CN112412064A - Multilayer synchronous construction material transportation platform - Google Patents

Multilayer synchronous construction material transportation platform Download PDF

Info

Publication number
CN112412064A
CN112412064A CN202011452412.0A CN202011452412A CN112412064A CN 112412064 A CN112412064 A CN 112412064A CN 202011452412 A CN202011452412 A CN 202011452412A CN 112412064 A CN112412064 A CN 112412064A
Authority
CN
China
Prior art keywords
square frame
support
frame
top plate
construction material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011452412.0A
Other languages
Chinese (zh)
Inventor
秦金垒
秦刚垒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011452412.0A priority Critical patent/CN112412064A/en
Publication of CN112412064A publication Critical patent/CN112412064A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Abstract

The invention discloses a multi-layer synchronous construction material transportation platform, which relates to the technical field of building material transportation platforms and comprises a plurality of support frames, a bottom plate and a top plate, wherein the plurality of support frames are all arranged together from top to bottom, and the top plate is arranged at the top end of a top side support frame. This synchronous construction material transport platform of multilayer, through mutually supporting between a plurality of support frames that set up and roof and the bottom plate, and through the workstation of the same one deck of four lift delivery rooms sharing that set up, can realize that four lift delivery rooms move simultaneously and carry the building material, and can not produce the influence when moving between four lift delivery rooms, can realize carrying the material simultaneously between the floor of difference, and then can satisfy and carry out the material simultaneously between a plurality of floors and carry, can improve the progress of construction, construction's time limit for a project extension has been avoided.

