KR101203134B1 - Fit segment structure for highrise elevator fit - Google Patents

Fit segment structure for highrise elevator fit Download PDF

Info

Publication number
KR101203134B1
KR101203134B1 KR1020110048569A KR20110048569A KR101203134B1 KR 101203134 B1 KR101203134 B1 KR 101203134B1 KR 1020110048569 A KR1020110048569 A KR 1020110048569A KR 20110048569 A KR20110048569 A KR 20110048569A KR 101203134 B1 KR101203134 B1 KR 101203134B1
Authority
KR
South Korea
Prior art keywords
pit
support beam
elevator
coupled
center support
Prior art date
Application number
KR1020110048569A
Other languages
Korean (ko)
Inventor
민광남
Original Assignee
(주)대산씨에스에이
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대산씨에스에이 filed Critical (주)대산씨에스에이
Priority to KR1020110048569A priority Critical patent/KR101203134B1/en
Application granted granted Critical
Publication of KR101203134B1 publication Critical patent/KR101203134B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0005Constructional features of hoistways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0035Arrangement of driving gear, e.g. location or support
    • B66B11/0045Arrangement of driving gear, e.g. location or support in the hoistway

Abstract

PURPOSE: A pit segment structure for a high-rise elevator pit is provided to prevent fall accidents when a worker installs a scaffold and an elevator structure inside an elevator pit. CONSTITUTION: A pit segment structure for a high-rise elevator pit comprises a divider(10). The divider is installed inside an elevator pit and divides the inside of the elevator pit(P) into upper and lower spaces. The divider comprises a support beam(11) and a support plate(12). The support beam comprises center support beams(13) and side support beams(15). One sides of the center support beams are coupled to both sides of the bottom of an elevator entrance(I), and the other sides are coupled to fixing members formed on the inner wall of the elevator pit. The side support beams are coupled to side support plates(122) and divide the inside of the elevator pit into upper and lower spaces.

Description

초고층 엘리베이터 피트용 피트분절구조{FIT SEGMENT STRUCTURE FOR HIGHRISE ELEVATOR FIT}FIT SEGMENT STRUCTURE FOR HIGHRISE ELEVATOR FIT}

본 발명은 초고층 엘리베이터 피트용 피트분절구조에 관한 것으로서, 특히 분절구에 의하여 엘리베이터 피트의 내부가 상부공간과 하부공간으로 구분되어지도록 하고, 분절된 상부로 제공되는 공간에 엘리베이터 구조물의 조기가설을 위한 권상기 등이 설치되어지도록 한 것이다.The present invention relates to a pit segment structure for a high-rise elevator pit, and in particular, the interior of the elevator pit is divided into an upper space and a lower space by a segment, and for the early construction of the elevator structure in the space provided as the segmented top. The hoist is to be installed.

일반적으로 고층 건물의 각 층에는 사람이나 화물이 상부에서 하부로 또는 하부에서 상부로 용이하게 이동할 수 있도록 하기 위한 방안으로 균형추, 케이블 및 도르래 장치를 이용하여 전동기로 작동되어지는 엘리베이터가 설치되어 있다.Generally, each floor of a high-rise building is equipped with an elevator operated by an electric motor using a balance weight, a cable and a pulley device as a way to easily move people or cargo from top to bottom or from bottom to top.

엘리베이터는 구조물의 일측 공간으로 제공되어지는 별도의 엘리베이터 피트에 설치되어지고, 엘리베이터 피트의 내벽에는 균형추 가이드 레일과 카측 가이드레일이 고정 설치되어지거나 별도의 엘리베이터 구조물에 의하여 설치되어지도록 구성되어 있다.The elevator is installed in a separate elevator pit provided as a space on one side of the structure, the counterweight guide rail and the car side guide rail is fixed to the inner wall of the elevator pit is configured to be installed by a separate elevator structure.

엘리베이터를 시공하기 위하여 엘리베이터 피트의 내부에 설치되어지는 엘리베이터 구조물은 먼저, 엘리베이터 피트의 내측 하부에서 상부를 향하여 다수개의 수직봉과 수평봉이 결합된 비계를 설치한 후 비계에 발판을 결합시켜 작업자가 발판에 올라가 외부로부터 공급된 철골바를 앵커볼트로 엘리베이터 피트에 고정 결합시켜 엘리베이터 구조물이 시공되어지게 된다.The elevator structure, which is installed inside the elevator pit for constructing an elevator, first installs a scaffold with a plurality of vertical rods and horizontal rods coupled from the inner lower part of the elevator pit to the upper side, and then combines the scaffold on the scaffold and the operator attaches to the scaffold. The elevator structure is constructed by fixing and fixing the steel bar supplied from the outside to the elevator pit with anchor bolts.

