KR100595019B1 - Fixing jacket for checking bridge - Google Patents

Fixing jacket for checking bridge Download PDF

Info

Publication number
KR100595019B1
KR100595019B1 KR1020050094960A KR20050094960A KR100595019B1 KR 100595019 B1 KR100595019 B1 KR 100595019B1 KR 1020050094960 A KR1020050094960 A KR 1020050094960A KR 20050094960 A KR20050094960 A KR 20050094960A KR 100595019 B1 KR100595019 B1 KR 100595019B1
Authority
KR
South Korea
Prior art keywords
fastening
pier
upright post
bridge
horizontal
Prior art date
Application number
KR1020050094960A
Other languages
Korean (ko)
Inventor
방성순
Original Assignee
주식회사 대호이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=37183434&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100595019(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 주식회사 대호이엔씨 filed Critical 주식회사 대호이엔씨
Priority to KR1020050094960A priority Critical patent/KR100595019B1/en
Application granted granted Critical
Publication of KR100595019B1 publication Critical patent/KR100595019B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교각의 상부에 설치되는 교량점검용 고정 자켓에 관한 것으로서, 교각 상단의 가장자리부분에 매입 설치된 앵커부재에 기역자형 걸이대를 고정하여 수직의 교각표면과 접촉되는 직립포스트를 설치하고 상기 직립포스트의 하단에 분리 제작된 수평받침대와 난간을 조립 설치함으로써 교각 상면에 설치되는 교좌장치라든가 교각상면의 형상에 따른 영향을 받음 없이 간편하게 조립할 수 있으며, 상기 직립포스트의 내부에는 복수의 격벽을 마련하여 구조적으로 취약한 것을 보완함으로써 충분한 강도보강이 이루어지며, 수평부위는 상면이 개방되고 수직부위는 교각의 측면과 접촉되는 내면이 개방된 걸이대로 마련함으로써 교각상면에 앵커볼트로 걸이대를 설치함에 그 작업성이 용이하고 수직부위에 직립포스트가 삽입되더라도 교각측면에 직립포스트가 밀착되어 외관이 미려하도록 한 교량점검용 고정 자켓을 특징으로 한다.The present invention relates to a bridge inspection fixing jacket installed on the upper part of the pier, by installing the upright post in contact with the vertical pier surface by fixing the cross-type hanger to the anchor member embedded in the upper edge of the pier and the upright post By assembling and installing the horizontal stand and railing separately manufactured at the bottom of the bridge, it is easy to assemble without being affected by the shape of the bridge device or the top of the bridge, and a plurality of partitions are provided inside the upright post. The strength is reinforced by supplementing the weak points, and the horizontal part is provided with an open hook on the upper part of the horizontal part and the inner part contacting the side of the pier with an open bolt. Easy and even pier side even if upright post is inserted into vertical part Is an upright post contact is characterized by a fixed jacket for a bridge to check the appearance is beautiful.

교량점검, 고정자켓, 직립포스트, 걸이대 Bridge Inspection, Fixed Jacket, Upright Post, Hanger

Description

교량점검용 고정 자켓{fixing jacket for checking bridge}Fixing jacket for checking bridge

도 1은 본 발명에 따른 교량점검용 고정 자켓을 분해하여 나타낸 사시도,1 is an exploded perspective view showing a fixed jacket for bridge inspection according to the present invention;

도 2는 도 1의 조립 사시도,2 is an assembled perspective view of FIG. 1;

도 3a는 도 2의 평면도,3a is a plan view of FIG.

도 3b는 도 2의 측면도,3B is a side view of FIG. 2;

도 4는 본 발명의 교량점검용 고정 자켓을 교각에 시공한 상태의 측면도,Figure 4 is a side view of the bridge construction fixed jacket for inspection of the present invention in the pier,

도 5는 도 4의 사시도,5 is a perspective view of FIG. 4,

도 6은 본 발명에 따른 교량점검용 고정 자켓에서 앵커부재에 대한 다른 실시 예를 나타낸 도면,6 is a view showing another embodiment of the anchor member in the fixed jacket for bridge inspection according to the present invention,

도 7a는 본 발명에 따른 교량점검용 고정 자켓에서 다른 실시 예의 걸이대를 이용하여 시공한 상태를 나타낸 사시도,Figure 7a is a perspective view showing a state of construction using the hanger of another embodiment in the fixed jacket for bridge inspection according to the present invention,

도 7b는 도 7a에서 걸이대 부분을 발췌하여 나타낸 조립 단면도이다.FIG. 7B is an assembly cross-sectional view showing an extracting portion of the hanger in FIG. 7A; FIG.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10: 걸이대 11: 수평부위10: hanger 11: horizontal part

12: 장공 15: 수직부위12: long hole 15: vertical part

16: 제1체결공 17: 제1체결부재16: First Fastening 17: First Fastening Member

20: 앵커부재 30: 직립포스트20: anchor member 30: upright post

31: 보강격벽 33: 제2체결공31: reinforcement bulkhead 33: second fastener

34: 제3체결공 35: 제2체결부재34: third fastening hole 35: second fastening member

40: 수평받침대 41: 체결부40: horizontal support 41: fastening part

42: 제4체결공 43,51: 직립플랜지42: 4th Fastener 43, 51: Upright Flange

44: 제5체결공 45: 제3체결부재44: fifth fastening hole 45: third fastening member

50: 난간부 52: 제6체결공50: handrail 52: sixth fastener

53: 파이프홀53: pipehole

본 발명은 교각의 상부에 설치되는 교량점검용 고정 자켓에 관한 것으로서, 더욱 상세하게는, 교각 상단의 가장자리부분에 미리 매입 설치된 앵커부재에 기역자형 걸이대를 고정하여 수직의 교각표면과 접촉됨은 물론 강도보강이 이루어진 직립포스트를 설치하며 상기 직립포스트의 하단에 분리 제작된 수평받침대와 난간이 조립 설치되는 교량점검용 고정 자켓에 관한 것이다.The present invention relates to a bridge inspection fixing jacket installed on the upper part of the pier, and more specifically, to the contact with the vertical pier surface by fixing the restrainer-type hanger to the anchor member pre-buried in the edge portion of the top of the pier as well as strength Reinforcing the installation of the upright post, and the horizontal stand and the handrail is installed on the bottom of the upright post, and the bridge inspection fixing jacket is installed.