Description

Multilayer synchronous construction material transportation platform
Technical Field
The invention relates to the technical field of building material conveying platforms, in particular to a multi-layer synchronous construction material conveying platform.
Background
The material transport platform can be when the construction is under construction for carry building material etc. between each floor, but current material transport platform generally carries the material for solitary lift delivery room, can not satisfy and carry the material simultaneously between a plurality of floors, and then can reduce the progress of construction, leads to the time limit for a project extension of construction.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a multi-layer synchronous construction material transportation platform, which solves the problems that the conventional material transportation platform generally conveys materials by a single lifting carrying room and cannot meet the requirement of simultaneously conveying the materials among a plurality of floors, so that the progress of building construction can be reduced, and the construction period of the building construction is prolonged.
(II) technical scheme
In order to achieve the above purposes, the technical scheme adopted by the invention is as follows: a multilayer synchronous construction material transportation platform comprises a top plate, a bottom plate and a plurality of support frames, wherein the plurality of support frames are installed together from top to bottom, the top plate is arranged at the top end of a top side support frame, the bottom plate is arranged at the bottom end of a bottom side support frame, three support plates are fixedly arranged on the left side and the right side of the top end of the top plate, two support shafts are fixedly arranged between the three support plates on the left side and between the three support plates on the right side through bearings, winding disks are fixedly arranged on the four support shafts, steel wire ropes are wound on the four winding disks and are fixedly connected with the winding disks, the front ends of the two support shafts on the front side and the rear ends of the two support shafts on the rear side are respectively fixedly connected with output shafts of four contracting brake motors, and the contracting brake motors are fixedly connected with the upper;
the support frame includes square frame, the bottom four corners of square frame is all fixed and is provided with bracing piece and square frame fixed connection down, the side is all fixed and is provided with two anchor struts around going up between square frame and the square frame down, it is fixed with the workstation to go up the middle part on the square frame, be provided with four lift delivery rooms in the support frame, four wire rope's the other end passes four notches and corresponding lift delivery room top fixed connection respectively, and four notches are seted up on the roof.
Preferably, safety doors are arranged on the opposite surfaces of the two left lifting carrying rooms and the two right lifting carrying rooms.
Preferably, the left side and the right side of the upper surface of the workbench are fixedly provided with three vertical rods, the left side of the workbench is three, the right side of the workbench is three, and two protective doors are fixedly mounted between the vertical rods.
Preferably, the four corners of the bottom plate, the top plate, the upper square frame and the lower square frame are all fixedly provided with installation butting sleeves.
(III) advantageous effects
The invention has the beneficial effects that:
this synchronous construction material transport platform of multilayer, through mutually supporting between a plurality of support frames that set up and roof and the bottom plate, and through the workstation of the same one deck of four lift delivery rooms sharing that set up, can realize that four lift delivery rooms move simultaneously and carry the building material, and can not produce the influence when moving between four lift delivery rooms, can realize carrying the material simultaneously between the floor of difference, and then can satisfy and carry out the material simultaneously between a plurality of floors and carry, can improve the progress of construction, construction's time limit for a project extension has been avoided.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic perspective view of the supporting frame of the present invention;
FIG. 3 is a top view of the top plate of the present invention.
In the figure: the device comprises a support frame 1, a bottom plate 2, a top plate 3, a supporting plate 4, a supporting shaft 5, a winding disc 6, a steel wire rope 7, a band-type brake motor 8, a notch 9, an upper square frame 10, a lower square frame 11, a supporting rod 12, a reinforcing rod 13, a protective net 14, a workbench 15, a lifting carrying room 16, a safety door 17, an abutting sleeve 18, a vertical rod 19 and a protective door 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-3, the present invention provides a technical solution: a multi-layer synchronous construction material transportation platform comprises a bottom plate 2, a top plate 3, a plurality of support frames 1 and a plurality of supporting frames, wherein the support frames 1 are arranged together from top to bottom, the material transportation platform is composed of the plurality of support frames 1, the bottom plate 2 and the top plate 3, the material transportation platform can be matched with floors after selecting the corresponding number of support frames 1 to combine according to the number of the floors, the top plate 3 is arranged at the top end of the top side support frame 1, a band-type brake motor 8, a winding disc 6 and the like arranged on the top plate 3 can wind and release a steel wire rope 7, so that a lifting carrying chamber 16 can be lifted or lowered, the bottom plate 1 is arranged at the bottom end of the bottom side support frame 1, three support plates 4 are fixedly arranged at the left side and the right side of the top plate 3, two support shafts 5 are fixedly arranged between the three support plates 4, the supporting plate 4 supports the supporting shaft 5, the supporting shaft 5 supports the winding disc 6, the winding discs 6 are fixedly arranged on the four supporting shafts 5, steel wire ropes 7 are wound on the four winding discs 6, the steel wire ropes 7 are fixedly connected with the winding discs 6, the front ends of the two supporting shafts 5 on the front side and the rear ends of the two supporting shafts 5 on the rear side are respectively fixedly connected with output shafts of four band-type brake motors 8, the band-type brake motors 8 are fixedly connected with the upper surface of the top plate 3 through fixing plates, the four band-type brake motors 8 can respectively operate to drive the four winding discs 6 to wind and unwind the steel wire ropes 7, so that the four lifting carrying chambers 16 can be lifted or lowered, no influence is generated during the operation among the four lifting carrying chambers 16, the simultaneous material conveying among different floors can be realized, and the simultaneous material conveying among a plurality of floors can be satisfied, the progress of building construction can be improved, and the construction period of the building construction is prevented from being prolonged;