그러나 엘리베이터 피트의 내부에 다수개의 엘리베이터 구조물을 시공하기 위하여 미리 비계를 설치하는 과정에서 많은 수직봉과 수평봉이 소요되어지게 되며 이를 조립하거나 해체하는 과정이 더 소요되어짐으로써, 그 만큼의 작업시간이 지연되어지며 비용이 상승하는 문제점이 있었다.However, many vertical rods and horizontal rods are required in the process of installing scaffolding in advance to construct a plurality of elevator structures inside the elevator pit, and as the assembly or dismantling process takes more time, the work time is delayed. There was a problem of rising costs.

또한, 엘리베이터 피트의 내부에 엘리베이터 구조물 설치를 위한 비계는 저층인 건축 구조물의 경우에만 유용할뿐 고층인 건축 구조물의 경우에는 엘리베이터 피트의 모든 부분에 비계를 설치하는데 어려움이 있었다.In addition, the scaffold for installing the elevator structure inside the elevator pit is useful only for low-rise building structures, and in the case of high-rise building structures, it is difficult to install the scaffold on all parts of the elevator pit.

또한, 엘리베이터 구조물의 설치가 통상 건축 구조물의 최상단층이 마무리되어진 후 진행되어지게 됨에 따라 고층 또는 초고층 건출 구조물의 경우 건축 구조물의 상단층의 작업이 마무리된 상태에서 엘리베이터의 구동 또는 작동까지 상단한 시간이 소요되는 또 다른 문제점이 있었다.In addition, as the installation of the elevator structure is usually progressed after the uppermost floor of the building structure is finished, the time when the elevator is driven or operated in the state where the work on the upper floor of the building structure is finished in the case of a high-rise or ultra-high building structure. There was another issue with this.

그리고 이러한 문제점을 해소하기 위한 방안으로 수개의 층에 별도의 작업대를 설치할 수 있으나, 이러한 경우 작업대의 설치와 해체에 따른 추가적인 시간과 비용이 더 소요되어지게 되며 간혹 작업자의 실수로 인하여 엘리베이터 피트의 내부로 추락하는 추락사고가 발생되는 또 다른 문제점이 있었다.In order to solve this problem, a separate workbench may be installed on several floors, but in this case, additional time and cost will be required due to the installation and dismantling of the workbench. There was another problem that caused the crash to fall.

본 발명은 초고층인 엘리베이터 피트의 내부로 설치되어지는 엘리베이터 구조물 설치작업이 최상층의 공사진행과 상관없이 이루어질 수 있도록 함으로써, 그 만큼의 작업시간을 단축시켜 비용을 줄일 수 있도록 하고, 이를 통해 엘리베이터의 구동 또는 작동까지 상단한 시간을 줄일 수 있도록 하고, 엘리베이터 피트의 상층에서 하층으로 낙하물이 낙하되거나 작업자가 추락하는 것을 방지할 수 있도록 한 것이다.The present invention allows the installation of the elevator structure, which is installed inside the elevator pit, which is a high-rise building, can be performed regardless of the top row of collaborative lines, thereby shortening the working time and reducing the cost, thereby driving the elevator. Alternatively, it is possible to reduce the upper time until operation, and to prevent falling objects falling or falling from the upper floor to the lower floor of the elevator pit.

본 발명은 엘리베이터 피트의 내부에 설치된 분절구(10)에 의하여 피트의 상부공간과 하부공간이 구분되어지는 초고층 엘리베이터 피트용 피트분절구조에 있어서, 상기 분절구(10)는 받침빔(11)과, 상기 받침빔(11)의 상부에 안착되게 결합된 받침판(12)으로 구성되어지되, 상기 받침빔(11)은 출입구의 양측 하부에 센터받침빔(13)의 일측 하부가 맞대어져 앵커볼트(B)로 결합되어지며, 타측이 출입구와 대응되는 피트의 내벽에 구비된 고정부재(14)에 결합되어지고, 상기 센터받침빔(13) 사이에 센터받침판(121)이 결합되어지고, 상기 받침빔(11)과 피트의 내벽 사이에 사이드받침빔(15)이 결합되어지고, 상기 사이드받침빔(15)에 사이드받침판(122)이 결합되어 피트의 상부와 하부가 분절되어지고, 분절된 상부로 제공되는 공간에 엘리베이터 구조물의 조기가설을 위한 권상기가 설치되어짐을 특징으로 한다.According to the present invention, in the pit segment structure for the high-rise elevator pit, in which the upper space and the lower space of the pit are divided by the segment 10 installed inside the elevator pit, the segment 10 is provided with a supporting beam 11. It is composed of a support plate 12 coupled to be seated on the upper portion of the support beam 11, the support beam 11, the lower side of the one side of the center support beam 13 to the lower side of both sides of the entrance to the anchor bolt ( B) is coupled, the other side is coupled to the fixing member 14 provided on the inner wall of the pit corresponding to the entrance and exit, the center support plate 121 is coupled between the center support beam 13, the support The side support beam 15 is coupled between the beam 11 and the inner wall of the pit, and the side support plate 122 is coupled to the side support beam 15 so that the upper and lower portions of the pit are segmented, and the segmented upper part. For early construction of elevator structures in the space provided by Characterized in that one hoist is installed.