일반적으로, 교량에서 교량의 안전도를 측정하는 기준이 교량을 지지하는 교좌장치부분에 의해 정해진다 할 것이다. 이렇게 교좌장치부분이 교량의 안전도에 중축적인 역할을 하기 때문에 교각의 상부에는 교좌장치부분의 상태, 즉 크랙이나 부식 등으로 인한 교량안전도의 점검이라든가 교량보수를 위한 점검대가 설치되며, 이러한 교량 점검대는 그 형상은 물론 취부구조가 다양하게 무수히 많은 것들이 제시되어 있다.In general, the standard for measuring the safety of a bridge in a bridge will be determined by the portion of the bridge device that supports the bridge. Since the bridge device plays a pivotal role in the safety of the bridge, the bridge is installed on the upper part of the bridge to check the condition of the bridge device, that is, to check the bridge safety due to cracks or corrosion, or to repair the bridge. In addition to the shape, there are a myriad of different kinds of mounting structures.

이러한 기술과 관련된 종래의 교량점검대 중에서 두어 개만을 발췌하여 설명하고자 한다.Only a couple of conventional bridge checkers associated with this technique will be described.

대한민국 등록특허공보 등록번호 제10-0374141호에는 교각의 상면에 설치되는 교각상면설치부와, 이 교각상면설치부의 길이방향 양단부에 각각 연속하여 교각측면과 면접되게 교각측면설치부가 설치되며 상기 각 교각측면설치부의 단부에서 수평으로 절곡되어 안전난간과 발판이 구비되는 점검대를 설치하기 위한 점검대받침부가 마련되고 상기 각 점검대받침부의 단부에서 교각의 측면을 향해 경사지게 절곡되어 상기 점검대받침부가 수평위치로 유지되게 하는 받침부보강부가 일체로 마련된 것이 그 특징이다.In the Republic of Korea Patent No. 10-0374141, the pier top installation portion is installed on the upper surface of the pier, and the pier side installation portion is installed so as to be continuously interviewed with the pier side surfaces at both ends in the longitudinal direction of the pier upper installation portion, respectively. A test stand support is provided for installing a check rail provided with a safety railing and a footrest horizontally bent at the end of the side mounting portion, and the check stand support is horizontally bent at an end of the check point support portion at an end. The pedestal reinforcing portion to be maintained in position is characterized in that it is provided integrally.

상기와 같이 구성된 등록특허공보의 교량점검용 고정자켓에 있어서는 교각상면설치부, 교각측면설치부, 점검대받침부 및 받침부보강부가 일체로 마련된 것이어서 교각상면에 걸쳐지도록 시공함이 번거로울 수 있으며, 특히 교각상면의 교좌장치(shoe)를 피하여 설치하여야 하므로 특정한 교각의 형상에 따라서는 동일간격으로의 설치에 제약이 따를 수 있고 이로 인하여 외부의 미관을 해칠 수 있다는 문제점이 있었다.In the fixed jacket for bridge inspection of the registered patent publication configured as described above, the bridge top mounting portion, the bridge side mounting portion, the check base support portion, and the support portion reinforcement portion are provided integrally, so that the construction may be cumbersome to span the bridge top surface. Particularly, since the pier should be installed to avoid the shoe of the upper surface of the pier, the installation of the same pier may be restricted according to the shape of the specific pier, which may damage the external aesthetics.

또한, 대한민국 등록실용신안공보 등록번호 제20-347029호의 교량점검용 자켓에는 한쪽 끝단에 수직으로 교각고정봉이 상부로 돌출 형성되고 다른 한쪽끝단에 상부를 향해 'ㄷ'자형 홈인 홀더를 형성시킨 발판지지대가 마련되고 이 발판지지대 의 끝단에 연결구와 조임 볼트, 너트를 이용하여 펜스지지대를 연결 고정하며, 상기 발판지지대의 교각고정봉을 감싸면서 이 교각고정봉과 볼트와 너트로 고정되면서 교각의 측면에 볼트를 취부하여 상기 발판지지대가 교각에 고정하는 교각고정구로 구성된 것이 그 특징이다. In addition, the bridge inspection jacket of the Republic of Korea Utility Model Registration No. 20-347029 is a scaffolding support that is formed with a piercing rod protruding upwards perpendicularly to one end and a 'c' shaped groove holder on the other end toward the top. Is secured to the end of the scaffold support by using a connector, a fastening bolt, and a nut to secure the connection to the fence support. It is characterized in that the scaffold support is composed of a pier fixture that is fixed to the pier by mounting.

상기와 같이 구성된 등록실용신안 제20-347029호의 교량점검용 자켓에 있어서는 발판지지대와 펜스지지대가 별도로 마련되어 주형 및 제품이 소형화에 따른 제작은 물론 시공이 용이하다는 이점이 있으나, 이는 발판지지대의 홀더부위와 펜스지지대의 홀더부위를 일치시킴과 아울러 연결구에 천공된 구멍을 일치시켜 볼트를 관통시켜 체결하는 작업이 번거롭고 그 작업성이 떨어진다는 문제점이 있었다. In the bridge inspection jacket of the registered Utility Model No. 20-347029, which is configured as described above, the scaffold support and the fence support are separately provided, so that the mold and the product can be manufactured according to the miniaturization, and the construction can be easily performed. In addition to matching the holder portion of the fence support, there was a problem in that the work of screwing through the bolt to match the perforated holes in the connector is cumbersome and its workability is poor.