the support frame 1 comprises an upper square frame 10, four corners of the bottom end of the upper square frame 10 are fixedly provided with support rods 12 fixedly connected with a lower square frame 11, the support rods 12 are used for connecting the upper square frame 10 and the lower square frame 11, two reinforcing rods 13 are fixedly arranged on the front side and the rear side between the upper square frame 10 and the lower square frame 11, the upper square frame 10 and the lower square frame 11 can be connected more firmly through the arranged reinforcing rods 13, a protective net 14 is arranged on the bottom side between the two reinforcing rods 13 on the front side, the protective net 14 can play a role in protecting the front end of a working table 15, the safety of the material conveying platform in operation is ensured, the working table 15 is fixedly arranged in the upper middle of the upper square frame 10, materials conveyed by a lifting carrying chamber 16 can temporarily stop through the arranged working table 15, then the protective net 14 is moved to a floor, and the working table 15 is arranged in the middle, can make four lift delivery rooms 16 use jointly, the space of this material conveying platform's of utilization that can maximize is provided with four lift delivery rooms 16 in the support frame 1, and four wire rope 7's the other end passes four notches 9 respectively and 16 top fixed connection of corresponding lift delivery room, and just four notches 9 are seted up on roof 3, and notch 9 can make wire rope 7 extend to the bottom of bottom plate 3 from the bottom of roof 3 and carry out fixed connection with lift delivery room 16.
Safety doors 17 are installed on the opposite surfaces of the two left lifting carrying rooms 16 and the two right lifting carrying rooms 16, the lifting carrying rooms 16 can be closed during operation through the arranged safety doors 17, and safety of the lifting carrying rooms 16 during use is guaranteed.
The upper surface left and right sides of workstation 15 all is fixed and is provided with three montant 19, and equal fixed mounting has two guard gate 20 between the three montant 19 of left side and between the three montant 19 of right side, and guard gate 20 can play the guard action to the side of workstation 15.
The four corners of bottom plate 2, roof 3, last square frame 10 and square frame 11 down all fixedly are provided with installation butt joint cover 18, and installation butt joint cover 18 can be in the same place a plurality of support frames 1, bottom plate 2 and roof 3 through installation such as bolt, conveniently assembles between a plurality of support frames 1, bottom plate 2 and the roof 3.
The method comprises the following operation steps:
during the use, can select corresponding quantity's support frame 1 according to the number of piles of floor, install bottom plate 2 and roof 3 at the bottom and the top of a plurality of support frames 1, during the operation, four band-type brake motors 8 can carry out the operation respectively and drive four rolling dishes 6 and receive and release wire rope 7, and then can realize that four lift delivery rooms 16 rise or descend, after lift delivery room 16 reachs the floor of relative usefulness, the accessible is opened emergency exit 17 and guard gate 20, then removes building material to workstation 15 on, then removes the material to this floor via workstation 15.
The above-mentioned embodiments, objects, technical solutions and advantages of the present invention are further described in detail, it should be understood that the above-mentioned embodiments are only illustrative of the present invention and are not intended to limit the present invention, and any modifications, equivalents, improvements and the like made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. The utility model provides a synchronous construction material transport platform of multilayer, includes that bottom plate (2), roof (3) and a plurality of support frame (1) constitute, its characterized in that: the plurality of supporting frames (1) are all installed together from top to bottom, the top plate (3) is arranged at the top end of the top side supporting frame (1), the bottom plate (1) is arranged at the bottom end of the bottom side support frame (1), the left side and the right side of the top end of the top plate (3) are respectively and fixedly provided with three support plates (4), two support shafts (5) are respectively and fixedly arranged between the three support plates (4) at the left side and between the three support plates (4) at the right side through bearings, the four support shafts (5) are respectively and fixedly provided with a winding disc (6), and steel wire ropes (7) are wound on the four winding discs (6), the steel wire rope (7) is fixedly connected with the winding disc (6), the front ends of the two support shafts (5) at the front side and the rear ends of the two support shafts (5) at the rear side are respectively and fixedly connected with output shafts of four band-type brake motors (8), the band-type brake motor (8) is fixedly connected with the upper surface of the top plate (3) through a fixing plate;
the supporting frame (1) comprises an upper square frame (10), supporting rods (12) and a lower square frame (11) are fixedly arranged at four corners of the bottom of the upper square frame (10), two reinforcing rods (13) are fixedly arranged at the front side and the rear side between the upper square frame (10) and the lower square frame (11), a protective net (14) is arranged at the bottom side between the reinforcing rods (13), a working table (15) is fixedly arranged at the upper middle part of the upper square frame (10), four lifting carrying chambers (16) are arranged in the supporting frame (1), four steel wire ropes (7) are respectively passed through four notches (9) and fixedly connected with the top ends of the corresponding lifting carrying chambers (16), and the four notches (9) are arranged on the top plate (3).
2. The multi-layer synchronous construction material transportation platform of claim 1, wherein: two on the left side lift delivery room (16) and two on the right side lift delivery room (16) the relative face all installs emergency exit (17).
3. The multi-layer synchronous construction material transportation platform of claim 1, wherein: the upper surface left and right sides of workstation (15) all is fixed and is provided with three montant (19), and the left side is three between montant (19) and the right side is three equal fixed mounting has two guard gate (20) between montant (19).
4. The multi-layer synchronous construction material transportation platform of claim 1, wherein: and installation butting sleeves (18) are fixedly arranged at four corners of the bottom plate (2), the top plate (3), the upper square frame (10) and the lower square frame (11).
CN202011452412.0A 2020-12-12 2020-12-12 Multilayer synchronous construction material transportation platform Pending CN112412064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011452412.0A CN112412064A (en) 2020-12-12 2020-12-12 Multilayer synchronous construction material transportation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011452412.0A CN112412064A (en) 2020-12-12 2020-12-12 Multilayer synchronous construction material transportation platform

Publications (1)

Publication Number Publication Date
CN112412064A true CN112412064A (en) 2021-02-26

Family

ID=74775571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011452412.0A Pending CN112412064A (en) 2020-12-12 2020-12-12 Multilayer synchronous construction material transportation platform

Country Status (1)

Country Link
CN (1) CN112412064A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113998564A (en) * 2021-10-22 2022-02-01 中建新疆建工集团第一建筑工程有限公司 Modular section steel floor unloading platform for construction site

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6425463B1 (en) * 2000-03-15 2002-07-30 Frederick Kenneth Broyan Non-personnel lifting device
KR20050102793A (en) * 2004-04-23 2005-10-27 금강공업 주식회사 Construction-material lift being installed at the outside of the construction-structure
CN209482671U (en) * 2019-02-01 2019-10-11 青岛德泰建设工程有限公司 A kind of lifting/lowering platform for high-building construction
CN110510541A (en) * 2019-08-02 2019-11-29 合肥融庄电子科技有限公司 A kind of novel intelligent architectural engineering feeder equipment
CN210105344U (en) * 2019-04-28 2020-02-21 南通市达欣工程股份有限公司 Over-and-under type construction platform of unloading
CN111206758A (en) * 2020-02-04 2020-05-29 左雪云 Lifting anti-falling operation platform for constructional engineering
CN210976535U (en) * 2019-11-01 2020-07-10 李宝娜 Building external climbing type building construction operation platform
CN211946099U (en) * 2020-04-23 2020-11-17 张志芯 Noise structure falls in construction platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6425463B1 (en) * 2000-03-15 2002-07-30 Frederick Kenneth Broyan Non-personnel lifting device
KR20050102793A (en) * 2004-04-23 2005-10-27 금강공업 주식회사 Construction-material lift being installed at the outside of the construction-structure
CN209482671U (en) * 2019-02-01 2019-10-11 青岛德泰建设工程有限公司 A kind of lifting/lowering platform for high-building construction
CN210105344U (en) * 2019-04-28 2020-02-21 南通市达欣工程股份有限公司 Over-and-under type construction platform of unloading
CN110510541A (en) * 2019-08-02 2019-11-29 合肥融庄电子科技有限公司 A kind of novel intelligent architectural engineering feeder equipment
CN210976535U (en) * 2019-11-01 2020-07-10 李宝娜 Building external climbing type building construction operation platform
CN111206758A (en) * 2020-02-04 2020-05-29 左雪云 Lifting anti-falling operation platform for constructional engineering
CN211946099U (en) * 2020-04-23 2020-11-17 张志芯 Noise structure falls in construction platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113998564A (en) * 2021-10-22 2022-02-01 中建新疆建工集团第一建筑工程有限公司 Modular section steel floor unloading platform for construction site
CN113998564B (en) * 2021-10-22 2024-03-29 中建新疆建工集团第一建筑工程有限公司 Modular section steel floor unloading platform for construction site

Similar Documents

Publication Publication Date Title
CN210457317U (en) Vertical transport vechicle is built in room
CN111453585A (en) Assembled intelligent single-tower nested double-cage construction elevator
CN112412064A (en) Multilayer synchronous construction material transportation platform
US20150060203A1 (en) Scaffold with an automatic installation characteristic
JP3372892B2 (en) Elevator for construction
CN216971814U (en) Rack roof boarding loading attachment
CN107814299B (en) Rapid construction method of building construction unloading platform and rapid unloading lift car
CN107720493A (en) Architectural engineering cargo lift quick discharging method and car
JPH11159128A (en) Multi-purpose stage for construction of building frame body
WO2009093974A1 (en) Frame system for supporting facade elements and use of the frame system
CN211313429U (en) Construction is with platform of unloading
CN212101833U (en) Lifter for building
JP4888694B2 (en) Lifting device and climbing method thereof
CN113175222A (en) Installation method of embedded prefabricated external wall panel component
CN207497867U (en) A kind of building machinery lifts machine support
CN218808202U (en) Segmented multilayer lifting type material rack
CN212757227U (en) Lifting type large flying man stage prop
CN220336408U (en) Building climbing frame for constructional engineering
JP3994458B2 (en) Operation method of vertical and horizontal transfer device
JP2007261795A (en) Lift mechanism for building
CN216836673U (en) Sliding frame type elevator
CN212374664U (en) Assembled intelligent single-tower nested double-cage construction elevator
CN113443284B (en) Multi-layer space expandable transportation frame for forming steel reinforcement framework and transportation method thereof
CN213509489U (en) Multifunctional rail type scaffold
CN220165711U (en) Elevator convenient to it is fixed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination