KR20050102793A - Construction-material lift being installed at the outside of the construction-structure - Google Patents

Construction-material lift being installed at the outside of the construction-structure Download PDF

Info

Publication number
KR20050102793A
KR20050102793A KR1020040028061A KR20040028061A KR20050102793A KR 20050102793 A KR20050102793 A KR 20050102793A KR 1020040028061 A KR1020040028061 A KR 1020040028061A KR 20040028061 A KR20040028061 A KR 20040028061A KR 20050102793 A KR20050102793 A KR 20050102793A
Authority
KR
South Korea
Prior art keywords
building
lifting
lifting box
guide
building material
Prior art date
Application number
KR1020040028061A
Other languages
Korean (ko)
Other versions
KR100583785B1 (en
Inventor
홍영근
Original Assignee
금강공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 금강공업 주식회사 filed Critical 금강공업 주식회사
Priority to KR1020040028061A priority Critical patent/KR100583785B1/en
Publication of KR20050102793A publication Critical patent/KR20050102793A/en
Application granted granted Critical
Publication of KR100583785B1 publication Critical patent/KR100583785B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • E04B1/7023Drying or keeping dry, e.g. by air vents by collecting water in basements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

본 발명은, 크레인에 의해 전체적으로 인양가능하며, 건축물의 외벽에 가설되어 건축자재(m)의 층간 운반에 이용되는 건축자재 인양장치(1)에 관한 것으로서, 하단의 고정부(11)가 건축물의 발코니에 분리가능하게 고정된 채 건축물의 외측에서 수직으로 가설되는 가설대(10)와; 상기 가설대(10)의 수평 지지대(14)에 일단이 고정 지지된 채 상기 건축물의 각 층을 가로질러 수직으로 부설된 가이드수단(20)과; 상기 가이드 수단(20)을 따라 상하로 슬라이딩 가능하게 설치되는 인양박스(30)와; 상기 가이드 수단(20)의 위쪽에 마련된 채 상기 인양박스(30)를 상하로 인양하는 윈치수단(40)을 포함하는 것을 특징으로 한다.The present invention relates to a building material lifting device (1) which can be lifted by a crane as a whole, and which is installed on an outer wall of a building and used for interlayer transport of building materials (m), wherein the lower fixing part (11) of the building A temporary stand 10 installed vertically on the outside of the building while being detachably fixed to the balcony; Guide means (20) vertically laid across each floor of the building, with one end fixedly supported by a horizontal support (14) of the temporary platform (10); A lifting box 30 installed to be slidable up and down along the guide means 20; It is characterized in that it comprises a winch means 40 for lifting the lifting box 30 up and down while being provided above the guide means 20.

Description

건축물의 외측에 가설되는 건축자재 인양장치{CONSTRUCTION-MATERIAL LIFT BEING INSTALLED AT THE OUTSIDE OF THE CONSTRUCTION-STRUCTURE} Construction material lifting device installed on the outside of the building {CONSTRUCTION-MATERIAL LIFT BEING INSTALLED AT THE OUTSIDE OF THE CONSTRUCTION-STRUCTURE}

본 발명은 건축자재 인양장치에 관한 것으로서, 보다 상세하게는, 고층 아파트 또는 다층의 건축구조물의 시공시에, 크레인 등에 의해 전체적으로 상층으로 인양될 수 있으며, 건축물의 외측 발코니에 가설되어 거푸집 등의 건축자재를 임의의 층에서 다른 층으로 인양하는데 이용되는 건축자재 인양장치에 관한 것이다.The present invention relates to a building material lifting device, and more particularly, in the construction of a high-rise apartment or multi-storey building structure, it can be lifted to the upper floor as a whole by a crane or the like, and is installed on the outer balcony of the building to form a formwork A building material lifting device used to lift a material from one floor to another.

널리 알려진 바와 같이, 다층의 건축물은 거푸집 등의 건축자재를 이용하여 한 층을 형성시키고, 그 층 위에 다른 층들을 연속적으로 형성시킴으로써 건조된다.As is well known, a multi-layered building is dried by forming a layer using building materials such as formwork and successively forming other layers on the layer.