특히, 위의 등록특허공보와 마찬가지로 수평걸이봉을 교각상면에 걸어놓은 후 그 양단에 수직걸이봉을 조인트로 연결 고정하되 수직걸이봉 상단에 구비된 기역자형 형상의 고정구를 이용하여 교각의 모서리에 걸쳐지도록 설치하고 상기 수직걸이봉의 하단에 교각고정구를 이용하여 연결 시공하여야 하므로 그 설치작업에 따른 작업공정이 추가되고 작업이 번거롭다는 문제점이 있었다.In particular, as in the above Patent Publication, the horizontal hanger rod is hung on the top of the pier, and then the vertical hanger rods are fixed to the joints at both ends thereof, but by using a cross-shaped fastener provided at the top of the vertical hanger rod, The installation process is to be spread over and connected to the bottom of the vertical hanger using a pier fixture, the work process according to the installation work is added and the work is cumbersome.

그리고 대한민국 등록실용신안공보 등록번호 제20-0388693호에는 교량점검용 자켓이 제시되어 있는데, 이는 교각의 측면에 설치되어 그 하단부에는 상기 교각 외측으로 연장되어 작업 가능한 공간을 형성하는 발판플레이트가 형성되고 상기 발판플레이트의 외측단으로 안전난간이 상향 설치되는 교량 점검용 자켓에 있어서, 양측면 상단에 인접하여 양측으로 연장되어 앵커삽입홀이 천공되어 있는 하나 이상의 고정리브가 장착되어 교각의 측면에 일정 간격으로 밀착 고정되는 수개의 수직 프레임; 상기 수직프레임의 상부에는 교각상면에 상응하여 밀착 지지하는 수평판과 이 수평판의 상면에 일체로 입설되는 보강판으로 연결되는 보강프레임으로 구성되며, 상기 보강프레임의 보강판에는 와이어 장착홀이 형성되어 와이어에 의하여 마주보는 또는/및 인접한 와이어 장착홀을 상호 연결한 것이 그 특징이다.And the Republic of Korea Utility Model Registration No. 20-0388693 is presented a bridge inspection jacket, which is installed on the side of the pier is formed on the bottom of the footrest plate extending to the outside of the pier to form a workable space is formed In the bridge inspection jacket in which the safety rail is installed upward to the outer end of the scaffolding plate, one or more fixing ribs are installed to extend to both sides adjacent to the upper ends of both sides and are drilled with anchor insertion holes and adhered to the sides of the piers at regular intervals. Several vertical frames set; The upper part of the vertical frame is composed of a reinforcing frame connected by a horizontal plate that closely supports and corresponding to the pier top surface and a reinforcement plate integrally placed on the upper surface of the horizontal plate, the wire mounting hole is formed in the reinforcement plate of the reinforcement frame And interconnecting adjacent wire mounting holes and / or opposed by wires.

상기와 같이 구성된 등록실용신안 제20-0388693호에 있어서는, 수직프레임의 고정리브를 앵커볼트로 교각측면에 고정하고 보강프레임들을 와이어로 상호 연결하여 교각에 동여 메는 것이어서 교좌장치의 영향 없이 시공할 수 있으나, 이 또한 수직프레임을 교각측면에 앵커볼트로 취부하고 보강프레임을 와이어로 교각에 동여 메어야 하는 등의 작업성이 저하될 수밖에 없다는 문제점이 있었다.In the Utility Model Utility Model No. 20-0388693 configured as described above, the fixed ribs of the vertical frame are fixed to the pier side with anchor bolts, and the reinforcing frames are interconnected with wires to be tied to the piers, so that they can be installed without the influence of the device. However, this also has a problem that the workability is inevitably deteriorated, such as mounting the vertical frame to the pier side with anchor bolts, and tightening the reinforcement frame to the pier with wires.

본 발명은 상기와 같은 종래의 제반 문제점을 해결하기 위해 연구 개발한 것으로서, 그 목적은 교각 상단의 가장자리부분에 미리 매입 설치된 앵커부재에 기역(ㄱ)자형 걸이대를 고정하여 수직의 교각표면과 접촉되는 직립포스트를 설치하고 상기 직립포스트의 하단에 분리 제작된 수평받침대와 난간을 조립 설치하는 것인바, 교각 상면에 설치되는 교좌장치라든가 교각상면의 형상에 따른 영향을 받음 없이 간편하게 조립할 수 있으며, 상기 직립포스트의 내부에는 복수의 격벽을 마련하여 구조적으로 취약한 것을 보완함으로써 충분한 강도보강이 이루어지도록 한 교량점검용 고정 자켓을 제공하는데 있다.The present invention has been researched and developed in order to solve the above-mentioned conventional problems, the object is to contact the vertical pier surface by fixing the air base (a) -shaped hanger to the anchor member pre-installed in the edge portion of the top of the pier It is to install the upright post and assemble and install the horizontal stand and handrail separately manufactured at the bottom of the upright post, can be easily assembled without being affected by the shape of the bridge device or the bridge device installed on the top of the pier, the upright The interior of the post is to provide a fixed inspection jacket for the bridge to provide a sufficient strength reinforcement by providing a plurality of partitions to compensate for the structural weakness.

또한 본 발명의 다른 목적은 수평부위는 상면이 개방되고 수직부위는 교각의 측면과 접촉되는 내면이 개방된 걸이대로 마련함으로써 교각상면에 앵커볼트로 걸이대를 설치함에 그 작업성이 용이하고 수직부위에 직립포스트가 삽입되더라도 교각측면에 직립포스트가 밀착되어 외관이 미려하도록 한 교량점검용 고정 자켓을 제공하는데 있다.In addition, the other object of the present invention is that the horizontal part is open to the upper surface and the vertical part is provided with a hook open the inner surface in contact with the side of the pier by the anchor bolt on the upper surface of the pier easy to work and the vertical part Even though the upright post is inserted, the upright post is in close contact with the side of the pier to provide a beautiful inspection inspection jacket for the beautiful appearance.

상기와 같은 목적을 달성하기 위한 본 발명은 교각의 모서리부분인 교각상면과 측면에 걸쳐지도록 측면에서 보았을 때 기역자형으로 형성되며 사각파이프가 기역자형으로 구부러지되 수평부위는 상면이 개방되고 수직부위는 교각의 측면과 접촉되는 내면이 개방됨은 물론 수평부위의 바닥에 하나이상의 장공이 형성되고 수직부위의 측면에 2개 이상의 체결공이 형성되어 있는 걸이대; 상기 교각 상단의 모서리부분에 매립 설치되며 상단부분이 상기 걸이대의 수평부위 바닥에 천공되는 장공을 통해 체결 고정되는 앵커부재; 상기 걸이대의 수직부위에 천공된 체결공으로 관통되는 체결부재를 통해 상부가 수직으로 연결 고정되며 내부에 하나이상의 격벽이 형성되고 하부에 체결공이 천공된 직립포스트; 상기 직립포스트의 하단에 복수의 체결부재를 통해 수평으로 연결 고정되며 한쪽끝단은 직립포스트의 하부외면을 감싸도록 수용하는 체결부가 마련되고 이 체결부에서 다른 한쪽끝단으로 갈수록 단면적이 작아지면서 소정 길이만큼 연장되고 그 끝단에 복수의 체결공이 천공된 넓은 체결용 직립플랜지가 마련되어 있는 수평받침대; 상기 수평받침대 끝단에서 체결부재를 통해 상부로 연결 고정되며 상기 수평받침대의 직립플랜지와 상응하는 형상으 로 체결용 직립플랜지가 마련되고 에이치자형 단면으로 소정 높이만큼 연장되고 상단과 그 하부로 소정간격으로 파이프를 체결하기 위한 파이프홀이 천공되어 있는 난간부로 구성된 것을 특징으로 한다.The present invention for achieving the above object is formed in a cross-sectional shape when viewed from the side so as to span the pier top surface and the side of the edge of the piers and the square pipe is bent into a cross-linker, the horizontal portion is the top surface is open and the vertical portion is A hanger having an inner surface in contact with the side of the pier, as well as one or more long holes formed on the bottom of the horizontal portion and two or more fastening holes formed on the side of the vertical portion; An anchor member buried in an edge portion of the upper end of the pier, the anchor part being fastened and fixed through a long hole which is perforated at the bottom of the horizontal portion of the hanger; An upright post having an upper portion vertically connected and fixed through a fastening member penetrated by a fastening hole drilled in a vertical portion of the hanger, and having one or more partition walls formed therein and a fastening hole drilled in a lower portion thereof; The lower end of the upright post is connected and fixed horizontally through a plurality of fastening members, and one end is provided with a fastening part for accommodating the lower outer surface of the upright post, and the cross-sectional area of the fastening part decreases toward the other end by a predetermined length. A horizontal support having a wide fastening upright flange which extends and has a plurality of fastening holes at its ends; It is connected and fixed to the upper through the fastening member at the end of the horizontal pedestal is provided in the shape corresponding to the upright flange of the horizontal pedestal is provided with a fastening flange for extending the H-shaped cross-section by a predetermined height and at a predetermined interval between the top and the bottom Characterized in that the railing portion is made of a perforated pipe hole for fastening the pipe.

본 발명에 있어서, 상기 걸이대는 교각의 상면에 앵커부재를 매설하지 않고 수평걸이봉을 체결부재로 연결 고정할 수 있도록 수평부위의 직립벽면에도 2개 이상의 장공을 천공하여둠이 바람직하다.In the present invention, it is preferable that the hanger is perforated with two or more long holes on the upright wall surface of the horizontal portion so that the horizontal hanger rod can be connected and fixed with the fastening member without embedding the anchor member on the upper surface of the pier.

본 발명에 있어서, 상기 앵커부재는 볼트나 너트를 매립 시공할 수 있는데, 볼트인 경우에는 상단이 약간 돌출되어 너트를 체결할 수 있도록 시공하고 너트인 경우에는 교각상면에 긴 너트를 매립 시공하되 그 내면에 시멘트 몰탈이 채워지지 않도록 교각을 세울 때 미리 매립 시공할 수 있다. 이 경우에는 판재에 걸이대가 시공되는 간격을 갖도록 2개의 너트를 하나의 유닛으로 마련하여 걸이대의 매립 시공의 편의성을 도모함이 바람직하다.In the present invention, the anchor member may be buried in the bolt or nut construction, in the case of a bolt to the top is slightly projected to be fastened to the nut, and in the case of a nut to be embedded in a long nut on the pier top surface When the piers are erected so that the cement mortar is not filled on the inner surface, they can be buried in advance. In this case, it is desirable to provide convenience for the construction of the rack by providing two nuts in one unit so as to have a space for the rack to be installed on the plate.

이하, 본 발명에 따른 교량점검용 고정자켓을 첨부도면에 의거하여 상세하게 설명하고자 한다.Hereinafter, the bridge inspection fixing jacket according to the present invention will be described in detail based on the accompanying drawings.

도 1은 본 발명에 따른 교량점검용 고정 자켓을 분해하여 나타낸 사시도이고, 도 2는 본 발명에 따른 교량점검용 고정 자켓의 조립 사시도이며, 도 3a는 도 2의 평면도이고, 도 3b는 도 2의 측면도이다.1 is an exploded perspective view showing the bridge inspection fixing jacket according to the present invention, Figure 2 is an assembled perspective view of the bridge inspection fixing jacket according to the present invention, Figure 3a is a plan view of Figure 2, Figure 3b is Figure 2 Side view.

