KR101031313B1 - The construction workbench for an elevator infrastructure establishment - Google Patents
The construction workbench for an elevator infrastructure establishment Download PDFInfo
- Publication number
- KR101031313B1 KR101031313B1 KR1020080098110A KR20080098110A KR101031313B1 KR 101031313 B1 KR101031313 B1 KR 101031313B1 KR 1020080098110 A KR1020080098110 A KR 1020080098110A KR 20080098110 A KR20080098110 A KR 20080098110A KR 101031313 B1 KR101031313 B1 KR 101031313B1
- Authority
- KR
- South Korea
- Prior art keywords
- elevator
- coupled
- unit
- frame
- temporary
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
본 발명은 엘리베이터 구조물 설치를 위한 가설 작업대에 관한 것이다.The present invention relates to a temporary work table for installing an elevator structure.
이를 위하여, 본 발명은 엘리베이터 피트의 상부에 ACS폼의 마루판 지지대가 설치되어지고, 상기 마루판 지지대에 가설작업대가 설치된 엘리베이터 구조물 설치를 위한 가설 작업대에 있어서, 상기 가설 작업대는 사각 모서리 형태로 수직되게 배열된 각각의 프레임 상단에 제1관통홈이 형성되어지고, 상기 프레임 상단에 대응되는 마루판 지지대에 제2관통홈을 형성하여 상기 제1관통홈과 제2관통홈이 볼트로 결합되어지고, 상기 볼트에 의하여 결합된 각각의 프레임에 단위작업부가 결합되어지되, 상기 단위작업부는 각각의 프레임에 바닥판의 모서리가 용접 이음되어지며, 상기 바닥판의 가장자리에 안전벽체가 둘려쳐지도록 결합됨을 특징으로 한다.To this end, the present invention is installed on the floor plate support of the ACS foam on the upper part of the elevator pit, the temporary work table for the installation of the elevator structure is installed on the floor plate support, the temporary work platform is arranged vertically in the shape of a square corner. A first through hole is formed at each of the upper ends of the frames, and a second through hole is formed in the floor supporter corresponding to the upper end of the frame, so that the first through hole and the second through hole are coupled by bolts, and the bolt The unit work unit is coupled to each frame coupled by the unit work unit, the edge of the bottom plate is welded and jointed to each frame, characterized in that coupled to the safety wall is surrounded by the edge of the bottom plate .
가설작업대, 엘리베이터 피트, 프레임, 관통홈, 단위작업부, ACS폼 Temporary Workbench, Elevator Feet, Frame, Through Groove, Unit Work Part, ACS Foam
Description
본 발명은 엘리베이터 구조물 설치를 위한 가설 작업대에 관한 것으로서, 특히 ACS(Auto Climbing System)폼을 이용하여 시공되어지는 건축 구조물의 엘리베이터 피트에 ACS폼의 마루판을 지지하는 다수개의 마루판 지지대에 의하여 가설 작업대가 엘리베이터 피트의 내부에 결합되어진 상태에서 ACS폼과 같이 상승하도록 함으로써, 건축 구조물의 최상단층이 마무리되지 않은 상태에서 엘리베이터 피트내에 엘리베이터 설치를 위한 엘리베이터 구조물이 건축 구조물의 높이에 거의 일치된 상태로 진행되어지도록 하여 공기를 단축시킬 수 있도록 하고, 아울러 엘리베이터 피트의 내부로 작업자 등이 추락하는 사고를 사전에 방지할 수 있도록 한 것이다.The present invention relates to a temporary workbench for installing an elevator structure, and in particular, the temporary workbench is supported by a plurality of floorboard supports supporting floorboards of an ACS foam on an elevator pit of a building structure that is constructed using an ACS (Auto Climbing System) foam. By ascending with the ACS foam while being coupled to the inside of the elevator pit, the elevator structure for installation of the elevator in the elevator pit is almost in line with the height of the building structure while the uppermost floor of the building structure is not finished. It is possible to shorten the air by making a loss, and also to prevent the accident of a worker or the like falling into the interior of the elevator pit in advance.
