curved surface shape convex downward. A hybrid tower for wind power generation.
前記プレストレストコンクリートが高さ方向に対して占める割合は、85%以下の範囲であることを特徴とする請求項1に記載の風力発電用ハイブリッドタワー。   The hybrid tower for wind power generation according to claim 1, wherein a ratio of the prestressed concrete with respect to a height direction is in a range of 85% or less. 前記プレストレストコンクリートは、フーチング上に設置されるとともに、前記フーチング内に埋設された固定側定着装置と、
前記プレストレストコンクリートの天端部と結んで挿通されたPC鋼材を緊張することによりプレストレスを付与したことを特徴とする請求項1または2に記載の風力発電用ハイブリッドタワー。
The prestressed concrete is installed on a footing, and a fixed-side fixing device embedded in the footing;
The hybrid tower for wind power generation according to claim 1 or 2, wherein prestress is applied by tensioning a PC steel material that is inserted through the top end portion of the prestressed concrete.
前記PC鋼材は、前記プレストレストコンクリート内周壁の一部に設置されたカップラーによって接続されたことを特徴とする請求項1〜3の何れか1に記載の風力発電用ハイブリッドタワー。   The hybrid tower for wind power generation according to any one of claims 1 to 3, wherein the PC steel material is connected by a coupler installed on a part of the inner peripheral wall of the prestressed concrete. フーチングを施工するとともに、フーチング内に固定側定着装置を設置するフーチング施工工程と、
フーチングの上に内型枠と外型枠を組立てコンクリート筒を順次垂直に打設するコンクリート筒打設工程と、
所定長に達したコンクリート筒の頂部に定着部を備え下端に形成したフランジ下面を下に凸の曲面形状としたアダプターリングを設置し、前記固定側定着装置と定着部との間にPC鋼材を挿通し、このPC鋼材を緊張することにより、コンクリート筒部にプレストレスを導入するプレストレス導入工程と、前記アダプターリングの上に鋼製円筒を垂直に継ぎ足してゆく、鋼製円筒取り付け工程とから成る風力発電用ハイブリッドタワーの施工法。
In addition to constructing a footing, a footing construction process in which a fixed fixing device is installed in the footing,
A concrete cylinder placing process for assembling an inner mold frame and an outer mold frame on the footing and placing concrete cylinders in order vertically;
An adapter ring having a fixing portion at the top of the concrete cylinder that has reached a predetermined length and having a bottom surface of the flange formed at the lower end with a convex curved surface downward is installed, and PC steel is placed between the fixing side fixing device and the fixing portion. By inserting and tensioning this PC steel material, from the prestress introduction step of introducing prestress into the concrete tube, and the steel cylinder mounting step of vertically adding a steel cylinder on the adapter ring The construction method of the hybrid tower for wind power generation.
前記コンクリート筒打設工程において、コンクリート筒の軸線方向にPC鋼材挿通用のシースを配置することを特徴とする請求項5記載の風力発電用ハイブリッドタワーの施工法。   6. The construction method for a hybrid tower for wind power generation according to claim 5, wherein a sheath for inserting a PC steel material is disposed in the axial direction of the concrete cylinder in the concrete cylinder placing step.
JP2007224031A 2007-08-30 2007-08-30 Hybrid tower for wind power generation and its construction method Active JP4850151B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007224031A JP4850151B2 (en) 2007-08-30 2007-08-30 Hybrid tower for wind power generation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007224031A JP4850151B2 (en) 2007-08-30 2007-08-30 Hybrid tower for wind power generation and its construction method

Publications (2)

Publication Number Publication Date
JP2009057713A JP2009057713A (en) 2009-03-19
JP4850151B2 true JP4850151B2 (en) 2012-01-11

Family

ID=40553711

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007224031A Active JP4850151B2 (en) 2007-08-30 2007-08-30 Hybrid tower for wind power generation and its construction method

Country Status (1)