도면에 나타낸 바와 같이, 걸이대(10)는 교각(B)의 모서리부분인 교각상면과 측면에 걸쳐지도록 측면에서 보았을 때 기역자형으로 형성되어지는 것이며, 이는 사각파이프가 기역자형으로 구부러지되 수평부위(11)는 상면이 개방되고 수직부위 (15)는 교각의 측면과 접촉되는 내면이 개방되어지며, 상기 수평부위(11)의 바닥에는 장공(12)이 형성되어 있고 수직부위(15)의 측면에는 3개의 제1체결공(16)이 형성되어 있다. 상기 장공(12)과 제1체결공(16)은 첨부도면과 같이 1개와 3개로 도시되었으나 그 이상으로 마련할 수 있음은 당연하다 할 것이다.As shown in the figure, the hanger 10 is formed in a transverse shape when viewed from the side so as to span the pier upper surface and the side of the corner portion of the bridge (B), which is a rectangular pipe bent in a transverse shape, but the horizontal portion ( 11) the upper surface is open and the vertical portion 15 is open to the inner surface in contact with the side of the piers, the bottom of the horizontal portion 11 has a long hole 12 is formed on the side of the vertical portion 15 Three first fastening holes 16 are formed. The long hole 12 and the first fastening hole 16 are shown as one and three as shown in the accompanying drawings, but it will be obvious that more than that can be provided.

상기 교각(B) 상단의 모서리부분에는 앵커부재(20)가 매립 설치되어 있으며 상기 앵커부재(20)는 걸이대(10)의 수평부위(11) 바닥에 천공되는 장공(12)을 통해 체결 고정할 수 있는 앵커볼트, 즉 매립볼트이면 족하다. Anchor member 20 is embedded in the corner portion of the top of the pier (B) and the anchor member 20 is fastened and fixed through the long hole 12 which is punched in the bottom of the horizontal portion 11 of the hanger 10 Anchor bolts, that is, buried bolts, are sufficient.

상기 앵커부재(20)는 앵커볼트로 도시하고 설명하였으나 교각(B)상면에 긴 너트를 매립 시공하되 그 내면에 시멘트 몰탈이 채워지지 않도록 교각을 세울 때 미리 매립 시공할 수 있다. 이 경우에는 도 6과 같이 판재(21)에 너트(22)를 하나의 유닛으로 마련하여 걸이대(10)를 볼트(23)로 체결할 수 있으며, 상기 판재(21)에 걸이대(10)가 시공되는 간격으로 2개의 너트(22)를 마련하면 매립 시공의 편의성을 도모할 수도 있다. Although the anchor member 20 is illustrated and described as an anchor bolt, a long nut may be buried in the upper surface of the pier B, but may be buried in advance when the pier is erected so that cement mortar is not filled on the inner surface thereof. In this case, as shown in FIG. 6, the nut 22 may be provided as one unit in the plate 21 to fasten the hanger 10 with the bolt 23, and the hanger 10 may be installed in the plate 21. If the two nuts 22 are provided at intervals to be provided, the convenience of embedding construction can also be aimed at.

상기 걸이대(10)의 수직부위(15)에는 내부에 충분한 강도보강을 위해 2개의 보강격벽(31)이 길이방형으로 형성된 직립포스트(30)가 복수의 제1체결부재(17)에 의해 연결 고정되어 지며, 상기 직립포스트(30)는 상기 수직부위(15)에 연결 고정하기 위해 상부에 수직부위(15)의 제1체결공(16)과 일치되는 제2체결공(33)이 천공되고 하부에는 수평받침대(40)의 연결을 위한 제3체결공(34)이 천공되어 있다. In the vertical portion 15 of the hanger 10, an upright post 30 having two reinforcing bulkheads 31 formed in a lengthwise shape to secure sufficient strength therein is connected and fixed by a plurality of first fastening members 17. The upright post 30 is perforated with a second fastening hole 33 coinciding with the first fastening hole 16 of the vertical part 15 in order to connect and fix the vertical part 15. The third fastening hole 34 for the connection of the horizontal support 40 is perforated.

상기 직립포스트(30)의 하단에는 상면이 수평을 이루도록 수평받침대(40)가 복수의 제2체결부재(35)를 통해 연결 고정되어 있으며, 상기 수평받침대(40)는 한 쪽끝단이 근부 역할을 하도록 직립포스트(30)의 하부외면을 감싸면서 수용하는 체결부(41)가 마련되어 있고 이 체결부(41)의 외측에는 직립포스트(30)의 제3체결공(34)들과 일치하면서 제2체결부재(35)가 관통되는 제4체결공(42)이 천공되어 있으며, 상기 체결부(41)에서 다른 한쪽끝단으로 갈수록 단면적이 작아지면서 소정 길이만큼 연장되어 있음은 물론 그 끝단에 복수의 제5체결공(44)이 천공된 넓은 체결용 직립플랜지(43)가 마련되어 있다. The bottom of the upright post 30 is fixed to the horizontal support 40 is connected via a plurality of second fastening members 35 so that the upper surface is horizontal, the one end of the horizontal support 40 is the root portion A fastening portion 41 is provided to surround the lower outer surface of the upright post 30 so as to be accommodated, and the second fastening portion 41 is aligned with the third fastening holes 34 of the upright post 30 on the outside of the fastening portion 41. The fourth fastening hole 42 through which the fastening member 35 penetrates is punctured, and the cross-sectional area decreases toward the other end of the fastening part 41 and extends by a predetermined length, as well as a plurality of first ends thereof. A wide fastening upright flange 43 in which five fastening holes 44 are drilled is provided.

상기 수평받침대(40)는 교량을 점검하는 점검자의 체중은 물론 기계장비 등의 중량을 지탱하여야 하므로 충분한 강성을 갖는 단면구조인 영문 알파벳대문자인 티형(T Type)단면이나 아이형(I Type) 단면, 에이치형(H Type)단면 중에서 택일하여 사용할 수 있다.Since the horizontal support 40 must support the weight of the inspector inspecting the bridge as well as the weight of the mechanical equipment, the T-type cross section or the I-type cross section, which is the uppercase alphabetic letter having sufficient rigidity, is a cross-sectional structure having sufficient rigidity. Can be used alternatively from H type cross section.

상기 수평받침대(40)의 끝단에는 상부로 난간부(50)가 제3체결부재(45)를 통해 연결 고정되어 있으며, 하단은 상기 수평받침대(40)의 직립플랜지(43)와 상응하는 형상으로 체결용 직립플랜지(51)가 마련되어 있고 이 직립플랜지(51)에는 수평받침대(40)의 제5체결공(44)과 일치하는 제6체결공(52)이 천공되어 있으며, 상기 직립플랜지(51)의 상부로는 에이치형(H Type) 단면으로 소정 높이만큼 연장되되 그 상단과 그 하부로 소정간격으로 파이프(54)를 체결하기 위한 파이프홀(53)이 천공되어 있다.Handrail 50 is connected to the upper end of the horizontal support 40 through the third fastening member 45, the lower end in a shape corresponding to the upright flange 43 of the horizontal support 40. A fastening upright flange 51 is provided, and the upright flange 51 is provided with a sixth fastening hole 52 corresponding to the fifth fastening hole 44 of the horizontal support 40, and the upright flange 51 is provided. In the upper part of the H), a pipe hole 53 for extending the predetermined height to the H type cross section and fastening the pipe 54 at predetermined intervals to the upper end and the lower part thereof is perforated.

상기와 같이 구성된 본 발명에 따른 교량점검용 고정 자켓이 교각에 시공되는 과정을 첨부된 도 4와 도 5를 참고로 하여 설명한다. The process of constructing the bridge inspection fixing jacket according to the present invention configured as described above in the pier will be described with reference to FIGS. 4 and 5.

먼저, 시공주변의 공터나 생산라인에서 걸이대(10), 직립포스트(30), 수평받 침대(40) 및 난간부(50)를 각각의 체결부재()를 이용하여 견고하게 조립한다. 상기 수평받침대(40)와 난간부(50)는 체결용 직립플랜지(43,51)에 천공된 체결공(44,52)을 일치시켜 제3체결부재(45)로 관통시킨 다음 체결 고정한다. 이와 같이 교량점검용 고정 자켓을 조립하는 동안이나 그 이전에 교각 상면의 모서리부분, 즉 가장자리에는 소정간격으로 앵커부재(20)가 미리 매립 시공되어 있어야 한다. First, the hanger 10, the upright post 30, the horizontal support 40 and the handrail part 50 in the empty lot or production line around the construction is firmly assembled using the respective fastening members (). The horizontal pedestal 40 and the handrail part 50 coincide with the fastening holes 44 and 52 drilled in the fastening upright flanges 43 and 51 to pass through the third fastening member 45, and then fix the fastening. In this way, during or before assembling the fixing jacket for the bridge inspection, the anchor member 20 should be buried in advance at a predetermined interval at the corner portion, that is, the edge of the upper surface of the bridge.

이와 같이 조립되어진 유닛을 시공하고자 하는 교각상단부분으로 운반하되 걸이대(10)의 수평부위(11) 바닥에 천공된 장공(12)으로 앵커부재(20)의 끝단이 관통되도록 하여 너트로 견고하게 체결한다.The unit thus assembled is transported to the upper end of the pier to be constructed, but the end of the anchor member 20 is penetrated firmly with a nut by a hole 12 drilled in the bottom of the horizontal portion 11 of the hanger 10. do.

상기와 같이 교각(B) 상면의 가장자리에만 시공하고자 하는 걸이대(10)의 개수만큼 앵커볼트(20)를 매립 시공하는 것이므로 교각(B)상면에 설치되는 교좌장치라든가 교각(B)상면의 형상에 따른 영향을 받지 않기 때문에 간편하게 조립할 수 있는 것이다. As described above, since the anchor bolt 20 is embedded in the number of the hooks 10 to be installed only at the edge of the upper surface of the pier B, the shape of the bridge device installed on the upper surface of the pier B or the upper surface of the pier B is as follows. Because it is not affected, it can be easily assembled.

또한 상기 걸이대(10)와 연결되고 수평받침대(40)와 연결되는 직립포스트(30)의 내부에는 복수의 격벽(31)을 마련함으로써 구조적으로 취약할 수 있는 직립포스트(30)의 충분한 강도보강이 이루어지는 것이다.In addition, a sufficient strength reinforcement of the upright post 30 that may be structurally vulnerable by providing a plurality of partition walls 31 inside the upright post 30 connected to the hanger 10 and connected to the horizontal support 40. It is done.

위와 같은 방법으로 다수의 교량점검용 고정 자켓을 일정간격으로 교각에 설치한 후에는 수평받침대(40)위에 발판을 깔고 난간부(50)의 파이프홀(53)마다 각각 파이프(54)를 한쪽으로부터 끼워 세트스크루로 체결 고정함으로써 조립 시공을 마무리한다. In the same manner as above, after installing a plurality of bridge inspection jackets on the pier at regular intervals, a footrest is placed on the horizontal support 40 and the pipes 54 for each of the pipe holes 53 of the railing part 50 from one side. The assembly is completed by fastening with a set screw.

그리고 도 7a 및 7b는 본 발명에 따른 교량점검용 고정 자켓에서 다른 실시 예의 걸이대를 이용하여 시공한 상태를 나타낸 도면이다. 여기에서는, 교각(B)의 상면에 앵커부재를 매설하지 않고 수평걸이봉(60)의 양단에 제4체결부재(62)로 연결 고정할 수 있도록 수평부위(11)의 직립벽면에 2개 이상의 장공(13)을 천공한 것이다. And Figure 7a and 7b is a view showing a state in which the construction of the bridge inspection fixed jacket according to the present invention using a hanger of another embodiment. Here, two or more on the upright wall surface of the horizontal portion 11 so as to be connected to the fourth fastening member 62 on both ends of the horizontal hook rod 60 without embedding the anchor member on the upper surface of the pier (B). The perforations 13 are perforated.