일반적으로 고층 건물의 각 층에는 사람이나 화물이 상부에서 하부로 또는 하부에서 상부로 용이하게 이동할 수 있도록 하기 위한 방안으로 균형추, 케이블 및 도르래 장치를 이용하여 전동기로 작동되어지는 엘리베이터(Elevator)가 설치되 어 있다.In general, an elevator is installed on each floor of a high-rise building to operate a motor using a balance weight, a cable, and a pulley device in order to easily move people or cargo from top to bottom or from bottom to top. It is done.
엘리베이터는 구조물의 일측 공간으로 제공되어지는 별도의 엘리베이터 피트에 설치되어지고, 엘리베이터 피트의 내벽에는 균형추 가이드 레일과 카측 가이드레일이 고정 설치되어지거나 별도의 엘리베이터 구조물에 의하여 설치되어지도록 구성되어 있다.The elevator is installed in a separate elevator pit provided as a space on one side of the structure, the counterweight guide rail and the car side guide rail is fixed to the inner wall of the elevator pit is configured to be installed by a separate elevator structure.
엘리베이터를 시공하기 위하여 엘리베이터 피트의 내부에 설치되어지는 엘리베이터 구조물은 먼저, 엘리베이터 피트의 내측 하부에서 상부를 향하여 다수개의 수직봉과 수평봉이 결합된 비계를 설치한 후 비계에 발판을 결합시켜 작업자가 발판에 올라가 외부로부터 공급된 철골바를 앵커볼트로 엘리베이터 피트에 고정 결합시켜 엘리베이터 구조물이 시공되어지게 된다.The elevator structure, which is installed inside the elevator pit for constructing an elevator, first installs a scaffold with a plurality of vertical rods and horizontal rods coupled from the inner lower part of the elevator pit to the upper side, and then combines the scaffold on the scaffold and the operator attaches to the scaffold. The elevator structure is constructed by fixing and fixing the steel bar supplied from the outside to the elevator pit with anchor bolts.
그러나 엘리베이터 피트의 내부에 다수개의 엘리베이터 구조물을 시공하기 위하여 미리 비계를 설치하는 과정에서 많은 수직봉과 수평봉이 소요되어지게 되며 이를 조립하거나 해체하는 과정이 더 소요되어짐으로써, 그 만큼의 작업시간이 지연되어지며 비용이 상승하는 문제점이 있었다.However, many vertical rods and horizontal rods are required in the process of installing scaffolding in advance to construct a plurality of elevator structures inside the elevator pit, and as the assembly or dismantling process takes more time, the work time is delayed. There was a problem of rising costs.
또한, 엘리베이터 피트의 내부에 엘리베이터 구조물 설치를 위한 비계는 저층인 건축 구조물의 경우에만 유용할 뿐 고층인 건축 구조물의 경우에는 엘리베이터 피트의 모든 부분에 비계를 설치하는데 어려움이 있었다.In addition, the scaffold for installing the elevator structure inside the elevator pit is useful only in the case of low-rise building structure, it is difficult to install the scaffold in all parts of the elevator pit.
또한, 엘리베이터 구조물의 설치가 통상 건축 구조물의 최상단층이 마무리되어진 후 진행되어지게 됨에 따라 고층 또는 초고층 건출 구조물의 경우 건축 구조물의 상단층의 작업이 마무리된 상태에서 엘리베이터의 구동 또는 작동까지 상단한 시간이 소요되는 또 다른 문제점이 있었다.In addition, as the installation of the elevator structure is usually progressed after the uppermost floor of the building structure is finished, the time when the elevator is driven or operated in the state where the work on the upper floor of the building structure is finished in the case of a high-rise or ultra-high building structure. There was another issue with this.