Country Link
JP (1) JP4850151B2 (en)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5274329B2 (en) * 2009-03-24 2013-08-28 戸田建設株式会社 Offshore wind power generation facility and its construction method
JP5350888B2 (en) * 2009-05-26 2013-11-27 鹿島建設株式会社 Wind turbine generator extension and remodeling method
IT1396433B1 (en) 2009-11-16 2012-11-23 Rolic Invest Sarl WIND POWER PLANT FOR THE GENERATION OF ELECTRICITY AND METHOD TO REALIZE A PILONE OF THE ABOVE WIND FACILITY.
DK2345810T3 (en) * 2010-01-18 2013-01-02 Siemens Ag Device and method for transporting a wind turbine tower segment
US8468776B2 (en) * 2010-06-16 2013-06-25 Cortina Innovations S.A. de C.V. Flange for wind power generators
US8307593B2 (en) * 2010-08-18 2012-11-13 General Electric Company Tower with adapter section
KR101222041B1 (en) * 2010-12-30 2013-01-15 재단법인 포항산업과학연구원 Hybrid tower structure
JP5732278B2 (en) * 2011-03-02 2015-06-10 太平洋セメント株式会社 Waste disposal method
DE102011090194B4 (en) * 2011-12-30 2013-12-05 Rolf J. Werner Tower-shaped structure
CN102966255B (en) * 2012-11-23 2014-09-17 北京金风科创风电设备有限公司 Connecting device for connecting concrete tower drum and steel tower drum
KR101358754B1 (en) * 2013-07-10 2014-02-10 원기업 주식회사 Pole for road facilities
DE102013216343A1 (en) * 2013-08-19 2015-02-19 Wobben Properties Gmbh Wind turbine foundation and wind turbine
DE102013217128A1 (en) 2013-08-28 2015-03-05 Wobben Properties Gmbh Rotor blade element for a wind energy plant, rotor blade, and a manufacturing method therefor and wind turbine with rotor blade
MX2018002415A (en) 2015-08-31 2018-08-24 Siemens Gamesa Renewable Energy Inc Tower segment and method utilizing segmented bearing plate.
CN106640542A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Concrete tower cylinder module and bonding method thereof
CN106481515A (en) * 2016-10-08 2017-03-08 霍尔果斯新国金新能源科技有限公司 Concrete towers cartridge module and its method for stretching
CN107762238B (en) * 2017-10-13 2019-05-10 中国水利水电第十一工程局有限公司 A kind of king-post prestressed strand lifting position control method
NL2022433B1 (en) 2019-01-22 2020-08-18 Koninklijke Bam Groep Nv Method for manufacturing a gravity based foundation for an offshore installation, and gravity based foundation.
CN111520289A (en) * 2020-05-12 2020-08-11 上海电气研砼(木垒)建筑科技有限公司 Connecting node of segmented prefabricated assembled combined tower cylinder and mounting method thereof
CN112112767A (en) * 2020-09-15 2020-12-22 重庆大学 Combined structure switching structure for wind turbine generator system steel-concrete tower cylinder
JPWO2023282086A1 (en) 2021-07-08 2023-01-12

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58121957A (en) * 1981-09-25 1983-07-20 日石三菱株式会社 Anti-thromotic medical material
JP2649709B2 (en) * 1988-10-07 1997-09-03 宇部興産株式会社 Pervaporation method of organic compound mixture
JPH0374144U (en) * 1989-11-15 1991-07-25
JPH05331809A (en) * 1992-05-28 1993-12-14 Taisei Corp Anchoring device for hanging diagonal member
JP4113110B2 (en) * 2003-12-22 2008-07-09 三井住友建設株式会社 Concrete tower

Also Published As

Publication number Publication date
JP2009057713A (en) 2009-03-19

Similar Documents

Publication Publication Date Title
JP4850151B2 (en) Hybrid tower for wind power generation and its construction method
CN101813069B (en) Foundation for enabling anchoring of wind turbine tower thereto by means of replaceable through-bolts
EP0793754B1 (en) Tensionless pier foundation
CN110847044B (en) Semi-prefabricated assembled bent cap construction method
EP2310595B1 (en) Method for the assembly of a tower and tower
KR100820299B1 (en) Temporary structure and precast concrete beam of pylon setting method using the bracket
JP5737554B2 (en) Seismic isolation foundation construction method
CN102296829B (en) Method for constructing three-dimensional cable net curtain wall
CN101575858A (en) Construction method of steel cofferdam used for reinforcing underwater pier
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN110565676B (en) Cantilever type tower crane foundation structure and construction method thereof
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN113338321B (en) Construction method of prestressed pier foundation
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
JP2639361B2 (en) Construction method of steel pipe / concrete composite structure pier
JP2012158912A (en) Base isolation structure and construction method for the same
JP5183606B2 (en) Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it
KR100840190B1 (en) I-beam segment connection method equipped with prestress steel synthetic concrete upper flange for continuous bridge
CN115807508A (en) Construction method and node for building steel structure column base installation foundation
CN113737661B (en) Construction method for steel-concrete combined section of tower base of cable-stayed bridge
CN215168600U (en) Steel pipe concrete combination formula tower section of thick bamboo
CN213062030U (en) Combined concrete filled steel tube waist beam structure, prefabricated member and connecting node
KR20100138433A (en) Prestressed steel composite girder with prestressed non-introducing portions provided at both ends of lower flange casing concrete, manufacturing method thereof, and rahmen structure and construction method thereof
CN111379265B (en) High-precision zero-interference weir die integrated structure with stable periphery and construction method thereof
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090619

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110914

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110920

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111018

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4850151

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141028

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531