상기와 같이 구성된 본 발명의 교량점검용 고정 자켓에 의하면, 걸이대(10)를 교각(B)에 장착하지 않고 시공할 수 있으며, 이러한 경우에는 교각(B)의 상면에 앵커부재를 매설함 없이 단순히 교각(B)의 상면에 수평걸이봉(60)을 가설하고 이 수평걸이봉(60)의 양단에 걸이대(10)가 연결되도록 제4체결부재(62)를 이용하여 종래와 같이 체결 고정할 수도 있는 것이다. According to the bridge inspection fixing jacket of the present invention configured as described above, it can be installed without mounting the hanger 10 to the bridge (B), in this case simply without embedding the anchor member on the upper surface of the bridge (B) It is also possible to install the horizontal hanger rod 60 on the upper surface of the pier B and fasten and fix it as in the prior art by using the fourth fastening member 62 so that the hanger 10 is connected to both ends of the horizontal hanger rod 60. It is.

이상에서 상세하게 설명한 바와 같이, 본 발명에 따른 교량점검용 고정 자켓은 교각 상단의 가장자리부분에 매입 설치된 앵커부재에 기역자형 걸이대를 고정하여 수직의 교각표면과 접촉되는 직립포스트를 설치하고 상기 직립포스트의 하단에 분리 제작된 수평받침대와 난간을 조립 설치함으로써 교각 상면에 설치되는 교좌장치라든가 교각상면의 형상에 따른 영향을 받음 없이 간편하게 조립할 수 있으며, 상기 직립포스트의 내부에는 복수의 격벽을 마련하여 구조적으로 취약한 것을 보완함으로써 충분한 강도보강이 이루어지는 등의 유용한 발명이다.As described in detail above, the bridge inspection fixing jacket according to the present invention by installing the upright post in contact with the vertical pier surface by fixing the cross-type hanger to the anchor member embedded in the upper edge of the bridge piers and the upright post By assembling and installing the horizontal stand and railing separately manufactured at the bottom of the bridge, it is easy to assemble without being affected by the shape of the bridge device or the top of the bridge, and a plurality of partitions are provided inside the upright post. It is a useful invention such as sufficient strength reinforcement is made by supplementing the weak.

또한 걸이대의 수평부위는 상면이 개방되고 수직부위는 교각의 측면과 접촉되는 내면이 개방된 걸이대로 마련함으로써 교각상면에 앵커볼트로 걸이대를 설치 함에 그 작업성이 용이하고 수직부위에 직립포스트가 삽입되더라도 교각측면에 직립포스트가 밀착되어 외관이 미려하게 되는 유용한 발명이다.In addition, the horizontal part of the hanger is open with the upper surface open and the vertical part is provided with an open hook with the inner surface in contact with the side of the pier. Therefore, it is easy to install the hanger with anchor bolts on the upper part of the pier. Even if the upright post is in close contact with the pier side is a useful invention that the appearance is beautiful.

Claims (3)

수직부위(15)의 측면에 2개 이상의 제1체결공(16)이 형성되어 있는 걸이대(10); 교각(B) 상단의 모서리부분에 매립 설치되며 상단부분이 상기 걸이대(10)의 수평부위(11) 바닥에 천공되는 장공(12)을 통해 체결 고정되는 앵커부재(20); 상기 걸이대(10)의 수직부위(15)에 천공된 제1체결공(16)으로 관통되는 제1체결부재(17)를 통해 상부가 수직으로 연결 고정되며 하부에 제3체결공(34)이 천공된 직립포스트(30); 상기 직립포스트(30)의 하단에 복수의 제2체결부재(35)를 통해 수평으로 연결 고정되며 한쪽끝단은 직립포스트(30)의 하부외면을 감싸도록 수용하는 체결부(41)가 마련되고 이 체결부(41)의 외측에 직립포스트(30)의 제3체결공(34)과 일치하면서 제2체결부재(35)가 관통되는 제4체결공(42)이 천공되는 수평받침대(40)로 이루어진 교량점검용 고정 자켓에 있어서,A hanger 10 having two or more first fastening holes 16 formed on a side surface of the vertical portion 15; Anchor member 20 is buried in the corner portion of the top of the pier (B) and the upper portion is fastened and fixed through the long hole (12) perforated in the bottom of the horizontal portion 11 of the hanger (10); The upper part is vertically connected and fixed through the first fastening member 17 penetrating into the first fastening hole 16 drilled in the vertical portion 15 of the hanger 10, and the third fastening hole 34 is disposed at the bottom thereof. Perforated upright post 30; The lower end of the upright post 30 is connected and fixed horizontally through a plurality of second fastening members 35 and one end thereof is provided with a fastening part 41 for accommodating the lower outer surface of the upright post 30. On the outer side of the fastening portion 41, the fourth fastening hole 42, through which the second fastening member 35 passes, coincides with the third fastening hole 34 of the upright post 30, is drilled into the horizontal support 40. In the bridge inspection fixed jacket, 상기 교각(B)의 모서리부분인 교각상면과 측면에 걸쳐지도록 측면에서 보았을 때 기역자형으로 형성되며 사각파이프가 기역자형으로 구부러지되 수평부위(11)는 상면이 개방되고 수직부위(15)는 교각의 측면과 접촉되는 내면이 개방됨은 물론 수평부위(11)의 바닥에 하나이상의 장공(12)이 형성되어 있는 걸이대(10); When viewed from the side so as to span the pier upper surface and the side of the pier (B) is formed in a transverse shape, the square pipe is bent in a transverse shape, the horizontal portion 11 is the top surface is open and the vertical portion (15) pier As well as the inner surface is in contact with the side of the hanger 10 is formed with at least one long hole 12 on the bottom of the horizontal portion (11); 내부에 하나이상의 격벽(31)이 형성되어 있는 직립포스트(30);An upright post 30 having one or more partition walls 31 formed therein; 상기 체결부(41)에서 다른 한쪽끝단으로 갈수록 단면적이 작아지면서 소정 길이만큼 연장되고 그 끝단에 복수의 제5체결공(44)이 천공된 넓은 체결용 직립플랜지(43)가 마련되어 있는 수평받침대(40); As the cross-sectional area decreases toward the other end from the fastening part 41, the horizontal supporter 43 is provided with a wide fastening upright flange 43 having a plurality of fifth fastening holes 44 bored at the ends thereof. 40); 상기 수평받침대(40)의 끝단에서 체결부재를 통해 상부로 연결 고정되며 상기 수평받침대(40)의 직립플랜지(43)와 상응하는 형상으로 체결용 직립플랜지(51)가 마련되고 이 직립플랜지(51)에는 수평받침대(40)의 제5체결공(44)과 일치하는 제6체결공(52)이 천공되며, 상기 직립플랜지(51)의 상부로는 에이치자형 단면으로 소정 높이만큼 연장되고 상단과 그 하부로 소정간격으로 파이프를 체결하기 위한 파이프홀(53)이 천공되어 있는 난간부(50)로 구성된 것을 특징으로 하는 교량점검용 고정 자켓.The upright flange 51 for fastening is connected to the upper portion through the fastening member at the end of the horizontal support 40 and has a shape corresponding to the upright flange 43 of the horizontal support 40, and the upright flange 51 is provided. 6) the sixth fastening hole 52 corresponding to the fifth fastening hole 44 of the horizontal support 40 is drilled, and the upper portion of the upright flange 51 extends by H-shaped cross section by a predetermined height and The fixed jacket for bridge inspection, characterized in that consisting of a railing part 50 in which a pipe hole 53 for fastening pipes at predetermined intervals is drilled thereunder. 삭제delete 삭제delete
KR1020050094960A 2005-10-10 2005-10-10 Fixing jacket for checking bridge KR100595019B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050094960A KR100595019B1 (en) 2005-10-10 2005-10-10 Fixing jacket for checking bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050094960A KR100595019B1 (en) 2005-10-10 2005-10-10 Fixing jacket for checking bridge

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020050028868U Division KR200405650Y1 (en) 2005-10-10 2005-10-10 fixing jacket for checking bridge

Publications (1)

Publication Number Publication Date
KR100595019B1 true KR100595019B1 (en) 2006-07-04

Family

ID=37183434

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050094960A KR100595019B1 (en) 2005-10-10 2005-10-10 Fixing jacket for checking bridge

Country Status (1)

Country Link
KR (1) KR100595019B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100779059B1 (en) 2006-12-21 2007-11-27 김원주 Check equipment for bridge of a deferred type and construction method thereof
KR200450033Y1 (en) 2010-04-28 2010-08-31 주식회사 제현산업 Frame for Fixed Bridge Inspection Facility
KR200451716Y1 (en) 2010-04-22 2011-01-07 김동수 Pedestrian Railings Fixed on Brackets of Bridge Bridges
KR102470452B1 (en) * 2022-02-04 2022-11-25 베스트플랜에이 주식회사 Temporary Structure for Bridge Inspection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100779059B1 (en) 2006-12-21 2007-11-27 김원주 Check equipment for bridge of a deferred type and construction method thereof
KR200451716Y1 (en) 2010-04-22 2011-01-07 김동수 Pedestrian Railings Fixed on Brackets of Bridge Bridges
KR200450033Y1 (en) 2010-04-28 2010-08-31 주식회사 제현산업 Frame for Fixed Bridge Inspection Facility
KR102470452B1 (en) * 2022-02-04 2022-11-25 베스트플랜에이 주식회사 Temporary Structure for Bridge Inspection

Similar Documents

Publication Publication Date Title
KR100779059B1 (en) Check equipment for bridge of a deferred type and construction method thereof
US6266938B1 (en) Steel floor structure
KR101383814B1 (en) Pretension reinforcement apparatus for masonry wall and reinforcement method for masonry wall using that
US20070289230A1 (en) Bracing For Shear Wall Construction
KR100595019B1 (en) Fixing jacket for checking bridge
JP6383891B1 (en) Wall forming panels, wall structures, and buildings
JP6846098B2 (en) Beam frame mounting structure, beam frame receiving member and beam frame passing member used for this
KR101387296B1 (en) Rail hanger type passage for inspection and maintenance of bridge
KR101775645B1 (en) Bridge inspection passage
KR200405650Y1 (en) fixing jacket for checking bridge
KR200409977Y1 (en) Hanger way bridge checking supporter
KR101390990B1 (en) Pretension reinforcement apparatus for masonry wall and reinforcement method for masonry wall using that
JP3814607B2 (en) Connecting structure of pillars and foundations of wooden buildings and assembling method of pillars and foundations of wooden buildings
JP3866256B2 (en) Reinforcement structure and construction method of existing houses and corner hardware used for this
KR100526996B1 (en) Fabricated inspecting support of bridge using steel bar and installing method thereof
JP2006241938A (en) Interconnecting metal fitting of column of balloon framing and beam and framework structural body of wooden building
JP2006214268A (en) Method of connecting foundation members, columns or beams in a wooden building
KR102071825B1 (en) Precast concrete staircase frame construction method of core type
KR20060016371A (en) Bridge inspection equipment fixed by laid nut
JP6464459B2 (en) Column base bracket, building unit including column base bracket, and installation method thereof
JPH0447300Y2 (en)
JP5687919B2 (en) Assembly building and construction method of assembly building
KR20080006638U (en) Bracket for roof structure
JP6434187B1 (en) Wall forming panels, wall structures, and buildings
JP3064764U (en) Reinforcement structure for foundations of wooden buildings and metal fittings

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J204 Invalidation trial for patent
J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20130515

Effective date: 20140227

FPAY Annual fee payment

Payment date: 20140609

Year of fee payment: 9

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20140326

Effective date: 20141017

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20141110

Effective date: 20141128