흔히, 건축자재를 상층으로 운반하는 공정은 각 층의 슬라브 형성시에 공동부를 미리 형성시키고 그 공동부를 통해 작업자들이 인력을 이용하여 직접 건축자재를 상층으로 옮긴 후 그 공동부를 다시 콘크리트로 타설하여 메우는 과정을 통해 이루어져 왔다.Frequently, the process of transporting building materials to the upper floor is to pre-form cavities at the time of slab formation in each floor, and workers directly move the building materials to the upper floor by using manpower to fill the cavities with concrete again. It has been through the process.

이러한 공정은 번거롭고 복잡할 뿐 아니라 건축자재의 낙하에 의한 안전사고와 낙하된 건축자재의 손상 및 이에 따른 경비 증가를 야기한다.Such a process is not only cumbersome and complicated, but also causes safety accidents caused by the falling of building materials, damage to the falling building materials, and an increase in expenses.

이와 달리, 종래에는 크레인으로 건축자재를 상층으로 인양하여 사용하기도 하는데, 이는 짧은 층간 거리의 건축자재 운반에 크레인을 매번 이용한다는 점에서 시공의 지연을 야기하며 매우 비효율적이다는 문제점을 야기하였다.On the other hand, conventionally, a crane is used to lift a building material to an upper floor, which causes a delay in construction and is very inefficient in that the crane is used to transport building materials with a short distance between floors.

이에 대해, 본 발명자는 건축물의 층간 운반에 이용되도록 가설되어질 수 있고 크레인 등에 의해 전체적으로 인양되어질 수 있는 건축자재 인양장치를 개발하게 되었다.In this regard, the present inventors have developed a building material lifting device that can be hypothesized to be used for interlayer transportation of buildings and can be lifted entirely by a crane or the like.

따라서, 본 발명의 목적은 건축물의 외측 발코니에 가설되는 가설대와 그 가설대 상에서 거푸집 등 건축자재를 인양하는 수단을 포함하며, 정해진 구간에서의 건축자재의 인양 작업이 끝난 후 크레인 등에 의해 인양되어 다른 높이에서 건축자재의 인양에 이용되는 건축자재 인양장치를 제공하는 것이다.Accordingly, an object of the present invention includes a temporary platform which is installed on an outer balcony of a building and a means for lifting a building material such as formwork on the temporary platform, and is lifted by a crane or the like after the lifting of the building material in a predetermined section is completed. To provide a building material lifting device used to lift the building material at different heights.

상술한 목적을 달성하기 위해, 본 발명은, 크레인에 의해 전체적으로 인양가능하며 건축물의 외벽에 가설되어 건축자재의 층간 운반에 이용되는 건축자재 인양장치를 제공하며, 이 인양장치는, 하단의 고정부가 건축물의 발코니에 분리가능하게 고정된 채 건축물의 외측에서 수직으로 가설되는 가설대와; 상기 가설대의 수평 지지대에 일단이 고정 지지된 채 상기 건축물의 각 층을 가로질러 수직으로 부설된 가이드수단과; 상기 가이드 수단을 따라 상하로 슬라이딩 가능하게 설치되는 인양박스와; 상기 가이드 수단의 위쪽에 마련된 채 상기 인양박스를 상하로 인양하는 윈치수단을 포함하는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a building material lifting device which can be lifted by a crane as a whole and is installed on the outer wall of a building and used for interlayer transport of building materials, and the lifting device includes A hypothesis that is vertically installed from the outside of the building while being detachably fixed to the balcony of the building; Guide means disposed vertically across each floor of the building, with one end fixedly supported on the horizontal support of the temporary frame; A lifting box installed to be slidable up and down along the guide means; It is characterized in that it comprises a winch means for lifting the lifting box up and down provided on the guide means.