그리고 이러한 문제점을 해소하기 위한 방안으로 수개의 층에 별도의 작업대를 설치할 수 있으나, 이러한 경우 작업대의 설치와 해체에 따른 추가적인 시간과 비용이 더 소요되어지게 되며 간혹 작업자의 실수로 인하여 엘리베이터 피트의 내부로 추락하는 추락사고가 발생되는 또 다른 문제점이 있었다.In order to solve this problem, a separate workbench may be installed on several floors, but in this case, additional time and cost will be required due to the installation and dismantling of the workbench. There was another problem that caused the crash to fall.
본 발명은 이와 같은 문제점을 해소하기 위해 창출된 것으로서 ACS폼을 이용하여 시공되어지는 건축 구조물의 엘리베이터 피트에 ACS폼의 마루판을 지지하는 다수개의 마루판 지지대에 의하여 가설 작업대가 피트의 내부에 결합되어진 상태에서 ACS폼과 같이 상승할 수 있는 엘리베이터 구조물 설치를 위한 가설 작업대를 제공하는데 그 목적이 있다.The present invention has been created to solve the above problems, the temporary work table is coupled to the interior of the pit by a plurality of floorboard support for supporting the floorboard of the ACS foam to the elevator pit of the building structure constructed using the ACS foam The purpose is to provide a temporary work platform for the installation of elevator structures that can be raised, such as ACS foam.
본 발명은 엘리베이터 피트의 상부에 ACS폼의 마루판 지지대가 설치되어지고, 상기 마루판 지지대에 가설작업대가 설치된 엘리베이터 구조물 설치를 위한 가설 작업대(A)에 있어서, 상기 가설 작업대(A)는 사각 모서리 형태로 수직되게 배열된 각각의 프레임(100) 상단에 제1관통홈(110)이 형성되어지고, 상기 프레임(100) 상단에 대응되는 마루판 지지대(210)에 제2관통홈(211)을 형성하여 상기 제1관통 홈(110)과 제2관통홈(211)이 볼트(B)로 결합되어지고, 상기 볼트(B)에 의하여 결합된 각각의 프레임(100)에 단위작업부(120)가 결합되어지되, 상기 단위작업부(120)는 각각의 프레임(100)에 바닥판(121)의 모서리가 용접 이음되어지며, 상기 바닥판(121)의 가장자리에 안전벽체(122)가 둘려쳐지도록 결합됨을 특징으로 한다.In the present invention, a floorboard support of ACS foam is installed on an upper part of an elevator pit, and a temporary worktable (A) for installing an elevator structure in which a temporary working platform is installed on the floorboard support, wherein the temporary working platform (A) has a rectangular corner shape. A first through
본 발명은 ACS폼을 이용하여 시공되어지는 건축 구조물의 엘리베이터 피트에 ACS폼의 마루판을 지지하는 다수개의 마루판 지지대에 의하여 가설 작업대가 피트의 내부에 결합되어진 상태에서 ACS폼과 같이 상승하도록 함으로써, 건축 구조물의 최상단층이 마무리되지 않은 상태에서 엘리베이터 피트내에 엘리베이터 설치를 위한 구조물이 거의 층높이로 진행되어지도록 할 수 있는 효과를 얻을 수 있다.The present invention is to build the construction work by ascending with the ACS foam in a state in which the temporary work table is coupled to the interior of the pit by a plurality of floorboard supports supporting the floorboard of the ACS foam to the elevator pit of the building structure constructed using the ACS foam, In the state in which the uppermost floor of the structure is not finished, it is possible to obtain an effect of allowing the structure for installation of the elevator in the elevator pit to proceed almost to the height of the floor.
이를 통해 건축 구조물의 최상단층이 마무리된 후 진행되어지던 엘리베이터 구조물 설치작업이 구조물의 각층의 상승과 함께 거의 동시에 진행할 수 있도록 함으로써, 별도의 엘리베이터 구조물 설치에 소요되는 작업 공기를 단축시켜 비용을 줄일 수 있는 효과를 얻을 수 있다.Through this, the elevator structure installation work that has been carried out after finishing the top floor of the building structure can proceed almost simultaneously with the rise of each floor of the structure, thereby reducing the work air required for the installation of a separate elevator structure and reducing the cost. You can get the effect.
아울러 엘리베이터 피트의 내부로 비계 설치와 해체 및 엘리베이터 구조물을 설치하는 과정에서 작업자의 실수로 인하여 작업자가 엘리베이터 피트의 하부로추락하는 추락사고를 방지할 수 있는 효과를 더 얻을 수 있다.In addition, in the process of installing the scaffolding and dismantling and installation of the elevator structure into the interior of the elevator pit can be more effective to prevent the fall accident of the operator falls to the bottom of the elevator pit due to the operator's mistake.
본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.
도1은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 설치된 상태를 도시한 건축 구조물의 평면도이고, 도2는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 사시도이고, 도3은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 요부 사시도이고, 도4는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 지지대에 결합된 상태를 도시한 사시도이고, 도5는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 ACS폼에 결합된 상태를 도시한 평면도이고, 도6은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 측면도이고, 도7은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 엘리베이터 피트의 내부에 설치된 상태를 도시한 단면도이다.1 is a plan view of a building structure showing a state in which the installation work platform for installing an elevator structure according to the present invention, Figure 2 is a perspective view of a construction work platform for installing an elevator structure according to the invention, Figure 3 is in the present invention Fig. 4 is a perspective view illustrating a state in which a temporary work bench for installing an elevator structure according to the present invention is coupled to a support table, and FIG. 5 illustrates an elevator structure installing according to the present invention. Fig. 6 is a plan view showing the construction work platform coupled to the ACS foam, Figure 6 is a side view of the construction work platform for the installation of the elevator structure according to the invention, Figure 7 is a construction work platform for the installation of the elevator structure according to the present invention It is sectional drawing which shows the state installed in the inside of a pit.