또한, 상기 센터받침빔(13)의 일측 하부에는 관통홀(135)을 갖는 수평플랜지(134)가 용접이음으로 결합되어지고, 상기 장홀(132)에 앵커볼트(B)가 삽입되어 출입구 바닥에 고정되어지고, 상기 센터받침빔(13)의 상부에 러그(133)가 결합되어짐을 특징으로 한다.In addition, a horizontal flange 134 having a through hole 135 is coupled to the bottom of one side of the center support beam 13 by a welding joint, and an anchor bolt B is inserted into the long hole 132 to the bottom of the entrance. It is fixed, characterized in that the lug 133 is coupled to the upper portion of the center support beam (13).

또한, 상기 사이드받침빔(15)은 단부에 관통홀(151)이 형성되어지고, 상기 센터받침빔(13)에 구비된 장홀(132)을 갖는 수직플랜지(131)에 상기 사이드받침빔(15)의 단부 내측이 맞대어져 상기 장홀(132)과 관통홀(151)을 관통한 볼트(B')에 의하여 결합되어짐을 특징으로 한다.In addition, the side support beam 15 has a through hole 151 formed at an end thereof, and the side support beam 15 in a vertical flange 131 having a long hole 132 provided in the center support beam 13. The inner side of the end) is butted and coupled by the bolt B 'penetrating the long hole 132 and the through hole 151.

또한, 상기 고정부재(14)는 피트의 내벽에 일측만이 개방된 형태로 매립된 중공박스(141) 또는 피트의 내벽에 앵커볼트(B)로 결합된 안착고정편(142)으로 구성됨을 특징으로 한다.In addition, the fixing member 14 is characterized by consisting of a hollow box 141 buried in the form of only one side open to the inner wall of the pit or a seating fixing piece 142 coupled to the inner wall of the pit anchor bolt (B). It is done.

또한, 상기 받침빔(11)을 구성하는 센터받침빔(13)과 사이드받침빔(15)은 I형 또는 H형으로 구성되어지고, 상기 센터받침판(121)과 사이드받침판(122)은 윗면에 미끄럼방지돌기(123)가 형성되어짐을 특징으로 한다.In addition, the center support beam 13 and the side support beam 15 constituting the support beam 11 is composed of an I type or H type, the center support plate 121 and the side support plate 122 is on the upper surface The anti-slip projection 123 is characterized in that it is formed.

그리고 상기 받침빔(11)과 받침판(12)에 의하여 분절된 피트의 상층에 지수막(20)이 경사지게 설치되어지되, 상기 지수막(20)은 프레임(21)의 상부에 지수커버(22)가 맞대어지게 결합되어지고, 상기 프레임(21)의 일측이 피트의 내부 일측에 돌출된 상부고정편(30)에 맞대어지며, 타측이 피트의 내부 타측에 돌출된 하부고정편(31)에 맞대어지게 고정되어 상부로부터 낙하되어지는 낙하물이 하부로 더 낙하되어지는 것을 방지하는 가운데 빗물이 피트를 따라 흘러내리는 것을 막을 수 있는 것을 특징으로 한다.And the water film 20 is inclined on the upper layer of the pit segmented by the support beam 11 and the support plate 12, the water film 20 is the water cover 22 on the upper portion of the frame 21 Are coupled to face each other, one side of the frame 21 abuts the upper fixing piece 30 protruding on one inner side of the pit, and the other side is opposed to the lower fixing piece 31 protruding on the other inner side of the pit. It is characterized in that it is possible to prevent rain from flowing down along the pit while preventing the falling objects falling from the top to be fixed and falling further down.

본 발명은 분절구에 의하여 엘리베이터 피트의 내부가 상부공간과 하부공간으로 구분되어지도록 하고, 분절된 상부로 제공되는 공간에 엘리베이터 구조물의 조기가설을 위한 권상기 등이 설치되어지도록 함으로써, 건축 구조물의 최상단층이 마무리되지 않은 상태에서 엘리베이터 피트내에 엘리베이터 설치를 위한 구조물이 거의 층높이로 진행되어지도록 할 수 있는 효과를 얻을 수 있다.The present invention allows the interior of the elevator pit to be divided into an upper space and a lower space by a segment, and a hoist for early construction of the elevator structure is installed in the space provided as the segmented upper portion, thereby providing the top of the building structure. It is possible to obtain an effect that the structure for installing the elevator in the elevator pit can be advanced to almost the floor height without the floor being finished.

이를 통해 건축 구조물의 최상단층이 마무리된 후 진행되어지던 엘리베이터 구조물 설치작업이 구조물의 각층의 상승과 함께 거의 동시에 진행할 수 있도록 함으로써, 별도의 엘리베이터 구조물 설치에 소요되는 작업 공기를 단축시켜 비용을 줄일 수 있는 효과를 얻을 수 있다.Through this, the elevator structure installation work that has been carried out after finishing the top floor of the building structure can proceed almost simultaneously with the rise of each floor of the structure, thereby reducing the work air required for the installation of a separate elevator structure and reducing the cost. You can get the effect.

아울러 엘리베이터 피트의 내부로 비계 설치와 해체 및 엘리베이터 구조물을 설치하는 과정에서 작업자의 실수로 인하여 작업자가 엘리베이터 피트의 하부로추락하는 추락사고를 방지할 수 있는 효과를 더 얻을 수 있다.In addition, in the process of installing the scaffolding and dismantling and installation of the elevator structure into the interior of the elevator pit can be more effective to prevent the fall accident of the operator falls to the bottom of the elevator pit due to the operator's mistake.

도1은 본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조를 도시한 사시도.
도2는 본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조의 내,외부를 도시한 절개 사시도.
도3은 본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조의 분해 사시도.
도4는 본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조의 종단면도.
도5는 본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조의 횡단면도.
1 is a perspective view showing a pit segment structure for a high-rise elevator pit according to the present invention.
Figure 2 is a cutaway perspective view showing the inside and outside of the pit segment structure for a high-rise elevator pit according to the present invention.
Figure 3 is an exploded perspective view of the pit segment structure for the high-rise elevator pit according to the present invention.
Figure 4 is a longitudinal sectional view of a pit segment structure for a high rise elevator pit according to the present invention.
5 is a cross-sectional view of a pit segment structure for a high rise elevator pit according to the present invention;

본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.

본 발명에 따른 초고층 엘리베이터 피트용 피트분절구조는 도1 내지 도5에 도시된 바와 같이, 초고층 엘리베이터 피트(P)의 내부가 그 내부에 설치된 분절구(10)에 의하여 상부공간과 하부공간으로 구분되어지게 설치됨으로써, 상부공간 즉, 분절구(10)의 상부로 임시기계실이 제공되어 곤도라 등을 와이어에 매달아 하부공간에서 이동작업이 가능하도록 하고, 엘리베이터 선시공 운행을 위한 권상기(양중용 윈치)를 설치하여 골조의 완성층까지 엘리베이터 구조물의 시공이 가능하도록 하게 된다.As shown in Figs. 1 to 5, the pit segment structure for the high-rise elevator pit according to the present invention is divided into an upper space and a lower space by a segment 10 installed therein. By being installed, a temporary machine room is provided in the upper space, that is, the upper part of the segment 10 so that the gondola and the like can be hung on a wire to enable movement work in the lower space, and a hoist (double winch) for operating the elevator pre-installation. It is installed to allow the construction of the elevator structure to the finished floor of the frame.

여기에서, 상기 분절구(10)는 엘리베이터 도어가 설치될 부분으로 위치된 엘리베이터 피트(P)의 내벽에 설치되어지는 것으로 받침빔(11)과, 상기 받침빔(11)의 상부에 안착되게 결합된 받침판(12)으로 구성된다.Here, the segment 10 is to be installed on the inner wall of the elevator pit (P) positioned as a part to be installed in the elevator door to be coupled to the support beam 11 and the top of the support beam (11). Consisting of a supporting plate 12.

상기 받침빔(11)은 받침판(12)을 비롯하여 그 상부로 설치되어지는 곤도라, 권상기 등이 안정되게 받쳐지도록 하는 가운데 받침판(12)이 하부로 쳐지는 것을 방지하는 기능을 갖는 것으로 이러한 상기 받침빔(11)은 엘리베이터 출입구(I)의 하부 양측에 센터받침빔(13)의 일측 하부가 맞대어져 앵커볼트(B)로 결합되어지고, 상기 센터받침빔(13)의 타측이 엘리베이터 출입구(I)와 대응되는 엘리베이터 피트(P)의 내벽에 미리 구비된 고정부재(14)에 결합되어지게 구성되어 있다.The support beam 11 has a function of preventing the support plate 12 from being struck to the bottom while the gondola, the hoisting machine, and the like, which are installed at the upper portion of the support plate 12, are stably supported. 11 is coupled to the anchor bolt (B) by the lower side of the one side of the center support beam 13 to the lower both sides of the elevator entrance (I), the other side of the center support beam 13 is the elevator entrance (I). It is configured to be coupled to the fixing member 14 provided in advance on the inner wall of the elevator pit (P) corresponding to.

상기 앵커볼트(B)에 의하여 엘리베이터 출입구(I) 하부 양측에 고정되는 부분은 센터받침빔(13)의 일측 하부 양측으로 관통홀(135)을 갖는 수평플랜지(134)가 형성되어 상기 수평플랜지(134)의 관통홀(135)을 앵커볼트(B)가 관통되어 출입구 바닥에 고정되어지게 된다.A portion of the anchor bolt B fixed to both sides of the lower part of the elevator entrance I by the anchor bolt B is formed with a horizontal flange 134 having a through hole 135 at both sides of the lower side of the center support beam 13 to form the horizontal flange ( The anchor bolt B penetrates the through hole 135 of 134 and is fixed to the bottom of the doorway.

상기 고정부재(14)는 엘리베이터 피트(P)의 내벽에 일측만이 개방된 형태로 매립된 중공박스(141)로 센터받침빔(13)이나 사이드받침빔(15)의 단부가 소정 깊이로 삽입됨으로써, 안정되게 지지될 수 있게 된다.The fixing member 14 is a hollow box 141 having only one side open to an inner wall of the elevator pit P. The end of the center support beam 13 or the side support beam 15 is inserted to a predetermined depth. By doing so, it can be stably supported.

상기 받침빔(11)을 구성하는 센터받침빔(13)과 사이드받침빔(15)은 I형 또는 H형으로 구성되어 자중을 줄이는 가운데 높을 강성 또는 강도가 제공되어질 수 있게 된다.The center support beam 13 and the side support beam 15 constituting the support beam 11 may be configured as an I type or an H type so that high rigidity or strength may be provided while reducing self weight.

본 발명에서는 상기 고정부재(14)가 엘리베이터 피트(P)의 내벽에 매립된 중공박스(141)의 형태를 갖도록 하였으나, 이러한 형태 이외에 도2에 일점쇄선으로 도시된 바와 같이, 엘리베이터 피트(P)의 내벽에 앵커볼트(B)로 결합된 안착고정편(142)으로 구성되어 센터받침빔(13)이나 사이드받침빔(15)이 상기 안착고정편(142)에 안착되어진 상태에서 용점이음으로 고정되어지도록 하는 것이 바람직하다.In the present invention, the fixing member 14 has a form of a hollow box 141 embedded in the inner wall of the elevator pit P, but in addition to this form, as shown by the dashed-dotted line in FIG. 2, the elevator pit P It is composed of a seating fixing piece 142 coupled to the inner wall of the anchor bolt (B) and the center support beam 13 or the side support beam 15 is in the state of being seated on the seating fixing piece 142 as a melting point It is desirable to be fixed.

상기 센터받침빔(13)의 상부에 러그(133)가 결합되어 미도시한 상층의 권상기에 의하여 엘리베이터 피트(P)의 내부에 용이하게 설치할 수 있게 된다.The lug 133 is coupled to the upper portion of the center support beam 13 so that it can be easily installed inside the elevator pit P by the upper traction machine not shown.

상기 센터받침빔(13) 사이에는 센터받침판(121)이 결합되어지고, 상기 받침빔(11)과 피트의 내벽 사이에 사이드받침빔(15)이 결합되어지고, 상기 사이드받침빔(15)에 사이드받침판(122)이 결합되어 엘리베이터 피트(P)의 내부 공간이 상부와 하부로 분절되어지게 된다.The center support plate 121 is coupled between the center support beams 13, and the side support beams 15 are coupled between the support beams 11 and the inner wall of the pit, and to the side support beams 15. The side support plate 122 is coupled so that the inner space of the elevator pit P is divided into upper and lower portions.

이를 위해, 상기 센터받침빔(13)의 일측 하부에는 장홀(132)을 갖는 수직플랜지(131)가 용접이음으로 결합되어지고, 상기 사이드받침빔(15)은 단부에 관통홀(151)이 형성되어지고, 상기 센터받침빔(13)에 구비된 장홀(132)을 갖는 수직플랜지(131)에 상기 사이드빔(15)의 단부 내측이 맞대어져 상기 장홀(132)과 관통홀(151)을 관통한 볼트(B')에 의하여 결합되어지게 구성되어 있다.To this end, a vertical flange 131 having a long hole 132 is coupled to the bottom of one side of the center support beam 13 by a welding joint, and the side support beam 15 has a through hole 151 formed at an end thereof. The inner side of the end portion of the side beam 15 is abutted with the vertical flange 131 having the long hole 132 provided in the center support beam 13 to penetrate the long hole 132 and the through hole 151. It is configured to be coupled by one bolt (B ').

상기 센터받침판(121)과 사이드받침판(122)은 윗면에 미끄럼방지돌기(123)가 형성되어 작업자가 그 위에서 이동하는 과정에서 미끄러져 넘어지는 것을 방지할 수 있게 된다.The center support plate 121 and the side support plate 122 is formed with a non-slip protrusion 123 on the upper surface to prevent the operator from slipping over in the process of moving thereon.

상기 분절구(10)에 의하여 분절된 상부로 제공되는 공간에 엘리베이터 구조물의 조기가설을 위한 권상기가 설치되어 있다.A hoist for early construction of an elevator structure is installed in a space provided to the upper part segmented by the segment 10.

본 발명에서는 엘리베이터 피트(P)의 내부에 설치된 분절구(10)에 의하여 상,하부의 공간이 구분되어지도록 한 상태에서 분절구(10)의 상부에 권상기가 설치되어지도록 하였으나, 이러한 형태 이외에 분절구(10)에 의하여 분절된 엘리베이터 피트의 상측 공간부 즉, 상부층에는 지수막(20)이 경사지게 설치되어지도록 할 수 있다.In the present invention, although the upper and lower spaces are divided by the segment 10 installed inside the elevator pit P, the hoist is installed on the upper portion of the segment 10, but in addition to these forms The water film 20 may be inclined in the upper space portion of the elevator pit segmented by the mortar 10, that is, the upper layer.

이러한 지수막(20)은 프레임(21)의 상부에 지수커버(22)가 맞대어지게 결합되어지고, 상기 프레임(21)의 일측이 피트의 내부 일측에 돌출된 상부고정편(30)에 맞대어지며, 타측이 피트의 내부 타측에 돌출된 하부고정편(31)에 맞대어지게 고정되어짐으로써, 상부로부터 낙하되어지는 낙하물이 하부로 더 낙하되어지는 것을 방지하는 가운데 빗물이 피트를 따라 흘러내리는 것을 막을 수 있도록 함으로써, 우천시에도 작업이 가능하게 된다.The water stop film 20 is coupled to the water stop cover 22 to the upper portion of the frame 21, the one side of the frame 21 abuts the upper fixing piece 30 protruding on one side of the inner pit The other side is fixed against the lower fixing piece 31 protruding from the other side of the pit, thereby preventing rain from falling down along the pit while preventing the falling object falling from the upper side to fall further down. By doing so, it becomes possible to work even in rainy weather.

이와 같은 초고층 엘리베이터 피트의 분절은 먼저, 엘리베이터 피트(P)의 상층에 임시로 미리 설치된 다른 권상기의 와이어 훅을 센터받침빔(13)에 형성된 러그(133)에 걸은 상태에서 센터받침빔(13)을 들어 올려 센터받침빔(13)의 단부가 엘리베이터 피트(P)에 형성된 고정부재(14)에 결합되어지게 된다.The segment of such a high-rise elevator pit is, first, the center support beam 13 in a state in which a wire hook of another hoist that is temporarily pre-installed on the upper floor of the elevator pit P is hung on the lug 133 formed on the center support beam 13. Lift the end of the center support beam 13 is coupled to the fixing member 14 formed in the elevator pit (P).

다음, 수평플랜지(134)에 형성된 관통홀(135)에 앵커볼트(B)를 삽입하여 출입구의 바닥에 고정되는 것으로 하나의 센터받침빔(13)이 설치되어지게 된다.Next, the anchor bolt B is inserted into the through hole 135 formed in the horizontal flange 134 to be fixed to the bottom of the entrance so that one center support beam 13 is installed.

다음, 이와 같은 과정의 반복을 통해 다른 센터받침빔(13)이 설치되어진 상태에서 각각의 센터받침빔(13) 사이에 센터받침판(121)의 양측이 받쳐지도록 삽입하여 작업공간이 확보되어지록 한다.Next, the work space is secured by inserting both sides of the center support plate 121 between the respective center support beams 13 while the other center support beams 13 are installed by repeating the above process. .

다음, 사이드빔받침빔(15)의 단부가 다른 고정부재(14)에 삽입되어지도록 한 후 수직플랜지(131)에 형성된 장홀(132)에 사이드받침빔(15)에 형성된 관통홀(151)의 중심을 일치시킨 상태에서 볼트(B')로 결합시키는 과정의 반복을 통해 다수개의 사이드받침빔(15)이 설치되어지도록 한다.Next, the end of the side beam bearing beam 15 is inserted into the other fixing member 14, and then the through hole 151 formed in the side bearing beam 15 in the long hole 132 formed in the vertical flange 131. The plurality of side support beams 15 are installed by repeating the process of coupling the bolts B 'in the state where the centers are aligned.

다음, 사이드받침빔(15)의 상부에 사이드받침판(122)에 받쳐지도록 하는 것으로 엘리베이터 피트(P)내의 분절이 마무리되며, 이 상태에서 그 상부에 곤도라나 권상기를 설치하면 된다.Next, the segment in the elevator pit P is finished by being supported by the side support plate 122 on the side support beam 15, and in this state, a gondola or a hoist may be installed.

10:분절구 11:받침빔
12:받침판 13:센터받침빔
14:고정부재 15:사이드받침빔
121:센터받침판 122:사이드받침판
10: Segment 11: Receptacle
12: support plate 13: center support beam
14: fixing member 15: side support beam
121: center support plate 122: side support plate

Claims (6)

엘리베이터 피트의 내부에 설치된 분절구(10)에 의하여 피트의 상부공간과 하부공간이 구분되어지는 초고층 엘리베이터 피트용 피트분절구조에 있어서,
상기 분절구(10)는 받침빔(11)과, 상기 받침빔(11)의 상부에 안착되게 결합된 받침판(12)으로 구성되어지되, 상기 받침빔(11)은 출입구의 양측 하부에 센터받침빔(13)의 일측 하부가 맞대어져 앵커볼트(B)로 결합되어지며, 타측이 출입구와 대응되는 피트의 내벽에 구비된 고정부재(14)에 결합되어지고, 상기 센터받침빔(13) 사이에 센터받침판(121)이 결합되어지고, 상기 받침빔(11)과 피트의 내벽 사이에 사이드받침빔(15)이 결합되어지고, 상기 사이드받침빔(15)에 사이드받침판(122)이 결합되어 피트의 상부와 하부가 분절되어지고, 분절된 상부로 제공되는 공간에 엘리베이터 구조물의 조기가설을 위한 권상기가 설치되어짐을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
In the pit segment structure for a high-rise elevator pit in which the upper space and the lower space of the pit are divided by a segment 10 installed inside the elevator pit,
The segment 10 is composed of a support beam 11 and a support plate 12 coupled to be seated on the upper portion of the support beam 11, the support beam 11 is the center support on both sides of the lower side of the entrance One side lower portion of the beam 13 is joined to the anchor bolt (B), the other side is coupled to the fixing member 14 provided on the inner wall of the pit corresponding to the entrance and exit, between the center support beam 13 The center support plate 121 is coupled to, the side support beam 15 is coupled between the support beam 11 and the inner wall of the pit, and the side support plate 122 is coupled to the side support beam 15. A pit segment structure for a high-rise elevator pit, characterized in that the upper and lower portions of the pit are segmented, and a hoist for early construction of the elevator structure is installed in a space provided as the segmented upper portion.
제1항에 있어서,
상기 센터받침빔(13)의 일측 하부에는 관통홀(135)을 갖는 수평플래지(134)가 용접이음으로 결합되어지고, 상기 관통홀(135)에 앵커볼트(B)가 삽입되어 출입구 바닥에 고정되어지고, 상기 센터받침빔(13)의 상부에 러그(133)가 결합되어짐을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
The method of claim 1,
A horizontal flange 134 having a through hole 135 is coupled to the bottom of one side of the center support beam 13 by a welding joint, and an anchor bolt B is inserted into the through hole 135 to be fixed to the bottom of an entrance. And a lug 133 is coupled to an upper portion of the center support beam 13.
제1항에 있어서,
상기 사이드받침빔(15)은 단부에 관통홀(151)이 형성되어지고, 상기 센터받침빔(13)에 구비된 장홀(132)을 갖는 수직플랜지(131)에 상기 사이드받침빔(15)의 단부 내측이 맞대어져 상기 장홀(132)과 관통홀(151)을 관통한 볼트(B')에 의하여 결합되어짐을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
The method of claim 1,
The side support beam 15 has a through hole 151 formed at an end thereof, and a vertical flange 131 having a long hole 132 provided in the center support beam 13 of the side support beam 15. A pit segment structure for a high-rise elevator pit, characterized in that the inner side of the end is joined by a bolt (B ') passing through the long hole (132) and the through hole (151).
제1항에 있어서,
상기 고정부재(14)는 피트의 내벽에 일측만이 개방된 형태로 매립된 중공박스(141) 또는 피트의 내벽에 앵커볼트(B)로 결합된 안착고정편(142)으로 구성됨을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
The method of claim 1,
The fixing member 14 is characterized in that it consists of a hollow box 141 embedded in only one side of the inner wall of the pit or a seating fixing piece 142 coupled to the inner wall of the pit by an anchor bolt (B). Pit segment structure for high-rise elevator feet.
제1항에 있어서,
상기 받침빔(11)을 구성하는 센터받침빔(13)과 사이드받침빔(15)은 I형 또는 H형으로 구성되어지고, 상기 센터받침판(121)과 사이드받침판(122)은 윗면에 미끄럼방지돌기(123)가 형성되어짐을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
The method of claim 1,
The center support beam 13 and the side support beam 15 constituting the support beam 11 is composed of an I type or H type, the center support plate 121 and the side support plate 122 is non-slip on the upper surface A pit segment structure for a high-rise elevator pit, characterized in that the projection 123 is formed.
제1항에 있어서,
상기 받침빔(11)과 받침판(12)에 의하여 분절된 피트의 상층에 지수막(20)이 경사지게 설치되어지되, 상기 지수막(20)은 프레임(21)의 상부에 지수커버(22)가 맞대어지게 결합되어지고, 상기 프레임(21)의 일측이 피트의 내부 일측에 돌출된 상부고정편(30)에 맞대어지며, 타측이 피트의 내부 타측에 돌출된 하부고정편(31)에 맞대어지게 고정되어 상부로부터 낙하되어지는 낙하물이 하부로 더 낙하되어지는 것을 방지하는 가운데 빗물이 피트를 따라 흘러내리는 것을 막을 수 있는 것을 특징으로 하는 초고층 엘리베이터 피트용 피트분절구조.
The method of claim 1,
The exponent film 20 is inclined on the upper layer of the pit segmented by the support beam 11 and the support plate 12, but the exponent film 20 has an index cover 22 formed on the upper portion of the frame 21. It is coupled to face to face, one side of the frame 21 is opposed to the upper fixing piece 30 protruding on the inner side of the pit, the other side is fixed to the lower fixing piece 31 protruding to the other side of the inside of the pit. And preventing rainwater from flowing down along the pit while preventing falling objects falling from the upper portion further falling to the lower portion of the pit segment structure.
KR1020110048569A 2011-05-23 2011-05-23 Fit segment structure for highrise elevator fit KR101203134B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110048569A KR101203134B1 (en) 2011-05-23 2011-05-23 Fit segment structure for highrise elevator fit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110048569A KR101203134B1 (en) 2011-05-23 2011-05-23 Fit segment structure for highrise elevator fit

Publications (1)

Publication Number Publication Date
KR101203134B1 true KR101203134B1 (en) 2012-11-21

Family

ID=47565041

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110048569A KR101203134B1 (en) 2011-05-23 2011-05-23 Fit segment structure for highrise elevator fit

Country Status (1)

Country Link
KR (1) KR101203134B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3115527A1 (en) * 2015-07-07 2017-01-11 Andreas Schulz Work bolt as fall protection device
KR102319977B1 (en) 2021-07-20 2021-11-01 주식회사 대산엘리베이터 hoistway segment structures for high rise elevator
KR20210141194A (en) 2020-05-15 2021-11-23 양경옥 Construction Method and Device of Wall and Floor Structure in Elevator's Machine Room in Apartment Building and Office Using Hanging Structural Method by Steel and Deck Plate in Top-down Structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236022Y1 (en) 2001-03-20 2001-10-08 (주)상지엔지니어링건축사사무소 Elevator pit safety-net

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236022Y1 (en) 2001-03-20 2001-10-08 (주)상지엔지니어링건축사사무소 Elevator pit safety-net

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3115527A1 (en) * 2015-07-07 2017-01-11 Andreas Schulz Work bolt as fall protection device
KR20210141194A (en) 2020-05-15 2021-11-23 양경옥 Construction Method and Device of Wall and Floor Structure in Elevator's Machine Room in Apartment Building and Office Using Hanging Structural Method by Steel and Deck Plate in Top-down Structure
KR102319977B1 (en) 2021-07-20 2021-11-01 주식회사 대산엘리베이터 hoistway segment structures for high rise elevator

Similar Documents

Publication Publication Date Title
US20200149301A1 (en) Architectual climbing system with improved structural stability
KR102033453B1 (en) Method for Construction Threshold of Gate for Elevator Cabin
JP6227153B2 (en) Ceiling unit and elevator car with ceiling unit
JP2018070362A (en) Elevator installation method
KR101203134B1 (en) Fit segment structure for highrise elevator fit
JP5417018B2 (en) How to install an elevator in an existing building
EP1647512B1 (en) Working scaffold system of elevator
KR101111234B1 (en) Elevator infrastructure establishment construction workbench
KR101031313B1 (en) The construction workbench for an elevator infrastructure establishment
KR100901016B1 (en) Safety bracket to external wall scaffolding for a structure
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
US20200216290A1 (en) Elevator system
JP2000086113A (en) Elevator, and installation method thereof
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP6854970B2 (en) Elevator work floor equipment and its assembly method
JP4037735B2 (en) Elevator construction method
JP6084936B2 (en) Elevator installation apparatus and method of assembling the installation apparatus
WO2019138545A1 (en) Elevator and refurbishing method therefor
KR200445362Y1 (en) Lower support of the safety netting device
KR101251308B1 (en) Imbed bracket for highrise elevator fit
JP2010058914A (en) Unit type elevator
JP6267253B2 (en) Elevator structure
JP2006044843A (en) Working bench scaffold for hoistway
JP5146076B2 (en) Elevator landing equipment
KR101724111B1 (en) Elevator

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150930

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161025

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20171025

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181114

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191104

Year of fee payment: 8