여기에서, 상기 가설대는, 미리 형성된 한 층의 발코니에 고정되는 고정부와, 그 고정부로부터 수직으로 상향 연장된 한 쌍의 나란한 수직 지지대와, 그 수직 지지대로부터 전방으로 연장 형성된 복수의 수평 지지대를 구비하며, 상기 가이드 수단은 상기 가설대의 수평 지지대 양측에 걸쳐 고정될 수 있는 수평의 베이스부와, 그 베이스부로부터 수직으로 상향 연장된 가이드부를 구비하되, 상기 가이드부가 서로 나란하게 형성된 한 쌍의 수직부재로 이루어진 가이드레일과 그 가이드레일을 보강하기 위한 복수의 수평 보강부를 구비하고 있으며, 그 상단에는 윈치 설치대가 수평되게 마련되어 상기 윈치수단의 부설을 허용하는 것이 바람직하다.Here, the hypothesis is a fixed part fixed to a balcony of a pre-formed floor, a pair of side-by-side vertical support extending vertically upward from the fixing portion, and a plurality of horizontal support extending forward from the vertical support The guide means includes a horizontal base part which can be fixed across both sides of the horizontal support of the temporary mount, and a guide part extending vertically upwardly from the base part, wherein the guide part is formed in parallel with each other. A guide rail made of a member and a plurality of horizontal reinforcement parts for reinforcing the guide rail are provided, and at the upper end thereof, a winch mount is horizontally provided to allow the installation of the winch means.

또한, 상기 인양박스는, 상기 가이드레일을 사이에 두고 그 가이드레일과 접해 롤링되는 2세트의 롤러를 좌, 우 양측에 구비하는 한편, 발코니 측을 향해 힌지식으로 개방되는 도어를 구비하여 그 도어가 개방되었을 때 작업자가 건축자재를 그 인양박스 내로 적재할 수 있게 해주며, 그 인양박스의 상단에는 윈치수단의 인양로프에 연결되는 걸고리가 마련되어 상기의 인양박스가 윈치수단의 구동에 따라 상하로 승강되게 하는 것이 바람직하다.In addition, the lifting box is provided with two sets of rollers which are rolled in contact with the guide rails on both the left and right sides with the guide rails interposed therebetween, and have doors that are hingedly opened toward the balcony side. Is opened, the operator can load the building materials into the lifting box, and at the top of the lifting box, a hook is connected to the lifting rope of the winch means so that the lifting box is moved up and down by driving the winch means. It is preferable to make it elevate.

<실시예><Example>

이하에서는 첨부된 도면을 참조로 하여 본 발명의 바람직한 실시예를 구체적으로 설명하고자 한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.

도 1은 본 발명의 일 실시예에 따른 건축자재 인양장치를 부분적으로 도시한 사시도이고 도 2는 도 1 인양장치를 발코니에 고정된 가설 상태로 도시한 측면도이고, 도 3은 도 1 및 도 2 인양장치의 평면도이다. 1 is a perspective view partially showing a building material lifting device according to an embodiment of the present invention, Figure 2 is a side view showing a lifting device fixed to the balcony in Figure 1, Figure 3 and Figures 1 and 2 Top view of the lifting device.

도 1 내지 도 3에 도시된 바와 같이, 본 실시예의 건축자재 인양장치(1)는 크게 가설대(10), 가이드 수단(20), 인양박스(30), 그리고 윈치수단(40)을 포함한다.As shown in Figures 1 to 3, the building material lifting device 1 of the present embodiment includes a temporary stand 10, guide means 20, lifting box 30, and winch means 40. .

이하 상세히 설명되는 바와 같이, 상기의 인양장치(1)는 건축물의 소정 높이 구간에 가설되어 건축자재(m)의 층간 운반 기능을 수행하며, 그 후, 작업자에 의해 해체된 채 크레인(미도시됨)에 의해 인양되어 상기 건축물의 다른 높이 구간에서 건축자재(m)의 운반 기능을 다시 수행한다.As will be described in detail below, the lifting device 1 is installed in a predetermined height section of the building to perform the interlayer conveying function of the building material (m), and then dismantled by a worker (not shown) Lifted by) to perform the transport function of the building material (m) at different height intervals of the building.

가설대(10)는, 미리 형성된 한 층의 발코니에 분리해체식 앵커(미도시됨)로 고정되는 고정부(11)와, 그 고정부(11)로부터 수직으로 상향 연장된 한 쌍의 나란한 수직 지지대(12a, 12b)와, 그 수직 지지대(12a, 12b)로부터 전방으로 연장 형성된 복수의 수평 지지대(14)를 구비한다.The hypothesis 10 includes a fixing part 11 fixed to a detached anchor (not shown) on a balcony of a pre-formed floor, and a pair of side by side vertically extending vertically from the fixing part 11. Supports 12a and 12b and a plurality of horizontal supports 14 extending forward from the vertical supports 12a and 12b are provided.

따라서, 상기의 가설대(10)는 고정부(11)가 발코니(b)에 고정되고 수직 지지대(12a, 12b)가 수직으로 상향 연장되는 것에 의해 건축물의 외벽과 나란하게 그리고 건축물의 각 층을 가로지르도록 가설된다.Accordingly, the hypothesis 10 is arranged in parallel with the outer wall of the building and each floor of the building by the fixing portion 11 is fixed to the balcony (b) and the vertical support (12a, 12b) extends vertically upward. It is hypothesized to traverse.

또한, 상기 가설대(10)의 수평 지지대(14)는 수직 지지대(12a, 12b)와 나란한 수직의 보강대(15)와 함께 예를 들면, 작업용 발판 또는 갱폼(미도시됨) 등의 가설을 가능하게 해주는 역할을 수행하는데, 이는 국내 실용신안 등록 제 219475호에 잘 개시되어 있다.In addition, the horizontal support 14 of the temporary support 10 together with the vertical reinforcement support 15 parallel to the vertical support (12a, 12b), for example, work scaffolding or gangform (not shown), etc. It is well described in the Korean Utility Model Registration No. 219475.

이 때, 상기의 가설대(10)에는 이하 설명될 인양박스(30)의 승강을 가능하게 하는 가이드 수단(20)이 부설되는데, 이 가이드 수단(20)은, 도 2에 가장 잘 도시된 바와 같이, 상기 가설대(10)의 수평 지지대(14) 양측에 걸쳐 고정될 수 있는 수평의 베이스부(22)와, 그 베이스부(22)로부터 수직으로 상향 연장된 가이드부(24)를 포함하고 있다.At this time, the temporary means 10 is provided with a guide means 20 to enable the lifting of the lifting box 30 to be described below, the guide means 20, as best shown in FIG. Likewise, it includes a horizontal base portion 22 which can be fixed across both sides of the horizontal support 14 of the temporary support 10, and a guide portion 24 extending vertically upward from the base portion 22, have.

가이드부(24)는 서로 나란하게 형성된 한 쌍의 수직부재로 이루어진 가이드레일(24a, 24b)과 그 가이드레일(24a, 24b)을 보강하기 위한 복수의 수평 보강부(25)를 구비하고 있으며, 그 상단에는 윈치 설치대(26)가 수평되게 마련되어 이하 기술될 윈치수단(40)의 부설을 허용한다.The guide portion 24 includes guide rails 24a and 24b formed of a pair of vertical members formed in parallel with each other, and a plurality of horizontal reinforcement portions 25 for reinforcing the guide rails 24a and 24b. The winch mount 26 is horizontally provided at the top thereof to allow the installation of the winch means 40 to be described below.

앞서 간략히 언급된 바와 같이, 가이드부(24)는 인양박스(30)가 상하로 슬라이딩 가능하게 설치되는 것을 허용하는데, 본 실시예에서는, 인양박스(30)가 환봉형의 가이드레일(24a, 24b; 도 3에 가장 잘 도시됨)을 사이에 두고 그 가이드레일(24a, 24b)과 접해 롤링되는 2세트의 롤러(31a, 31b 및 32a, 32b)를 좌, 우 양측에 구비함으로써 구현된다.As briefly mentioned above, the guide portion 24 allows the lifting box 30 to be installed to be slidable up and down. In this embodiment, the lifting box 30 is a round bar guide rail 24a, 24b. It is realized by having two sets of rollers 31a, 31b and 32a, 32b rolled in contact with the guide rails 24a, 24b with the two sides shown best in FIG. 3).

여기에서, 상기의 인양박스(30)는 발코니 측을 향해 힌지식으로 개방되는 도어(32)를 구비하여 그 도어(32)가 개방되었을 때 작업자가 건축자재를 그 인양박스(30) 내로 적재할 수 있게 해주며, 그 인양박스(30)의 상단에는 윈치수단(40)의 인양로프(46)에 연결되는 걸고리(34)가 마련되어 상기의 인양박스(30)가 윈치수단(40)의 구동에 따라 상하로 승강될 수 있게 해준다.Here, the lifting box 30 has a door 32 that is hingedly open toward the balcony side so that when the door 32 is opened, the worker can load the building materials into the lifting box 30. And the upper end of the lifting box 30 is provided with a hook 34 connected to the lifting rope 46 of the winch means 40 is the lifting box 30 to the drive of the winch means 40 It can be lifted up and down accordingly.

한편, 상기의 윈치수단(40)은 모터 구동에 따라 상하로 당겨지는 인양로프(46)를 구비하는 윈치(42)와 그 윈치(42)를 보호하는 윈치보호박스(44)를 구비하고 있으며, 상기 인양로프(46)는 그 선단에 인양박스(30)의 걸고리(34)에 선택적으로 걸리는 후크를 구비하는 것이 바람직하다. 이 때, 본 실시예의 인양로프(46)는 가이드 수단(20)에 설치된 와이어 유지롤(28)에 슬라이딩 가능하게 유지된다.On the other hand, the winch means 40 is provided with a winch 42 having a lifting rope 46 is pulled up and down in accordance with the motor drive and the winch protection box 44 to protect the winch 42, The lifting rope 46 is preferably provided with a hook that is selectively hooked to the hook 34 of the lifting box 30 at its tip. At this time, the lifting rope 46 of the present embodiment is slidably held by the wire holding roll 28 provided on the guide means 20.

도 4에는 도 1 내지 도 3 인양장치를 이용해 건축자재(m)를 인양하는 과정이 상세히 도시되어 있다.Figure 4 shows in detail the process of lifting the building material (m) using the lifting device of Figures 1-3.

도 4에 도시된 바와 같이, 건축물의 정해진 한 층에서 도어(32)가 개방된 후 발코니(b)로부터 인양박스(30) 내로 건축자재가 적재되고, 그 후, 도어(32)가 닫힌 후, 상기 인양박스(30)는 윈치수단(40)의 작동을 통해 다른 층으로 상승하게 된다. 그 후, 도어(32)가 열리고 작업자는 그 인양박스(30)로부터 건축자재를 발코니(b) 쪽으로 운반한다.As shown in FIG. 4, after the door 32 is opened on a predetermined floor of the building, the building material is loaded into the lifting box 30 from the balcony b, and after the door 32 is closed, The lifting box 30 rises to another layer through the operation of the winch means 40. Thereafter, the door 32 is opened and the worker carries building materials from the lifting box 30 toward the balcony b.

위와 같은 과정을 거친 후, 상기의 인양장치는 앵커의 해체에 의해 발코니(b)로부터 분리될 수 있으며, 분리 후, 크레인 등에 의해 건축물의 다른 높이 구간으로 인양된 후 다른 발코니에 고정 가설되어 건축자재의 인양을 다시 수행하게 된다.After the above process, the lifting device can be separated from the balcony (b) by the dismantling of the anchor, and after separation, the lifting device is lifted to another height section of the building by a crane, etc., and then fixedly installed on another balcony and building materials The salvage of will be performed again.

본 발명은, 정해진 구간에서 승강되는 인양박스로써 건축자재를 인양할 수 있도록 구성되어, 크레인만으로 건축자재를 인양하던 종래의 기술에 시공의 지연 및 비효율성과 같은 문제점을 해소하며, 통상의 건축시공시 갱폼 또는 안전난간 등의 가설물 설치를 위해 필요한 가설대를 이용하므로 경제적으로도 매우 저렴하다는 효과를 갖는다.The present invention is configured to lift a building material as a lifting box to be lifted in a predetermined section, to solve the problems such as delay and inefficiency of the construction in the conventional technology of lifting the building material only with a crane, and during normal construction It is economically very inexpensive because it uses the temporary platform needed for the installation of gangforms or safety railings.

도 1은 본 발명에 따른 건축자재 인양장치의 일부를 예시한 사시도.1 is a perspective view illustrating a part of a building material lifting device according to the present invention.

도 2는 도 1 건축자재 인양장치를 전체적으로 예시한 측면도.Figure 2 is a side view as a whole illustrating the building material lifting device of Figure 1;

도 3은 도 1 및 도 2 인양장치의 가이드수단과 인양박스의 상호 연결관계를 보이기 위해 그 인양장치의 위쪽에서 도시된 도면.Figure 3 is a view from above of the lifting device to show the interconnection of the lifting means and the guide means of the lifting device of Figures 1 and 2.

도 4는 도 1 및 도 3 인양장치로 건축자재를 운반하는 과정을 예시한 도면.4 is a view illustrating a process of transporting building materials to the lifting device of FIGS.

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

10: 가설대 14: 수평 지지대10: hypothesis 14: horizontal support

20: 가이드 수단 22: 베이스부20: guide means 22: base portion

24: 가이드부 26: 윈치 지지대24: guide portion 26: winch support

30: 인양박스 32: 도어30: lifting box 32: door

40: 윈치수단 46: 인양로프40: winch means 46: lifting rope

Claims (3)

크레인에 의해 전체적으로 인양가능하며, 건축물의 외벽에 가설되어 건축자재(m)의 층간 운반에 이용되는 건축자재 인양장치(1)로서,As a building material lifting device (1), which can be lifted by a crane as a whole, and is installed on the outer wall of a building and used for interlayer transportation of building materials (m), 하단의 고정부(11)가 건축물의 발코니에 분리가능하게 고정된 채 건축물의 외측에서 수직으로 가설되는 가설대(10)와;A hypothesis 10 that is fixed vertically on the outside of the building while being fixed detachably to the balcony of the building; 상기 가설대(10)의 수평 지지대(14)에 일단이 고정 지지된 채 상기 건축물의 각 층을 가로질러 수직으로 부설된 가이드수단(20)과;Guide means (20) vertically laid across each floor of the building, with one end fixedly supported by a horizontal support (14) of the temporary platform (10); 상기 가이드 수단(20)을 따라 상하로 슬라이딩 가능하게 설치되는 인양박스(30)와; A lifting box 30 installed to be slidable up and down along the guide means 20; 상기 가이드 수단(20)의 위쪽에 마련된 채 상기 인양박스(30)를 상하로 인양하는 윈치수단(40)을 포함하는 것을 특징으로 하는 건축물의 외측에 가설되는 건축자재 인양장치.Building material lifting device which is installed on the outside of the building, characterized in that it comprises a winch means for lifting the lifting box 30 up and down provided on the guide means (20). 제 1항에 있어서,The method of claim 1, 상기 가설대(10)는, 미리 형성된 한 층의 발코니에 고정되는 고정부(11)와, 그 고정부(11)로부터 수직으로 상향 연장된 한 쌍의 나란한 수직 지지대(12a, 12b)와, 그 수직 지지대(12a, 12b)로부터 전방으로 연장 형성된 복수의 수평 지지대(14)를 구비하며,The temporary stand 10 includes a fixed part 11 fixed to a balcony of a pre-formed floor, a pair of side-by-side vertical supports 12a and 12b extending vertically upward from the fixed part 11, and A plurality of horizontal supports 14 extending forward from the vertical supports 12a, 12b, 상기 가이드 수단(20)은 상기 가설대(10)의 수평 지지대(14) 양측에 걸쳐 고정될 수 있는 수평의 베이스부(22)와, 그 베이스부(22)로부터 수직으로 상향 연장된 가이드부(24)를 구비하되, 상기 가이드부(24)가 서로 나란하게 형성된 한 쌍의 수직부재로 이루어진 가이드레일(24a, 24b)과 그 가이드레일(24a, 24b)을 보강하기 위한 복수의 수평 보강부(25)를 구비하고 있으며, 그 상단에는 윈치 설치대(26)가 수평되게 마련되어 상기 윈치수단(40)의 부설을 허용하는 것을 특징으로 하는 건축물의 외측에 가설되는 건축자재 인양장치.The guide means 20 is a horizontal base portion 22 that can be fixed across both sides of the horizontal support 14 of the temporary table 10, and a guide portion (uprightly extending from the base portion 22 vertically) 24 and a plurality of horizontal reinforcing parts for reinforcing the guide rails 24a and 24b and the guide rails 24a and 24b formed of a pair of vertical members formed in parallel with each other. 25), the building material lifting device which is installed on the outside of the building, characterized in that the winch mounting stand 26 is provided at the upper end to allow the installation of the winch means (40). 제 2항에 있어서,The method of claim 2, 상기 인양박스(30)는, 상기 가이드레일(24a, 24b)을 사이에 두고 그 가이드레일(24a, 24b)과 접해 롤링되는 2세트의 롤러(31a, 31b 및 32a, 32b)를 좌, 우 양측에 구비하는 한편, 발코니 측을 향해 힌지식으로 개방되는 도어(32)를 구비하여 그 도어(32)가 개방되었을 때 작업자가 건축자재를 그 인양박스(30) 내로 적재할 수 있게 해주며, The lifting box 30 has left and right sides of two sets of rollers 31a, 31b and 32a, 32b rolled in contact with the guide rails 24a and 24b with the guide rails 24a and 24b interposed therebetween. And a door 32 that is hingedly open toward the balcony side to allow the worker to load the building material into the lifting box 30 when the door 32 is opened, 그 인양박스(30)의 상단에는 윈치수단(40)의 인양로프(46)에 연결되는 걸고리(34)가 마련되어 상기의 인양박스(30)가 윈치수단(40)의 구동에 따라 상하로 승강되게 하는 것을 특징으로 하는 건축물의 외측에 가설되는 건축자재 인양장치.A hook 34 connected to the lifting rope 46 of the winch means 40 is provided at an upper end of the lifting box 30 so that the above lifting box 30 can be lifted up and down by driving the winch means 40. Building material lifting device is installed on the outside of the building, characterized in that.
KR1020040028061A 2004-04-23 2004-04-23 Construction-material lift being installed at the outside of the construction-structure KR100583785B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040028061A KR100583785B1 (en) 2004-04-23 2004-04-23 Construction-material lift being installed at the outside of the construction-structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040028061A KR100583785B1 (en) 2004-04-23 2004-04-23 Construction-material lift being installed at the outside of the construction-structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0011299U Division KR200356598Y1 (en) 2004-04-23 2004-04-23 Construction-material lift being installed at the outside of the construction-structure

Publications (2)

Publication Number Publication Date
KR20050102793A true KR20050102793A (en) 2005-10-27
KR100583785B1 KR100583785B1 (en) 2006-06-01

Family

ID=37280880

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040028061A KR100583785B1 (en) 2004-04-23 2004-04-23 Construction-material lift being installed at the outside of the construction-structure

Country Status (1)

Country Link
KR (1) KR100583785B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101030795B1 (en) * 2008-03-27 2011-04-27 주식회사 콘솔에스더블유씨 Salvare unit with constructing care
CN109577658A (en) * 2018-12-06 2019-04-05 林旭清 Building materials transport device used in a kind of construction
CN110817729A (en) * 2019-11-20 2020-02-21 廖强 Convenient building material feeding unit who removes
CN112412064A (en) * 2020-12-12 2021-02-26 秦金垒 Multilayer synchronous construction material transportation platform
KR102279571B1 (en) 2020-03-27 2021-07-20 김대형 A temporary lifting structure for construction work
CN113620131A (en) * 2021-08-13 2021-11-09 中国建筑第七工程局有限公司 Prefabricated component hoisting platform control system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101523755B1 (en) * 2013-09-03 2015-05-28 주식회사 포스코 Apparatus for transferring scale
CN109577657B (en) * 2018-11-21 2020-10-27 义乌市研创工业设计有限公司 Brick conveying frame for wall building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101030795B1 (en) * 2008-03-27 2011-04-27 주식회사 콘솔에스더블유씨 Salvare unit with constructing care
CN109577658A (en) * 2018-12-06 2019-04-05 林旭清 Building materials transport device used in a kind of construction
CN109577658B (en) * 2018-12-06 2021-04-13 天长市天建建筑工程有限责任公司 Building materials conveyer that uses in construction
CN110817729A (en) * 2019-11-20 2020-02-21 廖强 Convenient building material feeding unit who removes
CN110817729B (en) * 2019-11-20 2021-06-15 安徽长灵建设工程有限公司 Convenient building material feeding unit who removes
KR102279571B1 (en) 2020-03-27 2021-07-20 김대형 A temporary lifting structure for construction work
CN112412064A (en) * 2020-12-12 2021-02-26 秦金垒 Multilayer synchronous construction material transportation platform
CN113620131A (en) * 2021-08-13 2021-11-09 中国建筑第七工程局有限公司 Prefabricated component hoisting platform control system

Also Published As

Publication number Publication date
KR100583785B1 (en) 2006-06-01

Similar Documents

Publication Publication Date Title
KR20120009429A (en) Construction system and method for multi-floor buildings
US11098490B2 (en) Self-lifting concrete form with platform adapted to accommodate horizontal reinforcing steel
KR100583785B1 (en) Construction-material lift being installed at the outside of the construction-structure
US20030136611A1 (en) Installing frame for installation of shaft equipment, installing elevator with installing frame and method of installation of shaft equipment
JP4092346B2 (en) Construction method and dismantling method of scaffold for high-rise building
KR101364198B1 (en) Variable scaffold for vuilding outer wall construction
KR102214564B1 (en) Non-scaffold work plate mounting method for end part working
KR200356598Y1 (en) Construction-material lift being installed at the outside of the construction-structure
CN209568688U (en) A kind of elevating construction platform
JP2014047479A (en) Method for lifting demolishing heavy machine to building to be demolished
JPH11159128A (en) Multi-purpose stage for construction of building frame body
JP2019112218A (en) Mobile elevation type scaffold with lifting device for people and cargoes, construction method using the same, and installation method thereof
JP4108076B2 (en) Construction method and dismantling method of scaffold for high-rise building
JP4841171B2 (en) Rise-up elevator installation method
JP3920527B2 (en) Elevator for construction
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
KR100925806B1 (en) Construction method of window in parallel with framework
CN205531262U (en) Steel construction construction platform can rise automatically
KR101105255B1 (en) Construction materials lifting system device using guide rail
JP2004143677A (en) Carrying in/out device of construction machine and material
CN217732381U (en) Elevator shaft with lifting platform
JPH09296610A (en) Outside curing unit
KR101031313B1 (en) The construction workbench for an elevator infrastructure establishment
KR200267717Y1 (en) Lifter for construction of a pier
JP3560000B2 (en) Vertical shaft moving center

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120328

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130410

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160329

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180329

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190327

Year of fee payment: 14