본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대(A)는 고층인 건축 구조물을 시공하는 과정에서 사용되어지는 ACS폼(200)의 마루판 지지대(210)의 하부로 위치한 엘리베이터 피트(P)에 매달리는 형태로 결합되어져 작업자가 ACS폼(200)이 상부로 이동하기 전에 ACS폼(200)의 하부에 시공되어진 엘리베이터 피트(P)의 내벽에 엘리베이터 구조물(S)을 용이하게 설치할 수 있도록 구성되어 있다.Temporary work table (A) for installing the elevator structure according to the invention is suspended in the elevator pit (P) located under the
상기 가설 작업대(A)는 프레임(100)의 상단에 제1관통홈(110)이 형성되어지고, 상기 프레임(100)의 상단과 대응되어지는 마루판 지지대(210)에 제2관통홈(211)을 형성하여 상기 제1관통홈(110)과 제2관통홈(211)이 볼트(B)로 결합되어져 엘리베이터 피트(P)의 내부에 프레임(100)이 매달린 상태가 유지되어 ACS 폼(200)과 같이 연동되어질 수 있도록 구성되어 있다.The temporary working table A has a first through
상기 프레임(100)는 중공인 형태를 갖는 각형관이 소정 길이로 절단되어 서로 용접이음으로 사각 모서리의 형태를 가지며 수직되게 배열되어지도록 구성되어 있다. 이때 사용되어지는 각형관은 가로×세로×두께는 각각 50×50×3.2t가 되도록 하는 것이 바람직하다. 이는 이보다 더 클 경우, 가설 작업대(A)의 하중 및 크기의 증가로 인하여 이를 고정하는 ACS폼(200)에 국부적인 하중의 집중으로 인하여 안정성이 결여될 수 있고, 이보다 더 작을 경우, 가설 작업대(A)의 하중 및 크기를 줄일 수 있으나 작업공간이 협소해지게 됨에 따라 작업자가 용이하게 작업을 하지 못하는 원인으로 작용하게 된다.The
본 발명에서는 프레임(100)의 상단과 마루판 지지대(210)에 각각 제1관통홈(110)과 제2관통홈(211)을 형성하여 볼트(B)로 결합되어지도록 하였으나, 볼트(B) 결합 이외에 프레임(100)의 상단을 절곡하여 절곡된 부분이 마루판 지지대(210)에 걸쳐지도록 할 수 도 있다.In the present invention, the first through
한편, 상기 볼트(B)에 의하여 결합된 각각의 프레임(100)에는 하부로 단위작업부(120)가 결합되어지도록 구성되어지고, 상기 단위작업부(120)는 각각의 프레임(100)에 바닥판(121)의 모서리가 용접 이음되어지며 상기 바닥판(121)의 가장자리에 안전벽체(122)가 둘려쳐질 수 있도록 결합되어 있다. 이때 각각의 바닥판(121)과 안전벽체(122)는 용접이음으로 결합되어지도록 하는 것이 바람직하며, 용접이음이 용이하지 않은 경우 별도의 브라켓을 맞대어 볼트 및 너트로 착탈 분리 가능하게 할 수 도 있다.On the other hand, each of the
본 발명에서는 상기 단위작업부(120)가 프레임(100)에 단순하게 하나가 설치되어지는 형태로 설명하였으나, 이러한 상기 단위작업부(120)는 하나 이상으로 즉, 프레임(100)에 상,하로 다수가 설치되어지도록 할 수 있다.In the present invention, the
이러한 경우, 최상단에 설치된 단위작업부(120)의 바닥판(121)에 소정 크기를 갖는 개구부(123)를 형성하여 사다리(130)가 최하단의 다른 단위작업부(120)까지 수직되게 설치되어 작업자가 상부에서 하부로 또는 하부에서 상부로 사다리(130)를 이용하여 이동할 수 있도록 구성되어 있다.In this case, an opening 123 having a predetermined size is formed in the
이때 상기 개구부(123)는 개구부(123)를 관통하는 사다리(130)와 대응되는 곳에 별도의 힌지(123-1)를 구비하고, 상기 힌지(123-1)에 덮개(123-2)가 결합되어 작업자가 상부나 하부로 이동한 상태에서 덮어놓고 작업을 할 수 있도록 함으로써, 개구부(123)를 통해 하부로 작업자가 발을 잘못 디뎌 떨어지는 것을 막을 수 있도록 구성되어 있다.In this case, the
상기 안전벽체(122)는 벽체 프레임(122-1)의 내측 또는 외측에 안전망(122-2)이 결합되어지도록 함으로써, 가설 작업대(A)의 하중을 줄이면서 작업자가 가설 작업대(A)의 밖으로 추락하는 것을 막을 수 있도록 구성되어 있다.The
상기 바닥판(121)에는 상부에 다수개의 미끄럼방지 돌기(121-1)가 형성되어작업자가 바닥판(121)을 밟고 이동하거나 작업하는 과정에서 미끄러짐을 막을 수 있도록 구성되어 있다.The
상기 가설 작업대(A)를 구성하는 프레임(100)의 폭과 높이는 각각 가로×세로×높이는 2300×2300×7500으로 하되, 각각의 단위작업부(120) 사이의 간격은 2500이 되도록 하는 것이 더욱 바람직하다. 이는 거의 세개의 층 높이에 해당하는 엘리베이터 피트(P)의 내부에서 엘리베이터 구조물(S) 설치작업이 동시에 이루어질 수 있도록 함과 동시에 길이가 긴 별도의 엘리베이터 구조물(S)을 용이하게 설치할 수 있도록 하기 위함이다.Width and height of the
이러한 구성을 갖는 가설 작업대(A)는 먼저, 중공형태를 갖는 길이가 긴 각형관을 2300과 7500의 길이로 절단하여 각각 용접이음으로 결합시켜 사각박스의 테두리 형태를 갖도록 한 후 길이가 긴 곳을 나누어 2500의 길이 마다 용접이음으로 수평되게 결합시켜 다층으로 이루어진 프레임(100)이 구비되어지도록 한다. 이때 최상단에 위치된 프레임(100)에는 제1관통홈(110)이 형성되어지도록 하고, 각각 안전벽체(122)가 용접이음으로 결합되어지도록 한다.Temporary work table A having such a configuration, first, cut a long rectangular tube having a hollow shape in the length of 2300 and 7500, respectively joined by a welding joint to form a border shape of a rectangular box, and then the long place By dividing horizontally by welding joints every 2500 lengths to be provided with a
다음, 각각의 안전벽체(122) 하부로 바닥판(121)이 결합되어지도록 한 후 바닥판(121)에 형성된 개구부(123)에 사다리(130)를 삽입하여 결합되어지도록 한다. 이때 사다리(130)는 상부의 개구부(123)를 관통하여 최하단층에 위치된 바닥판(121)에 맞대어지도록 하는 것으로 하나의 가설 작업대(A)가 얻어지게 된다.Next, the
이러한 과정을 통해 얻어진 가설 작업대(A)가 별도의 윈치 등에 의하여 엘리베이터 피트(P) 상부에 설치된 ACS폼(200)으로 이동되어지도록 한 후 엘리베이터 피트(P)의 내부로 삽입되어지도록 한다.The temporary work table A obtained through the above process is to be moved to the
다음, 프레임(100)의 상부에 형성된 제1관통홈(110)과 마루판 지지대(210)에 형성된 제2관통홈(211)을 일치시켜 볼트(B)로 결합시키는 것으로 가설 작업대(A)가 엘리베이터 피트(P)의 내부에 설치되어지게 되고, 이러한 가설 작업대(A)는 ACS 폼(200)이 상부로 이동되어짐과 동시에 같이 이동되어지게 된다. 이때 가설 작업대(A)가 ACS폼(200)에 매달린 상태에서 ACS폼(200)의 마루판(220)에 노출된 사다리(130)를 통해 작업자가 가설 작업대(A)의 내부로 들어가 엘리베이터 피트(P)의 내벽에 엘리베이터 구조물(S)을 설치하면 된다.Next, the
도1은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 설치된 상태를 도시한 건축 구조물의 평면도.1 is a plan view of a building structure showing a state where a temporary work bench for installing an elevator structure according to the present invention is installed.
도2는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 사시도.Figure 2 is a perspective view of a work bench for installing an elevator structure according to the present invention.
도3은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 요부 사시도.Figure 3 is a perspective view of the main portion of the temporary work platform for the installation of the elevator structure according to the present invention.
도4는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 지지대에 결합된 상태를 도시한 사시도.Figure 4 is a perspective view showing a state in which the temporary work table for the installation of the elevator structure according to the invention coupled to the support.
도5는 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 ACS폼에 결합된 상태를 도시한 평면도.Figure 5 is a plan view showing a state in which the temporary work table for the installation of the elevator structure according to the invention coupled to the ACS foam.
도6은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대의 측면도.Figure 6 is a side view of a temporary workbench for installing an elevator structure according to the present invention.
도7은 본 발명에 따른 엘리베이터 구조물 설치를 위한 가설 작업대가 엘리베이터 피트의 내부에 설치된 상태를 도시한 단면도.Figure 7 is a cross-sectional view showing a state where the temporary work table for installing the elevator structure according to the present invention installed inside the elevator pit.
<도면의 주요 부분에 대한 부호의 간단한 설명><Brief description of symbols for the main parts of the drawings>
A:가설작업대 B:볼트A: Temporary workbench B: Bolt
P:엘리베이터 피트 100:프레임P: Elevator feet 100: Frame
110:제1관통홈 120:단위작업부110: first through groove 120: unit work unit
121:바닥판 122:안전벽체121: bottom plate 122: safety wall
200:ACS폼 210:마루판 지지대200: ACS foam 210: floorboard support
211:제2관통홈211: second through groove
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080098110A KR101031313B1 (en) | 2008-10-07 | 2008-10-07 | The construction workbench for an elevator infrastructure establishment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080098110A KR101031313B1 (en) | 2008-10-07 | 2008-10-07 | The construction workbench for an elevator infrastructure establishment |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100038941A KR20100038941A (en) | 2010-04-15 |
KR101031313B1 true KR101031313B1 (en) | 2011-04-29 |
Family
ID=42215587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080098110A KR101031313B1 (en) | 2008-10-07 | 2008-10-07 | The construction workbench for an elevator infrastructure establishment |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101031313B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158938B (en) * | 2019-06-06 | 2021-04-20 | 中建二局第四建筑工程有限公司 | Steel construction platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63146044U (en) | 1987-03-16 | 1988-09-27 | ||
JPH0358550U (en) * | 1989-10-12 | 1991-06-07 | ||
KR100406619B1 (en) * | 2000-04-10 | 2003-11-21 | 주식회사 나우동인건축사사무소 | Sliding form |
KR100804214B1 (en) | 2007-03-13 | 2008-02-18 | 이혜경 | Hanging scaffolding |
-
2008
- 2008-10-07 KR KR1020080098110A patent/KR101031313B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63146044U (en) | 1987-03-16 | 1988-09-27 | ||
JPH0358550U (en) * | 1989-10-12 | 1991-06-07 | ||
KR100406619B1 (en) * | 2000-04-10 | 2003-11-21 | 주식회사 나우동인건축사사무소 | Sliding form |
KR100804214B1 (en) | 2007-03-13 | 2008-02-18 | 이혜경 | Hanging scaffolding |
Also Published As
Publication number | Publication date |
---|---|
KR20100038941A (en) | 2010-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101654483B1 (en) | The building is equipped with safety scaffold equipment | |
JP4886286B2 (en) | Temporary scaffolding unit | |
JP2009541612A (en) | Construction site stairs | |
KR0141461B1 (en) | Method of making step and stairway, its elements | |
JP5417018B2 (en) | How to install an elevator in an existing building | |
JP6167025B2 (en) | Stair lifting device and method for lifting heavy objects | |
KR20150127559A (en) | The Folding Suspended Scaffoldings | |
JPH10292618A (en) | Working scaffolding for wall construction work | |
KR101031313B1 (en) | The construction workbench for an elevator infrastructure establishment | |
KR101203134B1 (en) | Fit segment structure for highrise elevator fit | |
KR101111234B1 (en) | Elevator infrastructure establishment construction workbench | |
KR100583785B1 (en) | Construction-material lift being installed at the outside of the construction-structure | |
EP1647512B1 (en) | Working scaffold system of elevator | |
KR101725899B1 (en) | Separated climbing formwork apparatus | |
JP2018178573A (en) | Staircase structure and method of manufacturing steel staircase | |
KR200445362Y1 (en) | Lower support of the safety netting device | |
JP2008214062A (en) | Lifting device and structural material mounting method | |
JP4884429B2 (en) | Platform railing | |
KR101800622B1 (en) | Multi-type lifting scaffold | |
JP4011722B2 (en) | Hanging stairs | |
JP2004143677A (en) | Carrying in/out device of construction machine and material | |
CN212249110U (en) | All-steel attached scaffold | |
JP6084936B2 (en) | Elevator installation apparatus and method of assembling the installation apparatus | |
JP2006144402A (en) | Constructing method of scaffolding for high-rise building and dismantling method | |
JP5689273B2 (en) | Temporary scaffolding and building construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140228 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160518 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170324 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180418 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |